CN105649593B - A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section - Google Patents

A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section Download PDF

Info

Publication number
CN105649593B
CN105649593B CN201511015216.6A CN201511015216A CN105649593B CN 105649593 B CN105649593 B CN 105649593B CN 201511015216 A CN201511015216 A CN 201511015216A CN 105649593 B CN105649593 B CN 105649593B
Authority
CN
China
Prior art keywords
agent
blocking agent
model
temporary blocking
degradable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511015216.6A
Other languages
Chinese (zh)
Other versions
CN105649593A (en
Inventor
郝瑞芬
赵振峰
李宪文
马旭
叶亮
张燕明
来轩昂
古永红
周长静
马占国
何明舫
毕曼
胡杨明
史华
高伟
问晓勇
李楼楼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201511015216.6A priority Critical patent/CN105649593B/en
Publication of CN105649593A publication Critical patent/CN105649593A/en
Application granted granted Critical
Publication of CN105649593B publication Critical patent/CN105649593B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Sealing Material Composition (AREA)

Abstract

The present invention relates to a kind of methods for keeping multiple crack fracturing sealing flow conductivity in net horizontal section, prepare temporary stall first to working solution, temporary stall includes Degradable temporary blocking agent, biodegradable fiber, isodensity proppant and low viscous carrying liquid to working solution;Carry out staged fracturing, pump note order is the stall of prepad fluid → load fluid → temporarily to working solution;After the completion of whole pressure breaks, treat that temporary stall is degraded to working solution, drain, proppant stays in crack mouthful and forms seepage channel.This method improves closure efficiency, the wastage for reducing liquid between seam by using multiple dimensioned Degradable temporary blocking agent, after construction, temporary Degradable temporary blocking agent and biodegradable fiber of the stall into working solution is degradable under the action of bottom hole temperature (BHT), proppant then remains the flow conductivity of nearly pit shaft, available for conventional hydraulic pressure break segmentation transformation and the transformation of unconventional staged fracturing, the refracturing for not pressing off the transformation of perforation cluster and old well suitable for new well is transformed, suitable for the various techniques of horizontal well in segments transformation.

Description

A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section
Technical field
The present invention relates to low permeability gas reservoir horizontal well in segments to transform field, and in particular to more seams in a kind of holding net horizontal section The method of pressure break sealing flow conductivity.
Background technology
Sulige gas field of reviving is typical DAMAGE OF TIGHT SAND GAS RESERVOIRS, and reservoir Lateral heterogeneity is strong, and longitudinal direction more phases are stacked, water Horizontal well well track penetrates multiple sand bodies.Temporarily stifled multiple crack fracturing technique is a kind of technology for realizing the transformation of horizontal well multistage, is overcome The anisotropism of reservoir improves seam item number to greatest extent.Temporarily stifled multiple crack fracturing technology be in the construction process, in time to Suitable diverting agent is added in stratum, it then follows the principle flowed to resistance minimum direction, diverting agent are split with fracturing fluid into original Seam or high permeability zone, assemble under differential pressure action and generate the filter cake bridge blinding of high intensity, prevent follow-up fracturing fluid from being split into this Seam and high permeability zone, meanwhile, in certain level two under the conditions of stress difference, make pressure break generate new crack along with forefathers Work crack different orientation crack initiation and extension, so as to establish new oil and gas flow passage and change oil-gas Layer fluid neuron network displacement rule Rule, to improve the correctional effect of low permeability reservoir.
Crack is temporarily blocked up multiple crack fracturing technique and the shortcoming of diverting agent and is mainly had at present:
1st, the diverting agent of existing temporarily stifled turnaround fracture is added inside prepad fluid, and being that the remote well end of closure is cracky changes It makes.
2nd, uniform particle sizes' plugging effect of existing diverting agent is bad.
3rd, existing diverting agent is directly added inside fracturing fluid, easily scattered by oil pipe into stratum transmission process, closure Effect is bad.
4th, existing multistage fracturing technology is usually present some well sections and cannot effectively transform.
The content of the invention
The purpose of the present invention is overcoming problems of the prior art, multiple crack fracturing in a kind of holding net horizontal section is provided The method of sealing flow conductivity, comprises the following steps:
1)Temporary stall is determined first to working solution, and temporary stall includes to working solution:It is degradable by volume percentage, 8.5% Diverting agent, 8.5% proppant, 8.5%-17% biodegradable fibers and the low viscous carrying liquid of 66%-74.5%, according to different gas field reservoirs Young's modulus determines the mechanical fraction of Degradable temporary blocking agent, when Young's modulus is when less than 25000MPa, all with big grain size Degradable temporary blocking agent, when Young's modulus is in 25000-30000MPa, small particle Degradable temporary blocking agent accounts for 70%, and big grain size can drop Solution diverting agent accounts for 30%, and when Young's modulus is more than 30000MPa, small particle Degradable temporary blocking agent accounts for 30%, big grain size Degradable temporary Blocking agent accounts for 70%;
2)Carry out staged fracturing, pump note order is the stall of prepad fluid → load fluid → temporarily to working solution, prepad fluid, load fluid Ratio be 1:1, temporary stall is 30-40 side/section to working solution, and big grain size Degradable temporary blocking agent, which is cut, gets lodged in crack port, small Grain size Degradable temporary blocking agent is filled between big grain size Degradable temporary blocking agent;
3)After the completion of whole pressure breaks, treat that temporary stall is degraded to working solution, drain, proppant stays in crack mouthful formation seepage flow and leads to Road.
Above-mentioned Degradable temporary blocking agent particle size range is 0.1-10mm, and small particle Degradable temporary blocking agent particle size range is 0.1-1 Mm, big grain size Degradable temporary blocking agent particle size range are 1-10 mm.
Above-mentioned a diameter of 10 μm, length 5-10mm of biodegradable fiber, molecular weight are 50,000-250 ten thousand, and the proppant is The haydite of 20/40 mesh, 40/70 mesh or 70/140 mesh, the density of proppant are identical with Degradable temporary blocking agent.
The preparation method of above-mentioned Degradable temporary blocking agent is:At ambient temperature, by guanidine glue, alundum (Al2O3), magnesia, mistake Ammonium sulfate microcapsule degelling agent, Sodium Polyacrylate bead, sodium acid carbonate are according to 48:107:193:11~42:24:1.26 quality Ratio is uniformly mixed, and is then slowly added to mixture in water under agitation, the mass ratio of mixture and water for 26~ 28:72~74, stirring can obtain the Degradable temporary blocking agent after five minutes.
Above-mentioned low viscous carrying liquid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% fungicide, 0.5% foaming agent, 0.5% clay stabilizer and 98.08% water.
Above-mentioned prepad fluid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% Fungicide, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent and 97.98% water.
Above-mentioned load fluid includes:By mass percentage, 0.40% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% Fungicide, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent, 0.5% crosslinking agent and 97.38% water.
Above-mentioned hydroxypropyl guar thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3, Foaming agent model YFP-2, clay stabilizer model COP-2, and can be bought in Changqing oilfields Chemical Group Co., Ltd.
Above-mentioned hydroxypropyl guar thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3, Foaming agent model YFP-2, clay stabilizer model COP-2, temperature stability agent model TA-1, and can be in Changqing oilfields Chemical Group Co., Ltd buys.
Above-mentioned hydroxypropyl guar thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3, Foaming agent model YFP-2, clay stabilizer model COP-2, temperature stability agent model TA-1, crosslinking agent model JL- 1, and can be bought in Changqing oilfields Chemical Group Co., Ltd.
The technical scheme is that a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section is provided,
Beneficial effects of the present invention:
(1)The method of multiple crack fracturing sealing flow conductivity is according to Gruesbeck in this holding net horizontal section of the present invention Crane span structure criterion, the volume fraction of Degradable temporary blocking agent and proppant helps quickly to be formed near wellbore zone temporarily not less than 17% It is stifled.
(2)It is degradable used by the method for multiple crack fracturing sealing flow conductivity in this holding net horizontal section of the present invention Diverting agent is by multiple dimensioned(Grain size 0.1-10mm)Temporarily stifled particle mixes according to a certain percentage, and 1-10 mm are big, and grain size is degradable Diverting agent, which is cut, gets lodged in crack port, and 0.1-1 mm small particles are filled between big grain size Degradable temporary blocking agent, effectively quickly carry High plugging effect, mixed proportion optimizes according to different gas field reservoir characteristics to be determined.
(3)The method of multiple crack fracturing sealing flow conductivity is degradable by adding in this holding net horizontal section of the present invention Fiber plays the role of Degradable temporary blocking agent of the temporary stall into working solution and proppant auxiliary migration, improves temporary stall To stability of the working solution from ground to shaft bottom, while the laying effect of proppant is also improved, further improve and temporarily block up successfully Rate.
(4)Waterpower after the method pressure break of multiple crack fracturing sealing flow conductivity in this holding net horizontal section of the present invention Crack sealing has Degradable temporary blocking agent, biodegradable fiber and proppant, and proppant remains the flow conductivity of nearly pit shaft, reduces The risk of near wellbore zone obstruction remains the seepage channel of gas reservoir and pit shaft.Degradable temporary blocking agent and biodegradable fiber are in shaft bottom Degradable under the action of temperature, no residue does not generate pollution to stratum.Degradation mechanism is body solution, the reaction of non-surface, during degradation Between it is unrelated with particle size.
(5)The method of multiple crack fracturing sealing flow conductivity can be used for conventional hydraulic in this holding net horizontal section of the present invention Pressure break segmentation transformation and the transformation of unconventional staged fracturing, the refracturing for not pressing off the transformation of perforation cluster and old well suitable for new well change It makes, suitable for the various techniques of horizontal well in segments transformation.
The present invention is described in further details below with reference to attached drawing.
Specific embodiment
The present invention is described in further detail With reference to embodiment:
Embodiment 1:
In order to overcome problems of the prior art, the present embodiment provides multiple crack fracturing seams in a kind of holding net horizontal section The method of mouth flow conductivity, comprises the following steps:
1)Temporary stall is determined first to working solution, and temporary stall includes to working solution:It is degradable by volume percentage, 8.5% Diverting agent, 8.5% proppant, 8.5%-17% biodegradable fibers and the low viscous carrying liquid of 66%-74.5%, according to different gas field reservoirs Young's modulus determines the mechanical fraction of Degradable temporary blocking agent, when Young's modulus is when less than 25000MPa, all with big grain size Degradable temporary blocking agent, when Young's modulus is in 25000-30000MPa, small particle Degradable temporary blocking agent accounts for 70%, and big grain size can drop Solution diverting agent accounts for 30%, and when Young's modulus is more than 30000MPa, small particle Degradable temporary blocking agent accounts for 30%, big grain size Degradable temporary Blocking agent accounts for 70%;
2)Carry out staged fracturing, pump note order is the stall of prepad fluid → load fluid → temporarily to working solution, prepad fluid, load fluid Ratio be 1:1, temporary stall is 30-40 side/section to working solution, and big grain size Degradable temporary blocking agent, which is cut, gets lodged in crack port, small Grain size Degradable temporary blocking agent is filled between big grain size Degradable temporary blocking agent;
3)After the completion of whole pressure breaks, treat that temporary stall is degraded to working solution, drain, proppant stays in crack mouthful formation seepage flow and leads to Road.
The method of multiple crack fracturing sealing flow conductivity in this holding net horizontal section of the present invention, using Multiscale combination Degradable temporary blocking agent mixes according to a certain percentage, and big grain size Degradable temporary blocking agent, which is cut, gets lodged in crack port, smaller grain Footpath is filled between big grain size Degradable temporary blocking agent, and effectively quick to improve plugging effect, mixed proportion is according to different gas field reservoirs Characteristic optimization determines;According to the crane span structure criterion of Gruesbeck, the volume fraction of Degradable temporary blocking agent and proppant is not less than 17%, Help quickly to be formed near wellbore zone temporarily stifled.
The addition of biodegradable fiber of the present invention plays Degradable temporary blocking agent of the temporary stall into working solution and proppant auxiliary The effect of migration is helped, stability of the temporary stall to working solution from ground to shaft bottom is improved, while also improves the paving of proppant Effect is put, further improves temporarily stifled success rate.After pressure break hydraulic fracture sealing have Degradable temporary blocking agent, biodegradable fiber and Proppant, proppant remain the flow conductivity of nearly pit shaft, reduce the risk of near wellbore zone obstruction, remain gas reservoir and pit shaft Seepage channel.Degradable temporary blocking agent and biodegradable fiber are degradable under the action of bottom hole temperature (BHT), no residue, not to stratum Generate pollution.Degradation mechanism is body solution, non-surface reaction, and degradation time is unrelated with particle size.The present invention can be used for conventional water It forces and splits segmentation transformation and the transformation of unconventional staged fracturing, do not press off the refracturing of the transformation of perforation cluster and old well suitable for new well Transformation, suitable for the various techniques of horizontal well in segments transformation.
Embodiment 2:
On the basis of embodiment 1, multiple crack fracturing sealing water conservancy diversion energy in a kind of holding net horizontal section is present embodiments provided The method of power, the Degradable temporary blocking agent particle size range are 0.1-10mm, and small particle Degradable temporary blocking agent particle size range is 0.1-1 Mm, big grain size Degradable temporary blocking agent particle size range are 1-10 mm.Degradable temporary blocking agent is by multiple dimensioned(Grain size 0.1-10mm)It is temporarily stifled Particle mixes according to a certain percentage, and the big grain size Degradable temporary blocking agents of 1-10 mm, which are cut, gets lodged in crack port, and 0.1-1 mm are small Grain size is filled between big grain size Degradable temporary blocking agent, and effectively quick to improve plugging effect, mixed proportion is stored up according to different gas fields Layer characteristic optimization determines.
Further, a diameter of 10 μm of the biodegradable fiber, length 5-10mm, molecular weight is 50,000-250 ten thousand, described Proppant is the haydite of 20/40 mesh, 40/70 mesh or 70/140 mesh, and the density of proppant is identical with Degradable temporary blocking agent.
Biodegradable fiber is added in, biodegradable fiber, which is distributed to carry in liquid, forms net structure, improves Degradable temporary and blocks up Agent, from well head into the stability before stratum, improves closure success rate in liquid is carried;Proppant is Buddha's warrior attendant new material The low-density ceramsite of limited company's production, the main haydite for selecting 20/40 mesh, 40/70 mesh or 70/140 mesh, realizes pressure break After hydraulic fracture sealing have Degradable temporary blocking agent and a proppant, after the degradation of Degradable temporary blocking agent, proppant remains nearly well The flow conductivity of cylinder reduces the risk of near wellbore zone obstruction, remains the seepage channel of gas reservoir and pit shaft.
Embodiment 3:
A kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section is present embodiments provided, including following step Suddenly:
1)Temporary stall is determined first to working solution, and temporary stall includes to working solution:It is degradable by volume percentage, 8.5% Diverting agent, 8.5% proppant, 8.5%-17% biodegradable fibers and the low viscous carrying liquid of 66%-74.5%, according to different gas field reservoirs Young's modulus determines the mechanical fraction of Degradable temporary blocking agent, when Young's modulus is when less than 25000MPa, all with big grain size Degradable temporary blocking agent, when Young's modulus is in 25000-30000MPa, small particle Degradable temporary blocking agent accounts for 70%, and big grain size can drop Solution diverting agent accounts for 30%, and when Young's modulus is more than 30000MPa, small particle Degradable temporary blocking agent accounts for 30%, big grain size Degradable temporary Blocking agent accounts for 70%;
2)Carry out staged fracturing, pump note order is the stall of prepad fluid → load fluid → temporarily to working solution, prepad fluid, load fluid Ratio be 1:1, temporary stall is 30-40 side/section to working solution, and big grain size Degradable temporary blocking agent, which is cut, gets lodged in crack port, small Grain size Degradable temporary blocking agent is filled between big grain size Degradable temporary blocking agent;
3)After the completion of whole pressure breaks, treat that temporary stall is degraded to working solution, drain, proppant stays in crack mouthful formation seepage flow and leads to Road.
The preparation method of the Degradable temporary blocking agent is:At ambient temperature, by guanidine glue, alundum (Al2O3), magnesia, mistake Ammonium sulfate microcapsule degelling agent, Sodium Polyacrylate bead, sodium acid carbonate are according to 48:107:193:11~42:24:1.26 quality Ratio is uniformly mixed, and is then slowly added to mixture in water under agitation, the mass ratio of mixture and water for 26~ 28:72~74, stirring can obtain the Degradable temporary blocking agent after five minutes.
The low viscous carrying liquid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% fungicide, 0.5% foaming agent, 0.5% clay stabilizer and 98.08% water.
The prepad fluid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% Fungicide, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent and 97.98% water.
