CN105590030A - 水下滚石冲击力的计算方法 - Google Patents

水下滚石冲击力的计算方法 Download PDF

Info

Publication number
CN105590030A
CN105590030A CN201610059192.2A CN201610059192A CN105590030A CN 105590030 A CN105590030 A CN 105590030A CN 201610059192 A CN201610059192 A CN 201610059192A CN 105590030 A CN105590030 A CN 105590030A
Authority
CN
China
Prior art keywords
impact force
underwater
rolling
calculation method
calculation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610059192.2A
Other languages
English (en)
Inventor
余斌
易伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN201610059192.2A priority Critical patent/CN105590030A/zh
Publication of CN105590030A publication Critical patent/CN105590030A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
    • G01L5/0052Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes measuring forces due to impact
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明属于崩塌、落石防治工程、水利工程领域,涉及水下滚石的冲击力的计算方法,计算公式为F=0.212(Em2V4)1/3sin0.5θ。本发明提供的水下滚石的冲击力的计算方法,开创性的建立了水下滚石冲击力的计算模型,对于崩塌、落石在水中的防灾减灾具有更高的防灾适用性;对于水下滚石冲击力的计算考虑了量纲和谐这一基本原理,因此计算方法适用于野外大尺度的实际计算。

Description

水下滚石冲击力的计算方法
技术领域
本发明属于崩塌、落石防治工程、水利工程领域,涉及水下滚石的冲击力的计算方法。
背景技术
崩塌、落石是一种发生在山区或公路边坡的自然现象。崩塌、落石发生后,巨大的石块滚落到河中,对建在水中的桥墩等都会造成极大的破坏。
目前国内外对滚石的冲击力计算研究主要集中在地面。对水下滚石冲击力研究极少。因此一个室内研究且能在野外适用的水下计算冲击力模型显得非常重要,这也是崩塌和落石的防治工程设计必不可少的。
发明内容
针对上述技术问题,本发明提供一种水下滚石的冲击力的计算方法,为一种量纲和谐、计算结果准确的水下滚石冲击力的计算方法。
具体技术方案为:
水下滚石的冲击力的计算方法:
F=0.212(Em2V4)1/3sin0.5θ(1)
式中:
F——滚石冲击力,N;
m——滚石质量,kg;
V——滚石运动速度,m/s;
θ——滚石运动方向与被冲击物的平面夹角,单位°;
E——综合弹性模量,
E1——滚石弹性模量,Pa;
E2——水流中被冲击物弹性模量,Pa。
本发明提供的水下滚石的冲击力的计算方法,开创性的建立了水下滚石冲击力的计算模型,对于崩塌、落石在水中的防灾减灾具有更高的防灾适用性;对于水下滚石冲击力的计算考虑了量纲和谐这一基本原理,因此计算方法适用于野外大尺度的实际计算。
附图说明
图1为实施例试验数据分析结果。
具体实施方式
结合实施例说明本发明的具体实施方式。
在实验室用不同体积的清水从不同位置倒下,使撞击物体在淹没的情况下,以不同的速度撞击被撞物体。重复多次实验。通过多组实验,数据整理得到如图1所示,其中F为实验值,F1=(Em2V4)1/3,最终得到其系数为一个常数,其C=0.212,验证本发明提供的计算公式可行。

Claims (1)

1.水下滚石的冲击力的计算方法,其特征在于,由以下公式计算:
F=0.212(Em2V4)1/3sin0.5θ(1)
式中:
F——滚石冲击力,N;
m——滚石质量,kg;
V——滚石运动速度,m/s;
θ——滚石运动方向与被冲击物的平面夹角,单位°;
E——综合弹性模量, E = E 1 E 2 E 1 + 2 E 2 ;
E1——滚石弹性模量,Pa;
E2——水流中被冲击物弹性模量,Pa。
CN201610059192.2A 2016-01-28 2016-01-28 水下滚石冲击力的计算方法 Pending CN105590030A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610059192.2A CN105590030A (zh) 2016-01-28 2016-01-28 水下滚石冲击力的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610059192.2A CN105590030A (zh) 2016-01-28 2016-01-28 水下滚石冲击力的计算方法

Publications (1)

Publication Number Publication Date
CN105590030A true CN105590030A (zh) 2016-05-18

Family

ID=55929606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610059192.2A Pending CN105590030A (zh) 2016-01-28 2016-01-28 水下滚石冲击力的计算方法

Country Status (1)

Country Link
CN (1) CN105590030A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106052924A (zh) * 2016-06-02 2016-10-26 长沙理工大学 大型超高车辆撞击桥梁上部结构的撞击力计算方法及装置
CN107292009A (zh) * 2017-06-09 2017-10-24 成都理工大学 一种适用于旋转动能的滚石冲击力计算方法
CN112924305A (zh) * 2021-01-27 2021-06-08 中国地质大学(北京) 获取被动桩板拦石墙在崩塌落石地质灾害中动态响应数据的方法
CN114169053A (zh) * 2021-12-03 2022-03-11 中铁第一勘察设计院集团有限公司 落石最大冲击力计算方法
CN115575004A (zh) * 2022-08-18 2023-01-06 西南交通大学 落石冲击埋地管道的冲击性能计算方法、设备和存储介质

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005163532A (ja) * 2003-11-12 2005-06-23 Nihon Samicon Co Ltd 落石防護構造物の設計方法と落石防護構造物
CN104794352A (zh) * 2015-04-24 2015-07-22 成都理工大学 一种滚石的冲击力计算方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005163532A (ja) * 2003-11-12 2005-06-23 Nihon Samicon Co Ltd 落石防護構造物の設計方法と落石防護構造物
CN104794352A (zh) * 2015-04-24 2015-07-22 成都理工大学 一种滚石的冲击力计算方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
叶四桥 等: "落石冲击力计算方法", 《中国铁道科学》 *
蒲超: "滚石冲击力试验研究及其计算方法浅析", 《路基工程》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106052924A (zh) * 2016-06-02 2016-10-26 长沙理工大学 大型超高车辆撞击桥梁上部结构的撞击力计算方法及装置
CN107292009A (zh) * 2017-06-09 2017-10-24 成都理工大学 一种适用于旋转动能的滚石冲击力计算方法
CN112924305A (zh) * 2021-01-27 2021-06-08 中国地质大学(北京) 获取被动桩板拦石墙在崩塌落石地质灾害中动态响应数据的方法
CN114169053A (zh) * 2021-12-03 2022-03-11 中铁第一勘察设计院集团有限公司 落石最大冲击力计算方法
CN114169053B (zh) * 2021-12-03 2024-04-30 中铁第一勘察设计院集团有限公司 落石最大冲击力计算方法
CN115575004A (zh) * 2022-08-18 2023-01-06 西南交通大学 落石冲击埋地管道的冲击性能计算方法、设备和存储介质

Similar Documents

Publication Publication Date Title
CN105590030A (zh) 水下滚石冲击力的计算方法
CN104794352B (zh) 一种滚石的冲击力计算方法
CN105740620A (zh) 泥石流冲击力的计算方法
CN107292009B (zh) 一种适用于旋转动能的滚石冲击力计算方法
CN108009363A (zh) 一种泥石流冲刷桥墩的计算方法
CN106844859A (zh) 一种滑坡涌浪计算方法
Jayaratne et al. Predictive model for scour depth of coastal structure failures due to tsunamis
CN102943450A (zh) 一种粘性泥石流沟沟床最大冲刷深度的测算方法及应用
CN104484710B (zh) 一种波浪作用导致的软质海崖崖面侵蚀量预测方法
Shin et al. Understanding of rip current generation mechanism at Haeundae Beach of Korea: Honeycomb waves
Cai et al. Experimental and numerical study of the tidal bore impact on a newly-developed sheet-pile groin in Qiantang river
Xie et al. A preliminary study of the turbulence features of the tidal bore in the Qiantang River, China
Kuiry et al. Numerical simulations of morphological changes in barrier islands induced by storm surges and waves using a supercritical flow model
CN104729822A (zh) 一种涡轮叶片尾迹模拟装置
Wang et al. Numerical research of harbor oscillation influenced by vegetation
Carling Subaqueous “yardangs”: Analogs for aeolian yardang evolution
CN106192865B (zh) 一种泥石流弯道超高计算方法及其应用
CN204418097U (zh) 一种可调节式滑坡涌浪模型
CN104596735B (zh) 一种桥梁群的优化布置方法
CN212077801U (zh) 一种土建施工用护坡防护装置
RU2310707C2 (ru) Способ уменьшения разрушительного действия цунами
ZHANG Wave breaking simulation by non-hydrostatic numerical model
CN106245573A (zh) 一种粘性泥石流弯道超高计算方法及应用
Lu et al. Back silting and regulation of waterway with sand bar in strong tidal estuary.
Meireles et al. Flow characteristics along a USBR type III stilling basin downstream of steep stepped spillways

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160518