CN105591315B - Block corner block during a kind of high voltage power transmission construction - Google Patents
Block corner block during a kind of high voltage power transmission construction Download PDFInfo
- Publication number
- CN105591315B CN105591315B CN201511022315.7A CN201511022315A CN105591315B CN 105591315 B CN105591315 B CN 105591315B CN 201511022315 A CN201511022315 A CN 201511022315A CN 105591315 B CN105591315 B CN 105591315B
- Authority
- CN
- China
- Prior art keywords
- standing frame
- sheave
- power transmission
- high voltage
- voltage power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 230000005540 biological transmission Effects 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 8
- 239000004677 Nylon Substances 0.000 claims description 4
- 229920001778 nylon Polymers 0.000 claims description 4
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009414 blockwork Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Pulleys (AREA)
Abstract
Block corner block when the present invention provides a kind of high voltage power transmission construction, including:Left standing frame, right standing frame, top sheave, lower sheave, clutch shaft bearing, second bearing;The top sheave is more than the lower sheave;The top sheave and lower sheave are placed between the left standing frame and right standing frame;The top sheave is fixed between the left standing frame and right standing frame by the clutch shaft bearing;The lower sheave is fixed between the left standing frame and right standing frame by the second bearing;The top sheave upper ends bearing rope;Place danish seine rope in the space formed between the top sheave and lower sheave.Because top sheave and lower sheave are arranged above and below, and the diameter of top sheave is more than the end of lower sheave, can so ensure that bearing rope and danish seine rope will not mutually be intertwined, so as to improve efficiency of construction.
Description
Technical field
The present invention relates to high-voltage transmission equipment technical field, more particularly to block steering is slided during a kind of construction of high voltage power transmission
Car.
Background technology
The construction of China's extra high voltage line has been enter into the stage of fast development, in UHV transmission line work progress often
The situation across critical facility is run into, and shows that spanning height more and more higher, number be more and more, operating mode becomes increasingly complex
Feature.Across during critical facility, it is necessary to block protection be carried out to newly-built circuit, but in practice of construction, by the management list across facility
Position is very short to the block time of unit in charge of construction, and can block that within the limited time safely and fast become an important times
Business, this invention can greatly reduce the establishment netted in work progress and pull-in time.
Prior art carries out steering use in block work progress, using two-wheel lifting block, wherein, two pulley left sides
The right side is arranged side by side, and danish seine rope is placed on a pulley, bearing rope is placed on another pulley.So construction when, danish seine rope and
Bearing rope is easily intertwined.
Therefore, block corner block when those skilled in the art need to provide a kind of high voltage power transmission construction, can solve the problem that
The technical problem that danish seine rope and bearing rope are easily intertwined during construction.
The content of the invention
In order to solve prior art, block corner block when the present invention provides a kind of high voltage power transmission construction, can solve the problem that
The technical problem that danish seine rope and bearing rope are easily intertwined during construction.
Block corner block when the embodiment of the present invention provides a kind of high voltage power transmission construction, including:Left standing frame, right standing frame,
Top sheave, lower sheave, clutch shaft bearing, second bearing;
The diameter of the top sheave is more than the diameter of the lower sheave;
The top sheave and lower sheave are placed between the left standing frame and right standing frame;
The top sheave is fixed between the left standing frame and right standing frame by the clutch shaft bearing;
The lower sheave is fixed between the left standing frame and right standing frame by the second bearing;
The top sheave upper ends bearing rope;
Place danish seine rope in the space formed between the top sheave and lower sheave.
Preferably, in addition to:Upper hanging plate;
The upper hanging plate is located at the top of the coaster;
One end of the upper hanging plate is fixed on the right standing frame by Fixed latches;
The other end of the upper hanging plate is connected by movable latch with the left standing frame;
The top sheave places the bearing rope with the space that the upper hanging plate is formed.
Preferably, in addition to:Fixed tailing axle;
One end of the fixed tailing axle connects the right standing frame, and the other end of the fixed tailing axle connects the left standing frame,
For fixing the relative position of right standing frame and left standing frame.
Preferably, the material of the top sheave and lower sheave is nylon material.
Preferably, the right standing frame and left standing frame use No. 10 channel-section steels.
Preferably, the upper hanging plate uses Q345 steel.
Preferably, the fixed tailing axle uses No. 45 steel.
Preferably, the upper hanging plate is provided with through hole;
The coaster is hung on the cross-arm of power transmission tower using shackle through the through hole.
Compared with prior art, the present invention at least has advantages below:
In order to avoid bearing rope in work progress and danish seine rope are mutually intertwined, set on the top of coaster sliding
Wheel, bottom set lower sheave, i.e. top sheave is arranged above and below with lower sheave, can so make the distance at bearing rope and danish seine rope interval
Bigger, that is, the distance being spaced is about the diameter of top sheave.In addition, in order to further increase bearing rope and danish seine rope away from
From the present invention sets top sheave to be more than lower sheave.Because the diameter of top sheave is directly determined between bearing rope and danish seine rope
Distance, lower sheave are only to play a part of slip.It can so ensure that bearing rope and danish seine rope will not mutually be intertwined, from
And improve efficiency of construction.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is block corner block front view when high voltage power transmission provided by the invention is constructed;
Fig. 2 is along A1-A2 sectional view in Fig. 1;
Fig. 3 is corresponding side view when upper hanging plate provided by the invention is opened.
Embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention
Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only this
Invention part of the embodiment, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art exist
The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Referring to Fig. 1, block corner block front view when the figure is high voltage power transmission construction provided by the invention.Referring to Fig. 2,
The figure is along A1-A2 sectional view in Fig. 1.
Block corner block during the high voltage power transmission construction that the present embodiment provides, including:Left standing frame 101, right standing frame 102,
Top sheave 103, lower sheave 104, clutch shaft bearing 105, second bearing 106;
The diameter of the top sheave 103 is more than the diameter of the lower sheave 104;
The top sheave 103 and lower sheave 104 are placed between the left standing frame 101 and right standing frame 102;
The top sheave 103 is fixed between the left standing frame and right standing frame by the clutch shaft bearing 105;
The lower sheave 104 is fixed between the left standing frame 101 and right standing frame 102 by the second bearing 106;
The upper ends bearing rope of top sheave 103;
Place danish seine rope in the space 107 formed between the top sheave 103 and lower sheave 104.
It is understood that place danish seine rope for convenience, the periphery of top sheave 103 and lower sheave 104 can be spaced pre-
Set a distance, i.e., the circumference of two pulleys are not in contact with.
Due to the coaster that the present embodiment provides, in order to avoid bearing rope in work progress and danish seine rope are mutually wrapped in one
Rise, top sheave 103 is set on the top of coaster, bottom sets lower sheave 104, i.e. top sheave 103 is arranged with lower sheave about 104
Row, can so make the distance at bearing rope and danish seine rope interval bigger, that is, the distance being spaced is about the straight of top sheave 103
Footpath.In addition, in order to further increase the distance of bearing rope and danish seine rope, the present invention sets top sheave to be more than lower sheave.Due to upper
The diameter of pulley directly determines the distance between bearing rope and danish seine rope, and lower sheave is only to play a part of slip.So may be used
To ensure that bearing rope and danish seine rope will not mutually be intertwined, so as to improve efficiency of construction.
In addition, coaster provided by the invention also includes:Upper hanging plate 108;
The upper hanging plate 108 is located at the top of the coaster;
One end of the upper hanging plate 108 is fixed on the right standing frame 102 by Fixed latches 109;
The other end of the upper hanging plate 108 is connected by movable latch 110 with the left standing frame 101;
Place the bearing rope in the space 111 that the top sheave 103 is formed with the upper hanging plate 108.
It is understood that set one end of upper hanging plate 108 to be connected by movable latch 110 with the left standing frame 101, can
To facilitate placement bearing rope.When needing to place bearing rope, the movable latch 110 is pulled up, upper hanging plate 108 is opened, specifically
Referring to Fig. 3, the figure is corresponding side view when upper hanging plate 108 is opened.
After bearing rope is placed, when the movable latch 110 inserts the left standing frame 101.
In addition, the coaster that the present embodiment provides, in addition to:Fixed tailing axle 112;
One end of the fixed tailing axle 112 connects the right standing frame 102, the other end connection institute of the fixed tailing axle 112
Left standing frame 101 is stated, for fixing the relative position of right standing frame 102 and left standing frame 101.
It should be noted that the material of the top sheave 103 provided by the invention and lower sheave 104 is nylon material.
It is steel that pulley in corner block of the prior art, which uses material, will so increase the abrasion to insulating cord.And
Two pulleys that the present invention uses are nylon materials, can so reduce the abrasion to bearing rope and danish seine rope.
The right standing frame 102 and left standing frame 101 use No. 10 channel-section steels, sturdy and durable.
The upper hanging plate uses Q345 steel.
The fixed tailing axle uses No. 45 steel.
The upper hanging plate is provided with through hole;
The coaster is hung on the cross-arm of power transmission tower using shackle through the through hole.
The coaster that above example of the present invention provides, two pulleys, and top sheave is big up and down are set, truckle is small, full
Sufficient construction property, it can increase the distance between bearing rope and danish seine rope, avoid both from being mutually wrapped in work progress
Together.In addition, for the ease of placing thicker bearing rope, upper hanging plate is arranged around to the form of Fixed latches activity.Due to
Danish seine rope is thinner, therefore can directly seal in the space 107 between top sheave and lower sheave.
Coaster provided by the invention can improve efficiency of construction, ingenious in design, and unheavy.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention.Though
So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention.It is any to be familiar with those skilled in the art
Member, without departing from the scope of the technical proposal of the invention, all using the methods and technical content of the disclosure above to the present invention
Technical scheme makes many possible changes and modifications, or is revised as the equivalent embodiment of equivalent variations.Therefore, it is every without departing from
The content of technical solution of the present invention, the technical spirit according to the present invention is to any simple modification made for any of the above embodiments, equivalent
Change and modification, still fall within technical solution of the present invention protection in the range of.
Claims (8)
- A kind of 1. block corner block during high voltage power transmission construction, it is characterised in that including:Left standing frame, right standing frame, top sheave, Lower sheave, clutch shaft bearing, second bearing;The diameter of the top sheave is more than the diameter of the lower sheave;The top sheave and lower sheave are placed between the left standing frame and right standing frame;The top sheave is fixed between the left standing frame and right standing frame by the clutch shaft bearing;The lower sheave is fixed between the left standing frame and right standing frame by the second bearing;The top sheave upper ends bearing rope;Place danish seine rope in the space formed between the top sheave and lower sheave.
- 2. block corner block during high voltage power transmission construction according to claim 1, it is characterised in that also include:Upper extension Plate;The upper hanging plate is located at the top of the coaster;One end of the upper hanging plate is fixed on the right standing frame by Fixed latches;The other end of the upper hanging plate is connected by movable latch with the left standing frame;The top sheave places the bearing rope with the space that the upper hanging plate is formed.
- 3. block corner block during high voltage power transmission construction according to claim 1, it is characterised in that also include:It is fixed Tailing axle;One end of the fixed tailing axle connects the right standing frame, and the other end of the fixed tailing axle connects the left standing frame, is used for The relative position of fixed right standing frame and left standing frame.
- 4. block corner block during high voltage power transmission according to claim 1 construction, it is characterised in that the top sheave and The material of lower sheave is nylon material.
- 5. block corner block during high voltage power transmission according to claim 1 construction, it is characterised in that the right standing frame and Left standing frame uses No. 10 channel-section steels.
- 6. block corner block during high voltage power transmission construction according to claim 2, it is characterised in that the upper hanging plate is adopted With Q345 steel.
- 7. block corner block during high voltage power transmission construction according to claim 3, it is characterised in that the fixed tailing axle Using No. 45 steel.
- 8. block corner block during high voltage power transmission construction according to claim 2, it is characterised in that the upper hanging plate is set It is equipped with through hole;The coaster is hung on the cross-arm of power transmission tower using shackle through the through hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511022315.7A CN105591315B (en) | 2015-12-30 | 2015-12-30 | Block corner block during a kind of high voltage power transmission construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511022315.7A CN105591315B (en) | 2015-12-30 | 2015-12-30 | Block corner block during a kind of high voltage power transmission construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105591315A CN105591315A (en) | 2016-05-18 |
CN105591315B true CN105591315B (en) | 2018-03-20 |
Family
ID=55930666
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511022315.7A Active CN105591315B (en) | 2015-12-30 | 2015-12-30 | Block corner block during a kind of high voltage power transmission construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105591315B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107565451B (en) * | 2017-09-28 | 2019-09-13 | 陈剑青 | A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster |
CN111891935A (en) * | 2020-09-07 | 2020-11-06 | 广东电网能源发展有限公司 | On-line sliding trolley |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101364717A (en) * | 2008-04-28 | 2009-02-11 | 国网北京电力建设研究院 | Glue-sizing double R groove shaped conductive thread expanding pulley |
JP2011172448A (en) * | 2010-02-22 | 2011-09-01 | Chugoku Electric Power Co Inc:The | Device for preventing guide rope from dropping down, and method for stretching guide rope |
CN202014057U (en) * | 2011-03-28 | 2011-10-19 | 辽宁省电力有限公司本溪供电公司 | Pulley used for setting up power transmission line |
CN202424003U (en) * | 2011-12-22 | 2012-09-05 | 云南电网公司带电作业分公司 | Specially-used pulley for electrified crossing frame of insulating rope bridge |
CN203774690U (en) * | 2014-04-21 | 2014-08-13 | 国家电网公司 | Pay-off device for power line erecting |
CN203967615U (en) * | 2014-06-27 | 2014-11-26 | 国家电网公司 | Block coaster |
CN204349335U (en) * | 2014-12-15 | 2015-05-20 | 国家电网公司 | Block top skating car |
CN204577983U (en) * | 2015-04-30 | 2015-08-19 | 国网山西省电力公司信息通信分公司 | A kind of coaster setting up leads span net |
CN205646621U (en) * | 2015-12-30 | 2016-10-12 | 国家电网公司 | Corner block for block during high -tension transmission construction |
-
2015
- 2015-12-30 CN CN201511022315.7A patent/CN105591315B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101364717A (en) * | 2008-04-28 | 2009-02-11 | 国网北京电力建设研究院 | Glue-sizing double R groove shaped conductive thread expanding pulley |
JP2011172448A (en) * | 2010-02-22 | 2011-09-01 | Chugoku Electric Power Co Inc:The | Device for preventing guide rope from dropping down, and method for stretching guide rope |
CN202014057U (en) * | 2011-03-28 | 2011-10-19 | 辽宁省电力有限公司本溪供电公司 | Pulley used for setting up power transmission line |
CN202424003U (en) * | 2011-12-22 | 2012-09-05 | 云南电网公司带电作业分公司 | Specially-used pulley for electrified crossing frame of insulating rope bridge |
CN203774690U (en) * | 2014-04-21 | 2014-08-13 | 国家电网公司 | Pay-off device for power line erecting |
CN203967615U (en) * | 2014-06-27 | 2014-11-26 | 国家电网公司 | Block coaster |
CN204349335U (en) * | 2014-12-15 | 2015-05-20 | 国家电网公司 | Block top skating car |
CN204577983U (en) * | 2015-04-30 | 2015-08-19 | 国网山西省电力公司信息通信分公司 | A kind of coaster setting up leads span net |
CN205646621U (en) * | 2015-12-30 | 2016-10-12 | 国家电网公司 | Corner block for block during high -tension transmission construction |
Also Published As
Publication number | Publication date |
---|---|
CN105591315A (en) | 2016-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105591315B (en) | Block corner block during a kind of high voltage power transmission construction | |
CN105591313A (en) | Support frame equipment for high-voltage transmission cables | |
CN205646621U (en) | Corner block for block during high -tension transmission construction | |
CN205855858U (en) | A kind of derrick crane hoist rope passes around system | |
CN204577983U (en) | A kind of coaster setting up leads span net | |
CN105429055B (en) | Netting coaster in a kind of construction of high voltage transmission line | |
CN205936382U (en) | Pit ladder device | |
CN205355670U (en) | Coaster for insulator spindle in transmission line construction | |
CN204173790U (en) | A kind of suspension type limit switch | |
CN103578631A (en) | Anti-pulling waterproof rubber sleeve cable | |
CN204369461U (en) | For the triangle lifting rope structure of driving a vehicle | |
CN103318750A (en) | Bridge crane hook group structure | |
CN202384695U (en) | Hoisting tool | |
CN206928723U (en) | A kind of steel wire rope rear suspension bar | |
CN204199669U (en) | A kind of foot rest | |
CN106025926A (en) | Horizontal double split wire inspection robot walking obstacle-crossing device | |
CN204897179U (en) | Member lifts by crane cohesion device | |
CN204361573U (en) | A kind of high-voltage power transmission tower line eedle threader | |
CN203499321U (en) | Derrick for assembling electric transmission line iron tower | |
CN206117940U (en) | Earphone cord reinforcing sleeve | |
CN204002592U (en) | A kind of drilling machine mast | |
CN203673859U (en) | Tensile waterproof rubber sleeve cable | |
CN202443795U (en) | Electric cable for crane | |
CN202971704U (en) | Gas spring assembly | |
CN204497706U (en) | A kind of liftable cable paying-off tackle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |