Embedded sliding chute anchor leg extension connection member used in tunnel Download PDF

Info

Publication number
CN105649662A
CN105649662A CN201610115305.6A CN201610115305A CN105649662A CN 105649662 A CN105649662 A CN 105649662A CN 201610115305 A CN201610115305 A CN 201610115305A CN 105649662 A CN105649662 A CN 105649662A
Authority
CN
China
Prior art keywords
sliding chute
anchor leg
lower limb
chute anchor
anchor lower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610115305.6A
Other languages
Chinese (zh)
Inventor
方钱宝
谭永杰
何昌国
马青
张璞
曹彧
赵子龙
张士硕
肖飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201610115305.6A priority Critical patent/CN105649662A/en
Publication of CN105649662A publication Critical patent/CN105649662A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

An embedded sliding chute anchor leg extension connection member used in a tunnel aims at effectively solving the problem that an extension structure and a sliding chute anchor leg produce mutual adverse influence when a sliding chute anchor leg connection extension structure is embedded, and is convenient to assemble and disassemble so as to meet the needs of construction assembly and positioning. The embedded sliding chute anchor leg extension connection member comprises a U-shaped connecting member, a reserved sliding chute anchor leg and a limiting bolt assembly. A guide groove leading to the open end is formed in a base plate of the U-shaped connecting member, a limiting hole and an extension interface are formed in a top plate, and the limiting hole is close to the open end and corresponds to the guide groove. The longitudinal section of the reserved sliding chute anchor leg is T-shaped, the head portion of the reserved sliding chute anchor leg is clamped between the base plate and the top plate, and the anchor leg portion penetrates through the guide groove to extend downwards. A bolt in the limiting bolt assembly penetrates through the limiting hole and the guide groove.

Description

Tunnel built-in sliding chute anchor lower limb extension connecting elements
Technical field
The present invention relates to tunnel, particularly to a kind of tunnel built-in sliding chute anchor lower limb extension connecting elements.
Background technology
Now with country's railway network planning and construction, railway tunnel, vcehicular tunnel and subway occur in a large number between the mountain ridge and administrative region of a city, tunnel and in subway, are completed to meet later stage civil engineering
Rear-mounted cable or equipment etc. need, and now have started to introduce pre-buried channel flow technology. When setting pre-buried channel flow in plain concrete lining cutting, for meeting the stress needs of later stage suspension member, liner structure need to adopt the measures such as arrangement of reinforcement to strengthen. Present stage commonly used way has two kinds, a kind of way is vertically to be connected on chute anchor lower limb by the weldering of stiffener net, welding is adopted just to destroy the chute original zinc coat of anchor lower limb, namely the anticorrosive coat of chute anchor lower limb is destroyed, make the easy corrosion of anchor lower limb, shorten the service life of anchor lower limb, if anchor lower limb comes off during operation, will result in the severe safety accident of car crash and huge economic loss; Another kind of method be by stiffener mesh sheet colligation on built-in sliding chute anchor lower limb, but the restriction due to colligation intensity, lining cutting stiffener mesh sheet is difficult to effectively location, when lining concrete is built, reinforced mesh is under the effect of concreting power, position very easily changes, and stiffener mesh sheet effectively can not play a role by design. The likely drawing crack lining cutting when chute place davit power is sufficiently large, in some instances it may even be possible to cause chute place lining concrete to fall block and come off, jeopardize traffic safety and cause serious accident. All there is certain potential safety hazard in the method for attachment of existing both the above lining cutting stiffener net and anchor lower limb, haves much room for improvement.
Summary of the invention
The technical problem to be solved is to provide a kind of tunnel built-in sliding chute anchor lower limb extension connecting elements, effectively to solve expansion structure and the problem of chute anchor lower limb mutual adverse effect when built-in sliding chute anchor lower limb connects expansion structure, and disassemble easy to assembly, assemble with satisfied construction and location needs.
The technical solution adopted for the present invention to solve the technical problems is as follows:
The tunnel built-in sliding chute anchor lower limb extension connecting elements of the present invention, is characterized in that: include U-shaped connecting elements, reserved chute anchor lower limb and caging bolt assembly; Arranging on the base plate of described U-shaped connecting elements and lead to the gathering sill of opening, top board arranges spacing hole and expansion interface, spacing hole is near opening and corresponding with gathering sill;The vertical section of described reserved chute anchor lower limb is T-shaped, and its head is stuck between base plate, top board, and anchor leg downwardly extends through gathering sill; Bolt in described caging bolt assembly passes spacing hole and gathering sill.
ThisInventionProviding the benefit that, this anchor lower limb extension component is disassembled easy to assembly, and the construction being well positioned to meet expansion structure assembles and location needs, eliminates operation security hidden danger. Adopt this extension connector can effectively solve built-in sliding chute anchor lower limb and the connectivity problem being connected extension, be difficult to the problems such as restriction reinforced mesh position with liner structure stiffener mesh sheet colligation as chute anchor lower limb welds the destruction zinc-plated problem of anchor lower limb, chute anchor lower limb with liner structure stiffener mesh sheet; Adopt this extension connector can provide strong interface for other expansion structures, facilitate other expansion structures to access, eliminate again the security hidden trouble that existing anchor lower limb is connected with lining cutting stiffener, safely provided effective guarantee for railway operation.
Accompanying drawing explanation
This specification includes following four width accompanying drawings:
Fig. 1 is the axonometric chart of tunnel of the present invention built-in sliding chute anchor lower limb extension connecting elements;
Fig. 2 is the axonometric chart of U-shaped connecting elements in tunnel of the present invention built-in sliding chute anchor lower limb extension connecting elements;
Fig. 3 is the axonometric chart of reserved chute anchor lower limb in tunnel of the present invention built-in sliding chute anchor lower limb extension connecting elements;
Fig. 4 is the sectional view of U-shaped connecting elements in tunnel of the present invention built-in sliding chute anchor lower limb extension connecting elements.
Component shown in figure and corresponding labelling: U-shaped connecting elements 10, base plate 10a, top board 10b, gathering sill 11, spacing hole 12, expansion interface 13, reserved chute anchor lower limb 20, head 21, anchor leg 22, bolt assembly 30.
Detailed description of the invention
The present invention is further described to execute example below in conjunction with accompanying drawing and real *.
With reference to Fig. 1, the tunnel built-in sliding chute anchor lower limb extension connecting elements of the present invention includes U-shaped connecting elements 10, reserved chute anchor lower limb 20 and caging bolt assembly 30. With reference to Fig. 2 and Fig. 4, the base plate 10a of described U-shaped connecting elements 10 on, the gathering sill 11 of opening is led in setting, and top board 10b arranges spacing hole 12 and expansion interface 13, and spacing hole 12 is near opening and corresponding with gathering sill 11. With reference to Fig. 1 and Fig. 3, the vertical section of described reserved chute anchor lower limb 20 is T-shaped, and its head 21 is stuck between base plate 10a, top board 10b, and anchor leg 22 downwardly extends through gathering sill 11. With reference to Fig. 1, the bolt in described caging bolt assembly 30 passes spacing hole 12 and gathering sill 11. When adopting this extension connector can effectively solve built-in sliding chute anchor lower limb connection expansion structure, the problem of expansion structure and the mutual adverse effect of chute anchor lower limb, and chute anchor lower limb welds the destruction zinc-plated problem of anchor lower limb with liner structure stiffener mesh sheet, and chute anchor lower limb is difficult to limit the problems such as reinforced mesh position with liner structure stiffener mesh sheet colligation. This anchor lower limb extension component is disassembled easy to assembly, is well positioned to meet construction and assembles and location needs.
The transverse section of described anchor leg 22 is square or circular.
Some principles of the above tunnel of the present invention built-in sliding chute anchor lower limb extension connecting elements that simply explains through diagrams, it is not intended to the present invention be confined in shown and described concrete structure and the scope of application, therefore every corresponding amendment being likely utilized and equivalent, belong to the scope of the claims that the present invention applies for.

Claims (2)

1. tunnel built-in sliding chute anchor lower limb extension connecting elements, is characterized in that: include U-shaped connecting elements (10), reserved chute anchor lower limb (20) and caging bolt assembly (30);The base plate (10a) of described U-shaped connecting elements (10) is upper arranges the gathering sill (11) leading to opening, arranging spacing hole (12) and expansion interface (13) on top board (10b), spacing hole (12) is near opening and corresponding with gathering sill (11); The vertical section of described reserved chute anchor lower limb (20) is T-shaped, its head (21) is stuck between base plate (10a), top board (10b), and anchor leg (22) downwardly extends through gathering sill (11); Bolt in described caging bolt assembly (30) passes spacing hole (12) and gathering sill (11).
2. as claimed in claim 1, it is characterized in that: the transverse section of described anchor leg (22) is square or circular.
CN201610115305.6A 2016-03-01 2016-03-01 Embedded sliding chute anchor leg extension connection member used in tunnel Pending CN105649662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610115305.6A CN105649662A (en) 2016-03-01 2016-03-01 Embedded sliding chute anchor leg extension connection member used in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610115305.6A CN105649662A (en) 2016-03-01 2016-03-01 Embedded sliding chute anchor leg extension connection member used in tunnel

Publications (1)

Publication Number Publication Date
CN105649662A true CN105649662A (en) 2016-06-08

Family

ID=56492755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610115305.6A Pending CN105649662A (en) 2016-03-01 2016-03-01 Embedded sliding chute anchor leg extension connection member used in tunnel

Country Status (1)

Country Link
CN (1) CN105649662A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007146379A (en) * 2005-11-24 2007-06-14 Kumagai Gumi Co Ltd Segment connection device and segment
JP3946511B2 (en) * 2001-12-25 2007-07-18 株式会社トーヨーアサノ Precast member joint and precast member provided with the joint
CN103821535A (en) * 2014-03-06 2014-05-28 中铁第一勘察设计院集团有限公司 Shield method tunnel lining structure pre-buried groove connecting element and installing method thereof
JP2014201992A (en) * 2013-04-08 2014-10-27 日本ヒューム株式会社 Joint structure of segments
CN204754243U (en) * 2015-07-01 2015-11-11 中冶建工集团有限公司 Pre -buried mounting structure of channel -section steel
CN205400766U (en) * 2016-03-01 2016-07-27 中铁二院工程集团有限责任公司 Tunnel pre -buried spout anchor leg extension connecting elements

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3946511B2 (en) * 2001-12-25 2007-07-18 株式会社トーヨーアサノ Precast member joint and precast member provided with the joint
JP2007146379A (en) * 2005-11-24 2007-06-14 Kumagai Gumi Co Ltd Segment connection device and segment
JP2014201992A (en) * 2013-04-08 2014-10-27 日本ヒューム株式会社 Joint structure of segments
CN103821535A (en) * 2014-03-06 2014-05-28 中铁第一勘察设计院集团有限公司 Shield method tunnel lining structure pre-buried groove connecting element and installing method thereof
CN204754243U (en) * 2015-07-01 2015-11-11 中冶建工集团有限公司 Pre -buried mounting structure of channel -section steel
CN205400766U (en) * 2016-03-01 2016-07-27 中铁二院工程集团有限责任公司 Tunnel pre -buried spout anchor leg extension connecting elements

Similar Documents

Publication Publication Date Title
CN106522079B (en) The prefabricated assembled combination concrete trestle system of one kind and its construction method
CN105649202A (en) Prestress fabricated frame joint structure and construction method thereof
JP6343590B2 (en) Concrete slab joining method, concrete slab replacement method, concrete slab joining structure
CN110410099A (en) It is a kind of using corrugated plating come the construction method of Strengthening Tunnel
JP5064245B2 (en) Joining method of PC beam and steel beam
CN205400766U (en) Tunnel pre -buried spout anchor leg extension connecting elements
CN105649662A (en) Embedded sliding chute anchor leg extension connection member used in tunnel
CN109469003A (en) A kind of assembled pile foundation wharfs structure and attaching method thereof
CN203095340U (en) Construction elevator suitable for short-distance wall attaching
CN210343377U (en) Surrounding rock structure is consolidated to big section tunnel prestressed anchorage pole of high-speed railway
CN105804416B (en) The attachment structure of prefabrication tower crane
CN205541639U (en) Electron sign marker peg
CN106835954A (en) Ruggedized construction at steel box-girder bridge pier and the construction method with this structure steel box-girder
JP6130678B2 (en) Reinforcement method
CN208717750U (en) A kind of dedicated no-welding built-in fitting of bridge bracket
CN110307012B (en) Surrounding rock structure is consolidated to big section tunnel prestressed anchorage pole of high-speed railway
CN103758021B (en) For the prefabricated case beam of stretch-draw transverse prestress
CN209053007U (en) A kind of overcast
CN102116162B (en) Tension dispersed anchor cable for coal mine and anchoring method thereof
CN215681689U (en) Closed cable bridge trough type embedded part
CN209619872U (en) A kind of bridge air-guide handrail pedestal
CN207685999U (en) PC fabricated construction bean column node dry type connection structures
CN210289812U (en) Anchor rod backing plate assembly for coal mine roadway tunneling
CN106368720A (en) Mold type lining and foam concrete combined supporting structure and construction method
CN213038425U (en) Wear board lifting hook benefit mounting structure and track traffic station behind

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160608

WD01 Invention patent application deemed withdrawn after publication