CN105642806B - A kind of metal tube dual cuff processing unit (plant) - Google Patents

A kind of metal tube dual cuff processing unit (plant) Download PDF

Info

Publication number
CN105642806B
CN105642806B CN201410719199.3A CN201410719199A CN105642806B CN 105642806 B CN105642806 B CN 105642806B CN 201410719199 A CN201410719199 A CN 201410719199A CN 105642806 B CN105642806 B CN 105642806B
Authority
CN
China
Prior art keywords
hoop
shaping mould
head hoop
tail portion
pairing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410719199.3A
Other languages
Chinese (zh)
Other versions
CN105642806A (en
Inventor
文忠海
李宜立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC Guizhou Aircraft Co Ltd
Original Assignee
AVIC Guizhou Aircraft Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC Guizhou Aircraft Co Ltd filed Critical AVIC Guizhou Aircraft Co Ltd
Priority to CN201410719199.3A priority Critical patent/CN105642806B/en
Publication of CN105642806A publication Critical patent/CN105642806A/en
Application granted granted Critical
Publication of CN105642806B publication Critical patent/CN105642806B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of metal tube dual cuff processing unit (plant), including mouthful device that rises, head hoop molding machine and two hoop molding machines;Mouthful device that rises includes that molding mold base one, the mouth mold that rises and head hoop clamp shaping mould one;Head hoop molding machine includes that dual cuff combination die and head hoop clamp shaping mould two;Two hoop molding machines include molding mold base two, interior school circle mould and the tight shaping mould of two hoop clips; it forms two tail portion boss structure of mold base and the installation of upsetting pressure device drives device pairing connects; it forms two front end concave station structure of mold base and the circle mould tail portion boss structure pairing installation of interior school connects; the interior school circle straight hollow structure in mould front end binds round concave station structure pairing with the tight shaping mould front two of two hoop clips and connect, and the tight shaping mould tail portion of two hoop clips and the installation of upsetting pressure equipment fixing end pairing connect.The device carries out dual cuff processing by the fixed metal tube of clamping device, using upsetting pressure mode, easy to operate, labor intensity is low, product quality is high.

Description

A kind of metal tube dual cuff processing unit (plant)
Technical field
The present invention relates to metal tube end machining technical fields, process and fill more particularly to a kind of metal tube dual cuff It sets.
Background technique
In the prior art, metal tube dual cuff is processed using first the mouth that rises is carried out to product end, double using rolling Bander squeezes rotation product formation dual cuff by manual operation equipment on slewing, then carries out school rounded head (packet to dual cuff Include the round smart school of beating of interior school circle, outer school circle, rolling hoop slot).The product circularity processed using rolling hoop rotary squeezing mode is poor, school sired results Program process trouble;Meanwhile because caused by extruding resultant metal tube wall thickness be thinned, service life is short.
Summary of the invention
To solve the problems, such as circularity and wall thickness reduction problem, the present invention provides the device that a kind of upsetting pressure mode processes dual cuff, Fixed circle outer diameter;Meanwhile wall thickness reduction amount is ensured using upsetting pressure mode.
A kind of metal tube dual cuff processing unit (plant), including mouthful device that rises, head hoop molding machine and two hoop molding machines;Rise mouth Device includes that molding mold base one, the mouth mold that rises and head hoop clamp shaping mould one, molding one tail portion of mold base setting boss structure its Concave station structure is arranged in front end, and the mouth mold that rises tail portion is arranged its front end of boss structure and loudspeaker are arranged to external structure, and head hoop clamps shaping mould Its internal setting cavity of one front setting head hoop concave station structure forms one tail portion boss structure of mold base for installing metal tube It installs and connects with upsetting pressure device drives device pairing, molding one front end concave station structure of mold base and the mouth mold tail portion boss structure pair that rises Installation connection is closed, the mouth mold that rises front speaker clamps one front head hoop concave station structure pairing of shaping mould with head hoop to external structure and connect, Head hoop clamps one tail portion of shaping mould and the installation of upsetting pressure equipment fixing end pairing connects;Head hoop molding machine include dual cuff combination die and Head hoop clamp shaping mould two, dual cuff combination die tail portion be arranged its front end of boss structure be arranged head hoop concave station structure, head hoop clamp at Its internal setting cavity of two front of pattern setting head hoop concave station structure is for installing metal tube, dual cuff combination die tail portion boss knot Structure and the installation of upsetting pressure device drives device pairing connect, before dual cuff combination die front end head hoop concave station structure head hoop clamps shaping mould two The installation connection of size hoop concave station structure pairing, head hoop clamps two tail portion of shaping mould and the installation of upsetting pressure equipment fixing end pairing connects; Two hoop molding machines include molding mold base two, interior school circle mould and the tight shaping mould of two hoop clips, and the setting of molding two tail portion of mold base is convex Concave station structure is arranged in its front end of platform structure, and straight hollow structure, two hoops are arranged in interior school circle mould tail portion setting its front end of boss structure It clamps two its inside of hoop concave station structure of shaping mould front setting and cavity is set for installing metal tube, form two tail portion of mold base Boss structure and the installation of upsetting pressure device drives device pairing connect, molding two front end concave station structure of mold base and interior school circle mould tail portion The installation connection of boss structure pairing, interior school circle mould front end is straight hollow structure and the tight hoop of the shaping mould front two concave station structure of two hoop clips Pairing connection, the tight shaping mould tail portion of two hoop clips and the installation of upsetting pressure equipment fixing end pairing connect.
Further, mold base one is formed, head hoop clamps shaping mould one, dual cuff combination die, head hoop clamp shaping mould two, molding The tight shaping mould of the hoop clip of mold base two and two is two semicircle clamping structures.
What the present invention obtained has the beneficial effect that, the device by the fixed metal tube of clamping device, using upsetting pressure mode into The processing of row dual cuff, it is easy to operate, labor intensity is low, product quality is high.
Detailed description of the invention
Fig. 1 is dual cuff machining sketch chart of the invention.
Fig. 2 is mouthful schematic diagram that rises of the invention.
Fig. 3 is that head hoop of the invention clamps shaping schematic view.
Fig. 4 is the tight shaping schematic view of two hoop clips of the invention.
Fig. 5 is A of the invention to diagram.
Fig. 6 is B of the invention to diagram.
Fig. 7 is C of the invention to diagram.
Fig. 8 is D of the invention to diagram.
Fig. 9 is E of the invention to diagram.
In figure: 1, forming mold base one;2, rise mouth mold;3, head hoop clamps shaping mould one;4, dual cuff combination die;5, head hoop Clamp shaping mould two;6, mold base two is formed;7, interior school circle mould;8, the tight shaping mould of two hoop clips;9, metal tube.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and example is served only for explaining invention, not For limiting the scope of the invention.
A kind of metal tube dual cuff processing unit (plant), including mouthful device that rises, head hoop molding machine and two hoop molding machines;Rise mouth Device includes that molding mold base 1, the mouth mold that rises 2 and head hoop clamp shaping mould 1, and one 1 tail portion of the molding mold base setting is convex Concave station structure is arranged in its front end of platform structure, and 2 tail portion of the mouth mold that rises is arranged its front end of boss structure and loudspeaker are arranged to external structure, head hoop folder Tight its internal setting cavity of one 3 front of shaping mould setting head hoop concave station structure forms mold base 1 for installing metal tube 9 Tail portion boss structure and the installation of upsetting pressure device drives device pairing connect, molding one 1 front end concave station structure of mold base and the mouth mold 2 that rises The installation connection of tail portion boss structure pairing, it is recessed that 2 front speaker of the mouth mold that rises clamps one 3 front head hoop of shaping mould with head hoop to external structure The connection of platform structure pairing, head hoop clamps one 3 tail portion of shaping mould and the installation of upsetting pressure equipment fixing end pairing connects;Head hoop molding machine Shaping mould 25 is clamped including dual cuff combination die 4 and head hoop, 4 tail portion of dual cuff combination die is arranged its front end of boss structure and head hoop is arranged Concave station structure, head hoop clamp its inside of 25 front of shaping mould setting head hoop concave station structure and cavity are arranged for installing metal tube 9,4 tail portion boss structure of dual cuff combination die and the installation of upsetting pressure device drives device pairing connect, and 4 front end head hoop of dual cuff combination die is recessed Platform structure head hoop clamps the installation connection of 25 front head hoop concave station structure pairing of shaping mould, and head hoop clamps 25 tail portion of shaping mould and upsetting Press the installation connection of equipment fixing end pairing;Two hoop molding machines include molding mold base 26, interior school circle mould 7 and two hoop clips tightly at Concave station structure is arranged in pattern 8, molding 26 tail portion of mold base setting its front end of boss structure, and interior school circle 7 tail portion of the mould setting is convex Straight hollow structure is arranged in its front end of platform structure, its internal setting of tight 8 front of shaping mould setting, the two hoop concave station structure of two hoop clips is empty Chamber is connected for installing metal tube 9, molding 26 tail portion boss structure of mold base and the installation of upsetting pressure device drives device pairing, It forms 26 front end concave station structure of mold base and circle 7 tail portion boss structure pairing of the mould installation of interior school connects, hold level with both hands before interior school circle mould 7 Straight hollow structure is connect with tight 8 front two of the shaping mould hoop concave station structure pairing of two hoop clips, tight 8 tail portion of shaping mould of two hoop clips and upsetting Press the installation connection of equipment fixing end pairing.Above-mentioned upsetting pressure equipment can be upsetting pressure equipment in the prior art, as long as can mention For operating pressure, pushes molding mold base 1, dual cuff combination die 4 and molding mold base 26 to move forward, withstand metal tube 9 Reach upsetting pressure molding.Interior school circle mould 7 is used to ensure concentricity when two hoop moldings.
To be easily installed and dismantling, molding mold base 1 of the invention, head hoop clamp shaping mould 1, dual cuff combination die 4, It is two semicircle clamping structures that head hoop, which clamps shaping mould 25, molding mold base 26 and the tight shaping mould 8 of two hoop clips,.
Work step of the invention are as follows:
1, rise mouth: first installing mouthful device that rises, molding mold base 1 is mounted on to the driving end of upsetting pressure equipment, by head hoop It clamps shaping mould 1 and is mounted on upsetting pressure equipment fixing end, the metal tube 9 for the mouth that needs to rise is put into head hoop and clamps shaping mould 1 In, 2 pairing of the mouth mold that will rise be mounted on molding one 1 front end of mold base, start upsetting pressure equipment carry out upsetting pressure rise mouth molding;
2, head hoop forms: head hoop molding machine is first installed, dual cuff combination die 4 is mounted on to the driving end of upsetting pressure equipment, Head hoop clamping shaping mould 25 is mounted on upsetting pressure equipment fixing end, will rise that mouth is completed and need the molding metal tube 9 of head hoop It is put into head hoop to clamp in shaping mould 25, starts upsetting pressure equipment and carry out the molding of upsetting pressure head hoop;
3, two hoop molding (i.e. dual cuff molding): first installing two hoop molding machines, and molding mold base 26 is mounted on upsetting pressure The tight shaping mould 8 of two hoop clips is mounted on upsetting pressure equipment fixing end by the driving end of equipment, is formed completing by head hoop and is needed the mouth that rises Metal tube 9 be put into molding mold base 26 in, by interior school circle 7 pairing of mould be mounted on molding 26 front end of mold base, start upsetting Equipment is pressed to carry out the hoop molding of upsetting pressure two;Complete whole process.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (2)

1. a kind of metal tube dual cuff processing unit (plant), it is characterised in that: described device include rise a mouthful device, head hoop molding machine and Two hoop molding machines;Mouthful device that rises includes that molding mold base one (1), the mouth mold that rises (2) and head hoop clamp shaping mould one (3), Concave station structure is arranged in one (1) tail portion of molding mold base setting its front end of boss structure, and the mouth mold that rises (2) the tail portion setting is convex Loudspeaker are arranged to external structure in its front end of platform structure, and the head hoop clamps shaping mould one (3) front setting head hoop concave station structure in it For installing metal tube (9), one (1) tail portion boss structure of molding mold base and upsetting pressure device drives fill portion's setting cavity Set pairing installation connection, one (1) front end concave station structure of molding mold base and mouth mold (2) tail portion boss structure pairing installation of rising Connection, the mouth mold that rises (2) front speaker clamp shaping mould one (3) front head hoop concave station structure pairing to external structure and head hoop and connect It connects, the head hoop clamps shaping mould one (3) tail portion and the installation of upsetting pressure equipment fixing end pairing connects;The head hoop molding machine packet It includes dual cuff combination die (4) and head hoop clamps shaping mould two (5), its front end of boss structure is arranged in dual cuff combination die (4) tail portion Head hoop concave station structure is set, its internal setting cavity of head hoop clamping shaping mould two (5) front setting head hoop concave station structure is used In installation metal tube (9), dual cuff combination die (4) the tail portion boss structure and the installation of upsetting pressure device drives device pairing connect It connects, dual cuff combination die (4) the front end head hoop concave station structure and head hoop clamp shaping mould two (5) front head hoop concave station structure pairing Installation connection, the head hoop clamps shaping mould two (5) tail portion and the installation of upsetting pressure equipment fixing end pairing connects;The two hoops molding Device includes molding mold base two (6), interior school circle mould (7) and the tight shaping mould of two hoop clips (8), described two (6) tail of molding mold base Portion is arranged its front end of boss structure and concave station structure is arranged, and interior school circle mould (7) tail portion setting its front end of boss structure is arranged flat Straight hollow structure, its internal setting cavity of two hoop concave station structure of the tight shaping mould of two hoop clips (8) front setting is for installing gold Belong to pipe fitting (9), two (6) tail portion boss structure of molding mold base and the installation of upsetting pressure device drives device pairing connect, described It forms mold base two (6) front end concave station structure and circle mould (7) the tail portion boss structure pairing installation of interior school connects, the interior school circle mould (7) the straight hollow structure in front end and the tight shaping mould of two hoop clips (8) front two are bound round concave station structure pairing and are connect, two hoop clip tightly at Pattern (8) tail portion and the installation of upsetting pressure equipment fixing end pairing connect.
2. metal tube dual cuff processing unit (plant) according to claim 1, it is characterised in that: the molding mold base one (1), Head hoop clamps shaping mould one (3), dual cuff combination die (4), head hoop clamping shaping mould two (5), molding mold base two (6) and two hoop clips Tight shaping mould (8) is two semicircle clamping structures.
CN201410719199.3A 2014-12-03 2014-12-03 A kind of metal tube dual cuff processing unit (plant) Expired - Fee Related CN105642806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410719199.3A CN105642806B (en) 2014-12-03 2014-12-03 A kind of metal tube dual cuff processing unit (plant)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410719199.3A CN105642806B (en) 2014-12-03 2014-12-03 A kind of metal tube dual cuff processing unit (plant)

Publications (2)

Publication Number Publication Date
CN105642806A CN105642806A (en) 2016-06-08
CN105642806B true CN105642806B (en) 2019-02-22

Family

ID=56480449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410719199.3A Expired - Fee Related CN105642806B (en) 2014-12-03 2014-12-03 A kind of metal tube dual cuff processing unit (plant)

Country Status (1)

Country Link
CN (1) CN105642806B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201124204Y (en) * 2007-09-29 2008-10-01 贵州双阳飞机制造厂 Device for processing metal pipe end rolling hoop
CN201220256Y (en) * 2008-06-26 2009-04-15 贵州双阳飞机制造厂 Device for mouth stretching of end of metal pipe fittings
CN201220246Y (en) * 2008-06-26 2009-04-15 贵州双阳飞机制造厂 Device for processing end of metal pipe
CN201791833U (en) * 2010-09-30 2011-04-13 唐山德厚机械制造有限公司 Tube end belling mould of metal tube
CN103386756A (en) * 2013-08-06 2013-11-13 天津军星管业集团有限公司 Roundness corrector

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7275602B2 (en) * 1999-12-22 2007-10-02 Weatherford/Lamb, Inc. Methods for expanding tubular strings and isolating subterranean zones

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201124204Y (en) * 2007-09-29 2008-10-01 贵州双阳飞机制造厂 Device for processing metal pipe end rolling hoop
CN201220256Y (en) * 2008-06-26 2009-04-15 贵州双阳飞机制造厂 Device for mouth stretching of end of metal pipe fittings
CN201220246Y (en) * 2008-06-26 2009-04-15 贵州双阳飞机制造厂 Device for processing end of metal pipe
CN201791833U (en) * 2010-09-30 2011-04-13 唐山德厚机械制造有限公司 Tube end belling mould of metal tube
CN103386756A (en) * 2013-08-06 2013-11-13 天津军星管业集团有限公司 Roundness corrector

Also Published As

Publication number Publication date
CN105642806A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN207592631U (en) Double horn mouth process equipment
CN105642806B (en) A kind of metal tube dual cuff processing unit (plant)
CN203695760U (en) Ironing and thinning die structure
CN206652899U (en) A kind of three station drum type horn mouth pier nose devices of pipe fitting
CN103386661B (en) The pressure testing of U-shaped heat exchanger tube is with opening fixture soon
CN204470428U (en) Automobile ball head ball welding bell tool
CN204638928U (en) A kind of enlarging reducing all-in-one for refrigeration for refrigerator pipe fitting
CN209416177U (en) Self-styled base stock cylinder with lead
CN205684596U (en) A kind of New type detachable tube expansion mould
CN105798094A (en) Improved 180-degree pipe bending machine
CN106271390A (en) A kind of processing technique of lightweight water heater liner
CN205571107U (en) Reducing of interior high -pressure formed tube spare closing equipment for preforming
CN201858468U (en) Flaring and positioning mechanism of three-way pipe
CN205111747U (en) A pneumatic dolly for inciting somebody to action circular copper pipe bulldozes and embolias flat tub of forming die core
CN204817621U (en) Steel pipe mouth of pipe roll wave device
CN105618602A (en) Flaring device for thick-wall stainless steel pipe fitting
CN201970433U (en) Segmental vulcanization mould
CN104329528A (en) Plastic pipeline connector and production device for plastic pipeline connector
CN204590620U (en) A kind of construction formwork support member
CN204912439U (en) Punching die
CN204429930U (en) Modified 180 ° of bending machines
CN203864015U (en) Rubber ring die
CN208976653U (en) A kind of precise punching die
CN209402329U (en) One kind just repairing micromotor
CN204122605U (en) The contraction mouth frock of iron core case

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200702

Address after: No.222, Wujiang Road, economic and Technological Development Zone, Guiyang City, Guizhou Province

Patentee after: Guiyang Qianjiang aviation support equipment Co.,Ltd.

Address before: 561018 airport road, Anshun Development Zone, Guizhou, China

Patentee before: AVIC GUIZHOU AIRPLANE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210702

Address after: 561000 Songqi Town, Anshun economic and Technological Development Zone, Guizhou Province

Patentee after: AVIC GUIZHOU AIRPLANE Co.,Ltd.

Address before: No. 222, Wujiang Road, Guiyang Economic and Technological Development Zone, 550000, Guizhou Province

Patentee before: Guiyang Qianjiang aviation support equipment Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190222

Termination date: 20211203