The load fluid includes:By mass percentage, 0.40% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% Fungicide, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent, 0.5% crosslinking agent and 97.38% water.
Embodiment 4:
A kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section is present embodiments provided, including following step Suddenly:
1)Temporary stall is determined first to working solution, and temporary stall includes to working solution:It is degradable by volume percentage, 8.5% Diverting agent, 8.5% proppant, 8.5%-17% biodegradable fibers and the low viscous carrying liquid of 66%-74.5%, according to different gas field reservoirs Young's modulus determines the mechanical fraction of Degradable temporary blocking agent, when Young's modulus is when less than 25000MPa, all with big grain size Degradable temporary blocking agent, when Young's modulus is in 25000-30000MPa, small particle Degradable temporary blocking agent accounts for 70%, and big grain size can drop Solution diverting agent accounts for 30%, and when Young's modulus is more than 30000MPa, small particle Degradable temporary blocking agent accounts for 30%, big grain size Degradable temporary Blocking agent accounts for 70%;
2)Carry out staged fracturing, pump note order is the stall of prepad fluid → load fluid → temporarily to working solution, prepad fluid, load fluid Ratio be 1:1, temporary stall is 30-40 side/section to working solution, and big grain size Degradable temporary blocking agent, which is cut, gets lodged in crack port, small Grain size Degradable temporary blocking agent is filled between big grain size Degradable temporary blocking agent;
3)After the completion of whole pressure breaks, treat that temporary stall is degraded to working solution, drain, proppant stays in crack mouthful formation seepage flow and leads to Road.
The preparation method of the Degradable temporary blocking agent is:At ambient temperature, by guanidine glue, alundum (Al2O3), magnesia, mistake Ammonium sulfate microcapsule degelling agent, Sodium Polyacrylate bead, sodium acid carbonate are according to 48:107:193:11~42:24:1.26 ratio It is uniformly mixed, is then slowly added to mixture in water under agitation, the mass ratio of mixture and water is 26~28:72 ~74, stirring can obtain the Degradable temporary blocking agent after five minutes.
The low viscous carrying liquid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% fungicide, 0.5% foaming agent, 0.5% clay stabilizer and 98.08% water, the hydroxypropyl guar thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3, foaming agent model YFP-2, clay stabilizer model COP-2, and can be bought in Changqing oilfields Chemical Group Co., Ltd.
The prepad fluid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% Fungicide, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent and 97.98% water, the hydroxypropyl guar thickening Agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3, foaming agent model YFP-2, clay stabilization Agent model COP-2, temperature stability agent model TA-1, and can be bought in Changqing oilfields Chemical Group Co., Ltd.
The load fluid includes:By mass percentage, 0.40% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% Fungicide, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent, 0.5% crosslinking agent and 97.38% water, the hydroxyl Propyl guanidine glue thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3, foaming agent model YFP-2, clay stabilizer model COP-2, temperature stability agent model TA-1, crosslinking agent model JL-1, and can be in length Celebrate the purchase of oilfield chemical Group Co., Ltd.
Embodiment 5:
A kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section is present embodiments provided, with Su Lige gas Exemplified by Soviet Union and Eastern Europe of area of Tiandong County * * H horizontal wells, 7 sections are divided, 1,3,6 section adds in Degradable temporary stall to working solution, specific implementation process It is as follows:
(1)Temporary stall is configured first to working solution, is constructed according to the geologic characteristics of Soviet Union's Sulige gas field East and offset well Parameter determines the mechanical fraction of this well Degradable temporary blocking agent as 0.1m, 0.5m, 3mm, 7mm, ratio 2:1.5:3:0.7.Support The density of agent is identical with Degradable temporary blocking agent.Volume and temporary stall after Degradable temporary blocking agent and mixed with proppants is total to working solution The ratio of volume is 17%.The dosage of biodegradable fiber is the 65% of the sum of Degradable temporary blocking agent and proppant.Degradable temporary blocking agent Density with proppant be it is identical, the two temporary stall into working solution according to 1:1 ratio mixes.Degradable temporary blocking agent, branch Support agent and biodegradable fiber are dispersed in temporary stall to working solution the inside.The wherein temporary stall of paragraph 1 is to the dosage of working solution For 32m3, the 3rd section of dosage is 29m3, the 6th section of dosage is 25m3
(2)Pressure break paragraph 1, pump note order are the stall of prepad fluid → load fluid → temporarily to working solution.
(3)Remaining each section of pressure break, wherein the 3rd, 6 section, pump note order is the stall of prepad fluid → load fluid → temporarily to work Liquid.
(4)After the completion of 7 sections of whole pressure breaks, closing well 8 is treated temporarily to block up working solution degradation when small, and drain, proppant stays in crack Mouth forms seepage channel.
The foregoing examples are only illustrative of the present invention, does not form the limitation to protection scope of the present invention, all Be with the present invention it is the same or similar design all belong to the scope of protection of the present invention within.

Claims (10)

  1. A kind of 1. method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section, it is characterised in that:Comprise the following steps:
    1)Temporary stall is determined first to working solution, and temporary stall includes to working solution:By volume percentage, 8.5% Degradable temporary is blocked up Agent, 8.5% proppant, 8.5%-17% biodegradable fibers and the low viscous carrying liquid of 66%-74.5%, according to the Young of different gas field reservoirs Modulus determines the mechanical fraction of Degradable temporary blocking agent, when Young's modulus is when less than 25000MPa, can all be dropped with big grain size Diverting agent is solved, when Young's modulus is in 25000-30000MPa, small particle Degradable temporary blocking agent accounts for 70%, big grain size Degradable temporary Blocking agent accounts for 30%, and when Young's modulus is more than 30000MPa, small particle Degradable temporary blocking agent accounts for 30%, big grain size Degradable temporary blocking agent Account for 70%;
    2)Carry out staged fracturing, pump note order is the stall of prepad fluid → load fluid → temporarily to working solution, prepad fluid, the ratio of load fluid Example is 1:1, temporary stall is 30-40 side/section to working solution, and big grain size Degradable temporary blocking agent, which is cut, gets lodged in crack port, small particle Degradable temporary blocking agent is filled between big grain size Degradable temporary blocking agent;
    3)After the completion of whole pressure breaks, treat that temporary stall is degraded to working solution, drain, proppant stays in crack mouthful and forms seepage channel.
  2. 2. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 1, feature It is:The Degradable temporary blocking agent particle size range is 0.1-10mm, and small particle Degradable temporary blocking agent particle size range is 0.1-1 mm, Big grain size Degradable temporary blocking agent particle size range is 1-10 mm.
  3. 3. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 1, feature It is:A diameter of 10 μm, length 5-10mm of the biodegradable fiber, molecular weight are 50,000-250 ten thousand, and the proppant is 20/ The haydite of 40 mesh, 40/70 mesh or 70/140 mesh, the density of proppant are identical with Degradable temporary blocking agent.
  4. 4. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 1, feature It is:The preparation method of the Degradable temporary blocking agent is:At ambient temperature, by guanidine glue, alundum (Al2O3), magnesia, over cure Sour ammonium microcapsule degelling agent, Sodium Polyacrylate bead, sodium acid carbonate are according to 48:107:193:11~42:24:1.26 mass ratio Example is uniformly mixed, and is then slowly added to mixture in water under agitation, and the mass ratio of mixture and water is 26~28: 72~74, stirring can obtain the Degradable temporary blocking agent after five minutes.
  5. 5. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 1, feature It is:The low viscous carrying liquid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% Fungicide, 0.5% foaming agent, 0.5% clay stabilizer and 98.08% water.
  6. 6. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 1, feature It is:The prepad fluid includes:By mass percentage, 0.30% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% sterilization Agent, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent and 97.98% water.
  7. 7. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 1, feature It is:The load fluid includes:By mass percentage, 0.40% hydroxypropyl guar thickening agent, 0.5% cleanup additive, 0.12% kill Microbial inoculum, 0.5% foaming agent, 0.5% clay stabilizer, 0.10% temperature stability agent, 0.5% crosslinking agent and 97.38% water.
  8. 8. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 5, feature It is:The hydroxypropyl guar thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3 rise Infusion model YFP-2, clay stabilizer model COP-2.
  9. 9. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 6, feature It is:The hydroxypropyl guar thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3 rise Infusion model YFP-2, clay stabilizer model COP-2, temperature stability agent model TA-1.
  10. 10. a kind of method for keeping multiple crack fracturing sealing flow conductivity in net horizontal section according to claim 7, feature It is:The hydroxypropyl guar thickening agent model CJ2-6, cleanup additive model TGF-1, fungicide model CJSJ-3 rise Infusion model YFP-2, clay stabilizer model COP-2, temperature stability agent model TA-1, crosslinking agent model JL-1.
CN201511015216.6A 2015-12-31 2015-12-31 A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section Active CN105649593B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511015216.6A CN105649593B (en) 2015-12-31 2015-12-31 A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511015216.6A CN105649593B (en) 2015-12-31 2015-12-31 A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section

Publications (2)

Publication Number Publication Date
CN105649593A CN105649593A (en) 2016-06-08
CN105649593B true CN105649593B (en) 2018-06-01

Family

ID=56477312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511015216.6A Active CN105649593B (en) 2015-12-31 2015-12-31 A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section

Country Status (1)

Country Link
CN (1) CN105649593B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150429A (en) * 2016-08-24 2016-11-23 江汉油田科瑞德石油工程技术(武汉)有限公司 Shale gas is multistage splits pressure diverting agent, without bridging plug fracturing process and device
CN106526137A (en) * 2016-11-17 2017-03-22 青岛科技大学 Physical simulation experiment evaluation method for fracturing performance and flow conductivity of self-suspension propping agent
CN106917619B (en) * 2017-03-21 2019-06-11 中国石油天然气股份有限公司 The temporary stall of slit formation carbonate reservoir to fracture support integration remodeling method
CN107100607B (en) * 2017-04-12 2018-08-17 大庆中联信实石油科技开发有限公司 Temporary stall is to fracturing process
CN107558980B (en) * 2017-07-18 2020-05-08 中国石油天然气股份有限公司 Low-density temporary plugging crack length-extension-restraining fracturing method
CN109145497B (en) * 2018-09-12 2019-05-14 中国石油大学(华东) A kind of calculation method of hydraulic fracture near horizontal wellbore water blockoff plug agent amount
CN110259429A (en) * 2019-06-06 2019-09-20 中国石油天然气股份有限公司 A kind of temporary stifled volume acid fracturing method of multistage dynamic
CN112253073A (en) * 2020-11-20 2021-01-22 重庆地质矿产研究院 Stepped pulse circulation temporary plugging complex fracture network fracturing method for deep low-permeability reservoir
CN113684010B (en) * 2021-08-31 2022-12-27 陕西延长石油(集团)有限责任公司 Temporary fracture plugging diverter and application thereof in temporary plugging diverting sand fracturing process
CN114109338B (en) * 2021-12-07 2023-09-05 陕西海睿能源技术服务有限公司 Shaft temporary reconstruction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102093864A (en) * 2010-12-21 2011-06-15 中国石油天然气股份有限公司 Temporary plugging diversion agent for refracturing of oil-water well and preparation method thereof
CN103615228A (en) * 2013-11-26 2014-03-05 中国石油天然气股份有限公司 Temporary plugging and fracturing process in degradable fiber clearance
CN105041287A (en) * 2015-07-23 2015-11-11 中国石油天然气股份有限公司 Fiber temporary plugging turnaround fracture method capable of improving low permeability tight sandstone oil and gas well production capacity
CN105089603A (en) * 2015-07-13 2015-11-25 中国石油大学(北京) Reservoir modifying method through forming crack network by temporary plugging turning in cracks

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9091161B2 (en) * 2007-02-13 2015-07-28 Baker Hughes Incorporated Method of fracturing a subterranean formation at optimized and pre-determined conditions

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102093864A (en) * 2010-12-21 2011-06-15 中国石油天然气股份有限公司 Temporary plugging diversion agent for refracturing of oil-water well and preparation method thereof
CN103615228A (en) * 2013-11-26 2014-03-05 中国石油天然气股份有限公司 Temporary plugging and fracturing process in degradable fiber clearance
CN105089603A (en) * 2015-07-13 2015-11-25 中国石油大学(北京) Reservoir modifying method through forming crack network by temporary plugging turning in cracks
CN105041287A (en) * 2015-07-23 2015-11-11 中国石油天然气股份有限公司 Fiber temporary plugging turnaround fracture method capable of improving low permeability tight sandstone oil and gas well production capacity

Also Published As

Publication number Publication date
CN105649593A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN105649593B (en) A kind of method of multiple crack fracturing sealing flow conductivity in holding net horizontal section
CN105672970B (en) It is a kind of to realize in net horizontal section temporary stall to the method for multiple crack fracturing
CN105649594B (en) A kind of method that mining site keeps near wellbore zone fracture condudtiviy
CN112175596B (en) Temporary plugging agent for efficiently plugging fractures in deep oil and gas reservoir seams, preparation method of temporary plugging agent and large-seam high-fracturing process
CN105089603B (en) In a kind of crack, temporary stall is to the reservoir reconstruction method forming seam net
RU2402679C2 (en) Method for hydraulic rupture of low-permeable underground bed
CN105952430A (en) Volume fracturing and energy replenishing method for low-yield horizontal well in dense oil reservoir
CN104099074B (en) Volume fracturing reconstruction crack plugging agent and water plugging construction method
CN105112040B (en) A kind of fracturing process of the recyclable clean fracturing fluid of gas well high temperature resistant
CN102492412A (en) Fracturing prepad fluid
US20180237685A1 (en) Micro-proppant fracturing fluid compositions for enhancing complex fracture network performance
CN109915093A (en) A kind of method that " stifled/tune/drive " integration improves oil recovery
WO2015074588A1 (en) Zirconium dispersed-particle gel combination flooding system and preparation method thereof
CN106703775B (en) Coal bed gas fracturing method
DE112013007504T5 (en) Fibers as drag reducing support fibers in low permeability subterranean applications
CN108505982A (en) It is a kind of using liquid gum plug realize temporary stall to old well refracturing method for increasing
US10655444B2 (en) Enhancing propped complex fracture networks in subterranean formations
US11041114B2 (en) Methods and treatment fluids for microfracture creation and microproppant delivery in subterranean formations
US20200181480A1 (en) Alkyl polyglycoside surfactants for use in subterranean formations
CN109083626A (en) It is a kind of to realize temporary stall to the fracturing process with high-speed channel by fiber
CN106958438A (en) A kind of polymer flooding blocks the method for removing blockage of well
CN106833588A (en) A kind of sulfur-fixating combustion-promoting high temp profile control agent and preparation method and application
CN103952130A (en) Temporary blocking gel for low-pressure oil-gas well and preparation method thereof
CN105131922B (en) Workover treatment borehole wall resistance to compression stabilizer and its application process
US10501681B2 (en) Inorganic clay particulate additive for consolidating treatments

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant