CN105648988A - 一种面板堆石坝趾板垂直防渗结构的分期施工方法 - Google Patents
一种面板堆石坝趾板垂直防渗结构的分期施工方法 Download PDFInfo
- Publication number
- CN105648988A CN105648988A CN201610014816.9A CN201610014816A CN105648988A CN 105648988 A CN105648988 A CN 105648988A CN 201610014816 A CN201610014816 A CN 201610014816A CN 105648988 A CN105648988 A CN 105648988A
- Authority
- CN
- China
- Prior art keywords
- concrete
- stage
- toe board
- construction method
- seepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Building Environments (AREA)
Abstract
本发明涉及一种面板堆石坝趾板垂直防渗结构的分期施工方法。本发明旨在解决趾板、防渗墙施工工期交叉干扰问题,有效缩短工程工期。本发明的技术方案是:该防渗结构布置于强透水性覆盖层基础或透水率大、可灌性差的基岩上,防渗结构包括一期趾板、二期趾板、混凝土防渗墙和灌浆帷幕,施工步骤如下:1、施工混凝土防渗墙上下游的一期趾板,并在一期趾板中间预留T型的防渗墙槽孔,同时在一期趾板上预埋插筋;2、施工混凝土防渗墙,在混凝土防渗墙内部预埋帷幕灌浆管;3、凿毛一期趾板表面的混凝土,在混凝土防渗墙顶部浇筑T型的二期趾板,二期趾板与混凝土防渗墙的顶面预留5~10cm的结构缝;4、通过预埋在混凝土防渗墙内的帷幕灌浆管施工灌浆帷幕。
Description
技术领域
本发明涉及一种面板堆石坝趾板垂直防渗结构的分期施工方法,适用于建造在覆盖层或透水率大、可灌性差的全、强风化岩石(如软岩)基础地质条件下的水利水电工程。
背景技术
建造在覆盖层或透水率大、可灌性差的全、强风化岩石(如软岩)基础地质条件下面板堆石坝基础渗流控制的措施,根据挡水建筑物高度、水库的用途及基础地质条件,通过综合技术经济比较确定。
水工建筑物的防渗措施主要有水平铺盖防渗和垂直防渗两大类。
水平铺盖防渗是最常用的防渗措施,主要用于延长渗径,降低基础的渗透压力和渗透坡降。水平铺盖防渗,其主要优点是施工简单、质量容易保证。通过渗流计算表明为了满足渗透稳定要求,水平铺盖长度较长,工程量较大。通过对增加铺盖长度敏感性分析表明增加铺盖长度对延长渗径作用较为明显,但对渗漏量的减少作用甚微,这说明对于强透水覆盖层或透水率大的岩石(如软岩)基础地质条件,水平防渗效果较差。
垂直防渗一般采用防渗墙和帷幕灌浆,其中混凝土防渗墙是水工建设中较普遍采用的一种地下连续墙,具有适应性广、实用性强,施工质量易于控制,以及具有安全、技术可靠、防渗效果好等优点,并有现行施工技术规范可依。是强透水性覆盖层或透水率大、可灌性差的全强风化岩基(如软岩)地质条件防渗处理的一种有效措施,在工程防渗处理上非常成功。
根据规范混凝土面板堆石坝一般在趾板下布置帷幕灌浆进行防渗,趾板可置于密实的覆盖层上,对于建于全风化或强风化、可灌性差的基岩(如软岩)上的趾板,宜采用混凝土防渗墙防渗,防渗墙底部宜嵌入强风化基岩底部(或弱风化基岩),下部可设帷幕灌浆。
若防渗墙工程量较大,防渗墙和趾板、面板施工工期往往存在交叉,由于一般是先施工防渗墙,后施工趾板,但防渗墙施工工期较长,如果趾板未施工,就会影响垫层、过渡层、面板等的施工。
发明内容
本发明要解决的技术问题是:针对上述存在的问题,提供一种结构简单、安全可靠的面板堆石坝趾板垂直防渗结构的分期施工方法,旨在解决趾板、防渗墙施工工期交叉干扰问题,有效缩短工程工期。
本发明所采用的技术方案是:一种面板堆石坝趾板垂直防渗结构的分期施工方法,该防渗结构布置于强透水性覆盖层基础或透水率大、可灌性差的基岩上,防渗结构包括一期趾板、二期趾板、混凝土防渗墙和灌浆帷幕,其特征在于,所述施工方法有以下步骤:
1、首先施工混凝土防渗墙上下游的一期趾板,并在一期趾板中间预留T型的防渗墙槽孔,同时在一期趾板上预埋插筋;
2、施工混凝土防渗墙,在混凝土防渗墙内部预埋帷幕灌浆管;
3、凿毛一期趾板表面的混凝土,在混凝土防渗墙顶部浇筑T型的二期趾板,二期趾板与混凝土防渗墙的顶面预留5~10cm的结构缝;
4、最后通过预埋在混凝土防渗墙内的帷幕灌浆管施工灌浆帷幕。
在上述步骤3的结构缝内布置两道止水,分别是止水铜片和橡胶止水,结构缝内充填沥青马蹄脂。
所述混凝土防渗墙渗入强风化岩体底部或嵌入弱风化岩体1m。
所述混凝土防渗墙分槽段浇筑而成,一个槽段长6~8m。
本发明的有益效果是:本发明在面板堆石坝趾板下布置防渗墙及灌浆帷幕形成了完整的大坝垂直防渗体系,通过趾板的分期施工,解决了趾板、防渗墙施工时序的问题,并解决了防渗墙因施工工期较长影响趾板施工,进而影响大坝垫层、过渡层填筑和面板浇筑的问题,有效地缩短了施工工期。
附图说明
图1为本发明的剖面图。
具体实施方式
如图1所示,本实施例为一种面板堆石坝趾板垂直防渗结构的分期施工方法,所述的垂直防渗结构布置于强透水性覆盖层基础或透水率大、可灌性差的全、强风化岩基(如软岩)上,包括一期趾板1、二期趾板2、混凝土防渗墙3和灌浆帷幕4。本例的特点是,先在混凝土防渗墙3的上、下游进行一期趾板1施工,并在一期趾板1中间预留T型的防渗墙槽孔,并在槽孔位置预留插筋8(包括水平和竖向的插筋);然后进行混凝土防渗墙3的施工,防渗墙分槽段浇筑而成,一个槽段长6~8m,防渗墙一般嵌入强风化基岩底部(或深入弱风化岩体1m);接下去在防渗墙顶部浇筑二期趾板2,二期趾板浇筑前应对一、二期趾板的接触面做凿毛处理,二期趾板与防渗墙之间还应预留结构缝,结构缝中布置止水,并在结构缝中充填沥青马蹄脂7;最后通过预埋于防渗墙内部的帷幕灌浆管进行帷幕灌浆施工。
本实施例的具体施工方法如下:
1、首先在覆盖层基础或透水率大、可灌性差的全、强风化基岩上布置长度为6~10m(趾板长度根据水头、基础允许渗透坡降确定)的一期趾板1,即施工混凝土防渗墙3上下游的一期趾板1,并在一期趾板中间预留T型的防渗墙槽孔,以一期趾板作为该防渗墙槽孔的导向槽,同时在一期趾板1上预埋插筋8;
2、施工混凝土防渗墙3,在一期趾板1中间预留的防渗墙槽孔中分槽段浇筑嵌入强风化基岩底部或深入弱风化岩基深1m的防渗墙3,每个槽段长6~8m,并在混凝土防渗墙内部预埋帷幕灌浆管,一般采用PVC管;
3、凿毛一期趾板1表面的混凝土,在混凝土防渗墙3顶部浇筑T型的二期趾板2,二期趾板2与混凝土防渗墙3的顶面预留5~10cm的结构缝,并在结构缝中设置止水铜片5和橡胶止水6,并用沥青马蹄脂7充填;
4、最后通过预埋在混凝土防渗墙3内的帷幕灌浆管施工灌浆帷幕4,其灌浆深度根据坝高、坝的级别确定。
Claims (4)
1.一种面板堆石坝趾板垂直防渗结构的分期施工方法,该防渗结构布置于强透水性覆盖层基础或透水率大、可灌性差的基岩上,防渗结构主要包括一期趾板(1)、二期趾板(2)、混凝土防渗墙(3)和灌浆帷幕(4),其特征在于,所述施工方法有以下步骤:
1.1、首先施工混凝土防渗墙(3)上下游的一期趾板(1),并在一期趾板中间预留T型的防渗墙槽孔,同时在一期趾板(1)上预埋插筋(8);
1.2、施工混凝土防渗墙(3),在混凝土防渗墙内部预埋帷幕灌浆管,一般采用PVC管;
1.3、凿毛一期趾板(1)表面的混凝土,在混凝土防渗墙(3)顶部浇筑T型的二期趾板(2),二期趾板(2)与混凝土防渗墙(3)的顶面预留5~10cm的结构缝;
1.4、最后通过预埋在混凝土防渗墙(3)内的帷幕灌浆管施工灌浆帷幕(4)。
2.根据权利要求1所述的施工方法,其特征在于:在步骤1.3的结构缝内布置两道止水,分别是止水铜片(5)和橡胶止水(6),结构缝内充填沥青马蹄脂(7)。
3.根据权利要求1所述的施工方法,其特征在于:所述混凝土防渗墙(3)渗入强风化岩体底部或嵌入弱风化岩体1m。
4.根据权利要求3所述的施工方法,其特征在于:所述混凝土防渗墙(3)分槽段浇筑而成,一个槽段长6~8m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610014816.9A CN105648988B (zh) | 2016-01-11 | 2016-01-11 | 一种面板堆石坝趾板垂直防渗结构的分期施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610014816.9A CN105648988B (zh) | 2016-01-11 | 2016-01-11 | 一种面板堆石坝趾板垂直防渗结构的分期施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105648988A true CN105648988A (zh) | 2016-06-08 |
CN105648988B CN105648988B (zh) | 2017-10-31 |
Family
ID=56487031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610014816.9A Active CN105648988B (zh) | 2016-01-11 | 2016-01-11 | 一种面板堆石坝趾板垂直防渗结构的分期施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105648988B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013263A (zh) * | 2016-07-16 | 2016-10-12 | 黄河勘测规划设计有限公司 | 具有深厚砂砾石层深切河谷的黏土心墙坝基础防渗方法 |
CN106958257A (zh) * | 2017-04-28 | 2017-07-18 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种防止面板坝趾板不均匀沉降的施工方法及结构 |
CN109267544A (zh) * | 2018-10-11 | 2019-01-25 | 湖北省水利水电规划勘测设计院 | 一种穿堤箱涵与堤坝防渗封闭结构 |
CN110144850A (zh) * | 2019-05-22 | 2019-08-20 | 无锡市水利设计研究院有限公司 | 闸站用止水系统及方法 |
CN112032404A (zh) * | 2020-08-26 | 2020-12-04 | 华北水利水电大学 | 一种穿堤管道减震结构 |
CN113322904A (zh) * | 2021-06-04 | 2021-08-31 | 中国电建集团成都勘测设计研究院有限公司 | 用于覆盖层地基混凝土坝的高喷防渗墙及其施工方法 |
CN117328411A (zh) * | 2023-09-13 | 2024-01-02 | 大连理工大学 | 改善覆盖层上面板坝防渗体止水缝变形的趾板支撑墙设计和施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101200885A (zh) * | 2007-12-21 | 2008-06-18 | 中国水电顾问集团成都勘测设计研究院 | 水利水电工程土石坝深基础防渗止水结构 |
KR20100089375A (ko) * | 2009-02-03 | 2010-08-12 | 주식회사 일청엔지니어링 | 수위조절이 용이한 고무댐 및 그 가동방법 |
CN103628451A (zh) * | 2013-11-07 | 2014-03-12 | 日照市供水工程管理处 | 水利工程上的防渗止水结构 |
-
2016
- 2016-01-11 CN CN201610014816.9A patent/CN105648988B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101200885A (zh) * | 2007-12-21 | 2008-06-18 | 中国水电顾问集团成都勘测设计研究院 | 水利水电工程土石坝深基础防渗止水结构 |
KR20100089375A (ko) * | 2009-02-03 | 2010-08-12 | 주식회사 일청엔지니어링 | 수위조절이 용이한 고무댐 및 그 가동방법 |
CN103628451A (zh) * | 2013-11-07 | 2014-03-12 | 日照市供水工程管理处 | 水利工程上的防渗止水结构 |
Non-Patent Citations (2)
Title |
---|
邓铭江: "严寒、高震、深覆盖层混凝土面板坝关键技术研究综述", 《岩土工程学报》 * |
邓铭江等: "阿尔塔什水利枢纽坝基深厚覆盖层防渗及坝体结构设计", 《水利与建筑工程学报》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013263A (zh) * | 2016-07-16 | 2016-10-12 | 黄河勘测规划设计有限公司 | 具有深厚砂砾石层深切河谷的黏土心墙坝基础防渗方法 |
CN106013263B (zh) * | 2016-07-16 | 2018-04-20 | 黄河勘测规划设计有限公司 | 具有深厚砂砾石层深切河谷的黏土心墙坝基础防渗方法 |
CN106958257A (zh) * | 2017-04-28 | 2017-07-18 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种防止面板坝趾板不均匀沉降的施工方法及结构 |
CN109267544A (zh) * | 2018-10-11 | 2019-01-25 | 湖北省水利水电规划勘测设计院 | 一种穿堤箱涵与堤坝防渗封闭结构 |
CN109267544B (zh) * | 2018-10-11 | 2023-12-19 | 湖北省水利水电规划勘测设计院 | 一种穿堤箱涵与堤坝防渗封闭结构 |
CN110144850A (zh) * | 2019-05-22 | 2019-08-20 | 无锡市水利设计研究院有限公司 | 闸站用止水系统及方法 |
CN110144850B (zh) * | 2019-05-22 | 2020-10-20 | 无锡市水利设计研究院有限公司 | 闸站用止水系统的止水方法 |
CN112032404A (zh) * | 2020-08-26 | 2020-12-04 | 华北水利水电大学 | 一种穿堤管道减震结构 |
CN113322904A (zh) * | 2021-06-04 | 2021-08-31 | 中国电建集团成都勘测设计研究院有限公司 | 用于覆盖层地基混凝土坝的高喷防渗墙及其施工方法 |
CN113322904B (zh) * | 2021-06-04 | 2022-08-19 | 中国电建集团成都勘测设计研究院有限公司 | 用于覆盖层地基混凝土坝的高喷防渗墙及其施工方法 |
CN117328411A (zh) * | 2023-09-13 | 2024-01-02 | 大连理工大学 | 改善覆盖层上面板坝防渗体止水缝变形的趾板支撑墙设计和施工方法 |
CN117328411B (zh) * | 2023-09-13 | 2024-03-26 | 大连理工大学 | 改善覆盖层上面板坝防渗体止水缝变形的趾板支撑墙设计和施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105648988B (zh) | 2017-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105648988A (zh) | 一种面板堆石坝趾板垂直防渗结构的分期施工方法 | |
CN110242301B (zh) | 一种顶板含水层两步骤注浆改性保水采煤方法 | |
CN204510230U (zh) | 地下水丰富且地质不良深基坑开挖支护结构 | |
CN103967507B (zh) | 一种适于富水矿山井下开采堵水用的帷幕注浆工艺 | |
CN104404974B (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺 | |
CN109630195B (zh) | 煤矿地下水库强帮阻渗挡水坝 | |
CN204023501U (zh) | 一种用于土石坝的除险加固防渗处理结构 | |
CN205012284U (zh) | 建于覆盖层上的大坝坝基防渗结构 | |
CN204370373U (zh) | 一种水库封闭防渗帷幕结构 | |
CN104389610A (zh) | 一种穿越运营高速公路隧道超短台阶施工方法 | |
CN107675713B (zh) | 基坑支护拉森钢板桩系统及施工方法 | |
CN103572764A (zh) | 超深人工挖孔桩护壁止水结构及其施工方法 | |
CN105155472B (zh) | 深厚覆盖层土石坝坝基防渗结构及其施工方法 | |
CN114492226A (zh) | 一种含水层采动渗透破坏的评价方法 | |
CN105569062A (zh) | 渗透弱化减排降水法 | |
CN205894027U (zh) | 水电站地下厂房的截渗结构 | |
CN107060821A (zh) | 一种掌子面多岩性支护方法 | |
CN108532617B (zh) | 非均质潜水层悬挂式帷幕基坑定水位抽水量的确定方法 | |
CN111519626B (zh) | 一种适用于深厚覆盖层永久性帷幕的套阀管反向灌浆方法 | |
CN103343534A (zh) | 基坑施工封闭降水方法 | |
CN203161250U (zh) | 隧道深孔注浆加固系统 | |
CN204252148U (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构 | |
CN107165658A (zh) | 穿越地下洞室的层间错动带防渗治理结构及施工方法 | |
CN103967506A (zh) | 一种矿体顶板岩溶裂隙发育且强富水矿床的帷幕注浆技术 | |
CN204212168U (zh) | 一种利用溶洞联合筑坝的大坝挡水结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |