CN105607924B - A kind of downloading management method and device - Google Patents

A kind of downloading management method and device Download PDF

Info

Publication number
CN105607924B
CN105607924B CN201510945951.0A CN201510945951A CN105607924B CN 105607924 B CN105607924 B CN 105607924B CN 201510945951 A CN201510945951 A CN 201510945951A CN 105607924 B CN105607924 B CN 105607924B
Authority
CN
China
Prior art keywords
memory value
ratio
application program
value
interim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510945951.0A
Other languages
Chinese (zh)
Other versions
CN105607924A (en
Inventor
赵少雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TVMining Beijing Media Technology Co Ltd
Original Assignee
TVMining Beijing Media Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TVMining Beijing Media Technology Co Ltd filed Critical TVMining Beijing Media Technology Co Ltd
Priority to CN201510945951.0A priority Critical patent/CN105607924B/en
Publication of CN105607924A publication Critical patent/CN105607924A/en
Application granted granted Critical
Publication of CN105607924B publication Critical patent/CN105607924B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/445Program loading or initiating
    • G06F9/44557Code layout in executable memory
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5061Partitioning or combining of resources

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Information Transfer Between Computers (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The present invention relates to a kind of downloading management method and devices, wherein method includes: when application program carries out resource downloading, and controlling the application program is the interim memory value of the resource allocation;Obtain maximum committed memory value of the application program in the terminal device;Calculate the ratio between the interim memory value and the maximum committed memory value;The ratio is compared with default ratio;When the ratio is greater than or equal to the default ratio, start garbage collecting function, to recycle to the corresponding waste resources of the application program.Pass through the technical solution, it is ensured that downloading process smooth can carry out, and avoid memory load excessive and influence speed of download, downloading is caused Caton occur.

Description

A kind of downloading management method and device
Technical field
The present invention relates to terminal device technical field more particularly to a kind of downloading management methods and device.
Background technique
When browsing menu interface on the terminal devices such as TV, need to download and load interface data.A such as menu The brief introduction of 9 videos of showing interface, including stage photo and text.
In the data at download menu interface, junk data can be downloaded simultaneously.For example, terminal is high definition device, it is only necessary to It shows the stage photo of high definition, but simultaneously also downloads the stage photo of SD, do not show only, then the stage photo of SD is exactly rubbish Rubbish data.After carrying out menu page turning, the menu interface once shown has also become junk data.
These junk datas all can committed memory.Memory load excessive, will affect speed of download, and downloading is caused to block ?.If memory load continues to increase, lead to RAM leakage.
Summary of the invention
The embodiment of the present invention provides a kind of downloading management method and device, including following technical solution:
According to a first aspect of the embodiments of the present invention, a kind of downloading management method is provided, terminal device is used for, comprising:
When application program carries out resource downloading, controlling the application program is the interim memory value of the resource allocation;
Obtain maximum committed memory value of the application program in the terminal device;
Calculate the ratio between the interim memory value and the maximum committed memory value;
The ratio is compared with default ratio;
When the ratio is greater than or equal to the default ratio, start garbage collecting function, to the application program Corresponding waste resources are recycled.
In one embodiment, described before being compared the ratio with default ratio, the method also includes:
Obtain the unused memory value in the interim memory value;
It is calculated according to the unused memory value and the interim memory value and has used memory value;
Calculate the usage rate used between memory value and the interim memory value;
The default ratio is determined according to the usage rate.
It is in one embodiment, described that usage rate determines the default ratio according to, comprising:
Obtain the peak value of the usage rate;
The peak value of the usage rate is determined as the default ratio.
In one embodiment, the corresponding application program of the control is the interim memory value of the resource allocation, comprising:
It controls corresponding application program and obtains currently available memory value;
It is interim memory value described in the resource allocation according to the currently available memory value.
In one embodiment, the method also includes:
Receive the default ratio setting command of input;
According to the default ratio setting command, the default ratio is set.
According to a second aspect of the embodiments of the present invention, a kind of download management device is provided, terminal device is used for, comprising:
Distribution module, for when application program carries out resource downloading, controlling the application program to be the resource allocation Interim memory value;
First obtains module, for obtaining maximum committed memory value of the application program in the terminal device;
First computing module, for calculating the ratio between the interim memory value and the maximum committed memory value;
Comparison module, for the ratio to be compared with default ratio;
Recycling module, for starting garbage collecting function, with right when the ratio is greater than or equal to the default ratio The corresponding waste resources of the application program are recycled.
In one embodiment, described device further include:
Second obtains module, for obtaining the interim memory before being compared the ratio with default ratio Unused memory value in value;
Second computing module, in being calculated and having used according to the unused memory value and the interim memory value Deposit value;
Third computing module, for calculate it is described used between memory value and the interim memory value used than Rate;
Determining module, for determining the default ratio according to the usage rate.
In one embodiment, the determining module includes:
First acquisition submodule obtains the peak value of the usage rate;
Submodule is determined, for the peak value of the usage rate to be determined as the default ratio.
In one embodiment, the distribution module includes:
Second acquisition submodule obtains currently available memory value for controlling corresponding application program;
Distribution sub module, for being interim memory value described in the resource allocation according to the currently available memory value.
In one embodiment, described device further include:
Receiving module, default ratio setting command for receiving input;
Setup module, for the default ratio to be arranged according to the default ratio setting command.
The technical solution that the embodiment of the present invention provides can include the following benefits:
Above-mentioned technical proposal, when application program carries out resource downloading, calculating application program is the interim interior of resource allocation The ratio of the maximum committed memory value of value and application program in terminal device is deposited, and the ratio and default ratio are compared Compared with when the ratio is greater than or equal to default ratio, starting garbage collecting function carries out the corresponding waste resources of application program Recycling avoids memory load excessive and influences speed of download, under causing in this manner it is ensured that downloading process smooth can carry out Set out existing Caton.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not It can the limitation present invention.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention Example, and be used to explain the principle of the present invention together with specification.
Fig. 1 is a kind of flow chart of downloading management method shown according to an exemplary embodiment.
Fig. 2 is the flow chart of another downloading management method shown according to an exemplary embodiment.
Fig. 3 is the flow chart of step S204 in a kind of downloading management method shown according to an exemplary embodiment.
Fig. 4 is the flow chart of step S101 in a kind of downloading management method shown according to an exemplary embodiment.
Fig. 5 is the flow chart that another downloading management method is shown according to an exemplary embodiment.
Fig. 6 is a kind of block diagram of download management device shown according to an exemplary embodiment.
Fig. 7 is the block diagram of another download management device shown according to an exemplary embodiment.
Fig. 8 is the block diagram of determining module in a kind of download management device shown according to an exemplary embodiment.
Fig. 9 is the block diagram of distribution module in a kind of download management device shown according to an exemplary embodiment.
Figure 10 is the block diagram of another download management device shown according to an exemplary embodiment.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistented with the present invention.On the contrary, they be only with it is such as appended The example of device and method being described in detail in claims, some aspects of the invention are consistent.
The embodiment of the invention provides a kind of downloading management method, this method can be used in terminal device, as shown in Figure 1, The method comprising the steps of S101-S105:
In step s101, when application program carries out resource downloading, control application program is the interim memory of resource allocation Value;The interim memory value is less than maximum committed memory value of the application program in terminal device;
In step s 102, maximum committed memory value of the application program in terminal device is obtained;
In step s 103, the ratio between interim memory value and maximum committed memory value is calculated;
In step S104, ratio is compared with default ratio;
In step s105, when ratio is greater than or equal to default ratio, start garbage collecting function GC (Garbage Collection), to be recycled to the corresponding waste resources of application program.
In the technical scheme, when application program carries out resource downloading, calculating application program is the interim of resource allocation The ratio of the maximum committed memory value of memory value and application program in terminal device, and the ratio and default ratio are carried out Compare, when the ratio is greater than or equal to default ratio, start garbage collecting function, to the corresponding waste resources of application program into Row recycling avoids memory load excessive and influences speed of download, cause in this manner it is ensured that downloading process smooth can carry out There is Caton in downloading.
For example, it is 60% that default ratio, which is arranged, then the ratio between interim memory value and maximum committed memory value is greater than Or when being equal to 60%, downloading is it is possible that therefore Caton can star garbage collecting function, recycling rubbish, thus under guaranteeing Load process smooth can carry out, and avoid memory load excessive and influence speed of download, downloading is caused Caton occur.
As shown in Fig. 2, in one embodiment, before above-mentioned steps S104, the above method further includes step S201- S204:
In step s 201, the unused memory value in interim memory value is obtained;
In step S202, it is calculated according to unused memory value and interim memory value and has used memory value;
In step S203, the usage rate used between memory value and interim memory value is calculated;
In step S204, default ratio is determined according to usage rate.
In this embodiment it is possible to default ratio be determined according to the usage rate of interim memory value, to guarantee Start GC when suitable, because if pre-cooling GC, because GC itself is also cost source, the consumption of system can be increased. If delaying starting GC, cause downloading not smooth.Therefore, default ratio is determined according to the usage rate of interim memory value Value, it is ensured that downloading process smooth can carry out.
As shown in figure 3, in one embodiment, above-mentioned steps S204 includes step S301-S302:
In step S301, the peak value of usage rate is obtained;
In step s 302, the peak value of usage rate is determined as default ratio.
In this embodiment, the usage rate of interim memory value is dynamic change, but it has peak value to be Interim memory value accounts for the ratio of the maximum committed memory value of each application, when getting this value by calculating and test, under Carrying speed can reach most fast, therefore, can be using this peak value as default ratio.
For example, temporarily distribute in save as 4M, rubbish can download generation Caton, that is, 2M after occupying 50%.It is so real When monitor rubbish quantity, start GC when reaching 2M.
Alternatively, the size of a high definition picture is 500K, text be can be ignored.So 4 high definition pictures with regard to it is poor not More 2M.So downloading and just starting GC after loading 4 high definition pictures.
As shown in figure 4, in one embodiment, above-mentioned steps S101 includes step S401-S402:
In step S401, controls corresponding application program and obtain currently available memory value;
It is the interim memory value of resource allocation according to currently available memory value in step S402.
In this embodiment, application program can carry out the distribution of interim memory according to the currently running memory situation of system, To guarantee the normal operation of system.
As shown in figure 5, in one embodiment, the above method further includes step S501-S502:
In step S501, the default ratio setting command of input is received;
In step S502, default ratio is arranged according to default ratio setting command.
In this embodiment, default ratio can also rule of thumb oneself be arranged in user, to guarantee when suitable Starting GC, because GC itself is also cost source, can increase the consumption of system because if pre-cooling GC.It is opened if delayed Dynamic GC, then cause downloading not smooth.Therefore, the suitably default ratio of setting, it is ensured that downloading process smooth can carry out.
Wherein, each application program maximum committed memory value is one dynamic value-calculation formula are as follows:
IntmaxMemory (the current maximum committed memory value of terminal device)=((int) Runtime.getRuntime ().maxMemory())/1024/1024;
The memory value that interim memory value i.e. current application program are got, calculation formula are as follows:
Long totalGetMemory=((int) Runtime.getRuntime () .totalMemory ())/1024/ 1024;
Interim memory value accounts for the percentage of each application program maximum committed memory value are as follows:
Int maxPercent=totalGetMemory/maxMemory
Unused memory value in interim memory value are as follows:
Long freeMemory=((int) Runtime.getRuntime () .freeMemory ())/1024/1024;
The usage rate of interim memory value are as follows:
Int usingMemoryPercent=(totalGetMemory-freeMemory)/totalGetMemory
Following is embodiment of the present disclosure, can be used for executing embodiments of the present disclosure.
Fig. 6 is a kind of block diagram of download management device shown according to an exemplary embodiment, which can be by soft Part, hardware or both are implemented in combination with as some or all of of terminal device.As shown in fig. 6, the download management device Include:
Distribution module 61, for when application program carries out resource downloading, control application program to be that resource allocation is temporarily interior Deposit value;
First obtains module 62, for obtaining maximum committed memory value of the application program in terminal device;
First computing module 63, for calculating the ratio between interim memory value and maximum committed memory value;
Comparison module 64, for ratio to be compared with default ratio;
Recycling module 65, for starting garbage collecting function when ratio is greater than or equal to default ratio, to using journey The corresponding waste resources of sequence are recycled.
As shown in fig. 7, in one embodiment, above-mentioned apparatus further include:
Second obtains module 71, for obtaining in interim memory value before being compared ratio with default ratio Memory value is not used;
Second computing module 72, for being calculated according to unused memory value and interim memory value and having used memory value;
Third computing module 73, for calculating the usage rate used between memory value and interim memory value;
Determining module 74, for determining default ratio according to usage rate.
As shown in figure 8, in one embodiment, determining module 74 includes:
First acquisition submodule 81, for obtaining the peak value of usage rate;
Submodule 82 is determined, for the peak value of usage rate to be determined as default ratio.
As shown in figure 9, in one embodiment, distribution module 61 includes:
Second acquisition submodule 91 obtains currently available memory value for controlling corresponding application program;
Distribution sub module 92, for being the interim memory value of resource allocation according to currently available memory value.
As shown in Figure 10, in one embodiment, above-mentioned apparatus further include:
Receiving module 101, default ratio setting command for receiving input;
Setup module 102, for default ratio to be arranged according to default ratio setting command.
About the device in above-described embodiment, wherein modules execute the concrete mode of operation in related this method Embodiment in be described in detail, no detailed explanation will be given here.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.) Formula.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (6)

1. a kind of downloading management method is used for terminal device characterized by comprising
When application program carries out resource downloading, controlling the application program is the interim memory value of the resource allocation;
Obtain maximum committed memory value of the application program in the terminal device;
Calculate the ratio between the interim memory value and the maximum committed memory value;
The ratio is compared with default ratio;
When the ratio is greater than or equal to the default ratio, start garbage collecting function, with corresponding to the application program Waste resources recycled;
It is described before the ratio is compared with default ratio, the method also includes:
Obtain the unused memory value in the interim memory value;
It is calculated according to the unused memory value and the interim memory value and has used memory value;
Calculate the usage rate used between memory value and the interim memory value;
The default ratio is determined according to the usage rate.
2. the method according to claim 1, wherein described, usage rate determines the default ratio according to Value, comprising:
Obtain the peak value of the usage rate;
The peak value of the usage rate is determined as the default ratio.
3. the method according to claim 1, wherein the corresponding application program of the control is the resource allocation Interim memory value, comprising:
It controls corresponding application program and obtains currently available memory value;
It is interim memory value described in the resource allocation according to the currently available memory value.
4. a kind of download management device is used for terminal device characterized by comprising
Distribution module, for when application program carries out resource downloading, controlling the application program to be that the resource allocation is interim Memory value;
First obtains module, for obtaining maximum committed memory value of the application program in the terminal device;
First computing module, for calculating the ratio between the interim memory value and the maximum committed memory value;
Comparison module, for the ratio to be compared with default ratio;
Recycling module, for starting garbage collecting function, to described when the ratio is greater than or equal to the default ratio The corresponding waste resources of application program are recycled;
Second obtains module, for obtaining in the interim memory value before being compared the ratio with default ratio Unused memory value;
Second computing module, for being calculated according to the unused memory value and the interim memory value and having used memory Value;
Third computing module, for calculating the usage rate used between memory value and the interim memory value;
Determining module, for determining the default ratio according to the usage rate.
5. device according to claim 4, which is characterized in that the determining module includes:
First acquisition submodule, for obtaining the peak value of the usage rate;
Submodule is determined, for the peak value of the usage rate to be determined as the default ratio.
6. device according to claim 4, which is characterized in that the distribution module includes:
Acquisition submodule obtains currently available memory value for controlling corresponding application program;
Distribution sub module, for being interim memory value described in the resource allocation according to the currently available memory value.
CN201510945951.0A 2015-12-16 2015-12-16 A kind of downloading management method and device Expired - Fee Related CN105607924B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510945951.0A CN105607924B (en) 2015-12-16 2015-12-16 A kind of downloading management method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510945951.0A CN105607924B (en) 2015-12-16 2015-12-16 A kind of downloading management method and device

Publications (2)

Publication Number Publication Date
CN105607924A CN105607924A (en) 2016-05-25
CN105607924B true CN105607924B (en) 2019-01-18

Family

ID=55987878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510945951.0A Expired - Fee Related CN105607924B (en) 2015-12-16 2015-12-16 A kind of downloading management method and device

Country Status (1)

Country Link
CN (1) CN105607924B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117544762B (en) * 2023-11-17 2024-04-19 广东信佰工程监理有限公司 Project supervision method and system based on big data analysis

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060053246A1 (en) * 2004-08-30 2006-03-09 Lee Schweiray J Systems and methods for providing nonvolatile memory management in wireless phones
CN101221535A (en) * 2008-01-25 2008-07-16 中兴通讯股份有限公司 Garbage recovery mobile communication terminal of Java virtual machine and recovery method thereof
US20100077163A1 (en) * 2007-02-05 2010-03-25 Kyoto University Memory Management Method, Memory Management Apparatus, and Recording Medium Recording the Memory Management Program
CN103927230A (en) * 2014-03-25 2014-07-16 优视科技有限公司 Memory usage feedback method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060053246A1 (en) * 2004-08-30 2006-03-09 Lee Schweiray J Systems and methods for providing nonvolatile memory management in wireless phones
US20100077163A1 (en) * 2007-02-05 2010-03-25 Kyoto University Memory Management Method, Memory Management Apparatus, and Recording Medium Recording the Memory Management Program
CN101221535A (en) * 2008-01-25 2008-07-16 中兴通讯股份有限公司 Garbage recovery mobile communication terminal of Java virtual machine and recovery method thereof
CN103927230A (en) * 2014-03-25 2014-07-16 优视科技有限公司 Memory usage feedback method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Android 应用开发中内存管理优化方法的研究;孙岳龙;《中国优秀硕士学位论文 全文数据库》;20150415(第4期);第2,13,23,28-29,35-36页

Also Published As

Publication number Publication date
CN105607924A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
US10572285B2 (en) Method and apparatus for elastically scaling virtual machine cluster
CN104767809B (en) A kind of download control method and system
CN107733985B (en) Method and device for deploying functional components of cloud computing system
TW201426493A (en) Method and apparatus for adapting custom control components to a screen
CN109643241A (en) Display processing method, device, storage medium and electric terminal
CN105843819B (en) Data export method and device
CN104572301A (en) Resource distribution method and system
CN102800045A (en) Image processing method and device
CN109344062A (en) The cross-domain method for jumping test of the page and terminal device
CN106406839A (en) Processing method and device of screen adaption file
CN106843794B (en) Split screen display method and system based on android
CN110764892A (en) Task processing method, device and computer readable storage medium
CN104301788A (en) Method and device for providing video interaction
CN104918112A (en) Camera resource application method and device
CN114943885A (en) Synchronous cache acceleration method and system based on training task
CN105607924B (en) A kind of downloading management method and device
CN104360909B (en) A kind of method for processing video frequency and device
WO2018177286A1 (en) Static resource request processing method and device
CN103914223B (en) The generation method and device at terminal applies interface
CN107678863A (en) The page assembly means of communication and device
CN114786069B (en) Video generation method, device, medium and electronic equipment
CN112905072B (en) Application processing method and device and electronic equipment
CN104699240A (en) Control method and electronic equipment
CN105740141B (en) A kind of automated detection method and its device
CN105389205B (en) A kind of information processing method and electronic equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A download management method and device

Effective date of registration: 20210104

Granted publication date: 20190118

Pledgee: Inner Mongolia Huipu Energy Co.,Ltd.

Pledgor: TVMINING (BEIJING) MEDIA TECHNOLOGY Co.,Ltd.

Registration number: Y2020990001527

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190118

Termination date: 20211216