CN105629907B - Area control system and its method of automatic configuration - Google Patents

Area control system and its method of automatic configuration Download PDF

Info

Publication number
CN105629907B
CN105629907B CN201410608028.3A CN201410608028A CN105629907B CN 105629907 B CN105629907 B CN 105629907B CN 201410608028 A CN201410608028 A CN 201410608028A CN 105629907 B CN105629907 B CN 105629907B
Authority
CN
China
Prior art keywords
area
network architecture
area network
controller
equipment control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410608028.3A
Other languages
Chinese (zh)
Other versions
CN105629907A (en
Inventor
陈孟淞
罗天赐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Delta Optoelectronics Inc
Original Assignee
Delta Optoelectronics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Delta Optoelectronics Inc filed Critical Delta Optoelectronics Inc
Priority to CN201410608028.3A priority Critical patent/CN105629907B/en
Publication of CN105629907A publication Critical patent/CN105629907A/en
Application granted granted Critical
Publication of CN105629907B publication Critical patent/CN105629907B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

A kind of area control system and its method of automatic configuration, area control system include at least zone controller, equipment control node and sensor.Zone controller has area network architecture model, the topology network that wherein area network architecture model record area controller region need to use.Zone controller carries out the calculating of degree of relevancy to all devices control node and sensor of surrounding, content according to calculated result and area network architecture model establishes connection with the highest equipment control node of correlation automatically, and controls the equipment control node of connection and the highest sensor of correlation establishes connection.By means of the present invention, the area network architecture of region can be automatically configured by zone controller, and establish the area control system of region.

Description

Area control system and its method of automatic configuration
Technical field
The present invention relates to automatically configuring for region control more particularly to area control system and the area control system Method.
Background technique
In recent years, the concept of intelligent building is risen, and many emerging buildings are all developed towards this direction one after another.
Existing intelligent building usually configures many sensor and device controller between floors, is built with sensing Every environmental parameter in object is built, and control every electronic equipment in building according to environmental parameter, is relaxed with adjusting environment Appropriateness.
In the existing practice, it will usually interior of building are divided into multiple regions, and distinguished in each area One or more sensors are set, one or more device controllers and one are specific to the intelligent controller in the region.Wherein, Information of the intelligent controller to receive all devices controller and sensor in the region, and the intelligence with other regions Controller transmits mutually.
In general, those above-mentioned intelligent controllers, those device controllers and those sensors all have for identification Identification code, such as device number or wireless module MAC addresses (Media Access Control Address, MAC Address) etc..It is installed by those intelligent controllers, those device controllers and those sensor entities Before into building, installation personnel usually requires first to establish one corresponding list (mapping table), so as to it is subsequent be each Correct area network architecture is respectively configured in region.
For example, which needs to record: first area include an intelligent controller (device number: A00001), One device controller (device number: B00001) with a sensor (number: C00001) by device;Second area includes an intelligence control Device processed (device number: A00002), two device controllers (device number: B00002, B00003), three sensors (device number: C00002, C00003, C00004), and so on.
When configuring the above-mentioned area network architecture for each region, installation personnel can operate computer and login the region The intelligent controller (as passed through web server), and the content according to the correspondence list, control the intelligent controller and are connected to The corresponding device controller and the sensor use the action of configuration for completing the area network architecture in the region.
However, the real statistical time that installation personnel need to be spent considerable of the foundation of above-mentioned corresponding list.If also, this is built The region quantity built in object is numerous, if then installation personnel is by the way of above-mentioned manual configuration, need to spend sizable time in fact Cost.
Summary of the invention
The main object of the present invention is to provide a kind of area control system and its method of automatic configuration, can be by region Controller automatically configure the area network architecture of region, and establish the area control system of region.
In order to reach above-mentioned purpose, the present invention provides include at least a zone controller, at least equipment control section One area control system of point and an at least sensor.Zone controller has area network architecture model, wherein Local Area Network The topology network that framework model record area controller region need to use.Zone controller controls all devices of surrounding Node and sensor carry out the calculating of degree of relevancy, according to calculated result and the content of area network architecture model automatically with phase The highest equipment control node of closing property establishes connection, and controls the equipment control node of connection and the highest sensor of correlation is built Vertical connection.
In the present invention, which configures the area network architecture of region by above-mentioned connecting moves, and builds The local area network system of vertical region, wherein the area network architecture and the local area network system meet the area network architecture The topology network that model is recorded.
The present invention compares the attainable technical effect of the relevant technologies institute and is, can be come from by the zone controller in a region The equipment control node and sensor that dynamic selection to be connected, to configure the area network architecture in the region, and establish the region Area control system.In the present invention, zone controller and one or more that user is not required in one region of manual configuration are set Connection between standby control node, one or more the equipment control nodes being also not required in the manual configuration region and one or more sensings Connection between device.In this way, for user can be saved a large amount of setup time.
Detailed description of the invention
Fig. 1 is the area control system schematic diagram of the first specific embodiment of the invention.
Fig. 2 is the area control system Booting sequence figure of the first specific embodiment of the invention.
Fig. 3 automatically configures flow chart for the first specific embodiment of the invention.
Fig. 4 A is the first connecting moves figure of the first specific embodiment of the invention.
Fig. 4 B is the second connecting moves figure of the first specific embodiment of the invention.
Fig. 4 C is the third connecting moves figure of the first specific embodiment of the invention.
Fig. 5 is the area network architecture model schematic diagram of the first specific embodiment of the invention.
Fig. 6 is the zone controller configuration flow figure of the first specific embodiment of the invention.
Fig. 7 is matching for the first specific embodiment of the invention to postpone schematic diagram.
Fig. 8 A is the area network architecture information schematic diagram of the first specific embodiment of the invention.
Fig. 8 B is the fine tuning schematic diagram of the first specific embodiment of the invention.
Wherein, the reference numerals are as follows:
1 ... building
11 ... first areas
12 ... second areas
13 ... third regions
14 ... the fourth regions
2 ... zone controllers
3 ... equipment control nodes
4 ... sensors
5 ... configuration equipment
51 ... display screens
511 ... the display pages
512 ... the fine tuning pages
6 ... zone controllers
61 ... first area controllers
62 ... second area controllers
63 ... third zone controllers
64 ... the fourth region controllers
71 ... fan governors
72 ... lamp dimmers
81 ... temperature and humidity sensors
82 ... hot electric infrared sensors
T1 ... area network architecture model
S10~S14 ... starting step
S20~S38 ... configuration step
S40~S48 ... configuration step
Specific embodiment
Hereby with regard to preferable embodiment, cooperate attached drawing, detailed description is as follows.
Head is referring to Fig. 1, be the area control system schematic diagram of the first specific embodiment of the invention.The present invention is mainly public An area control system is opened, is set among a region.The area control system is mainly to sense the items in the region Environmental parameter, and according to the items of equipment in those environment parameter controls region, to adjust the environmental degree of comfort in the region.
Fig. 1 discloses a building 1, which has multiple regions, and multiple region is located at identical or different building Layer, in the present embodiment by taking a first area 11, a second area 12, a third region 13 and a fourth region 14 as an example, but not It is limited.In the present embodiment, one group of area control system is respectively arranged in the 11-14 of those regions.More specifically, if There are four regions for tool in the building 1, then are preferably provided with four groups of area control systems;If having ten areas in the building 1 Domain is then preferably provided with the ten groups area control system, and so on.
The area control system mainly includes 2, at least one equipment control of a zone controller (Zone Controller, ZC) Node 3 processed and at least a sensor 4.In embodiment as shown in Figure 1, the area control system in the first area 11 includes One zone controller, 2, two equipment control nodes 3 and two sensors 4;Region control in the second area 12 System includes 2, two equipment control nodes 3 of the zone controller and three sensors 4;In the third region 13 The area control system includes 2, equipment control nodes 3 of the zone controller and two sensors 4;4th The area control system in region 14 then includes 2, equipment control nodes 3 of the zone controller and the sense Survey device 4.However, being merely to illustrate the foregoing is merely preferred embodiments of the invention, but not limited to this.
Every indoor environment parameter and Outdoor Air Parameters of those sensors 4 to detect region, such as temperature, Whether humidity has personnel's disengaging, the activity of personnel, the clothing amount of personnel etc., and provides those environmental parameters to being connected The equipment control node 3.In the present embodiment, those sensors 4 may be, for example, temperature/humidity sensor (T/H sensor), heat Electric infrared sensor (Pyroelectric Infrared sensor, PIR sensor) etc., but be not limited.
Those equipment control nodes 3 are separately connected those sensors 4 in the same area, and detect according to those sensors 4 The environmental parameter of survey, controls every electronic equipment (figure do not indicate) in region, for example, fan, room conditioning, dehumidifier, Electric light etc., to adjust the environmental degree of comfort of region.Also, the fortune of those electronic equipments of those equipment control nodes 3 offer Make state to the zone controller 2 connected.In the present embodiment, those equipment control nodes 3 may be, for example, fan governor (Fan Controller, FC), lamp dimmer (Light Controller, LC) etc., but be not limited.
Those zone controllers 2 connect the equipment control node 3 in the same area, receive the equipment control node 3 and return The data (environmental parameter that the operating state of such as those electronic equipments, the sensor 4 are detected) of biography.Whereby, those regions are controlled Device 2 processed can carry out optimization calculating by ambient condition of the algorithm to region.Furthermore those zone controllers 2 can be by By other zone controllers 2 in the above-mentioned data of wireless network transmissions to the building 1, use respectively that the zone controller 2 can be mutual It is wirelessly connected, and understands the current state in other regions.It is noted that those above-mentioned zone controllers 2, those equipment controls Node 3 processed need to have wireless network connection function with those sensors 4, use to establish being wirelessly connected each other.
In embodiment shown in FIG. 1, those zone controllers 2, those equipment control nodes 3 and those sensors 4 are By entity setting up to the corresponding position in the building 1, but not yet it is configured to complete.More specifically, those zone controllers 2, Those equipment control nodes 3 and those sensors 4 are by after the completion of entity setting up, it is also necessary to by user's manual configuration to connect It connects, and then establishes the above-mentioned area control system or method of automatic configuration disclosed by the invention, controlled by the respectively region Device 2 processed automatically configures the area network architecture of each region (configure), and establishes the above-mentioned area control system.
Referring to Fig.2, being the area control system Booting sequence figure of the first specific embodiment of the invention.The present invention to be executed The method of automatic configuration, user first need to be by those zone controllers 2, those equipment control nodes 3 and those sensors 4 It is respectively arranged at (step S10) on the corresponding position in respectively region 11-14 in the building 1.
Then, user enables those zone controllers 2, those equipment control nodes 3 be separately energized and open with those sensors 4 Dynamic (step S12).In the present embodiment, those zone controllers 2 can automatically configure an initial network framework after the starting that is powered (step S14).For example, a zone controller A can be after the starting that is powered, and the nearest equipment of automatic connection distance controls section Point A, and equipment control node A is enabled to connect the nearest sensor A of distance automatically, an initial Local Area Network frame is configured whereby Structure.However, above are only example of the present invention, step S14 not necessarily exists in the present invention.
Refering to Fig. 3, flow chart is automatically configured for the first specific embodiment of the invention.It is intended to execute that of the invention this is automatic Configuration method, then user need to use an additional configuration equipment (such as equipment 5 is configured shown in Fig. 4 A).In the present embodiment, The configuration equipment 5 is a kind of portable electronic device for having wireless network connection ability, such as tablet computer, notebook computer Or smart phone etc., it is not limited.One or more area network architecture models predetermined are stored in the configuration equipment 5 (area network architecture model T1 as shown in Figure 4 C), wherein respectively area network architecture model T1 records different networks respectively Topology, and those topology networks are respectively suitable for each different region 11-14.
It is that a kind of cellular logic topology (or is opened up for network correlation it is noted that signified topology network herein Piao).Each endpoint (such as zone controller 2, those equipment control nodes in the cellular logic topology essential record region 3 and those sensors 4) between logic connecting relation, rather than absolute connection relationship.For example, if an equipment control node A To the air-conditioning A in the A of control area, and a sensor A is set to region B, and a sensor B is set to region A.In this feelings Under condition, because being logic connecting relation rather than absolute connection relationship referenced by equipment control node A, equipment control Node A can preferentially be connect with the sensor B being located in the same area, without connecting sensor A.
In the present embodiment, user passes through the configuration equipment 5 first and searches neighbouring all 2 (steps of zone controller S20).It, can be in listing the clear of all zone controllers 2 searched on screen also, after the configuration equipment 5 is searched It is single.In the present embodiment, Wi-Fi direct, bluetooth is mainly can be used in the configuration equipment 5 and those zone controllers 2 (Bluetooth), purple honeybee (Zigbee), radio frequency (Radio Frequency, RF) or near-field communication (Near Field Communication, NFC) etc. wireless protocols, and the configuration equipment 5 searched according to above-mentioned wireless protocols it is neighbouring all The zone controller 2, but be not limited.
Then, user can operate the configuration equipment 5, and all zone controllers 2 searched in the configuration equipment 5 In, selection, which is intended to execute one, automatically configures one of the operation zone controller 2, as a target area controller (step S22). After step S22, which obtains the corresponding Local Area Network frame according to the region where the target area controller Structure model T1, and it is sent to the target area controller (step S24).
The area network architecture model T1 transmitted in step S24, where having recorded the target area controller The topology network used needed for region.It is noted that user can carry out customized above-mentioned Local Area Network of planning on demand Framework model T1, if there are two and or more than two regions need to use identical topology network, those regions can be corresponded to To the same area network architecture model T1.In this way, can be by the identical area network architecture model of reuse T1 reduces the time that user repeats planning.
Please refer to Fig. 4 A, Fig. 4 B and Fig. 4 C, the first connecting moves of the first specific embodiment respectively of the invention Figure, the second connecting moves figure and third connecting moves figure.
In the embodiment shown in Fig. 4 A, when the configuration equipment 5 is searched, can search nearby has a first area 61, one second area controller (ZC2) of controller (ZC1), 62, one third zone controller (ZC3) 63 and a fourth region control Device (ZC4) 64, wherein four zone controller 61-64 are separately positioned on four different regions.Meanwhile the configuration equipment 5 The four zone controller 61-64 searched can be subjected to list, and shown on a display screen 51 thereon, for making User selects.
Then as shown in the embodiment of Fig. 4 B, when user has selected one of four zone controller 61-64 After the target area controller, the configuration equipment 5 can directly controller establishes connection with the target area, to trigger the mesh Mark zone controller executes above-mentioned this and automatically configures operation.In the present embodiment, with the first area controller 61 as the target For zone controller.
It is noted that the configuration equipment 5 can first send a control command to the target area and control after successful connection Device (that is, the first area controller 61) processed has used prompting user at present to enable the target area controller issue light Which the target area controller for establishing connection is.Meanwhile user can judge that the target area is controlled by the light Whether device processed is really oneself selected zone controller (for example, judging whether the target area controller is located at user It is intended in the region of selection).
In the present embodiment, for enabling the target area controller issue light, user is reminded.In other realities It applies in example, so that the target area controller is issued the sound by the control command, or (figure is not via display thereon Mark) show that specific content should not be as limit to remind user.
Then as shown in the embodiment of Fig. 4 C, after the configuration equipment 5 establishes connection with the target area controller, this is matched Corresponding area network architecture model T1 can be obtained, and transmit according to the region where the target area controller by installing standby 5 To the target area controller.In the present embodiment, area network architecture model T1 is stored in the configuration equipment 5, and in this After configuration equipment 5 and the target area controller establish connection, it is sent to the target area controller.Only, in other embodiments In, also it can first be about to area network architecture model T1 before the target area controller is by entity setting up into the building 1 It is stored in the target area controller.In this embodiment, above-mentioned step S24 not necessarily exists.
It is the area network architecture model schematic diagram of the first specific embodiment of the invention please refer to Fig. 5.The region Network architecture model T1 has recorded a kind of topology network, and in the embodiment of Fig. 5, which includes a zone controller (ZC) 6, temperature and humidity sensors of lamp dimmer (LC) 72, two of fan governor (FC) 71, one (T/H sensor) 81 and a hot electric infrared sensor (PIR) 82, wherein the zone controller 6 connects the fan governor 71 and the lamp simultaneously Optical controller 72, the fan governor 71 connect two temperature and humidity sensors 81 simultaneously, the lamp dimmer 72 connects the heat Electric infrared sensor 82.
In Fig. 3 the embodiment described, which passes the area network architecture model T1 in step S24 It send to the target area controller, therefore, after when the target area, controller completes this and automatically configures operation, what configuration was completed The area network architecture and the area control system for establishing completion, it is necessary to being somebody's turn to do for area network architecture model T1 record Topology network is consistent.
More specifically, it if the target area controller uses area network architecture model T1 shown in fig. 5, builds Vertical area control system completed must be somebody's turn to do comprising the target area controller, one fan governor 71, one 72, two temperature and humidity sensors 81 of lamp dimmer and the hot electric infrared sensor 82, wherein the target area is controlled Device processed connects the fan governor 71 simultaneously and connect two temperature and humidity simultaneously with the lamp dimmer 72, the fan governor 71 Sensor 81, the lamp dimmer 72 connect the hot electric infrared sensor 82.Also, the described fan governor 71, the lamp Optical controller 72, two temperature and humidity sensors 81 and the hot electric infrared sensor 82 need to be located at the target area controller Among the same region.
After step S24, the target area controller by the configuration equipment 5 triggering, and according to the received area of institute Domain network architecture model T1, executes this and automatically configures operation, to automatically configure the area network architecture (step in region S26), and with one or more equipment control nodes 3 and one or more sensors 4 area control system is established jointly. More specifically, which finds out and nearby controls with the target area mainly by the calculating of a degree of relevancy The highest equipment control node 3 of the correlation of device processed and sensor 4.It uses, which can be with correlation highest One or more equipment control nodes 3 and one or more highest sensors 4 of correlation establish jointly the region control System.
In the present embodiment, which can be mainly that respectively this sets according to the calculated result of the degree of relevancy Standby control node 3 generates different scores (Cost) from the respectively sensor 4, with the comparison foundation as degree of relevancy, but not It is limited.
It is the zone controller configuration flow figure of the first specific embodiment of the invention please refer to Fig. 6.The above-mentioned step After rapid S24, which can receive the area network architecture model T1 (step S40) of the configuration equipment 5 transmission. Meanwhile the target area controller searches neighbouring all equipment control nodes 3 and the sensor 4, and carries out respectively above-mentioned The calculating (step S42) of the degree of relevancy.
In the present embodiment, the target area controller can respectively with all equipment control nodes 3 for searching and the sense It surveys device 4 to be attached, and analyzes the signal strength of respectively the equipment control node 3 and the respectively sensor 4.Furthermore the target area Domain controller can also obtain respectively all equipment control nodes 3 and the sense searched by a radio node location technology The relative position of device 4 is surveyed, and then calculates the target area controller and respectively the equipment control node 3 and respectively between the sensor 4 Distance.Whereby, which can calculate separately the respectively equipment by the signal strength and/or the distance The score of control node 3 and each sensor 4, and the target area controller and the respectively equipment are confirmed according to score height The height of the degree of relevancy of control node 3, and the respectively equipment control node 3 and the respectively degree of relevancy of the sensor 4 Just.In the present embodiment, the score is higher, indicates that degree of relevancy is higher, but be not limited.
After step S42, which is the content according to area network architecture model T1, and connection is related One or more highest equipment control nodes 3 (step S44) of property.Wherein, area network architecture model T1 has recorded the mesh The type and quantity for the equipment control node 3 that mark zone controller need to connect.
Also, the target area controller also according to area network architecture model T1 control connection this one or more set Standby control node 3 enables one or more equipment control nodes 3 be separately connected one or more highest (steps of sensor 4 of correlation Rapid S46).Wherein, area network architecture model T1 has recorded the sensor that one or more equipment control nodes 3 need to connect 4 type and quantity.Specifically, the target area controller is mainly the content according to area network architecture model T1, The which type of sensor 4 should be connected by informing those equipment control nodes 3 respectively, and the quantity that should be connected why.
After step S46, which is controlled according to the target area controller, one or more equipment Node 3 and one or more sensors 4, configure the area network architecture of region, and generate the corresponding Local Area Network frame Structure information is back to the configuration equipment 5 (step S48).So far, which completes this and automatically configures operation, And establish the area control system of region.
Fig. 3 is returned to, after controller completes this and automatically configures operation when the target area, which can receive should Area network architecture information (step S28) that target area controller transmits, wherein the area network architecture information has recorded The current area network architecture in the region.
After step S28, which makes in showing the area network architecture information on the display screen 51 Just whether user can judge the area network architecture that the target area controller is configured according to the area network architecture information Really (step S30).Specifically, user can determine whether the area network architecture of target area controller configuration meets One preset desired value.In the present invention, user mainly can foundation: the equipment control of (one) target area controller connection Whether whether the type of node 3 and quantity correct (being consistent with the content of area network architecture model T1);(2) those equipment The type of the sensor 4 that control node 3 is connected and quantity it is whether correct (whether in area network architecture model T1 Appearance is consistent);(3) whether the target area controller, those equipment control nodes 3 and those sensors 4 are located in the same area Deng judgement, confirm whether the area network architecture meets the preset desired value.
If thinking that the area network architecture is correct after judgement, the regional network after confirmation is replied by the configuration equipment 5 Network Schema information is to the target area controller (step S32).The target area controller is according to the received Local Area Network of institute Schema information reconfigures the area network architecture of final version, and establishes the area control system (step of final version S34)。
If judge that the area network architecture is incorrect in step S30, for example, the target area controller connection should The type and discrepancy of quantity of equipment control node 3 close the content of area network architecture model T1 record, the equipment control node 3 The type and discrepancy of quantity of the sensor 4 of connection close content or target area of area network architecture model T1 record Controller, those equipment control nodes 3 are located at different region etc. from those sensors 4, then 5 acceptable use of configuration equipment The peripheral operation of person is finely adjusted (fine tune) (step S36) with the content to the area network architecture information.
The purpose of above-mentioned step S36 is, by the part correcting of the target area controller configuration error, to meet this Preset desired value.After step S36, which transmits the area network architecture information after fine tuning to the target area Domain controller (step S38).It uses, which reconfigures according to the received area network architecture information of institute The area network architecture of final version, and establish the area control system (step S34) of final version.
Refering to Fig. 7, schematic diagram is postponed for matching for the first specific embodiment of the invention.In the embodiment of Fig. 7, the configuration Equipment 5 selects the zone controller 6 in the first area 11 as the target area controller, and transmits shown in fig. 5 The area network architecture model T1 gives the target area controller.It uses, which performs this and automatically configure After operation, area network architecture as shown in Figure 7 is configured for the first area 11 automatically.
In the embodiment of Fig. 7, which is connected to the fan governor 71 and the light Controller 72, the fan governor 71 connect two temperature and humidity sensors 81, which connects the thermoelectricity Infrared sensor 82, and the target area controller, the fan governor 71, the lamp dimmer 72, this two it is warm and humid Sensor 81 and the lamp dimmer 72 is spent all to be located in the first area 11.It will thus be seen that the target area controller institute The area network architecture of configuration and the local area network system established, are to record with area network architecture model T1 Topology network be consistent.Therefore, user can determine whether that the area network architecture is correct, it is preset to meet this after confirmation Desired value.
In the embodiment of Fig. 7, which can automatically configure correct Local Area Network frame for the first area 11 Structure, therefore user is not required to by any manual configuration, can quickly establish the area control system of the first area 11, in turn Save considerable setup time.
It is noted that as shown in fig. 7, the third region 13 adjacent to the first area 11, and in the third region 13 The zone controller 6 in the first area 11 of the fan governor 71.Therefore, when the zone controller 6 is searched simultaneously When connecting the fan governor 71, the correct fan governor 71 might connect to (that is, the wind in the first area 11 Fan controller 71), it also might connect to the fan governor 71 of mistake (that is, the fan control in the third region 13 Device 71).To solve the problems, such as 6 configuration error of zone controller, the invention proposes the technical solutions of aforementioned step S36.
Please refer to Fig. 8 A and Fig. 8 B, the area network architecture information of the first specific embodiment respectively of the invention is shown It is intended to and fine tuning schematic diagram.After the step S26 of Fig. 3, which can receive being somebody's turn to do for target area controller passback Area network architecture information, and be shown on the display screen 51.As shown in Figure 8 A, which can be in the display screen The page 511 is shown on 51, and via the received area network architecture information of the display page 511 display institute.It uses Person checks the area network architecture information by the display page 511, uses and confirms the target area controller region mesh Preceding area network architecture.
As shown in Figure 8 A, which shows the current area network architecture of region A, wherein ZC1 connects simultaneously LC1 and FC3 are met, LC1 connection PIR1, the FC3 while T/H sensor1 and T/H sensor2.If thinking after user's confirmation The area network architecture is wrong, then can be finely adjusted by the step S36 of above-mentioned Fig. 3 to the area network architecture.
For example, the ZC1, the LC1 and all positions the PIR1 first area 11 in the present embodiment, and the then position the FC3 In the third region 13.Specifically, there is another FC1 in the first area 11, and only, the distance between the FC3 and the ZC1 ratio The distance between the FC1 and ZC1 comes short.The ZC1 has found that the score of the FC3 is high after the calculating of the degree of relevancy In the score of the FC1, therefore the preferential attachment FC3.In this embodiment, user be can trigger on the display page 511 one micro- Key is adjusted, to enter a fine tuning page 512 and be finely adjusted to the area network architecture of region A.
As shown in Figure 8 B, the distance between the FC3 and the ZC1 are 1 meter, and score is 9 points, is searched for the ZC1 Highest score in all FC, therefore the ZC1 preferential attachment FC3.It, should although the FC1 and ZC1 is located at the same area The distance between FC1 and the ZC1 are 1.2 meters, and score is 8.8 points, the score lower than the FC3, therefore the ZC1 is executed and is somebody's turn to do certainly It, will not the preferential attachment FC1 when dynamic configuration operation.
By the fine tuning page 512, the FC1 is may be selected to modify the area network architecture information in user, is used, and enabling should The disconnected connection except with the FC3 of ZC1, and establish the connection with the FC1.It is noted that in the present embodiment, when user is in this When selecting any appliance control node (such as FC or LC) or sensor (such as PIR or T/H sensor) in the fine tuning page 512, this is matched Standby 5 capable of emitting control instructions are installed, the equipment control node selected is controlled or sensor issues light or the sound, to remind Whether user has selected correct object.
As described above, the configuration equipment 5 can generate the area network architecture letter after fine tuning after user determines and modifies It ceases, and is sent to the ZC1, whereby the area network architecture of the final version of the reconfigurable region A of the ZC1, and establish The area control system of the final version of region A.
Area control system and method for automatic configuration through the invention, the zone controller in each region can be by this After configuring the selection of equipment 5, configured automatically according to area network architecture model T1, to configure the Local Area Network of region Framework, and establish the area control system of region.In this way, which it is numerous to work as region involved in a building, and there is crowd When more area control systems is to be configured, a large amount of human configuration time can be saved.
In addition, the zone controller in each region can be also pre-filled with region and is applicable in other embodiments Area network architecture model T1.It uses, after respectively the zone controller is activated, respectively the zone controller can be automatically according to The area network architecture model T1 of interior storage select under those corresponding equipment control nodes and those sensors, and automatically with Establish connection.The practice through the foregoing embodiment, respectively the zone controller need not wait the configuration equipment 5 to transmit the regional network Network framework model T1, therefore can effectively promote the configuration speed of the respectively area control system.
Furthermore even if the result after zone controller automatically configures is wrong, user is only needed by the configuration equipment 5 Operation, can be finely adjusted easily, quite convenient.
The foregoing is merely preferred embodiments of the invention, and therefore, it does not limit the scope of the patents of the invention, therefore such as It with the equivalence changes carried out by the content of present invention, is similarly all included within the scope of the present invention, Chen Ming is given in conjunction.

Claims (20)

1. a kind of method of automatic configuration of area control system is realized by a configuration equipment, comprising:
A) select one of multiple regions controller for a target area controller;
B) the target area controller executes one and automatically configures operation to generate an area network architecture information;
C) the area network architecture information is received;
D) when judging that the area network architecture is correct, the area network architecture information to the target area after transmission confirmation is controlled Device processed;
E) when judging the area network architecture mistake, the area network architecture information to the target area after transmission fine tuning is controlled Device processed;And
F) after step d or step e, which matches again according to the received area network architecture information of institute The area network architecture is set, and establishes an area control system.
2. method of automatic configuration as described in claim 1 further includes wherein the following steps before step a:
A01 neighbouring multiple zone controller) is searched;And
A02) in the inventory for showing the multiple zone controller searched on a display screen.
3. method of automatic configuration as claimed in claim 2 further includes wherein a step a1 after step a: one control of transmission Order is to the target area controller, to enable the target area controller issue light.
4. method of automatic configuration as described in claim 1 further includes wherein a step a2 after step a: according to the target Region where zone controller obtains corresponding area network architecture model, and is sent to the target area controller, In the area network architecture model record the region use topology network, and the area network architecture and the region control be System is consistent with the topology network.
5. method of automatic configuration as claimed in claim 4, wherein the area control system includes the target area controller, extremely A few equipment control node and an at least sensor.
6. method of automatic configuration as claimed in claim 5, wherein step b includes the following steps:
B1) the target area controller receives the area network architecture model;
B2 neighbouring all equipment control nodes and the sensor) are searched;
B3) all equipment control nodes and the sensor for searching are carried out with the calculating of a degree of relevancy;
B4) one or more highest equipment control nodes of join dependency, the wherein class of one or more equipment control nodes Type is consistent with quantity with the topology network;
B5) one or more equipment control nodes of control connection are separately connected one or more highest sensors of correlation, Wherein the type with quantity of one or more sensors are consistent with the topology network;And
B6) according to the target area controller, one or more equipment control nodes and one or more sensor configurations area The domain network architecture, and generate the corresponding area network architecture information.
7. method of automatic configuration as claimed in claim 6, wherein step b3 is according to the respectively equipment control node and the respectively sense Survey device signal strength or the target area controller and respectively between the equipment control node and between the respectively sensor away from From respectively respectively the equipment control node with each sensor calculates a score, and carries out correlation journey with the height of the score The judgement of degree.
8. method of automatic configuration as claimed in claim 6, wherein in step e, in being somebody's turn to do for target area controller connection The type of a little equipment control nodes is not inconsistent with quantity and the topology network, or in those sensings of those equipment control nodes connection When the type and quantity of device and the topology network are not inconsistent, the area network architecture mistake is judged.
9. method of automatic configuration as claimed in claim 6, wherein in step e, in the target area controller, those equipment When control node and those sensors are not in the same area, the area network architecture mistake is judged.
10. method of automatic configuration as claimed in claim 6, wherein step e shows the Local Area Network by a configuration equipment Schema information, and receive a peripheral operation and the area network architecture information is finely adjusted, to generate the regional network after fine tuning Network Schema information, and reply the zone controller.
11. a kind of area control system is set in a region, comprising:
One sensor detects an indoor environment parameter or an Outdoor Air Parameters in the region;
One equipment control node, receives the indoor environment parameter or the Outdoor Air Parameters and the electronics controlled in the region is set It is standby, to adjust the environmental degree of comfort in the region;And
One zone controller connects the equipment control node, and controls the equipment control node and connect the sensor;
Wherein, which has an area network architecture model, which records region use Topology network, the zone controller is according to the zone controller, the equipment control node and the sensor configurations region One area network architecture, and the area network architecture is consistent with the topology network.
12. area control system as claimed in claim 11, wherein further including a configuration equipment, according to the zone controller institute Region obtain the corresponding area network architecture model, and be sent to the zone controller, which triggers the area Domain controller executes one and automatically configures operation, to configure the area network architecture in the region.
13. area control system as claimed in claim 12, wherein the zone controller automatically configures operation by this and searches Neighbouring all equipment control nodes and the sensor, and the calculating of a degree of relevancy is carried out, and the zone controller Highest equipment control node of content join dependency according to the area network architecture model, and control this of connection and set Standby highest sensor of control node join dependency.
14. area control system as claimed in claim 13, the equipment control node that wherein zone controller connects Type is consistent with quantity with the topology network, and the type of the sensor of equipment control node connection and quantity and the net Network topology is consistent.
15. area control system as claimed in claim 11, wherein the sensor is temperature and humidity sensor or hot electric infrared Sensor, the equipment control node are fan governor or lamp dimmer.
16. a kind of method of automatic configuration of area control system, applies among a region, which controls with a target area Device processed, the method for automatic configuration include:
A) the target area controller receives an area network architecture model, and wherein the area network architecture model records the region The topology network of use;
B) neighbouring an at least equipment control node and an at least sensor are searched;
C) calculating of a degree of relevancy is carried out to the equipment control node and the sensor for searching;
D) highest one or more equipment control nodes of join dependency, the wherein type of one or more equipment control nodes It is consistent with quantity with the topology network;
E) one or more equipment control nodes of control connection are separately connected highest one or more sensors of correlation, In the types of one or more sensors be consistent with quantity with the topology network;And
F) according to the target area controller, one or more equipment control nodes and one or more sensor configurations region An area network architecture.
17. method of automatic configuration as claimed in claim 16 further includes wherein the following steps before step a:
A01) the neighbouring multiple regions controller of a configuration equipment searching, wherein respectively the zone controller is respectively arranged at not same district Domain;
A02) in the inventory for showing the multiple zone controller searched on a display screen;
A03) select one of multiple zone controller as the target area controller;And
A04) the corresponding area network architecture model is obtained according to the region where the target area controller.
18. method of automatic configuration as claimed in claim 17, wherein further including the following steps:
G) after step f, which receives an area network architecture information of target area controller reply, wherein should Area network architecture information records the area network architecture in the region;
H) when judging that the area network architecture is correct, the area network architecture information to the target area after replying confirmation is controlled Device processed;
I) when judging the area network architecture mistake, the area network architecture information to the target area after replying fine tuning is controlled Device processed;And
J) after step h or step i, which reconfigures according to the received area network architecture information The area network architecture in the region, and establish an area control system in the region.
19. method of automatic configuration as claimed in claim 18, wherein step c according to one or more equipment control nodes with The signal strength of one or more sensors or the target area controller and one or more equipment control nodes and this one or The distance between multiple sensors, respectively one or more equipment control nodes and one or more sensors calculate one point Number, and with the judgement of the height of score progress degree of relevancy.
20. method of automatic configuration as claimed in claim 18, wherein in step i, in the target area controller, this one or When multiple equipment control node and one or more sensors are not in the same area, area network architecture mistake is judged Accidentally.
CN201410608028.3A 2014-10-30 2014-10-30 Area control system and its method of automatic configuration Active CN105629907B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410608028.3A CN105629907B (en) 2014-10-30 2014-10-30 Area control system and its method of automatic configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410608028.3A CN105629907B (en) 2014-10-30 2014-10-30 Area control system and its method of automatic configuration

Publications (2)

Publication Number Publication Date
CN105629907A CN105629907A (en) 2016-06-01
CN105629907B true CN105629907B (en) 2018-12-28

Family

ID=56044969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410608028.3A Active CN105629907B (en) 2014-10-30 2014-10-30 Area control system and its method of automatic configuration

Country Status (1)

Country Link
CN (1) CN105629907B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6414240B2 (en) * 2017-01-26 2018-10-31 ダイキン工業株式会社 Ventilation system
CN107392453A (en) * 2017-07-11 2017-11-24 武汉虹信技术服务有限责任公司 A kind of configuration device and method for dynamic configuration intelligent building management system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2271448A1 (en) * 1999-05-12 2000-11-12 Stuart Energy Systems Inc. Energy distribution network
US7734572B2 (en) * 2006-04-04 2010-06-08 Panduit Corp. Building automation system controller
US7725764B2 (en) * 2006-08-04 2010-05-25 Tsx Inc. Failover system and method
CN102385065A (en) * 2011-07-15 2012-03-21 广州市捷众科贸有限公司 Wireless area detection system
CN103176516B (en) * 2011-12-23 2016-07-06 英业达股份有限公司 The monitoring method of cabinet system and cabinet system

Also Published As

Publication number Publication date
CN105629907A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
EP3122000B1 (en) Controller setup method in a wireless building management system
JP6543282B2 (en) Method for managing a networked thermostat
US10002524B2 (en) Method and apparatus for controlling devices in home network system
EP1897332B1 (en) An apparatus and method of configuring a device in a network
US20140070919A1 (en) User Identification and Location Determination in Control Applications
US20140106735A1 (en) User Identification and Location Determination in Control Applications
US20140129006A1 (en) Smart gateway, smart home system and smart controlling method thereof
US11867420B2 (en) Backup control for HVAC system with headless thermostat
US11300308B2 (en) Faceless system control
US10326658B2 (en) Zone control system and method of automatically configuring the same
CN106681194B (en) The autocontrol method of zone controller
CN104122999A (en) Intelligent device interaction method and system
US20200374149A1 (en) Systems and methods for the implementation of an ai/iot hub in the control of electrical devices, electronics and appliances
CN105629907B (en) Area control system and its method of automatic configuration
US20230032735A1 (en) Next generation touchless building controls
KR102596220B1 (en) Lighting control platform system through user taste and environmental pattern analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant