CN105607937B - A kind of hot patch method and apparatus - Google Patents

A kind of hot patch method and apparatus Download PDF

Info

Publication number
CN105607937B
CN105607937B CN201511002772.XA CN201511002772A CN105607937B CN 105607937 B CN105607937 B CN 105607937B CN 201511002772 A CN201511002772 A CN 201511002772A CN 105607937 B CN105607937 B CN 105607937B
Authority
CN
China
Prior art keywords
function
jump
jumps
short
jumping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511002772.XA
Other languages
Chinese (zh)
Other versions
CN105607937A (en
Inventor
吴伟锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Comba Network Systems Co Ltd
Original Assignee
Comba Telecom Technology Guangzhou Ltd
Comba Telecom Systems China Ltd
Comba Telecom Systems Guangzhou Co Ltd
Tianjin Comba Telecom Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Comba Telecom Technology Guangzhou Ltd, Comba Telecom Systems China Ltd, Comba Telecom Systems Guangzhou Co Ltd, Tianjin Comba Telecom Systems Co Ltd filed Critical Comba Telecom Technology Guangzhou Ltd
Priority to CN201511002772.XA priority Critical patent/CN105607937B/en
Publication of CN105607937A publication Critical patent/CN105607937A/en
Application granted granted Critical
Publication of CN105607937B publication Critical patent/CN105607937B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • G06F8/656Updates while running

Abstract

The present embodiments relate to field of communication technology more particularly to a kind of hot patch method and apparatus, for by patch function between patch function at a distance from it is too long when, reduce the probability that system break caused by hot patch process and the system failure occur.In the embodiment of the present invention, acquisition jumps function information table, jumps function from least one for determining in unused state in function information table is jumped, generation jumps channel;Addition first short jumps function before by patch function, wherein the first short function that jumps is for jumping first in channel and jumping function from being jumped to by patch function, and then by jumping channel hop to patch function.In this way, then avoiding in the prior art by long jump from the problem of program interrupt generated when being reoriented to patch function by patch function and the system failure.

Description

A kind of hot patch method and apparatus
Technical field
The present embodiments relate to the communications field more particularly to a kind of hot patch method and apparatus.
Background technique
With the progress of technology and management, although the quality of a large amount of manpower and energy promotion software will have been put into, Still it is difficult to completely eliminate the defect of software, and current procedure is developed by iteration, function gradually adds in each iteration Add.When the defect for needing to repair software or when for software increasing function, in order not to the normal use process of interrupted application program, Loophole reparation or update are carried out to the application program generally in a manner of hot patch, i.e., it is right in the case where not stopping application program The application program is repaired or is updated.The processing mode of hot patch, can be by appearance substantially as unit of function The function that loophole or needs update is repaired, to realize the reparation to the application program.
In the prior art, too long if being reoriented to the distance between patch function by patch function, it needs to carry out long jump Turn, but is realized in patching technology from the long jump for being reoriented to patch function by patch function and at least need two instructions, it can It can lead to program interrupt or even the system failure.
For example, function B is jumped to from function A by long jump, is at least realized in the prior art using two instructions The jump procedure, wherein one or one or more instruction realize that the acquisition of the address function B, instruction are realized and jumped.It is vulcanizing In fourth technology, be likely to cause system crash in this way, concrete reason is as follows: needs are at least repaired at by patch function first address Change two instructions, such as instructs INST1 and instruction INST2, and during modification, it is more likely that some task (task) has just been held It has gone instruction INST1, has also been not carried out instruction INST2, is just interrupted by patch task.If patch task has modified instruction at this time INST1 and instruction INST2 be jump instruction, when task continues to run, due to instruction INST2 modified, and with just The instruction INST1 of execution can not be matched completely, will lead to central processing unit (Central Processing Unit, abbreviation CPU error in data) is calculated, and then causes the system failure.
To sum up, need a kind of hot patch method and apparatus, for by patch function between patch function at a distance from mistake When long, reduce the probability that system break caused by hot patch process and the system failure occur.
Summary of the invention
The embodiment of the present invention provides a kind of hot patch method and apparatus, for by between patch function and patch function Apart from it is too long when, reduce the probability that system break and the system failure caused by hot patch process occur.
The embodiment of the present invention provides a kind of hot patch method, comprising:
In the code for determining program to be repaired by patch function between patch function at a distance from be greater than short jump When maximum jump range, acquisition jumps function information table;Wherein, jumping function information table includes in advance in the generation of program to be repaired Multiple address and the service conditions for jumping each of function and jumping function being inserted into code;
It each of include address and the service condition for jumping function in function information table according to jumping, from jumping function letter Determine that at least one for being in unused state jumps function in breath table;Wherein, at least one jumps function and includes at least the One jumps function;First, which jumps function, is not more than the short maximum jump range jumped with by the distance between patch function;
Function is jumped according at least one determined, generation jumps channel;Wherein, it jumps channel and jumps function with first Function is jumped for starting, channel is jumped and finally jumps to patch function;
Addition first is short before by patch function jumps function, wherein the first short function that jumps is for from by patch function It jumps to first jumped in channel and jumps function, and then by jumping channel hop to patch function.
Optionally, function is jumped according at least one determined, generation jumps channel, specifically includes:
If it is determined that at least one, which jumps function, meets first condition, then:
Determine first jump function not and be it is short jump function when, jumping function setup for first is short to jump function;
Function is jumped not determining that at least one jumps in function also included N number of second and jumps any of function second It is short when jumping function, will is not that short to jump the second of function to jump function setup be short to jump function;
According to determine be it is short jump the first of function and jump function and N number of third jumps function, generate by first It jumps function and what N number of third jumped function composition jumps channel;Wherein, the last one jumped in channel second jumps function Jump to patch function;
Wherein, first condition are as follows: first jumps function and N number of second to jump function be short when jumping function, is short jump Turn the first of function and jump function and N number of second to jump the total of function and execute the execution that the time is no longer than a long jump function Time.
Optionally, jumping in function information table further includes each function name for jumping function;
According to determine be it is short jump the first of function and jump function and N number of second jump function, generate by first Jump function and N number of second jump function composition jump channel after, further includes:
From jumping in function information table, by first jump function and N number of second jump function function name be changed to short jump Turn the function name of function;
From jumping in function information table, by first jump function and N number of second jump function service condition be identified as Use state.
Optionally, function is jumped according at least one determined, generation jumps channel, specifically includes:
If it is determined that at least one, which jumps function, is unsatisfactory for first condition, then:
When determining first to jump function not being long jump function, jumping function setup for first is long jump function;
Jump function according to be set as long jump function first, generate by first jump that function forms jump channel; It jumps and is set as the first of long jump function jumping function and jumping to patch function in channel.
Optionally, jumping in function information table further includes each function name for jumping function;
Jump function according to be set as long jump function first, generate by first jump that function forms jump channel it Afterwards, further includes:
From jumping in function information table, the function name that first jumps function is changed to the function name of long jump function;
From jumping in function information table, the service condition that first jumps function is identified as use state.
Optionally, it obtains before jumping function information table, further includes:
Multiple location points are determined in the code of program to be repaired;
Link script by treating repair procedure is modified, and each location point insertion in multiple location points is multiple Jump function;
Be inserted into the unified code for extracting program to be repaired it is all jump each of function jump function function name, Address and service condition, generation jump function information table.
Optionally, in multiple location points any one location point insertion it is multiple jump function be it is short jump function and/or Long jump function;
If a location point in multiple location points be inserted into it is multiple jump function be it is short jump function, the location point insert Enter it is multiple jump at least one of function jump the occupied position range of function be a long jump function it is occupied Position range.
Optionally, the distance between adjacent two location point in multiple location points is not more than the short maximum jump jumped Range;Or
Each location point in multiple location points is located at the adjacent two sections of codes in all codes of program to be repaired included Intermediate position.
The embodiment of the present invention provides a kind of hot patch equipment, comprising:
Acquiring unit, in the code for determining program to be repaired by patch function between patch function at a distance from When greater than the short maximum jump range jumped, acquisition jumps function information table;Wherein, jump function information table include in advance to Multiple address and the service conditions for jumping each of function and jumping function being inserted into the code of repair procedure;
Determination unit, for according to jump include in function information table each jump function address and use feelings Condition determines that at least one for being in unused state jumps function from jumping in function information table;Wherein, at least one is jumped Function includes at least first and jumps function;First, which jumps function, is not more than the short maximum jumped with by the distance between patch function Jump range;
Generation unit, for jumping function according at least one determined, generation jumps channel;Wherein, channel is jumped Function is jumped with first and jumps function for starting, is jumped channel and is finally jumped to patch function;
Processing unit, for before by patch function addition first short jump function, wherein the first short function that jumps is used for It jumps first in channel from being jumped to by patch function and jumps function, and then by jumping channel hop to patch function.
Optionally, generation unit is specifically used for:
If it is determined that at least one, which jumps function, meets first condition, then:
Determine first jump function not and be it is short jump function when, jumping function setup for first is short to jump function;
Function is jumped not determining that at least one jumps in function also included N number of second and jumps any of function second It is short when jumping function, will is not that short to jump the second of function to jump function setup be short to jump function;
According to determine be it is short jump the first of function and jump function and N number of third jumps function, generate by first It jumps function and what N number of third jumped function composition jumps channel;Wherein, the last one jumped in channel second jumps function Jump to patch function;
Wherein, first condition are as follows: first jumps function and N number of second to jump function be short when jumping function, is short jump Turn the first of function and jump function and N number of second to jump the total of function and execute the execution that the time is no longer than a long jump function Time.
Optionally, jumping in function information table further includes each function name for jumping function;
Processing unit is also used to:
According to determine be it is short jump the first of function and jump function and N number of second jump function, generate by the One jump function and N number of second jump function composition jump channel after, from jumping in function information table, jump letter for first Several and the N number of second function name for jumping function is changed to the short function name for jumping function;
From jumping in function information table, by first jump function and N number of second jump function service condition be identified as Use state.
Optionally, generation unit is specifically used for:
If it is determined that at least one, which jumps function, is unsatisfactory for first condition, then:
When determining first to jump function not being long jump function, jumping function setup for first is long jump function;
Jump function according to be set as long jump function first, generate by first jump that function forms jump channel; It jumps and is set as the first of long jump function jumping function and jumping to patch function in channel.
Optionally, jumping in function information table further includes each function name for jumping function;
Processing unit is also used to:
Jumping function according to being set as the first of long jump function, generate by first jump that function forms jump channel Later, from jumping in function information table, the function name that first jumps function is changed to the function name of long jump function;
From jumping in function information table, the service condition that first jumps function is identified as use state.
Optionally, further include extracting unit, be used for:
Multiple location points are determined in the code of program to be repaired;
Link script by treating repair procedure is modified, and each location point insertion in multiple location points is multiple Jump function;
Be inserted into the unified code for extracting program to be repaired it is all jump each of function jump function function name, Address and service condition, generation jump function information table.
Optionally, in multiple location points any one location point insertion it is multiple jump function be it is short jump function and/or Long jump function;
If a location point in multiple location points be inserted into it is multiple jump function be it is short jump function, the location point insert Enter it is multiple jump at least one of function jump the occupied position range of function be a long jump function it is occupied Position range.
Optionally, the distance between adjacent two location point in multiple location points is not more than the short maximum jump jumped Range;Or
Each location point in multiple location points is located at the adjacent two sections of codes in all codes of program to be repaired included Intermediate position.
In the embodiment of the present invention, in the code for determining program to be repaired by between patch function and patch function away from When from being greater than the short maximum jump range jumped, acquisition jumps function information table;Wherein, jumping function information table includes existing in advance Multiple address and the service conditions for jumping each of function and jumping function being inserted into the code of program to be repaired;According to jump Turn each of to include address and the service condition for jumping function in function information table, determines source in function information table from jumping At least one in unused state jumps function;Wherein, at least one jumps function and jumps function including at least first;First It jumps function and is not more than the short maximum jump range jumped with by the distance between patch function;According at least one determined Function is jumped, generation jumps channel;Wherein, jumping channel and jumping function with first is that starting jumps function, and it is last to jump channel Jump to patch function;Addition first short jumps function before by patch function, wherein the first short function that jumps is for from being mended Fourth function jumps to first jumped in channel and jumps function, and then by jumping channel hop to patch function.Due to true Fixed to be greater than the short maximum jump range jumped by the distance between patch function and patch function, having pre-established can jump to Patch function jumps channel, later by the first short function that jumps from being jumped directly to jump channel by patch function, in this way, Then avoid in the prior art by long jump from program interrupt generated when being reoriented to patch function by patch function and The problem of system failure.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly introduced, it should be apparent that, drawings in the following description are only some embodiments of the invention, for this For the those of ordinary skill in field, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is a kind of hot patch method flow schematic diagram provided in an embodiment of the present invention;
Fig. 2 is another hot patch method flow schematic diagram provided in an embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of hot patch equipment provided in an embodiment of the present invention.
Specific embodiment
In order to which the purpose of the present invention, technical solution and beneficial effect is more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used to explain this hair It is bright, it is not intended to limit the present invention.
First in the embodiment of the present invention jump function, second jump function, be to jump function, function can be jumped to be short Can also be long jump function, first it is short jump function be it is short jump function, therein first, second is used only for the mesh distinguished 's.
Fig. 1 illustrates a kind of flow diagram of hot patch method provided in an embodiment of the present invention.
As shown in Figure 1, a kind of hot patch method provided in an embodiment of the present invention, comprising:
Step 101, in the code for determining program to be repaired by patch function between patch function at a distance from be greater than When the short maximum jump range jumped, acquisition jumps function information table;Wherein, jumping function information table includes in advance to be repaired Multiple address and the service conditions for jumping each of function and jumping function being inserted into the code of program;
It step 102, each of include address and the service condition for jumping function in function information table according to jumping, from jump Turn to determine that at least one for being in unused state jumps function in function information table;Wherein, at least one jumps function extremely Function is jumped including first less;First, which jumps function, is not more than the short maximum jump model jumped with by the distance between patch function It encloses;
Step 103, function is jumped according at least one determined, generation jumps channel;Wherein, channel is jumped with first It jumps function and jumps function for starting, jump channel and finally jump to patch function;
Step 104, addition first is short before by patch function jumps function, wherein the first short function that jumps is used for from quilt Patch function jumps to first jumped in channel and jumps function, and then by jumping channel hop to patch function.
Due to determine by patch function between patch function at a distance from be greater than the short maximum jump range jumped, in advance The channel that jumps that can jump to patch function is established, is directly jumped by the first short function that jumps from by patch function later To channel is jumped, patch function when institute is reoriented to from by patch function by long jump in the prior art in this way, then avoiding The problem of program interrupt and the system failure of generation.
Optionally, in the embodiment of the present invention, before acquisition jumps function information table, further includes:
Multiple location points are determined in the code of program to be repaired;Link script by treating repair procedure is repaired Change, each location point insertion in multiple location points is multiple to jump function;It is inserted into the unified code for extracting program to be repaired All function name, address and service conditions for jumping each of function and jumping function, generation jump function information table.It can See, without extending compiler in the embodiment of the present invention, just with the link script of compiler itself, realizes simpler Just, reduce the cost of exploitation and maintenance.
Optionally, in multiple location points any one location point insertion it is multiple jump function be it is short jump function and/or Long jump function;If a location point in multiple location points be inserted into it is multiple jump function be it is short jump function, the position Multiple at least one of functions that jump of point insertion jump the occupied position range of function as shared by a long jump function Position range.
Three location points are determined, in first location point Insertion it is multiple jump function be it is short jump function, the multiple functions that jump being inserted into second location point are long jump Function, the multiple functions that jump being inserted into third location point include that the short of part jumps function and partial long jump letter Number.Preferably, the multiple functions that jump being inserted into first location point are short when jumping function, in order to which the later period facilitates The short function that jumps being inserted into one location point is changed to long jump function, multiple the jumping in function extremely of location point insertion It is an occupied position range of long jump function that few one, which jumps the occupied position range of function, that is to say, that, it should Reserved at least one short position for jumping function can by the short position for jumping function and being revised as long jump function, with The phase needs to determine in first position Dian Chu one that can modify long jump function short to jump function after an action of the bowels.
Specifically, one jumps function and is used, and the service condition for jumping function is that this is jumped at function at this time In use state;When this jumps function and is not used by, the service condition for jumping function is that this jumps function and be in and does not make at this time Use state.The address for jumping function is that this jumps specific address information of the function in the link script of the program to be repaired, i.e., This, which can be found, by the address jumps function.If the function name that one jumps function is modified in use, Then the function name for jumping function should also be modified in jumping function information table.
Optionally, the distance between adjacent two location point in multiple location points is not more than the short maximum jump jumped Range;Or each location point in multiple location points is located at the adjacent two sections of codes in all codes of program to be repaired included Intermediate position.
Specifically, file of the corresponding code of program to be repaired before not formed image file is known as linking script, Linking includes multistage code segment in script, can be inserted into multiple jump between the two sections of code segments that are connected in advance in the embodiment of the present invention Function.
Preferably, since the initial position of the code of program to be repaired, multiple jump is inserted into every first distance length Function, first distance length be not more than the short maximum jump range jumped, in this way, no matter which of the code of program to be repaired Part needs to carry out hot patch, can carry out determining that first jumps function near hot patch in the needs, first jumps letter Number with need to carry out hot patch by the distance between patch function no more than the short maximum jump range jumped.
Another optionally embodiment is to determine several location points in the link script of program to be repaired, this is several A location point is the position that possible need to carry out hot patch in the future, is inserted into multiple jump near the several location points determined Function, in this way, can be carried out in the needs when then the location point in the several location points determined needs to carry out hot patch Determine that first jumps function near hot patch, first jump function and need to carry out hot patch by between patch function Distance is not more than the short maximum jump range jumped.
Optionally, it in above-mentioned steps 101, is jumped at a distance between patch function no more than short determining by patch function Maximum jump range when, add second before by patch function and short jump function, wherein the second short function that jumps is for from quilt Patch function jumps to patch function.Specifically, second is added by modification or increased mode before by patch function It is short to jump function, in this way, that is, execution second is short jumps function, and due to the second short jump when program is run to by patch function Turn function and jumps to patch function, therefore, programming jump to patch function, and patch function is run, it runs and ties in patch function After beam, jumps back to and needed to run the code by after patch function by the ending of patch function.
Include a variety of implementations in above-mentioned steps 103, provides following two specific embodiment in the embodiment of the present invention.
It needs to determine that at least one jumps whether function meets first condition in following manner one and mode two, optionally, the One condition are as follows: first jumps function and N number of second to jump function be short when jumping function, jumps the first of function to be short and jumps Function and N number of second jumps the total of function and executes the execution time that the time is no longer than a long jump function.At this point, not will First jump function and it is N number of jump function setup be it is short jump function, only determine when first jump function and it is N number of second jump Turning function is short when jumping function, for it is short jump the first of function and jump function and N number of second jump total execution of function Whether the time is no longer than the execution time of a long jump function, exports judging result after judgement, in judgement at least one It is a to jump in the step of whether function meets first condition, function can't be jumped to first and N each second jumps the letter of function It is several to carry out practical change.
In another optional embodiment, it is possible to determine that whether N is greater than threshold value, because N is not more than threshold value, then first jumps Turn function and N number of second to jump function be short when jumping function, for it is short jump the first of function and jump function and N number of second jump The total execution time for turning function is centainly no longer than the execution time of a long jump function.Therefore, first condition can also be N No more than threshold value.
Mode one, however, it is determined that at least one jumps function and meets first condition, then to jump function not be short determining first When jumping function, function setup is jumped by first and jumps function to be short;Determining that it is also included N number of in function that at least one is jumped Second, which jumps any of function second, jumps function not and is short when jumping function, will short jump the second of function and jump letter Number is set as short and jumps function;If it is determined that first jump function and N number of second jump function and be it is short jump function, then without into Row operation.
Later according to determine be it is short jump the first of function and jump function and N number of third jumps function, generate by First jumps function and what N number of third jumped function composition jumps channel;Wherein, the last one jumped in channel second jumps Function jumps to patch function.
Optionally, according to determine be it is short jump the first of function and jump function and N number of second jump function, generate By first jump function and N number of second jump that function forms jump channel after, from jumping in function information table, first is jumped Turn function and N number of second jump function function name be changed to the short function name for jumping function;It, will from jumping in function information table First jump function and N number of second jump function service condition be identified as use state.
Specifically, in a kind of embodiment, N zero, at this point, first each in function information table jumping function according to jumping Address and service condition, determine that first jumps function, at this point, first jumps function and be in unused state, and first It jumps function and, no more than the short maximum jump range jumped, first jumps function and patch letter by the distance between patch function The distance between number is not more than the short maximum jump range jumped.It jumps in channel and only jumps function including one first. Patch function is loaded in the code of program to be repaired at this time, and jumps function to first and modifies, so that modified One, which jumps function, jumps to patch function.After jumping channel and establishing connection with patch function, added before by patch function First short jumps function, wherein the first short function that jumps is for jumping first in channel and jumping from being jumped to by patch function Function, and then by jumping channel hop to patch function.
In another embodiment, N is not zero, at this point, first basis jumps each ground for jumping function in function information table Location and service condition determine that first jumps function and N number of second and jump function, at this point, first jumps function and N number of Two, which jump function, is in unused state.First, which jumps function and N number of second, jumps function according to location information composition one Sequence, first jump function and N number of second jump function composition (N+1) it is a jump in function, adjacent two on position The distance between function is jumped no more than the short maximum jump range jumped, the so adjacent two short function that jumps can be realized It jumps.Function is jumped by first jumping function composition with N number of second and jump channel, first to jump function be to jump channel at this time First short to jump function, the last one jumped in channel second jumps function and needs to jump to patch function.And due to One, which jumps function, no more than the short maximum jump range jumped, is jumping channel and patch letter with by the distance between patch function Number is established after connection, and first is added before by patch function and short jumps function, wherein the first short function that jumps is for from being mended Fourth function jumps to first jumped in channel and jumps function, and then by jumping channel hop to patch function.
Mode two, however, it is determined that at least one jumps function and is unsatisfactory for first condition, then is determining that first jumps function not and be When long jump function, jumping function setup for first is long jump function;Determine first jump function be long jump function when, Then without operation.
Jump function according to being set as the first of long jump function later, generate by first jump that function forms jump it is logical Road;It jumps and is set as the first of long jump function jumping function and jumping to patch function in channel.
Optionally, function is jumped according to be set as long jump function first, generates and jumps the jump that function forms by first After turning channel, from jumping in function information table, the function name that first jumps function is changed to the function name of long jump function; From jumping in function information table, the service condition that first jumps function is identified as use state.
In this way, state first jump function and N number of second jump function total execution time be longer than a long jump letter Several execution time then jumps function for first and is revised as long jump function, and jumps function and patch function foundation for first Connection jumps channel only and includes first and jumps function, jump channel and patch function establishes connection, in this way, can then save Program runtime.
Fig. 2 illustrates the flow diagram of another hot patch method provided in an embodiment of the present invention.
In order to more clearly introduce above method process, another hot patch method and step of offer in the embodiment of the present invention, As shown in Figure 2, comprising:
Step 201, each location point insertion in advance in multiple location points in the link script of program to be repaired is more It is a to jump function, wherein the distance between each adjacent two location point is not more than the short maximum jump range jumped;
Step 202, all each of the functions that jump being inserted into the unified code for extracting program to be repaired jump function Function name, address and service condition, generation jump function information table;
Step 203, patch function is loaded in the code of program to be repaired;
Step 204, judge whether big by the distance between patch function and patch function in the code of program to be repaired In the short maximum jump range jumped, if it is not, thening follow the steps 205;If so, thening follow the steps 206;
Step 205, addition second is short before by patch function jumps function, wherein the second short function that jumps is used for from quilt Patch function jumps to patch function;
It step 206, each of include address and the service condition for jumping function in function information table according to jumping, from jump Turn to determine that at least one for being in unused state jumps function in function information table, wherein at least one jumps function at least Function is jumped including first;
Step 207, judge that at least one jumps whether function meets first condition, if so, thening follow the steps 208;If no It is to then follow the steps 209;
Step 208, then at least one is jumped to the first function for including in function and N number of second function is disposed as short jump Turn function, and generate and jump channel, jumping channel is to jump function starting from first, jumps function by N number of second and jumps to Patch function;Addition first is short before by patch function jumps function, wherein the first short function that jumps is for from by patch function It jumps to first jumped in channel and jumps function, and then by jumping channel hop to patch function;
Step 209, jumping function setup for first is long jump function, and makes first to jump function and jump to patch letter Number;Addition first is short before by patch function jumps function, wherein the first short function that jumps from by patch function for jumping to It jumps first in channel and jumps function, and then by jumping channel hop to patch function;
Step 210, patch function is run.
It can be seen from the above: in the code for determining program to be repaired by between patch function and patch function Distance be greater than the short maximum jump range jumped when, acquisition jump function information table;Wherein, it includes pre- for jumping function information table Multiple address and the service conditions for jumping each of function and jumping function being first inserted into the code of program to be repaired;Root Each of include address and the service condition for jumping function in function information table according to jumping, is determined from jumping in function information table Source jumps function at least one of unused state;Wherein, at least one jumps function and jumps function including at least first; First, which jumps function, is not more than the short maximum jump range jumped with by the distance between patch function;According to determining at least One jumps function, and generation jumps channel;Wherein, jumping channel and jumping function with first is that starting jumps function, jumps channel Finally jump to patch function;Addition first short jumps function before by patch function, wherein first it is short jump function for from First jumped in channel is jumped to by patch function and jumps function, and then by jumping channel hop to patch function.Due to Determine by patch function between patch function at a distance from be greater than the short maximum jump range jumped, having pre-established can jump The channel that jumps of patch function is gone to, later by the first short function that jumps from being jumped directly to jump channel by patch function, In this way, then avoiding in the prior art by long jump from program generated when being reoriented to patch function by patch function The problem of disconnected and system failure.
Fig. 3 illustrates a kind of structural schematic diagram of hot patch equipment provided in an embodiment of the present invention.
Based on same idea, the embodiment of the present invention provides a kind of hot patch equipment 300, as shown in figure 3, including acquiring unit 301, determination unit 302, generation unit 303, processing unit 304 further include optionally extracting unit 305:
Acquiring unit, in the code for determining program to be repaired by patch function between patch function at a distance from When greater than the short maximum jump range jumped, acquisition jumps function information table;Wherein, jump function information table include in advance to Multiple address and the service conditions for jumping each of function and jumping function being inserted into the code of repair procedure;
Determination unit, for according to jump include in function information table each jump function address and use feelings Condition determines that at least one for being in unused state jumps function from jumping in function information table;Wherein, at least one is jumped Function includes at least first and jumps function;First, which jumps function, is not more than the short maximum jumped with by the distance between patch function Jump range;
Generation unit, for jumping function according at least one determined, generation jumps channel;Wherein, channel is jumped Function is jumped with first and jumps function for starting, is jumped channel and is finally jumped to patch function;
Processing unit, for before by patch function addition first short jump function, wherein the first short function that jumps is used for It jumps first in channel from being jumped to by patch function and jumps function, and then by jumping channel hop to patch function.
Optionally, generation unit is specifically used for:
If it is determined that at least one, which jumps function, meets first condition, then:
Determine first jump function not and be it is short jump function when, jumping function setup for first is short to jump function;
Function is jumped not determining that at least one jumps in function also included N number of second and jumps any of function second It is short when jumping function, will is not that short to jump the second of function to jump function setup be short to jump function;
According to determine be it is short jump the first of function and jump function and N number of third jumps function, generate by first It jumps function and what N number of third jumped function composition jumps channel;Wherein, the last one jumped in channel second jumps function Jump to patch function;
Wherein, first condition are as follows: first jumps function and N number of second to jump function be short when jumping function, is short jump Turn the first of function and jump function and N number of second to jump the total of function and execute the execution that the time is no longer than a long jump function Time.
Optionally, jumping in function information table further includes each function name for jumping function;
Processing unit is also used to:
According to determine be it is short jump the first of function and jump function and N number of second jump function, generate by the One jump function and N number of second jump function composition jump channel after, from jumping in function information table, jump letter for first Several and the N number of second function name for jumping function is changed to the short function name for jumping function;
From jumping in function information table, by first jump function and N number of second jump function service condition be identified as Use state.
Optionally, generation unit is specifically used for:
If it is determined that at least one, which jumps function, is unsatisfactory for first condition, then:
When determining first to jump function not being long jump function, jumping function setup for first is long jump function;
Jump function according to be set as long jump function first, generate by first jump that function forms jump channel; It jumps and is set as the first of long jump function jumping function and jumping to patch function in channel.
Optionally, jumping in function information table further includes each function name for jumping function;
Processing unit is also used to:
Jumping function according to being set as the first of long jump function, generate by first jump that function forms jump channel Later, from jumping in function information table, the function name that first jumps function is changed to the function name of long jump function;
From jumping in function information table, the service condition that first jumps function is identified as use state.
Optionally, further include extracting unit, be used for:
Multiple location points are determined in the code of program to be repaired;
Link script by treating repair procedure is modified, and each location point insertion in multiple location points is multiple Jump function;
Be inserted into the unified code for extracting program to be repaired it is all jump each of function jump function function name, Address and service condition, generation jump function information table.
Optionally, in multiple location points any one location point insertion it is multiple jump function be it is short jump function and/or Long jump function;
If a location point in multiple location points be inserted into it is multiple jump function be it is short jump function, the location point insert Enter it is multiple jump at least one of function jump the occupied position range of function be a long jump function it is occupied Position range.
Optionally, the distance between adjacent two location point in multiple location points is not more than the short maximum jump jumped Range;Or
Each location point in multiple location points is located at the adjacent two sections of codes in all codes of program to be repaired included Intermediate position.
It can be seen from the above: in the code for determining program to be repaired by between patch function and patch function Distance be greater than the short maximum jump range jumped when, acquisition jump function information table;Wherein, it includes pre- for jumping function information table Multiple address and the service conditions for jumping each of function and jumping function being first inserted into the code of program to be repaired;Root Each of include address and the service condition for jumping function in function information table according to jumping, is determined from jumping in function information table Source jumps function at least one of unused state;Wherein, at least one jumps function and jumps function including at least first; First, which jumps function, is not more than the short maximum jump range jumped with by the distance between patch function;According to determining at least One jumps function, and generation jumps channel;Wherein, jumping channel and jumping function with first is that starting jumps function, jumps channel Finally jump to patch function;Addition first short jumps function before by patch function, wherein first it is short jump function for from First jumped in channel is jumped to by patch function and jumps function, and then by jumping channel hop to patch function.Due to Determine by patch function between patch function at a distance from be greater than the short maximum jump range jumped, having pre-established can jump The channel that jumps of patch function is gone to, later by the first short function that jumps from being jumped directly to jump channel by patch function, In this way, then avoiding in the prior art by long jump from program generated when being reoriented to patch function by patch function The problem of disconnected and system failure.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method or computer program product. Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the present invention Form.It is deposited moreover, the present invention can be used to can be used in the computer that one or more wherein includes computer usable program code The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (14)

1. a kind of hot patch method characterized by comprising
In the code for determining program to be repaired by patch function between patch function at a distance from be greater than the short maximum jumped When jump range, acquisition jumps function information table;Wherein, the function information table that jumps includes in advance in the program to be repaired Code in multiple address and service conditions for jumping each of function and jumping function for being inserted into;
Each of include address and the service condition for jumping function in function information table according to described jump, jumps letter from described Determine that at least one for being in unused state jumps function in number information table;Wherein, it is described at least one jump function extremely Function is jumped including first less;Described first jumps function is jumped most by the distance between patch function no more than short with described Big jump range;
At least one jumps function according to determining, generation jumps channel;Wherein, the channel that jumps is with described first It jumps function and jumps function for starting, the channel that jumps finally jumps to the patch function;
It is described by patch function before addition first short jump function, wherein the described first short function that jumps is for from the quilt Patch function jumps to described first jumped in channel and jumps function, and then by the channel hop that jumps to described Patch function;
Wherein, the basis determine it is described at least one jump function, generation jumps channel, specifically include:
If it is determined that it is described at least one jump function and meet first condition, then:
Determine described first jump function not and be it is short jump function when, jumping function setup for described first is short to jump letter Number;
Determine it is described at least one jump in function also included N number of second and jump any of function second and jump function not It is short when jumping function, will is not that short to jump the second of function to jump function setup be short to jump function;
According to determine be it is short jump the first of function and jump function and N number of third jumps function, generate by described first It jumps function and what N number of third jumped function composition jumps channel;Wherein, it is described jump in channel the last one second It jumps function and jumps to the patch function;
Wherein, the first condition are as follows: described first jumps function and described N number of second to jump function be short to jump function When, for it is short jump described the first of function jump function and described N number of second jump function total execution time be no longer than one The execution time of a long jump function.
2. the method as described in claim 1, which is characterized in that described jump in function information table further includes each jumping function Function name;
What the basis was determined be it is short jump the first of function and jump function and N number of second jump function, generate by described First jump function and described N number of second jump function composition jump channel after, further includes:
It is jumped in function information table from described, jumps function and described N number of second for described first and jump the function name of function more It is changed to the short function name for jumping function;
It is jumped in function information table from described, jumps function and described N number of second for described first and jump the service condition of function It is identified as use state.
3. the method as described in claim 1, which is characterized in that the basis determine it is described at least one jump function, Generation jumps channel, specifically includes:
If it is determined that it is described at least one jump function and be unsatisfactory for first condition, then:
When determining described first to jump function not being long jump function, jumping function setup for described first is long jump letter Number;
Be set as the first of long jump function according to described and jump function, generate by described first jump that function forms jump it is logical Road;It is described jump in channel described be set as the first of long jump function and jump function jumping to the patch function.
4. method as claimed in claim 3, which is characterized in that described jump in function information table further includes each jumping function Function name;
It is described to be set as the first of long jump function according to and jump function, it generates and jumps the jump that function forms by described first After turning channel, further includes:
It is jumped in function information table from described, the function name that described first jumps function is changed to the function of long jump function Name;
It is jumped in function information table from described, the service condition that described first jumps function is identified as use state.
5. the method as described in claim 1, which is characterized in that the acquisition jumps before function information table, further includes:
Multiple location points are determined in the code of the program to be repaired;
It is modified by the link script to the program to be repaired, each location point insertion in the multiple location point It is multiple to jump function;
Be inserted into the unified code for extracting the program to be repaired it is all jump each of function jump function function name, Address and service condition jump function information table described in generation.
6. method as claimed in claim 5, which is characterized in that the institute of any one location point insertion in the multiple location point Stating multiple functions that jump is short to jump function and/or long jump function;
If a location point in the multiple location point be inserted into it is the multiple jump function be it is short jump function, the position The multiple at least one of function that jumps of point insertion jumps the occupied position range of function as a long jump function Occupied position range.
7. method as claimed in claim 5, which is characterized in that between adjacent two location point in the multiple location point Distance be not more than the short maximum jump range jumped;Or
Each location point in the multiple location point is located at adjacent two sections in all codes of the program to be repaired included Position among code.
8. a kind of hot patch equipment characterized by comprising
Acquiring unit, in the code for determining program to be repaired by patch function between patch function at a distance from be greater than When the short maximum jump range jumped, acquisition jumps function information table;Wherein, the function information table that jumps includes in advance in institute State multiple address and the service conditions for jumping each of function and jumping function being inserted into the code of program to be repaired;
Determination unit each of includes jumping the address of function and using feelings in function information table for jumping according to Condition determines that at least one for being in unused state jumps function from described jump in function information table;Wherein, it is described at least One jumps function and jumps function including at least first;Described first jump function and it is described by the distance between patch function no Greater than the short maximum jump range jumped;
Generation unit, for according to determining at least one jump function, generation jumps channel;Wherein, described to jump Channel jumps function with described first and jumps function for starting, and the channel that jumps finally jumps to the patch function;
Processing unit, for it is described by patch function before addition first short jump function, wherein described first short jumps function For jumping to described first jumped in channel from described by patch function and jumping function, so by it is described jump it is logical Road jumps to the patch function;
Wherein, the generation unit, is specifically used for:
If it is determined that it is described at least one jump function and meet first condition, then:
Determine described first jump function not and be it is short jump function when, jumping function setup for described first is short to jump letter Number;
Determine it is described at least one jump in function also included N number of second and jump any of function second and jump function not It is short when jumping function, will is not that short to jump the second of function to jump function setup be short to jump function;
According to determine be it is short jump the first of function and jump function and N number of third jumps function, generate by described first It jumps function and what N number of third jumped function composition jumps channel;Wherein, it is described jump in channel the last one second It jumps function and jumps to the patch function;
Wherein, the first condition are as follows: described first jumps function and described N number of second to jump function be short to jump function When, for it is short jump described the first of function jump function and described N number of second jump function total execution time be no longer than one The execution time of a long jump function.
9. equipment as claimed in claim 8, which is characterized in that described jump in function information table further includes each jumping function Function name;
The processing unit, is also used to:
According to determine be it is short jump the first of function and jump function and N number of second jump function, generate by described the One jump function and described N number of second jump function composition jump channel after, jumped in function information table from described, by institute State first jump function and described N number of second jump function function name be changed to the short function name for jumping function;
It is jumped in function information table from described, jumps function and described N number of second for described first and jump the service condition of function It is identified as use state.
10. equipment as claimed in claim 8, which is characterized in that the generation unit is specifically used for:
If it is determined that it is described at least one jump function and be unsatisfactory for first condition, then:
When determining described first to jump function not being long jump function, jumping function setup for described first is long jump letter Number;
Be set as the first of long jump function according to described and jump function, generate by described first jump that function forms jump it is logical Road;It is described jump in channel described be set as the first of long jump function and jump function jumping to the patch function.
11. equipment as claimed in claim 10, which is characterized in that described jump in function information table further includes each jumping letter Several function names;
The processing unit, is also used to:
Jump function in be set as long jump function according to first, generate by described first jump that function forms jump It after channel, is jumped in function information table from described, the function name that described first jumps function is changed to long jump function Function name;
It is jumped in function information table from described, the service condition that described first jumps function is identified as use state.
12. equipment as claimed in claim 8, which is characterized in that further include extracting unit, be used for:
Multiple location points are determined in the code of the program to be repaired;
It is modified by the link script to the program to be repaired, each location point insertion in the multiple location point It is multiple to jump function;
Be inserted into the unified code for extracting the program to be repaired it is all jump each of function jump function function name, Address and service condition jump function information table described in generation.
13. equipment as claimed in claim 12, which is characterized in that any one location point in the multiple location point was inserted into The multiple function that jumps is short to jump function and/or long jump function;
If a location point in the multiple location point be inserted into it is the multiple jump function be it is short jump function, the position The multiple at least one of function that jumps of point insertion jumps the occupied position range of function as a long jump function Occupied position range.
14. equipment as claimed in claim 12, which is characterized in that adjacent two location point in the multiple location point it Between distance be not more than the short maximum jump range jumped;Or
Each location point in the multiple location point is located at adjacent two sections in all codes of the program to be repaired included Position among code.
CN201511002772.XA 2015-12-25 2015-12-25 A kind of hot patch method and apparatus Active CN105607937B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511002772.XA CN105607937B (en) 2015-12-25 2015-12-25 A kind of hot patch method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511002772.XA CN105607937B (en) 2015-12-25 2015-12-25 A kind of hot patch method and apparatus

Publications (2)

Publication Number Publication Date
CN105607937A CN105607937A (en) 2016-05-25
CN105607937B true CN105607937B (en) 2019-01-18

Family

ID=55987891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511002772.XA Active CN105607937B (en) 2015-12-25 2015-12-25 A kind of hot patch method and apparatus

Country Status (1)

Country Link
CN (1) CN105607937B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107357622B (en) * 2017-07-17 2020-09-22 迈普通信技术股份有限公司 Hot patch implementation method and communication equipment
CN108874438B (en) * 2018-06-25 2021-09-21 南京中感微电子有限公司 Patch generation method and device, electronic equipment and computer storage medium
CN112015491B (en) 2019-05-30 2022-08-09 华为技术有限公司 Method, device and computer storage medium for realizing function jump
CN111666096B (en) * 2020-07-02 2021-03-16 腾讯科技(深圳)有限公司 Hot updating method and device for target application, storage medium and electronic equipment
CN113342389B (en) * 2021-05-31 2022-09-30 深圳市腾讯网络信息技术有限公司 Service updating method and device and computer readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101482834A (en) * 2009-01-20 2009-07-15 华为技术有限公司 On-line patch activation method, communication device and system
CN101799763A (en) * 2009-02-10 2010-08-11 华为技术有限公司 Method, device and system for patching kernel on line
CN102609241A (en) * 2012-01-19 2012-07-25 中兴通讯股份有限公司 Hot patching method and device
CN103530184A (en) * 2013-10-24 2014-01-22 华为技术有限公司 Method and device for online patch activation
CN104424037A (en) * 2013-08-29 2015-03-18 中兴通讯股份有限公司 Method and device for dynamically patching function
CN104809018A (en) * 2015-05-18 2015-07-29 烽火通信科技股份有限公司 Method and system for injecting hotfix into software of embedded system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156661B (en) * 2010-02-11 2013-06-12 华为技术有限公司 Method, device and system for online activating patches

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101482834A (en) * 2009-01-20 2009-07-15 华为技术有限公司 On-line patch activation method, communication device and system
CN101799763A (en) * 2009-02-10 2010-08-11 华为技术有限公司 Method, device and system for patching kernel on line
CN102609241A (en) * 2012-01-19 2012-07-25 中兴通讯股份有限公司 Hot patching method and device
CN104424037A (en) * 2013-08-29 2015-03-18 中兴通讯股份有限公司 Method and device for dynamically patching function
CN103530184A (en) * 2013-10-24 2014-01-22 华为技术有限公司 Method and device for online patch activation
CN104809018A (en) * 2015-05-18 2015-07-29 烽火通信科技股份有限公司 Method and system for injecting hotfix into software of embedded system

Also Published As

Publication number Publication date
CN105607937A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN105607937B (en) A kind of hot patch method and apparatus
CN105677404B (en) A kind of configuration update method and device based on Zookeeper
CN106803790B (en) A kind of upgrade control method and device of group system
US9342295B2 (en) Dynamic software updates
CN109358887A (en) A kind of the online upgrading method, apparatus and system of SCM program
CN106201615A (en) The application utilizing successful Resolving probiems is compatible
CN106685894B (en) Risk identification method, device and system
CN106020905A (en) Microcontroller firmware developing and updating method and system
CN103744730B (en) Task scheduling method and device
CN107656776A (en) A kind of firmware update, device and the medium of FPGA accelerator cards
CN105630557A (en) Hotfix method and device
CN110764839A (en) Business processing flow configuration method, business request processing method and device
CN110471693A (en) Application issued, operation method and equipment
CN110162334A (en) A kind of code administration method, apparatus, storage medium and computer program product
CN106528293A (en) Database access method and apparatus
CN111638884B (en) Method, system, device and storage medium for plug-in engineering compilation
CN105512562B (en) Vulnerability mining method and device and electronic equipment
CN111142922B (en) Application program updating method, device, terminal and server
CN105117329A (en) Application automatic online system and method
CN107301105B (en) Method and device for checking hot patch or dynamic library
CN102087607B (en) Method and device for installing patch packets
CN109445878B (en) Method and device for injecting Java class in running
CN111158655A (en) Deployment method and device of software running environment
CN109144806B (en) Function verification method and device for register transmission stage circuit
EP2820547B1 (en) Debugging method and computer program product

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180227

Address after: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou, Guangzhou economic and Technological Development Zone, Guangdong Province, No. 10

Applicant after: Comba Telecom System (China) Co., Ltd.

Applicant after: Comba Telecom Systems (Guangzhou) Co., Ltd.

Applicant after: Jingxin Communication Technology (Guangzhou) Co., Ltd.

Applicant after: TIANJIN COMBA TELECOM SYSTEMS CO., LTD.

Address before: 510663 Guangdong city of Guangzhou Province Economic and Technological Development Zone Jinbi Road No. 6

Applicant before: Jingxin Communication Technology (Guangzhou) Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200106

Address after: 510663 No. 10, Shenzhou Road, Science City, Guangzhou, economic and Technological Development Zone, Huangpu District, Guangzhou, Guangdong Province

Patentee after: Jingxin Communication System (China) Co., Ltd.

Address before: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou, Guangzhou economic and Technological Development Zone, Guangdong Province, No. 10

Co-patentee before: Jingxin Communication System (Guangzhou) Co., Ltd.

Patentee before: Jingxin Communication System (China) Co., Ltd.

Co-patentee before: Jingxin Communication Technology (Guangzhou) Co., Ltd.

Co-patentee before: TIANJIN COMBA TELECOM SYSTEMS CO., LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510663 No.10, Shenzhou Road, Guangzhou Science City, economic and Technological Development Zone, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: Jingxin Network System Co.,Ltd.

Address before: 510663 No.10, Shenzhou Road, Guangzhou Science City, economic and Technological Development Zone, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: Comba Telecom System (China) Ltd.