CN105610157B - A kind of area power grid static security analysis system of failure driving - Google Patents

A kind of area power grid static security analysis system of failure driving Download PDF

Info

Publication number
CN105610157B
CN105610157B CN201610052284.8A CN201610052284A CN105610157B CN 105610157 B CN105610157 B CN 105610157B CN 201610052284 A CN201610052284 A CN 201610052284A CN 105610157 B CN105610157 B CN 105610157B
Authority
CN
China
Prior art keywords
deduction
equipment
subsystem
points value
risk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610052284.8A
Other languages
Chinese (zh)
Other versions
CN105610157A (en
Inventor
申永强
张昀
王飞
李萍
周铭遥
陈芬
程秀娟
王璐
王玉生
胡婷婷
郝红
王兴飞
刘晓婧
孙祝寿
迟丽芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610052284.8A priority Critical patent/CN105610157B/en
Publication of CN105610157A publication Critical patent/CN105610157A/en
Application granted granted Critical
Publication of CN105610157B publication Critical patent/CN105610157B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Power Engineering (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Whether, the invention discloses a kind of area power grid static security analysis system of failure driving, its On-line Fault analyzing subsystem downloads the warning information that main website collects, analyze and broken down in operation of power networks;Collect all(It is doubtful)Faulty equipment and change bit switch, faulty equipment list and displacement switch list are formed, as startup event, static security analysis subsystem is passed to by far call;Static security analysis subsystem analysis calculates starts Risk Calculation subsystem by far call;Risk Calculation subsystem starts calculating process, calculates power network present risk value;Man-machine interface shows result, including faulty equipment, trip switch, correlation protection action message, overload prevention device, the bus of voltage out-of-limit and power grid risk value;The present invention scores for electric network security, assesses power network current safety grade, reduces the scope and number of calculating, greatly reduce calculating pressure, substantially increase the engineering practicability of static security analysis system.

Description

A kind of area power grid static security analysis system of failure driving
Technical field:
The present invention relates to a kind of area power grid static security analysis system of failure driving, belong to Automation of Electric Systems skill Art field, suitable for area power grid intelligent control main website, intelligent Ji Kong main websites and intelligent allocation integration main website, it is also applied for having The intelligent power distribution main website of standby condition(Hereinafter referred to as " main website ").
Background technology:
Contingency Analysis of Power Systems is to after systematic failures referred to as " N-1 scannings "(Or after forecast accident occurs)Electricity The steady-state operation situation of net is analyzed(Such as the security and margin of safety of generator, line disconnection post analysis power network).Engineering Using when, often to operating state power network in real time(Or the power network under a certain research state), it is first one by one according to N-1 principles, research After part is out of service, if other elements overload and node voltage can be caused out-of-limit, and for it is some of it is out-of-limit, overload that provide can Selective adjustable strategies.
Early stage static security analysis more using AC power flow and DC power flow come decision-making system security, but as power network is advised Mould expands, and its practicality receives huge challenge.In recent years, two key points of static security analysis research were how to reduce to treat Analysis(Anticipation)Accident Number and the speed for how accelerating analysis calculating.
At present, the static security analysis system in engineer applied, there are artificial triggering, cycle triggering and event triggering etc. several Starting mode.Artificial triggering is to start the triggering analysis of static security analysis software by operations staff, and this is the triggering used earliest Mode.Opportunity for manually triggering relies on the experience of operations staff, when triggers, triggers under the conditions of which kind of, it is difficult to hold, therefore When power network occurs abnormal, it is likely that miss the analysis time of most worthy, it is difficult to find the weak link of system in time.Cycle touches Hair is to utilize timer, sets a time cycle(Such as 15 minutes), time is up once analyzes with regard to triggering.Cycle triggering can To mitigate the pressure of operations staff, but still the analysis time of most worthy may be missed, can not ensure timely to find system Weak link.To solve the deficiency of artificial triggering, cycle triggering, event triggering is arisen at the historic moment.Event triggering is periodically to catch The switch changed position information in system is caught, using switch changed position all in power network in a timeslice as an event, to trigger Analysis.Currently, network system is on a grand scale, and switch changed position is more and frequent in system, runs the service of static security analysis system Device calculating pressure is very big, therefore scene is typically not provided with " event-driven ", and its practical level is very limited.
Which kind of in addition, no matter triggered using mode, the result that N-1 scanning analysis are calculated, the exhibition more in a manner of list Show, person on duty is difficult to grasp all list informations rapidly, lacks the concept of a quantization to the security of current electric grid.
The content of the invention:
One kind is provided by electric network fault equipment and association it is an object of the invention to overcome the shortcomings of above-mentioned prior art Become bit switch and be used as event, to drive static security analysis system to complete quick analysis calculating, and the method for introducing risk assessment, Scored for electric network security, assess power network current safety grade, reduce the scope and number of calculating, greatly reduce operation The calculating pressure of static security analysis system server, substantially increase the failure of the engineering practicability of static security analysis system The area power grid static security analysis system of driving.
The purpose of the present invention can be reached by following measure:A kind of area power grid static security analysis of failure driving System, it is characterised in that it is made up of On-line Fault analyzing subsystem, static security analysis subsystem and Risk Calculation subsystem;
(1)On-line Fault analyzing subsystem downloads the warning information that collects of main website, analysis obtain in operation of power networks there occurs Failure;
(2)The analysis of On-line Fault analyzing subsystem is out of order, and collects all faulty equipments or suspected malfunctions equipment and change Bit switch, faulty equipment list and displacement switch list are formed, as the event of startup, static security is passed to by far call Analyzing subsystem;
(3)Static security analysis subsystem starts, and starts analysis and calculates;
(4)Static security analysis subsystem, which calculates, to be terminated, and by far call, starts Risk Calculation subsystem;
(5)Risk Calculation subsystem starts calculating process, calculates power network present risk value;
(6)Man-machine interface show result, including faulty equipment, trip switch, correlation protection action message, overload prevention device, The bus and power grid risk value of voltage out-of-limit;
(7)On-line Fault analyzing subsystem continues to download the warning information that main website collects, and analysis is obtained in operation of power networks not Break down, do not start(2)、(3)、(4)、(5)、(6)Processing;
(8)Whether On-line Fault analyzing subsystem continues to download the warning information that main website collects, analyze and sent out in operation of power networks Raw failure, it is faulty, start(2)、(3)、(4)、(5)、(6)Processing;Fault-free, press(7)Processing.
In order to further realize the purpose of the present invention, described On-line Fault analyzing subsystem downloads various alarms from main website Information, first filtering maintenance, debug, warning information caused by cold standby equipment, then detect relevant with electric network fault in warning information Protection information and switch changed position information, judge grid collapses, and by preset " protection --- equipment " incidence relation, It is aided with topological analysis, judges faulty equipment or suspected malfunctions equipment, then collects the change bit switch of correlation, generation faulty equipment row Table, displacement switch list, using them as startup event, pass to static security analysis subsystem by far call, drive Static security analysis subsystem is calculated;Meanwhile fault message is sent to alarm and shows boundary by On-line Fault analyzing subsystem Face;
Described On-line Fault analyzing subsystem calling appraisal of equipment, the fault history of appraisal of equipment bonding apparatus, Equipment one " normal ", " attention ", the state of "abnormal" or " urgent " are given, and updates equipment information database;Facility information The state of equipment or the artificial mark of inserting of releasing are modified by " state is inserted " in database;The state inserted, which has, " stops With ", " cold standby ", " maintenance ", four kinds of " debugging ";" deactivation ", " cold standby ", " maintenance ", the equipment of " debugging " are inserted, is not involved in Risk Calculation;
Described static security analysis subsystem is started analysis and calculated using faulty equipment list and displacement switch list, meter Calculate result and be transported to the out-of-limit showing interface of overload;
Described static security analysis subsystem calls breakdown loss to calculate, and calculates the reality in the case of power network current failure Breakdown loss, out-of-limit, the overload percentage of current operational outfit, then update equipment information database;Power network is normally transported again Capable equipment, according to N-1 principles, breakdown loss calculating is carried out, calculate the loss of the forecast failure after each equipment forecast failure, mistake Percentage, out-of-limit percentage are carried, is saved in equipment information database;
Described static security analysis subsystem calls appraisal of equipment, and appraisal of equipment bonding apparatus is out-of-limit, the history of overload Record, equipment one " normal ", " attention ", the state of "abnormal" or " urgent " are given, and update equipment information database;If therefore Barrier analyzing subsystem and static security analysis subsystem make different evaluation to the state of same equipment, take the state that consequence is serious It is defined;Static security analysis subsystem is completed analysis and calculated, and starts Risk Calculation by remote procedure call;
Described Risk Calculation subsystem risk defines instrument and is used for defining equipment failure rate, power grid risk etc. Level, risk class deduction of points value, breakdown loss deduction of points value, apparatus overload deduction of points value, equipment voltage out-of-limit deduction of points value;
The span of described equipment failure rate is(0,1);
Described power grid risk grade is set to VI, V, IV, III, II, I 6 rank, I level risk highests;Each risk etc. The corresponding risk class deduction of points value of level, risk class deduction of points value is a score range;
Described breakdown loss has two kinds, and one kind is physical fault loss, and one kind is forecast failure loss, and its deduction of points value is all It is comprehensive loss load, customer interrupted number, a deduction of points value corresponding to customer interrupted grade;
Described apparatus overload deduction of points value is
1)For 35kV/110kV/220kV/500kV circuit overloads deduction of points value is defined according to overload percentage;
2)For 35kV/110kV/220kV main transformer overloads deduction of points value is defined according to overload percentage;
Described equipment voltage out-of-limit deduction of points value be for 10kV/35kV/110kV/220kV buses it is out-of-limit according to out-of-limit percentage Than defining deduction of points value;
All information that risk defines instrument definition are saved in risk and defined in file;
Reading risk defines the information in file when described Risk Calculation subsystem starts, when Risk Calculation subsystem connects The computations of static security analysis subsystem is received, is read in slave unit information database:
(1)Power network physical fault is lost;
(2)The state of operational outfit, failure overload in power network/out-of-limit percentage, forecast failure loss, anticipation overload/are got over Limit percentage;
After reading above- mentioned information, Risk Calculation subsystem is calculated:
1)Lost by power network physical fault, deduction of points value 1 is calculated;
2)Grid operation equipment is traveled through, calculates its failure overload, the out-of-limit deduction of points value of failure, computational methods are:
(Anticipation overload deduction of points is worth+envisioned voltage out-of-limit deduction of points value)× failure rate;
3)Detection 2)Middle deduction of points value highest equipment, and its deduction of points value is designated as deduction of points value 2;
4)The deduction of points value that forecast failure occurs for each operational outfit is calculated, computational methods are:
(Breakdown loss deduction of points value+anticipation overload deduction of points is worth+envisions voltage out-of-limit deduction of points value)× failure rate;
5)Detection 4)After middle generation forecast failure, deduction of points value highest equipment, and its deduction of points value is designated as deduction of points value 3;
6)Deduction of points value 1+ deduction of points value 2+ deduction of points value 3=total penalties values;
7)With 6)In total penalties value go match power grid risk grade score range;
The risk class of current electric grid is output to risk displaying interface.
The present invention can produce following good effect compared with the prior art:The present invention develops a kind of failure for area power grid and driven Dynamic static security analysis system, when being broken down in power network, by faulty equipment with associate become bit switch as event, to drive Dynamic system is completed quick analysis and calculated, it is ensured that catches the analysis time of most worthy, prompts the weak link of power network in time;Introduce Methods of risk assessment, the security to power network score, assess electric network security grade, allow operations staff's moment to electric network security There is the concept of quantization, so as to improve the safety operation level of power network;Due to faulty equipment with associate displacement number of switches be much smaller than The number of switch changed position in conventional event triggering, the scope and number of calculating are reduced, greatly reduces operation static security point The calculating pressure of analysis system server, substantially increase the engineering practicability of static security analysis system.
Brief description of the drawings:
Fig. 1 is the overall plan schematic diagram of the present invention;
Fig. 2 is specific embodiments of the present invention schematic diagram.
Embodiment:
The embodiment of the present invention is elaborated below in conjunction with the accompanying drawings:
Embodiment:A kind of area power grid static security analysis system of failure driving(Referring to Fig. 1), it is by On-line Fault point Analysing subsystem, static security analysis subsystem and Risk Calculation subsystem, altogether 3 subsystems are formed;Its workflow is as follows:
(1)On-line Fault analyzing subsystem downloads the warning information that collects of main website, analysis obtain in operation of power networks there occurs Failure;
(2)The analysis of On-line Fault analyzing subsystem is out of order, and collects all faulty equipments or suspected malfunctions equipment and change Bit switch, faulty equipment list and displacement switch list are formed, as the event of startup, static security is passed to by far call Analyzing subsystem;
(3)Static security analysis subsystem starts, and starts analysis and calculates;
(4)Static security analysis subsystem, which calculates, to be terminated, and by far call, starts Risk Calculation subsystem;
(5)Risk Calculation subsystem starts calculating process, calculates power network present risk value;
(6)Man-machine interface show result, including faulty equipment, trip switch, correlation protection action message, overload prevention device, The bus and power grid risk value of voltage out-of-limit;
(7)On-line Fault analyzing subsystem continues to download the warning information that main website collects, and analysis is obtained in operation of power networks not Break down, do not start(2)、(3)、(4)、(5)、(6)Processing;
(8)Whether On-line Fault analyzing subsystem continues to download the warning information that main website collects, analyze and sent out in operation of power networks Raw failure, it is faulty, start(2)、(3)、(4)、(5)、(6)Processing;Fault-free, press(7)Processing.
Wherein(Referring to Fig. 2),
1st, On-line Fault analyzing subsystem
On-line Fault analyzing subsystem downloads various warning information from main website, first filtering maintenance, debugging, the production of cold standby equipment Raw warning information, then detect protection information relevant with electric network fault in warning information(Including accident is total, protection exit, again Combined floodgate, prepared auto restart and voltage to frequency control action information)With switch changed position information, grid collapses are judged, and by preset " protect --- equipment " incidence relation, it is aided with topological analysis, judges faulty equipment(Or suspected malfunctions equipment), then collect correlation Change bit switch, generation faulty equipment list, displacement switch list, using them as startup event, pass through far call transmission Static security analysis subsystem is given, driving static security analysis subsystem is calculated;Meanwhile On-line Fault analyzing subsystem will Fault message is sent to alarm display interface, for operations staff's reference, confirms.
On-line Fault analyzing subsystem calls appraisal of equipment, the fault history of appraisal of equipment bonding apparatus, gives and sets The state of standby one " normal ", " attention ", "abnormal" or " urgent "(The order of severity raises from front to back), and update facility information Database.
The original state of each equipment in equipment information database, is imported from the area of safety III, and IIIth area is each safely sets Standby state, it is that electric company carries out the conclusion that equipment evaluation work is drawn.The state of equipment in equipment information database(Or solution Except manually inserting mark)Modified by " state is inserted ".
Operations staff uses the state of an equipment in " state is inserted " modification status information of equipment database(Or release people Work inserts mark), the state inserted has " deactivation ", " cold standby ", " maintenance ", four kinds of " debugging ".Insert the state of an equipment Afterwards, stamped in status information of equipment database to this equipment and insert mark.On-line Fault analyzing subsystem(It is and described below Static security analysis subsystem)The state of insertion apparatus can not be updated, unless operations staff uses " state is inserted " to relieve It inserts mark.
" deactivation ", " cold standby ", " maintenance ", the equipment of " debugging " are inserted, is not involved in Risk Calculation.
2nd, static security analysis subsystem
Static security analysis subsystem uses startup event(That is faulty equipment list and displacement switch list), start analysis Calculate, result of calculation(Overload, more limit information)The out-of-limit showing interface of overload is transported to, is referred to for operations staff.
Static security analysis subsystem calls breakdown loss to calculate, and calculates the physical fault damage in the case of power network current failure Lose(Lose load, customer interrupted number, customer interrupted grade), out-of-limit, the overload percentage of current operational outfit, then update and set Standby information database;Again by the equipment of power network normal operation, according to N-1 principles, breakdown loss calculating is carried out, calculates each equipment Forecast failure loss after forecast failure(Lose load, customer interrupted number, customer interrupted grade), overload percentage, out-of-limit hundred Divide ratio, be saved in equipment information database.
Static security analysis subsystem calls appraisal of equipment, and appraisal of equipment bonding apparatus is out-of-limit, the historical record of overload, gives Equipment one " normal ", " attention ", the state of "abnormal" or " urgent " are given, and updates equipment information database.If accident analysis Subsystem and static security analysis subsystem make different evaluation to the state of same equipment, and the state for taking consequence serious is defined.
Static security analysis subsystem is completed analysis and calculated, and starts Risk Calculation by remote procedure call.
3rd, Risk Calculation subsystem
Risk defines instrument and is used for defining equipment failure rate, power grid risk grade, risk class deduction of points value, failure damage Lose deduction of points value, apparatus overload deduction of points value, equipment voltage out-of-limit deduction of points value.
The span of equipment failure rate is(0,1).When defining equipment failure rate, equipment state, electricity are considered 3 grade, device type key elements are pressed, such as:When 110kV line status is " attention ", failure rate is set to 0.1, and state is Failure rate is set to 0.3 during "abnormal";Failure rate is set to 0.3 when 10kV line status is " attention ", and state is " different Failure rate is set to 0.5 when often ".Equipment failure rate is empirical value, dependent on historical statistical data and operations staff Experience is, it is necessary to constantly amendment in the application.
Power grid risk grade is set to VI, V, IV, III, II, I 6 rank, I level risk highests.
The corresponding risk class deduction of points value of each risk class, risk class deduction of points value are a score ranges, such as I Deduction of points value >=1000 corresponding to level.
Breakdown loss has two kinds, and one kind is physical fault loss, and one kind is forecast failure loss, and its deduction of points value is all comprehensive Lose load, customer interrupted number, a deduction of points value corresponding to customer interrupted grade.
Apparatus overload deduction of points value is
(1)For 35kV/110kV/220kV/500kV circuit overloads deduction of points value is defined according to overload percentage;
(2)For 35kV/110kV/220kV main transformer overloads deduction of points value is defined according to overload percentage.
Equipment voltage out-of-limit deduction of points value is to be defined for 10kV/35kV/110kV/220kV buses are out-of-limit according to out-of-limit percentage Deduction of points value.
All information that risk defines instrument definition are saved in risk and defined in file.
Risk is read when Risk Calculation subsystem starts and defines information in file, when Risk Calculation subsystem receive it is quiet The computations of state safety analysis subsystem, read in slave unit information database:
(1)Power network physical fault is lost;
(2)The state of operational outfit, failure overload in power network/out-of-limit percentage, forecast failure loss, anticipation overload/are got over Limit percentage;
After reading above- mentioned information, Risk Calculation subsystem is calculated:
1)Lost by power network physical fault, deduction of points value 1 is calculated;
2)Grid operation equipment is traveled through, calculates its failure overload, the out-of-limit deduction of points value of failure, computational methods are:
(Anticipation overload deduction of points is worth+envisioned voltage out-of-limit deduction of points value)× failure rate;
3)Detection 2)Middle deduction of points value highest equipment, and its deduction of points value is designated as deduction of points value 2;
4)The deduction of points value that forecast failure occurs for each operational outfit is calculated, computational methods are:
(Breakdown loss deduction of points value+anticipation overload deduction of points is worth+envisions voltage out-of-limit deduction of points value)× failure rate;
5)Detection 4)After middle generation forecast failure, deduction of points value highest equipment, and its deduction of points value is designated as deduction of points value 3;
6)Deduction of points value 1+ deduction of points value 2+ deduction of points value 3=total penalties values;
7)With 6)In total penalties value go match power grid risk grade score range;
The risk class of current electric grid be output to risk displaying interface, for operations staff refer to, and can have access to deduction of points value, Deduction of points item.
The embodiment of the present invention is only used for that the present invention is further illustrated, not exhaustive, does not form to claim The restriction of protection domain, the enlightenment that those skilled in the art obtain according to embodiments of the present invention, without creative work with regard to energy Enough expect other substantially equivalent replacements, all fall in the scope of protection of the present invention.

Claims (1)

1. a kind of area power grid static security analysis system of failure driving, it is characterised in that it analyzes subsystem by On-line Fault System, static security analysis subsystem and Risk Calculation subsystem are formed;
(1)On-line Fault analyzing subsystem downloads the warning information that collects of main website, and analysis obtains in operation of power networks that there occurs failure;
(2)The analysis of On-line Fault analyzing subsystem is out of order, and collects all faulty equipments or suspected malfunctions equipment and displacement is opened Close, form faulty equipment list and displacement switch list, as the event of startup, static security analysis is passed to by far call Subsystem;
(3)Static security analysis subsystem starts, and starts analysis and calculates;
(4)Static security analysis subsystem, which calculates, to be terminated, and by far call, starts Risk Calculation subsystem;
(5)Risk Calculation subsystem starts calculating process, calculates power network present risk value;
(6)Man-machine interface shows result, including faulty equipment, trip switch, correlation protection action message, overload prevention device, voltage Out-of-limit bus and power grid risk value;
(7)On-line Fault analyzing subsystem continues to download the warning information that main website collects, and analysis obtains not occurring in operation of power networks Failure, do not start(2)、(3)、(4)、(5)、(6)Processing;
(8)On-line Fault analyzing subsystem continues to download the warning information that main website collects, and analyzes in operation of power networks event whether occurs Barrier, it is faulty, start(2)、(3)、(4)、(5)、(6)Processing;Fault-free, press(7)Processing;
Described On-line Fault analyzing subsystem downloads various warning information from main website, first filtering maintenance, debugging, cold standby equipment Caused warning information, then protection information relevant with electric network fault in warning information and switch changed position information are detected, judge electricity Net breaks down, and by preset " protection --- equipment " incidence relation, is aided with topological analysis, judges faulty equipment or doubtful Faulty equipment, then collect the change bit switch of correlation, the list of generation faulty equipment, displacement switch list, using them as startup thing Part, static security analysis subsystem is passed to by far call, driving static security analysis subsystem is calculated;Meanwhile Fault message is sent to alarm display interface by On-line Fault analyzing subsystem;
Described On-line Fault analyzing subsystem calls appraisal of equipment, the fault history of appraisal of equipment bonding apparatus, gives Equipment one " normal ", " attention ", the state of "abnormal" or " urgent ", and update equipment information database;Facility information data The state of equipment or the artificial mark of inserting of releasing are modified by " state is inserted " in storehouse;The state inserted has " deactivation ", " cold It is standby ", " maintenance ", four kinds of " debugging ";" deactivation ", " cold standby ", " maintenance ", the equipment of " debugging " are inserted, is not involved in risk meter Calculate;
Described static security analysis subsystem is started analysis and calculated using faulty equipment list and displacement switch list, calculates knot Fruit is transported to the out-of-limit showing interface of overload;
Described static security analysis subsystem calls breakdown loss to calculate, and calculates the physical fault in the case of power network current failure Loss, out-of-limit, the overload percentage of current operational outfit, then update equipment information database;Again by power network normal operation Equipment, according to N-1 principles, breakdown loss calculating is carried out, calculate the loss of the forecast failure after each equipment forecast failure, overload hundred Point than, out-of-limit percentage, equipment information database is saved in;
Described static security analysis subsystem calls appraisal of equipment, and appraisal of equipment bonding apparatus is out-of-limit, the historical record of overload, Equipment one " normal ", " attention ", the state of "abnormal" or " urgent " are given, and updates equipment information database;If failure point Analysis subsystem and static security analysis subsystem make different evaluation to the state of same equipment, and the state for taking consequence serious is It is accurate;Static security analysis subsystem is completed analysis and calculated, and starts Risk Calculation by remote procedure call;
Described Risk Calculation subsystem risk defines instrument and is used for defining equipment failure rate, power grid risk grade, wind Dangerous grade deduction of points value, breakdown loss deduction of points value, apparatus overload deduction of points value, equipment voltage out-of-limit deduction of points value;
The span of described equipment failure rate is(0,1);
Described power grid risk grade is set to VI, V, IV, III, II, I 6 rank, I level risk highests;Each risk class pair A risk class deduction of points value is answered, risk class deduction of points value is a score range;
Described breakdown loss has two kinds, and one kind is physical fault loss, and one kind is forecast failure loss, and its deduction of points value is all comprehensive Close loss load, customer interrupted number, a deduction of points value corresponding to customer interrupted grade;
Described apparatus overload deduction of points value is
For 35kV/110kV/220kV/500kV circuit overloads deduction of points value is defined according to overload percentage;
For 35kV/110kV/220kV main transformer overloads deduction of points value is defined according to overload percentage;
Described equipment voltage out-of-limit deduction of points value is to determine for 10kV/35kV/110kV/220kV buses are out-of-limit according to out-of-limit percentage Adopted deduction of points value;
All information that risk defines instrument definition are saved in risk and defined in file;
Reading risk defines the information in file when described Risk Calculation subsystem starts, when Risk Calculation subsystem receives The computations of static security analysis subsystem, read in slave unit information database:
Power network physical fault is lost;
The state of operational outfit, failure overload/out-of-limit percentage, forecast failure loss, anticipation overload/out-of-limit percentage in power network Than;
After reading above- mentioned information, Risk Calculation subsystem is calculated as follows:
1)Lost by power network physical fault, deduction of points value 1 is calculated;
2)Grid operation equipment is traveled through, calculates its failure overload, the out-of-limit deduction of points value of failure, computational methods are:
(Anticipation overload deduction of points is worth+envisioned voltage out-of-limit deduction of points value)× failure rate;
3)Detect above-mentioned 2)Middle deduction of points value highest equipment, and its deduction of points value is designated as deduction of points value 2;
4)The deduction of points value that forecast failure occurs for each operational outfit is calculated, computational methods are:
(Breakdown loss deduction of points value+anticipation overload deduction of points is worth+envisions voltage out-of-limit deduction of points value)× failure rate;
5)Detect above-mentioned 4)After middle generation forecast failure, deduction of points value highest equipment, and its deduction of points value is designated as deduction of points value 3;
6)Deduction of points value 1+ deduction of points value 2+ deduction of points value 3=total penalties values;
7)With above-mentioned 6)In total penalties value go match power grid risk grade score range;
The risk class of current electric grid is output to risk displaying interface.
CN201610052284.8A 2016-01-27 2016-01-27 A kind of area power grid static security analysis system of failure driving Expired - Fee Related CN105610157B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610052284.8A CN105610157B (en) 2016-01-27 2016-01-27 A kind of area power grid static security analysis system of failure driving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610052284.8A CN105610157B (en) 2016-01-27 2016-01-27 A kind of area power grid static security analysis system of failure driving

Publications (2)

Publication Number Publication Date
CN105610157A CN105610157A (en) 2016-05-25
CN105610157B true CN105610157B (en) 2018-01-09

Family

ID=55989788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610052284.8A Expired - Fee Related CN105610157B (en) 2016-01-27 2016-01-27 A kind of area power grid static security analysis system of failure driving

Country Status (1)

Country Link
CN (1) CN105610157B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109167354B (en) * 2018-10-08 2022-02-22 国网天津市电力公司电力科学研究院 Power grid expected fault parallel analysis and calculation method based on file exchange

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917001B (en) * 2010-07-13 2012-08-29 东北电力大学 Fault sequencing method for on-line static security analysis of power system
CN102163878B (en) * 2011-03-17 2013-06-12 国电南瑞科技股份有限公司 Method for classifying and realizing integral alarm facing to dispatching running way
CN103208049B (en) * 2013-04-25 2016-10-05 国家电网公司 Abnormality alarming quick accident analysis method and system

Also Published As

Publication number Publication date
CN105610157A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN104578426B (en) Detection method for information comprehensive analysis and intelligent alarming application
CN106908690A (en) Distributed intelligence warning system and its method for diagnosing faults between boss station
CN103489138B (en) The Controlling UEP method of a kind of power transmission network failure message and the out-of-limit information of circuit
CN110941918A (en) Intelligent substation fault analysis system
CN109001596B (en) Power grid fault diagnosis and power transmission line parameter identification system
CN103218754B (en) A kind of risk checking method of Forming Electrical Dispatching Command Tickets and device
CN105158647B (en) Dan Zhanduan electric network failure diagnosis and aid decision-making method based on grid monitoring system
CN108876197B (en) Power equipment cluster and group analysis system
CN104331042A (en) State evaluation method of hydropower plant computer monitoring system
CN103227450B (en) On-line failure recovery method and system
CN110515333B (en) Intelligent Internet of things terminal box, ubiquitous power Internet of things platform and application method thereof
CN112713649A (en) Power equipment residual life prediction method based on extreme learning machine
CN110046782A (en) A kind of automatic identifying method of power grid accident tripping monitoring information problem
CN110739637A (en) power transmission line monitoring method, system, terminal and storage medium
CN103208049A (en) Quick accident analysis method and system for abnormal alarm
CN105119237A (en) Method of operating and checking under relay protection
CN109741653B (en) Intelligent power failure emergency treatment training simulation method based on reasoning
CN105610157B (en) A kind of area power grid static security analysis system of failure driving
CN104600680A (en) Intelligent alarming method based on data fusion
CN106487004A (en) Intelligent substation one electrical secondary system runs hidden danger Intelligent drainage checking method
CN106199251A (en) A kind of distribution network failure early warning system analyzed based on adaptive modeling and method
CN101943722A (en) On-line detecting device for surge protector
CN106877503A (en) Risk identification and method for early warning in secondary device intelligence operational system
CN103346544A (en) Electric power line distance III-section protection misoperation hidden danger eliminating method and device
CN115378127A (en) Fault depth diagnosis method based on multi-dimensional data real-time analysis of power grid equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180109

Termination date: 20200127