CN105608847B - A kind of inland river double fuel Power Vessel security control system - Google Patents
A kind of inland river double fuel Power Vessel security control system Download PDFInfo
- Publication number
- CN105608847B CN105608847B CN201510977042.5A CN201510977042A CN105608847B CN 105608847 B CN105608847 B CN 105608847B CN 201510977042 A CN201510977042 A CN 201510977042A CN 105608847 B CN105608847 B CN 105608847B
- Authority
- CN
- China
- Prior art keywords
- plc controller
- combustible gas
- cabin
- electrically connected
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/02—Alarms for ensuring the safety of persons
- G08B21/12—Alarms for ensuring the safety of persons responsive to undesired emission of substances, e.g. pollution alarms
- G08B21/16—Combustible gas alarms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B45/00—Arrangements or adaptations of signalling or lighting devices
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Toxicology (AREA)
- Environmental & Geological Engineering (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of inland river double fuel Power Vessel security control system, including main control cabinet, point aobvious control flow, six combustible gas probes, combined aural and visual alarm, general alarm system and second level security systems.When any of six combustible gas probes detect that combustable gas concentration is higher than 30%LEL, PLC controller sends instructions to master control screen, point aobvious control flow and combined aural and visual alarm respectively, master control screen, a point aobvious control flow show fuel gas danger signal and danger source place, light crossing-signal then signal an alert;If carrying out dangerous releasing without staff at this time and resetting, after the minute that is delayed, full ship general alarm system is triggered;When any of six combustible gas probes detect that combustable gas concentration continues to increase and be higher than 45%LEL, while acoustic-optic alarm and second level security system are triggered, cutting gas tank supplies main valve, then double fuel supply is converted to diesel fuel mode from dual fuel mode.
Description
Technical field
The present invention relates to a kind of inland river double fuel Power Vessel security control systems, belong to engine room automation control technology neck
Domain.
Background technique
Security inspection and control system is the safety assurance of the operation of double fuel Power Vessel and the weight of cabin detection system
Want the critical system of component part and diesel-LNG double fuel or even the mono- fuels and energy ship of LNG.It for monitoring ship in real time
The peripheral electromechanical parameters ensured are done in upper all dual fuel engine operations, when tested measuring point data is more than to limit to be worth, aboard ship
It formulates position and issues sound-light alarm, and the unmanned reset such as within 2 minutes of this system alarm failure, then extend to the general report of full ship
Alert system.Wherein when operative sensor data further offset from predefined parameter, then starts second class protection, issue the same of sound-light alarm
When, the corresponding gas supply valve group of output action instruction, directly cutting prevents dangerous further upgrading, while dual fuel engine
Diesel fuel mode can be automatically converted to continue to navigate by water.But when can not solve the failure occurred in this system, generally require to pass through
Instrument factory carrys out Solve on site, so that ship must be navigated by water to be repaired to corresponding harbour etc. with diesel fuel mode, this makes LNG double fuel
Ship is economical to be lowered significantly, and dual fuel engine operation poor continuity, the degree of automation are low in the prior art.
Summary of the invention
The purpose of the present invention is to provide a kind of inland river double fuel Power Vessel security control systems, solve double in the prior art
Engine fuel runs the low technical problem of poor continuity, the degree of automation, and during ship's navigation, event occurs for security system
Barrier can carry out remote maintenance to system by wireless control module, avoid device manufacturer because of the time brought by field maintenance and
Cost issues.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of inland river double fuel Power Vessel security control system, including main control cabinet, point aobvious control flow, six fuel gas
Detector, combined aural and visual alarm, general alarm system and second level security system.The main control cabinet is arranged in cabin antetheca, master control
PLC controller and power module are provided in cabinet processed, power module is PLC controller power supply, is provided with master above main control cabinet
Control screen, is electrically connected between master control screen and PLC controller;It include GPRS wireless communication module in PLC controller;Described point of aobvious control
Screen is arranged in driver's cabin, and a point aobvious control flow is communicated with PLC controller by GPRS wireless communication module;Described six can
Combustion gas bulk detector includes two combustible gas probes of setting in the ice chest of the gas tank of deck stern, host and hair in cabin
Respectively it is arranged in the combustible gas probe that the top of motor group is respectively arranged, host GVU clack box and generating set GVU clack box
One combustible gas probe;Six combustible gas probes are electrically connected with PLC controller respectively;The combined aural and visual alarm setting
Above cabin, combined aural and visual alarm is electrically connected with PLC controller;The general alarm system is electrically connected with PLC controller;It is described
Second level security system is electrically connected with PLC controller.Can so gas detector and temperature-sensitive/smoke sensor current signal test point,
The analog input point of PLC controller is both designed as 4 ~ 20mA current signal of standard, facilitates being uniformly processed for PLC signal;It is defeated
Part is mainly valve group control cabinet DCV, combined aural and visual alarm, display screen, scram button, GPRS wireless communication module out.
Six combustible gas probes give real time detection signal to PLC controller, when six combustible gas detectings
When any of device detects that combustable gas concentration is higher than 30%LEL, PLC controller sends instructions to master control screen, point aobvious control respectively
System screen and combined aural and visual alarm, master control screen, a point aobvious control flow show fuel gas danger signal and danger source place, light crossing-signal
Then signal an alert;If carrying out dangerous releasing without staff at this time and resetting, after the minute that is delayed, full ship is triggered
General alarm system reminds full ship personnel;When any of six combustible gas probes detect that combustable gas concentration continues
When increasing and being higher than 45%LEL, while acoustic-optic alarm and second level security system are triggered, cutting gas tank supplies main valve, then double combustions
Material supply is converted to diesel fuel mode from dual fuel mode.
It is further improved, the power module includes that main power source and backup power source are automatically shifted to after main power source power loss
Backup power source prevents the operation for influencing equipment because of main power source power loss, improves safety guarantee.
It is further improved, further includes four explosion-proof fans, respectively include being arranged in two explosion-proof wind on the ice chest of gas tank
Machine and two explosion-proof exhaust fans that the cabin gas supply exit air trunking general pipeline is arranged in, four explosion-proof fans are controlled with PLC respectively
Device electrical connection processed.
It is further improved, gas tank fills area's setting filling scram button, and the filling scram button is electrically connected with PLC controller
It connects.When ship is in charging operation, when sensor monitors in gas tank that liquid level is higher than setting value or gas pressure inside the tank is higher than and sets
When definite value, while triggering sound-light alarm, cutting fills the automatic stop valve on general pipeline, prevents the generation of potential danger.Pass through
It is invalid to prevent from automatically controlling provided with emergency stop button filling region, by this manual scram button, gas can be cut off
All air-powered electromagnetic valve groups in fuel charging system and gas fuel supply system, open simultaneously automatic vent valve.The present apparatus
Setting, contain all LNG peripheral systems, the one-stop monitoring and control for solving LNG running environment, save it is previous individually
Combustible gas probe detects control cabinet, fire alarming and controlling case.Cost is greatly saved, greatly improves double fuel power
The safety in operation grade stability of ship.
It is further improved, adds a combustible gas probe in the cabin, and be additionally provided with a temperature-sensitive in cabin
Detector and a smoke detector, the combustible gas probe, heat detector and smoke detector are controlled with PLC respectively
Device electrical connection.The investigative range of three combustible gas probes covers entire cabin, improves safety guarantee.
It is further improved, the master control screen, a point aobvious control flow are all made of touch screen design, easy to operate.
It is further improved, further includes intelligent terminal, intelligent terminal is carried out by GPRS wireless communication module and PLC controller
Communication, can remotely monitor the operating condition of security control system, when the security control system software break down when, ship without
Need landing pier waiting facilities manufacturer technical staff repair, directly can by intelligent terminal connect internet, can at any time with
The PLC of ship in the access navigation on ground, carries out software program modification, and monitoring programme to maintain equipment easily realizes cloud monitoring, significantly
The operating condition that ship is navigated by water using LNG double fuel is improved, shipping transport cost is greatlyd save.
Compared with prior art, the invention has the following beneficial effects:
1, during reducing ship's navigation, the normal/cruise of ship is influenced the problem of because of entire LNG system peripherals environment, is mentioned
The continuity of high dual fuel engine operation, reduces the on duty of ship's staff, improves the degree of automation of such ship's navigation.
2, simultaneously during ship's navigation, security system breaks down, and can be carried out by wireless control module to system
Remote maintenance avoids device manufacturer because of time and expense problem brought by field maintenance.
3, the present invention is based on fail safe designs, have automatic control, fault message diagnosis, display and self protective function,
In the case where failing similar to ship main power source and emergency power supply, system default failure simultaneously automatically cuts off corresponding gas supply valve group.
Ensure personnel and safety of ship.
Detailed description of the invention
Fig. 1 shows the structural schematic diagram of double fuel Power Vessel in inland river described in work of the present invention.
Fig. 2 shows the block diagram of double fuel Power Vessel security control system in inland river of the present invention.
Specific embodiment
To keep the purpose of the present invention and technical solution clearer, below in conjunction with the embodiment of the present invention to skill of the invention
Art scheme is clearly and completely described.
As shown in Figure 1, 2, a kind of inland river double fuel Power Vessel security control system, including main control cabinet 10, point aobvious control
Screen, six combustible gas probes, combined aural and visual alarm 11, general alarm system and second level security system.The main control cabinet 10
Setting is provided with PLC controller and power module in cabin antetheca, main control cabinet 10, and power module is PLC controller power supply,
It is provided with master control screen above main control cabinet 10, is electrically connected between master control screen and PLC controller;In PLC controller include GPRS without
Line communication module;Described point of aobvious control flow is arranged in driver's cabin, and point aobvious control flow and PLC controller pass through GPRS wireless telecommunications
Module is communicated;Six combustible gas probes include that two of setting in the ice chest of the gas tank 2 of deck stern 1 are flammable
The combustible gas probe that the top of host 7 and generating set 9 is respectively arranged in gas detector, cabin, host GVU clack box
A combustible gas probe being respectively arranged in 6 and generating set GVU clack box 8;Six combustible gas probes are controlled with PLC respectively
Device electrical connection processed;The combined aural and visual alarm 11 is arranged above cabin, and combined aural and visual alarm 11 is electrically connected with PLC controller;It is described
General alarm system is electrically connected with PLC controller;The second level security system is electrically connected with PLC controller.It can right detection of gas
Device and temperature-sensitive/smoke sensor current signal test point, the analog input point of PLC controller are both designed as standard 4 ~ 20mA electricity
Signal is flowed, being uniformly processed for PLC signal is facilitated;Output par, c be mainly valve group control cabinet DC24V, combined aural and visual alarm, display screen,
Scram button, GPRS wireless communication module.
Six combustible gas probes give real time detection signal to PLC controller, when six combustible gas detectings
When any of device detects that combustable gas concentration is higher than 30%LEL, PLC controller sends instructions to master control screen, point aobvious control respectively
System screen and combined aural and visual alarm 11, master control screen, a point aobvious control flow show fuel gas danger signal and danger source place, light alarm
The then signal an alert of device 11;If carrying out dangerous releasing without staff at this time and resetting, after delay 2 minutes, touching
It sends out ship general alarm system complete, reminds full ship personnel;When any of six combustible gas probes detect that fuel gas is dense
When degree continues to increase and be higher than 45%LEL, while acoustic-optic alarm and second level security system being triggered, cutting gas tank supplies main valve,
Then double fuel supply is converted to diesel fuel mode from dual fuel mode.
The power module includes that main power source and backup power source are automatically shifted to backup power source after main power source power loss, is prevented
The operation that equipment is only influenced because of main power source power loss, improves safety guarantee.
The invention also includes four explosion-proof fans 4, respectively include be arranged on the ice chest of gas tank 2 two explosion-proof fans 4
With two explosion-proof fans 4 that cabin gas supply 5 exit air trunking general pipeline is arranged in, four explosion-proof fans 4 are controlled with PLC respectively
Device electrical connection.
Gas tank fills area's setting filling scram button 12, and the filling scram button 12 is electrically connected with PLC controller.Work as ship
When oceangoing ship is in charging operation, when sensor monitors that liquid level is higher than setting value or gas pressure inside the tank higher than setting value in gas tank,
While triggering sound-light alarm, cutting fills the automatic stop valve on general pipeline, prevents the generation of potential danger.By filling area
It is invalid to prevent from automatically controlling that domain is provided with emergency stop button, and by this manual scram button, cut-off gaseous fuel is filled
All air-powered electromagnetic valve groups in system and gas fuel supply system, open simultaneously automatic vent valve.The setting of the present apparatus, packet
All LNG peripheral systems are contained, previous independent fuel gas is saved in the one-stop monitoring and control for solving LNG running environment
Detector detects control cabinet, fire alarming and controlling case.Cost is greatly saved, greatly improves the operation of double fuel Power Vessel
Safety grade stability.
A combustible gas probe is added in cabin of the present invention, and a heat detector is additionally provided in cabin
With a smoke detector, the combustible gas probe, heat detector and smoke detector are electrically connected with PLC controller respectively
It connects.The investigative range of three combustible gas probes covers entire cabin, improves safety guarantee.
Master control screen of the present invention, a point aobvious control flow are all made of touch screen design, easy to operate.
It further include intelligent terminal, intelligent terminal is communicated by GPRS wireless communication module with PLC controller, can be long-range
The operating condition for monitoring security control system, when the software of the security control system breaks down, ship is not necessarily to landing pier
Waiting facilities manufacturer technical staff maintenance directly can connect internet by intelligent terminal, can access boat anywhere or anytime
The PLC of ship in row, carries out software program modification, and monitoring programme to maintain equipment easily realizes cloud monitoring, substantially increases ship
The operating condition navigated by water using LNG double fuel greatlys save shipping transport cost.
Do not done in the present invention illustrate be the prior art or can be realized by the prior art, and the present invention
Described in specific implementation case be only preferable case study on implementation of the invention, practical range not for the purpose of limiting the invention.
Equivalent changes and modifications made by i.e. all contents according to scope of the present invention patent all should be used as technology scope of the invention.
Claims (4)
1. a kind of inland river double fuel Power Vessel security control system characterized by comprising
Main control cabinet, the main control cabinet setting are provided with PLC controller and power module in cabin antetheca, main control cabinet,
Power module is PLC controller power supply, is provided with master control screen above main control cabinet, is electrically connected between master control screen and PLC controller;
It include GPRS wireless communication module in PLC controller;
Divide aobvious control flow, described point of aobvious control flow is arranged in driver's cabin, and point aobvious control flow is wireless by GPRS with PLC controller
Communication module is communicated;
Six combustible gas probes, two combustible gas probes, machines being arranged in the ice chest of the gas tank including deck stern
The combustible gas probe that the top of cabin host and generating set is respectively arranged, host GVU clack box and generating set GVU clack box
A combustible gas probe being inside respectively arranged;Six combustible gas probes are electrically connected with PLC controller respectively;
Combined aural and visual alarm, the combined aural and visual alarm are arranged above cabin, and combined aural and visual alarm is electrically connected with PLC controller;
General alarm system, the general alarm system are electrically connected with PLC controller;
Second level security system, the second level security system are electrically connected with PLC controller;
Six combustible gas probes give real time detection signal to PLC controller, when in six combustible gas probes
When any one detects that combustable gas concentration is higher than 30%LEL, PLC controller sends instructions to master control screen, point aobvious control flow respectively
And combined aural and visual alarm, master control screen, a point aobvious control flow show fuel gas danger signal and danger source place, combined aural and visual alarm is then
Signal an alert;If carrying out dangerous releasing without staff at this time and resetting, after delay 2 minutes, trigger general
Alarm system reminds full ship personnel;
When any of six combustible gas probes detect that combustable gas concentration continues to increase and be higher than 45%LEL, simultaneously
Acoustic-optic alarm and second level security system are triggered, cutting gas tank supplies main valve, then double fuel supply is converted from dual fuel mode
For diesel fuel mode;
Further include four explosion-proof fans, respectively includes being arranged in two explosion-proof fans and setting on the ice chest of gas tank and supplied in cabin
Two explosion-proof exhaust fans in the exit gas air trunking general pipeline, four explosion-proof fans are electrically connected with PLC controller respectively;
The filling area of gas tank is provided with filling scram button, and the filling scram button is electrically connected with PLC controller;
A combustible gas probe is added in the cabin, and a heat detector and a sense cigarette are additionally provided in cabin
Detector, the combustible gas probe, heat detector and smoke detector are electrically connected with PLC controller respectively.
2. double fuel Power Vessel security control system in inland river according to claim 1, which is characterized in that the power module
Backup power source is automatically shifted to after main power source power loss including main power source and backup power source.
3. double fuel Power Vessel security control system in inland river according to claim 1, which is characterized in that the master control screen,
Dividing aobvious control flow is touch screen.
4. double fuel Power Vessel security control system in inland river according to claim 1, which is characterized in that further include intelligent end
End, intelligent terminal are communicated by GPRS wireless communication module with PLC controller, the long-range operation for monitoring security control system
Situation, when the software of the security control system breaks down, ship is tieed up without landing pier waiting facilities manufacturer technical staff
It repairing, internet is directly connected by intelligent terminal, the PLC of ship, carries out software program modification in access navigation anywhere or anytime,
Monitoring programme to maintain equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510977042.5A CN105608847B (en) | 2015-12-23 | 2015-12-23 | A kind of inland river double fuel Power Vessel security control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510977042.5A CN105608847B (en) | 2015-12-23 | 2015-12-23 | A kind of inland river double fuel Power Vessel security control system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105608847A CN105608847A (en) | 2016-05-25 |
CN105608847B true CN105608847B (en) | 2019-01-18 |
Family
ID=55988753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510977042.5A Active CN105608847B (en) | 2015-12-23 | 2015-12-23 | A kind of inland river double fuel Power Vessel security control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105608847B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107585270A (en) * | 2016-07-18 | 2018-01-16 | 左迁 | Ship sound control device and ship sound control system |
CN106081040B (en) * | 2016-08-10 | 2018-08-28 | 江苏鸿运绿色能源有限公司 | A kind of LNG ship oceangoing ship dynamical system whole updating method |
CN106815976A (en) * | 2017-02-14 | 2017-06-09 | 中国国际海运集装箱(集团)股份有限公司 | Compressed natural gas ship and its emergency switching-off system |
CN108932822B (en) * | 2017-05-24 | 2019-12-31 | 中国石油化工股份有限公司 | Combustible gas detection alarm system and method |
CN108961654B (en) * | 2017-05-24 | 2019-12-03 | 中国石油化工股份有限公司 | A kind of smoke detection alarm system and method |
CN108932821B (en) * | 2017-05-24 | 2019-12-03 | 中国石油化工股份有限公司 | A kind of poisonous gas detection alarm system and method |
CN110450934B (en) * | 2018-01-23 | 2021-04-30 | 中广核研究院有限公司 | Configuration system of nuclear power ship main control room |
CN110937095A (en) * | 2019-12-13 | 2020-03-31 | 江苏科技大学海洋装备研究院 | Cargo ship using LNG-battery hybrid power propulsion system |
CN111634367A (en) * | 2020-06-05 | 2020-09-08 | 中国船舶工业集团公司第七0八研究所 | Dual-fuel bulk cargo ship |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101207044B1 (en) * | 2008-04-08 | 2012-11-30 | 현대중공업 주식회사 | Improved flammable gas detection system for ballast tanks of double hull tankers |
CN104021650A (en) * | 2014-06-09 | 2014-09-03 | 山东航宇船业集团有限公司 | Protection and alarm device for leakage of gas in marine engine room |
CN204231421U (en) * | 2014-12-01 | 2015-03-25 | 徐绍衡 | The offshore work one real-time data base information platform of a kind of boats and ships, oceanographic equipment, aircraft |
CN204399450U (en) * | 2014-12-09 | 2015-06-17 | 威海中复西港船艇有限公司 | A kind of hybrid power fishery mangement and enforcement of the law ship |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4682564B2 (en) * | 2004-09-01 | 2011-05-11 | トヨタ自動車株式会社 | Gas detection system and gas detection method |
-
2015
- 2015-12-23 CN CN201510977042.5A patent/CN105608847B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101207044B1 (en) * | 2008-04-08 | 2012-11-30 | 현대중공업 주식회사 | Improved flammable gas detection system for ballast tanks of double hull tankers |
CN104021650A (en) * | 2014-06-09 | 2014-09-03 | 山东航宇船业集团有限公司 | Protection and alarm device for leakage of gas in marine engine room |
CN204231421U (en) * | 2014-12-01 | 2015-03-25 | 徐绍衡 | The offshore work one real-time data base information platform of a kind of boats and ships, oceanographic equipment, aircraft |
CN204399450U (en) * | 2014-12-09 | 2015-06-17 | 威海中复西港船艇有限公司 | A kind of hybrid power fishery mangement and enforcement of the law ship |
Also Published As
Publication number | Publication date |
---|---|
CN105608847A (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105608847B (en) | A kind of inland river double fuel Power Vessel security control system | |
CN101966375B (en) | Fire extinguishing system of wind generating set | |
CN102720594B (en) | Automatic protection device of anti-explosive diesel engine | |
CN205800803U (en) | A kind of automobile fuel filler safety warning system | |
CN204203678U (en) | A kind of boats and ships hazardous gas detecting and warning system | |
CN103585737B (en) | Wind power generating set automatic Fire-protection Control System | |
CN205877709U (en) | Marine automatic control LNG removes tank gas supply system's integrated control device | |
CN102961842A (en) | Fire alarm joint control system applied to chemical enterprise | |
CN109347176A (en) | A kind of concentration electric charging cabinet safety management system | |
CN106970597B (en) | Control device and control method | |
CN105299470A (en) | Methane monitoring automatic emptying device of middle-lower pressure gas pipe network | |
CN106044434B (en) | A kind of protective device of elevator host | |
CN205036458U (en) | Fuel control system suitable for small -size LNG power boats and ships | |
CN102903291A (en) | Simulation platform of cooling system of high-voltage direct-current transmission converter valve | |
CN210206210U (en) | Dust explosion-proof monitoring alarm device applied to dust remover | |
CN115371733A (en) | Natural gas fuel supply safety monitoring system for dual-fuel ship | |
CN204256881U (en) | A kind of oil to gas monitoring and alarming system | |
CN204116974U (en) | External boiler water level measuring and controlling device | |
CN105551535A (en) | Hydrogen elimination system of nuclear power plant concrete containment | |
CN205670255U (en) | A kind of carboxylic styrene butadiene latex safety production monitoring system | |
CN201921359U (en) | Fire extinguishing system for wind power generation set | |
CN205089458U (en) | Novel diesel engine control system | |
CN202154971U (en) | Wind-power safe and intelligent early-warning firefighting emergency rescue device | |
CN203595932U (en) | Emergency shutdown system based on petrochemical collection-storage station | |
CN108470928A (en) | Fuel system and its detection method for unmanned plane fuel cell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160525 Assignee: CHANGJIANG SAMSUNG ENERGY TECHNOLOGY Co.,Ltd. Assignor: JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd. Contract record no.: X2020980000788 Denomination of invention: Inland river dual fuel power-driven vessel security control system Granted publication date: 20190118 License type: Exclusive License Record date: 20200317 |