CN105586831A - Hanging basket bracket combination method - Google Patents

Hanging basket bracket combination method Download PDF

Info

Publication number
CN105586831A
CN105586831A CN201410573289.6A CN201410573289A CN105586831A CN 105586831 A CN105586831 A CN 105586831A CN 201410573289 A CN201410573289 A CN 201410573289A CN 105586831 A CN105586831 A CN 105586831A
Authority
CN
China
Prior art keywords
hanging basket
combination method
bracket combination
basket bracket
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410573289.6A
Other languages
Chinese (zh)
Inventor
李晓庆
徐刚
田运朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CN201410573289.6A priority Critical patent/CN105586831A/en
Publication of CN105586831A publication Critical patent/CN105586831A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a hanging basket bracket combination method. A cross beam at the bottom of a hanging basket and a pier top of a pier are used by a blocky cast-in-place support as brackets to erect a platform. Thirteen I32 I-beams are installed between the cross beam and the pier top to serve as distributive beams. By the adoption of the hanging basket bracket combination method, side span linear cast-in-place section and closure section construction is carried out, operation of a railway of an existing line is not affected, and the purposes that installation is safe and convenient and manpower and capital are saved can be achieved as well. The hanging basket bracket combination method is adopted for construction, the number of used materials, support erecting cost and the number of employed workers are reduced in the bridge construction process under special conditions, and normal travel safety of the existing line is further guaranteed.

Description

Hanging Basket bracket combination method
Technical field
The present invention relates to a kind of combined method, specifically a kind of Hanging Basket bracket combination method.
Background technology
Common continuous beam end bay straight line cast-in-place section construction generally adopts the construction such as full framing, bracket. But when continuous beam is near existing line when construction, while adopting full framing and bracket, very inconvenience and potential safety hazard be installed very big, therefore adopt the construction of Hanging Basket bracket combination method.
Summary of the invention
The object of this invention is to provide a kind of Hanging Basket bracket combination method, can address the above problem.
The present invention for achieving the above object, be achieved through the following technical solutions: a kind of Hanging Basket bracket combination method, piece cast-in-place support utilizes the beneath crossbeam of Hanging Basket and bridge pier Dun Ding to set up platform as bracket, between crossbeam and pier top, 13 I32 I-steel is installed as distribution beam.
In order further to realize object of the present invention, can also be by the following technical solutions: I32 I-steel one end rides over before Hanging Basket on sill, has adjusted rear employing welding manner and front sill stable connection. After piece is cast-in-place, to residue tension of prestressed tendon
The invention has the advantages that: adopt Hanging Basket bracket combination method, carry out end bay straight line Cast-in-Situ Segment and the construction of closure section section, neither affect Existing Railway Line operation, can reach again safety, convenient is installed, save the object of manpower, fund. Adopt the construction of Hanging Basket bracket combination method, the beam body construction under specific condition has been reduced to material usage, support and set up expense and artificial consumption, more guaranteed both wired normal row car safety. Along with the high speed development of railway, Hanging Basket bracket combination method has dissemination widely.
The present invention also has advantages of compactness simple for structure, cheap for manufacturing cost and easy to use.
Brief description of the drawings
Fig. 1 is construction procedure first step schematic diagram of the present invention; Fig. 2 is construction procedure second step schematic diagram of the present invention.
Detailed description of the invention
Hanging Basket bracket combination method, as depicted in figs. 1 and 2, a kind of Hanging Basket bracket combination method, piece cast-in-place support utilizes the beneath crossbeam of Hanging Basket and bridge pier Dun Ding to set up platform as bracket, between crossbeam and pier top, 13 I32 I-steel is installed as distribution beam.
I32 I-steel one end rides on the front sill of Hanging Basket, has adjusted rear employing welding manner and front sill stable connection. After piece is cast-in-place, to residue tension of prestressed tendon
Adopt Hanging Basket bracket combination method, carry out end bay straight line Cast-in-Situ Segment and the construction of closure section section, neither affect Existing Railway Line operation, can reach again safety, convenient is installed, save the object of manpower, fund. Adopt the construction of Hanging Basket bracket combination method, the beam body construction under specific condition has been reduced to material usage, support and set up expense and artificial consumption, more guaranteed both wired normal row car safety. Along with the high speed development of railway, Hanging Basket bracket combination method has dissemination widely.
Technical scheme of the present invention is not restricted in the scope of embodiment of the present invention. The present invention not technology contents of detailed description is known technology.

Claims (3)

1. Hanging Basket bracket combination method, is characterized in that: piece cast-in-place support utilizes the beneath crossbeam of Hanging Basket and bridge pier Dun Ding to set up platform as bracket, between crossbeam and pier top, 13 I32 I-steel is installed as distribution beam.
2. Hanging Basket bracket combination method according to claim 1, is characterized in that: I32 I-steel one end rides on the front sill of Hanging Basket, has adjusted rear employing welding manner and front sill stable connection.
3. Hanging Basket bracket combination method according to claim 1, is characterized in that: after piece is cast-in-place, to residue tension of prestressed tendon.
CN201410573289.6A 2014-10-24 2014-10-24 Hanging basket bracket combination method Pending CN105586831A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410573289.6A CN105586831A (en) 2014-10-24 2014-10-24 Hanging basket bracket combination method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410573289.6A CN105586831A (en) 2014-10-24 2014-10-24 Hanging basket bracket combination method

Publications (1)

Publication Number Publication Date
CN105586831A true CN105586831A (en) 2016-05-18

Family

ID=55926717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410573289.6A Pending CN105586831A (en) 2014-10-24 2014-10-24 Hanging basket bracket combination method

Country Status (1)

Country Link
CN (1) CN105586831A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371846A (en) * 2018-11-28 2019-02-22 中交第二航务工程局有限公司 A kind of assembled Multifunction side is across cast-in-place support and its construction method
CN111926720A (en) * 2020-08-12 2020-11-13 中建七局交通建设有限公司 Construction method suitable for continuous steel-structure cantilever beam closure in loess area

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371846A (en) * 2018-11-28 2019-02-22 中交第二航务工程局有限公司 A kind of assembled Multifunction side is across cast-in-place support and its construction method
CN111926720A (en) * 2020-08-12 2020-11-13 中建七局交通建设有限公司 Construction method suitable for continuous steel-structure cantilever beam closure in loess area
CN111926720B (en) * 2020-08-12 2022-01-25 中建七局交通建设有限公司 Construction method suitable for continuous steel-structure cantilever beam closure in loess area

Similar Documents

Publication Publication Date Title
CN204775829U (en) A protect apart from roof beam for container ship transverse bulkhead carries on fast
CN104652283A (en) Asynchronous splicing construction method for symmetrically splicing main steel girder erection cranes of cable-stayed bridge
CN205638490U (en) A portable platform truck that is used for subway station tread wind channel to pour
CN105586831A (en) Hanging basket bracket combination method
CN207244469U (en) Beam body aids in thrustor
CN103979437A (en) Tower crane wall attached member bar device
CN202944344U (en) Displacement limiting device of girder carrying platform of wheel-track type girder transporting vehicle
CN108952768A (en) A kind of stage apparatus of Shield tunnel secondary grouting
CN204644878U (en) A kind of transom pier steel truss girder lifting construction device
CN205397881U (en) Truss structure girder
CN203958138U (en) Utilize the overhead railway that headroom is built at the bottom of overpass
CN206814224U (en) T font suspension bracket curb girders mechanism
CN202945548U (en) Girder carrying platform of wheel-track type girder transporting vehicle
CN203947409U (en) Shrinkage joint system and the expansion gap device thereof of the Cast-in-Situ Continuous Beam of bridge
CN205558308U (en) Integrated form platform of unloading
CN202047581U (en) Wall connecting piece for scaffold
CN205399216U (en) Mould is demolishd in step to ballastless track precast box girder end mould
CN205349372U (en) For a short time, construct to fold friendship tunnel controllable gate shaped steel frame apart from shield only
CN204919348U (en) Supplementary head tower of using of self anchored suspension bridge installation
CN204081536U (en) For the detachable safety device of Steel Structure Installation in a kind of building operations
CN209536813U (en) Precast beam lifts center rest
CN203947425U (en) Set a roof beam in place system and Bridge Erector curved section of Bridge Erector curved section set a roof beam in place and used leg system
CN207672429U (en) A kind of cast-in-place guardrail activity tool car of highway bridge
CN205975348U (en) Bridge expansion device
CN202944350U (en) Inclined strut of girder carrying platform of wheel-track type girder transporting vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160518