CN105631079A CN201410697814.5A CN201410697814A CN105631079A CN 105631079 A CN105631079 A CN 105631079A CN 201410697814 A CN201410697814 A CN 201410697814A CN 105631079 A CN105631079 A CN 105631079A
Authority
CN
China
Prior art keywords
sub
technique
configurable
technological process
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410697814.5A
Other languages
Chinese (zh)
Other versions
CN105631079B (en
Inventor
姚亚仙
黄建中
张晓煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Institute of Automation of CAS
Original Assignee
Shenyang Institute of Automation of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Institute of Automation of CAS filed Critical Shenyang Institute of Automation of CAS
Priority to CN201410697814.5A priority Critical patent/CN105631079B/en
Publication of CN105631079A publication Critical patent/CN105631079A/en
Application granted granted Critical
Publication of CN105631079B publication Critical patent/CN105631079B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention relates to a configurable sectional type-type production task scheduling method, which comprises the following steps: 1) firstly, according to the practical technological process of a factory, segmenting the technological process into a plurality of associated parts; 2) establishing a virtual connection pool among all sub technologies, determining the input/output contents of the connection pool, and finishing the information transfer of an upper-level technology and a lower-level technology; 3) according to the specific technological process, establishing a model by each sub technology, and determining the input/output parameter of the model; 4) according to a given format, inputting a releasing plan parameter on the first sub technology; 5) observing an output result to obtain execution plans and the specific parameter value of each execution plan in the technological process of the execution plan; and 6) according to practical requirements, regulating the parameters, and optimizing the execution plan. The configurable sectional type production task scheduling method is applied to the manufacture execution system software of an industrial site, and carries out controllable generation according to different releasing plan input parameters and technological processes.

Description

A kind of configurable stagewise production task scheduling method
Technical field
The present invention relates to Computer Applied Technology field, it is especially applicable in the manufacturing execution system of industry spot, generates implement plan according to different process feature and the configurable stagewise production task scheduling method of one of implement plan can be regulated according to input parameter.
Background technology
In manufacturing execution system software, the generation of implement plan can directly affect production efficiency, the output time etc. of product, in part industry, owing to production process is various, complex manufacturing, common implement plan generates method and causes that production efficiency is low, heavy then assign plans and cannot be timely completed payment, cause economic loss. In order to improve production efficiency, it is provided that one according to process characteristic modeling and can regulate the method for implement plan according to parameter and is very important.
Summary of the invention
For above shortcomings part in prior art, the present invention provides a kind of based on according to process characteristic modeling the configurable stagewise production task scheduling method that can regulate implement plan according to parameter.
The present invention is the technical scheme is that a kind of configurable stagewise production task scheduling method for achieving the above object, comprises the following steps:
According to factory's actual process flow process, technological process is divided into the some sub-technique being associated, and every sub-technique is implemented in production, formed and produce module;
Each produces sets up virtual connection pool between module, establish the input and output content of connection pool, completes the information transmission of the superior and the subordinate's technique;
Each production module sets up model according to the concrete technological process of its correspondence, the input/output argument of establishing model;
Input, at first line technique place, parameter of assigning plans according to given form, obtain implement plan and each implement plan design parameter value in its technological process;
According to the actual requirements, adjust parameter, optimize implement plan.
Described every sub-technique is used for generating this stage product, in whole technological process goods be interim product and need will the Data Enter of this stage product in information system, then the sub-technique of this stage product of generation being split.
Virtual connection pool is set up between described each sub-technique, particularly as follows:
The operation result that upper one produces module is entered in data base;
Call Giffler&Thompson algorithm and carry out computing record product title, coding, quantity information in connection pool as the finished product information of current block;
The finished product information of current block is converted the input raw material information of next module to: the title of the finished product in connection pool and coding are constant, quantity is divided by batch size, the new finished product information generated exists in other database table, as the input raw material information of next module.
Described every sub-technique sets up model according to concrete technological process, and model comprises following information: process name, the operation comprised under this flow process, the material that this flow process generates, the station corresponding with operation.
The present invention has the following advantages and beneficial effect:
1) the method has wide applicability. Due to the difference between industry, even the production technology of each producer internal of the same trade is also not quite similar, the implement plan that regular software provides generates method or the suitability is narrow, or enforceability is low. This method is according to different productive prospecting piecemeal modelings so that the method has industrial applicability widely.
2) accuracy of the method and adjustability are significantly high. Process provides the real-time of the motility for control plan of two parameters and production status. Once Plan rescheduling, this method can quickly generate new implement plan so that plan has significantly high feasibility and accuracy. Can ensure that system reflects the production status of whole technological process really by machine state state modulator production status.
Accompanying drawing explanation
Fig. 1 is carried out plan product process figure.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
According to industry characteristic, whole technique is split as several sub-process modelings being associated, and this little process modeling can be flexible manufacturing model by naturalization. The present invention has gone out a set of calculation operation method based on Giffler&Thompson algorithm according to flexible manufacturing model development.
[basic conception]
Assign plans: according to production task demand, manufacturer can by the production schedule assigning certain type product output quantity in month or week.
Implement plan: for assigning plans, factory to formulate process time and the processing sequence of each workpiece, processing work time of every machine and order.
Operation: the order of whole production process Zhong Ge workshop section converted products.
Technique: process the whole production process of certain type product.
One, first illustrate according to process characteristic modeling.
1, under normal circumstances, the production of a product can through some roads production process, and some operations are single machines, and some operations are that pipeline system produces. The processing mode of heat treatment etc. is also different with the mode of common process. The raw material batch quantity of some operation is also different with other operations. So the first step of modeling is according to the mode of production, processing mode, reproduced goods processing mode, batch etc. feature, by the sequencing of operation, the operation of close technology mode is classified as one and produces module. This Sample Method produces module by abstract for the technique of a product for several;
2, virtual link pond is set up, by generating the finished product information of this module according to a upper operation result producing module in pond, including material is processed on which platform machine, beginning process time on this machine. This information is automatically converted into the input raw material information of next module by system built-in algorithms, and the finished product information of last production module is the input raw material information of next production module.
3, system provides different implement plan schemes. Difference between scheme is to be determined by the iterations of different algorithms. Iterations is more many, and it is more tight that implement plan is arranged, but operation time is more long. Iterations is less, and computing is more fast, but the implement plan result obtained is likely to many not as iterations. So make client can select to meet according to practical situation the scheme of oneself productive prospecting.
Two, the realization of method can be adjusted after generating implement plan according to parameter
In order to ensure real-time and the adjustability of system, this implement plan generates system and introduces two parameters, and one is the weight parameter assigned plans, and another is the operational factor of production equipment.
The weight parameter assigned plans is divided into Three Estate, and 1 is non-emergent, if it is later for date of delivery to produce order, may be configured as this weight. 2 is common order, and this weight is default value. Being rush order more than 3, the more big then urgency level of numerical value is more high. The typing when raw material information inputs of this parameter. In process of production, if order adjusts, then can adjusting this parameter value, then system regenerates new implement plan for Instructing manufacture. Production efficiency can be improved, in order to avoid equipment is dragged the phase by non-emergent task Occupation time and hot job.
The operational factor of production equipment is used for controlling the operation of everyday devices. If device damage or ordinary maintenance, it is possible to adjust equipment operational factor. So can make a plan accurately according to production status, it is ensured that the accuracy of implement plan and motility.
As it is shown in figure 1, one embodiment of the present of invention is:
1, produce module to set up, by process characteristic difference, whole production procedure is split into several according to produced on-site situation and produce module.
2, information needed is modeled in the typing of Data Enter interface. Include M platform machine as produced modules A, machine m can process part kind e1, e2 ... en} and processing duration t1, t2 ... tn}; The machining set of part n needs and order.
3, system sets up virtual link pond automatically between adjacent production module, includes the finished product information producing module and be automatically converted into the input raw material information of next module in pond;
4, will assign plans and split into raw material information, and typing before first production module;
5, system can record according to built-in algorithm and generate the product information in each connection pool and the finished product information of last production module generation automatically.
6, assign plans according to order adjustment, keep the accuracy of implement plan. State parameter according to equipment adjusts equipment state, it is ensured that the real-time of the production process of system reflection.

Claims (4)

1. a configurable stagewise production task scheduling method, it is characterised in that comprise the following steps:
According to factory's actual process flow process, technological process is divided into the some sub-technique being associated, and every sub-technique is implemented in production, formed and produce module;
Each produces sets up virtual connection pool between module, establish the input and output content of connection pool, completes the information transmission of the superior and the subordinate's technique;
Each production module sets up model according to the concrete technological process of its correspondence, the input/output argument of establishing model;
Input, at first line technique place, parameter of assigning plans according to given form, obtain implement plan and each implement plan design parameter value in its technological process;
According to the actual requirements, adjust parameter, optimize implement plan.
2. the configurable stagewise production task scheduling method of one according to claim 1, it is characterized in that, described every sub-technique is used for generating this stage product, in whole technological process goods be interim product and need will the Data Enter of this stage product in information system, then the sub-technique of this stage product of generation being split.
3. the configurable stagewise production task scheduling method of one according to claim 1, it is characterised in that set up virtual connection pool between described each sub-technique, particularly as follows:
The operation result that upper one produces module is entered in data base;
Call Giffler&Thompson algorithm and carry out computing record product title, coding, quantity information in connection pool as the finished product information of current block;
The finished product information of current block is converted the input raw material information of next module to: the title of the finished product in connection pool and coding are constant, quantity is divided by batch size, the new finished product information generated exists in other database table, as the input raw material information of next module.
4. the configurable stagewise production task scheduling method of one according to claim 1, it is characterized in that, described every sub-technique sets up model according to concrete technological process, model comprises following information: process name, the operation comprised under this flow process, the material that this flow process generates, the station corresponding with operation.
CN201410697814.5A 2014-11-27 2014-11-27 A kind of configurable segmented production task scheduling method Expired - Fee Related CN105631079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410697814.5A CN105631079B (en) 2014-11-27 2014-11-27 A kind of configurable segmented production task scheduling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410697814.5A CN105631079B (en) 2014-11-27 2014-11-27 A kind of configurable segmented production task scheduling method

Publications (2)

Publication Number Publication Date
CN105631079A true CN105631079A (en) 2016-06-01
CN105631079B CN105631079B (en) 2019-03-12

Family

ID=56046010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410697814.5A Expired - Fee Related CN105631079B (en) 2014-11-27 2014-11-27 A kind of configurable segmented production task scheduling method

Country Status (1)

Country Link
CN (1) CN105631079B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109146125A (en) * 2018-07-02 2019-01-04 中化能源科技有限公司 A kind of oil product processing benefit measuring method, system and visualization system, method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1622528A (en) * 2003-11-26 2005-06-01 国际商业机器公司 Efficient connection pool management system and method
CN101079121A (en) * 2006-05-24 2007-11-28 宝山钢铁股份有限公司 Metallurgical industry integrative plan scheduling system and method
CN102034167A (en) * 2010-12-27 2011-04-27 用友软件股份有限公司 Method and device for making production task
CN102663963A (en) * 2012-06-06 2012-09-12 上海爱捷斯敏软件开发有限公司 Manufacturing precision marking system of trademark-based subdividing process section, and use method of manufacturing precision marking system
CN102722785A (en) * 2012-05-29 2012-10-10 安徽金缆信息技术有限公司 Workshop operation management method, system and server
CN103377076A (en) * 2012-04-28 2013-10-30 国际商业机器公司 Method and system for adjusting task execution plans during operation
CN103941674A (en) * 2014-03-27 2014-07-23 上海华力微电子有限公司 Method for designing multi-channel controlling technological processes

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1622528A (en) * 2003-11-26 2005-06-01 国际商业机器公司 Efficient connection pool management system and method
CN101079121A (en) * 2006-05-24 2007-11-28 宝山钢铁股份有限公司 Metallurgical industry integrative plan scheduling system and method
CN102034167A (en) * 2010-12-27 2011-04-27 用友软件股份有限公司 Method and device for making production task
CN103377076A (en) * 2012-04-28 2013-10-30 国际商业机器公司 Method and system for adjusting task execution plans during operation
CN102722785A (en) * 2012-05-29 2012-10-10 安徽金缆信息技术有限公司 Workshop operation management method, system and server
CN102663963A (en) * 2012-06-06 2012-09-12 上海爱捷斯敏软件开发有限公司 Manufacturing precision marking system of trademark-based subdividing process section, and use method of manufacturing precision marking system
CN103941674A (en) * 2014-03-27 2014-07-23 上海华力微电子有限公司 Method for designing multi-channel controlling technological processes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109146125A (en) * 2018-07-02 2019-01-04 中化能源科技有限公司 A kind of oil product processing benefit measuring method, system and visualization system, method

Also Published As

Publication number Publication date
CN105631079B (en) 2019-03-12

Similar Documents

Publication Publication Date Title
CN107832497A (en) A kind of intelligent workshop fast custom design method and system
CN108009739A (en) Production-Plan and scheduling integral method between a kind of intelligent machine extra bus
Bako et al. Trends in simulation and planning of manufacturing companies
CN108053047A (en) Cloud resources of production scheduling methods, devices and systems
CN102411333A (en) Fast numerical control machining process system for complex parts of airplane
CN103823455A (en) Workshop scheduling simulation method based on equipment failure scheduling model
US10303161B2 (en) Apparatus and method for dynamic operation of machines
CN104102196A (en) Batch production-based industrial automatic control system
CN103500375A (en) EM-Plant-based MES (Manufacturing Execution Systems) dispatching control method
Azemi et al. The use of advanced manufacturing technology to reduce product cost
CN112465333A (en) Intelligent production line scheduling optimization method based on multiple time scales
CN106951621B (en) A kind of simulation optimization method carrying Plan rescheduling for ship
KR100971908B1 (en) System of Proactive Scheduling approach using Simulation
CN103902757A (en) System and method for rapid creation and interaction of three-dimensional model
Kuric et al. Computer aided process planning in machinery industry
Mourtzis et al. A framework for adaptive scheduling in cellular manufacturing systems
CN105631079A (en) Configurable sectional type production task scheduling method
Wang et al. Web-DPP: towards job-shop machining process planning and monitoring
CN100383914C (en) Method for determining machinery processing sequence and manufacturing system therewith
Zhu et al. User-centered information provision of cyber-physical machine tools
Zhang et al. A model-driven dynamic synchronization mechanism of lifecycle business activity for complicated and customized products
CN106909992B (en) Split charging production method and device of multi-variety small-batch mixed flow assembly line
Modrák Case on manufacturing cell formation using production flow analysis
Gola et al. Rms–system of the future or new trend in science?
Fecova et al. Computer aided manufacturing process planning by group technology application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190312

Termination date: 20211127