CN105585193B - A kind of water intake mechanism of sewage treatment equipment - Google Patents
A kind of water intake mechanism of sewage treatment equipment Download PDFInfo
- Publication number
- CN105585193B CN105585193B CN201511023920.6A CN201511023920A CN105585193B CN 105585193 B CN105585193 B CN 105585193B CN 201511023920 A CN201511023920 A CN 201511023920A CN 105585193 B CN105585193 B CN 105585193B
- Authority
- CN
- China
- Prior art keywords
- water
- tank
- settling tank
- transition
- treatment equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F9/00—Multistage treatment of water, waste water or sewage
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/001—Processes for the treatment of water whereby the filtration technique is of importance
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/52—Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2301/00—General aspects of water treatment
- C02F2301/08—Multistage treatments, e.g. repetition of the same process step under different conditions
Abstract
The present invention provides a kind of water intake mechanisms of sewage treatment equipment, belong to technical field of environment protection equipment.It solves existing wastewater treatment equipment before waste water evaporation process, it is difficult to remove the technical issues of giving up impurities in water.The water intake mechanism of this sewage treatment equipment includes settling tank, transition water tank and water inlet pipe for from the transport wastewater to settling tank, settling tank bottom offers the discharge port being discharged for sediment, there is the filtration that can be filtered to the waste water in settling tank at the top of settling tank, it is provided with partition board in transition water tank, transition water tank cavity is separated into front chamber and rear chamber by partition board, waste water in settling tank flows into front chamber by filtration, it is provided in rear chamber and waste water is drained to the indoor water inlet of evaporation, have so that front chamber is connected with rear chamber to cross liquid channel in transition water tank, the upper edge of partition board is higher than water inlet, cross the upper edge that liquid channel is less than partition board.The present invention realizes the pretreatment of waste water, can remove most of impurity in waste water.
Description
Technical field
The invention belongs to technical field of environment protection equipment, are related to a kind of water intake mechanism of sewage treatment equipment.
Background technology
Good ecological environment is the basic premise of human survival and development, and it is required to be provided for our survival and development
Resource and condition.With the development of the social economy, environmental problem has been used as a unavoidable major issue.Waste water
An important factor for arbitrarily discharge is as environmental pollution, therefore to the recovery processing of waste water for particularly important for environmental protection,
Miscellaneous sewage treatment equipment is also derived simultaneously.
As Chinese patent literature discloses a kind of evaporative sewage treatment device (application number 201010259218.0), including
There is evaporation blanket, the lower end for evaporating blanket is fixed by fixing pipe, and the side for evaporating blanket is equipped with wind turbine, and wind turbine is connected with hot blast pipe, evaporates
The other side of blanket is equipped with condenser and air filter, which is additionally provided with sub-truss, and sub-truss is equipped with
Flat water slot, flat water slot are supplied water by water supply pump, and flat water slot has more opening water pipes and is connected together with flat water slot, is open
Water pipe is equipped with multiple openings, and evaporation blanket is hung on each water pipe that is open.The device is first sent sewage to flat water by pipeline
In slot, sewage uniformly sent to evaporation blanket by the water pipe that is open, evaporation blanket is vertically in a row placed, and opening water pipe and solid is fixed on
On fixed tube.Wind turbine extracts hot-air by hot blast pipe, and hot wind is passed through from the gap between evaporation blanket, is carried away and is steamed from evaporation blanket
The moisture of hair, the dirt retention that cannot be evaporated is on evaporation blanket.In air opening end, it is equipped with condenser, the vapor of evaporation is cold
Solidifying recycling.The device has the following disadvantages in actual use:In the industrial production, miscellaneous containing solid-state in the waste water of generation
Matter and the various suspended impurities for being suspended in wastewater surface.The device is realized by pipeline intakes, solid impurity, suspended impurity
It is all directly reached with waste water on evaporation blanket, causes the pollution of evaporation blanket, and during evaporation, solid impurity, suspension are miscellaneous
Matter can all absorb heat, influence evaporation effect.Also, the device cannot achieve the recycling of the solid impurity in waste water.It is aobvious
So, which can only be to being recycled containing the less waste water of impurity, and being for impure more industrial wastewater can not
Realize recycling.
Invention content
The purpose of the present invention is there is the above problem in view of the prior art, it is proposed that a kind of water inlet of sewage treatment equipment
Mechanism, the technical problem to be solved by the present invention is to how realize the pretreatment of waste water, to remove most of impurity in waste water.
Object of the invention can be realized by the following technical scheme:A kind of water intake mechanism of sewage treatment equipment, it is described
Sewage treatment equipment includes babinet, has the vaporization chamber that processing can be evaporated to waste water in the babinet, which is characterized in that institute
It includes settling tank, transition water tank and the water inlet pipe for the transport wastewater into settling tank, the settling tank bottom to state water intake mechanism
The discharge port being discharged for sediment is offered, there is the filtering that can be filtered to the waste water in settling tank at the top of the settling tank
Structure is provided with partition board in the transition water tank, and transition water tank cavity is separated into front chamber and rear chamber by the partition board, described
Waste water in settling tank flows into front chamber by filtration, is provided with that waste water is drained to evaporation is indoor in the rear chamber
Water inlet, the transition water tank is interior to have so that front chamber is connected with rear chamber to cross liquid channel, and the upper edge of the partition board is high
In the water inlet, the upper edge crossed liquid channel and be less than partition board.
Mechanism pre-processes waste water during conveying for waste water to be delivered in vaporization chamber, with
Remove most of impurity in waste water.Concrete operating principle is:First, water inlet pipe interior transport wastewater, waste water into transition water tank exists
It being precipitated in settling tank, solid waste sinks toward settling tank bottom, and forms sediment and be discharged from the discharge port of settling tank, and
More clear waste water stays in the upper layer of settling tank, while suspended impurity is also suspended in wastewater surface.When waste water stream is tied through filtering
When structure, filtration can carry out waste water by-pass filtration, and the suspension of most of impurity especially large grained in waste water is miscellaneous
Matter filters out.Filtration is set at the top of settling tank by the present apparatus, and the solid impurity that the waste water at this contains is less, therefore energy
The waste water entered in transition water tank front chamber by filtration is set more to clarify.
The front chamber of transitional water case is flowed by the waste water of coagulation, then, transition water tank carries out two level mistake to waste water
Filter.Concrete principle is:When the indoor waste water liquid level of back cavity reaches water inlet, waste water is just discharged from water inlet, flows into vaporization chamber
It is inside evaporated processing, and the upper edge of partition board is higher than water inlet, therefore waste water liquid level is not above the upper edge of partition board always,
The indoor waste water of ante-chamber is only capable of flowing into rear chamber by crossing liquid channel.And the upper edge less than partition board in liquid channel is crossed, therefore
Remaining suspended impurity blocking in partition board energy waste water, prevents suspended impurity from entering in rear chamber.
Therefore, this water intake mechanism is sent in waste water to before vaporization chamber processing, can be by the solid impurity in waste water, and is suspended
Impurity removes, and waste water is made to enter in vaporization chamber with more pure state, the evaporation effect of lifting waste water, with more efficiently to useless
Water is recycled.
In the water intake mechanism of above-mentioned sewage treatment equipment, the partition board is vertically arranged, and partition board two is vertical
Side is respectively fixedly connected on the opposite two side of transition water tank, between the lower edge and transition tank bottom wall of the partition board there are
Every forming liquid channel.Sealing is formed between the two side opposite with transition water tank of the vertical side of partition board two so that transitional water
The indoor waste water of case ante-chamber can only be flowed by the liquid channel of crossing below partition board in rear chamber, to stop the indoor suspension of ante-chamber
Impurity enters in rear chamber.
In the water intake mechanism of above-mentioned sewage treatment equipment, the partition board is vertically arranged, and partition board two is vertical
Side is respectively fixedly connected on the opposite two side of transition water tank, and the lower edge of the partition board is connected on the bottom wall of transition water tank,
The liquid channel of crossing is the liquid pass hole for being opened in the lower partition.
In the water intake mechanism of above-mentioned sewage treatment equipment, the transition water tank is located at settling tank side, the mistake
Filter structure includes bottom plate and filter plate, and the bottom plate is connected in the top of precipitation box inner wall, and the filter plate is connected in bottom plate
Upper and filter plate, bottom plate and precipitation box inner wall surround opening up lautertuns, if the upper edge of the filter plate offers
Liquid notch was done, the flow liquid channel of connection lautertuns and the front chamber is additionally provided on the settling tank side wall.This filtration
Work principle of filter be:It flows into lautertuns since the waste water in settling tank can only pass through liquid notch, then is flowed into from flow liquid channel
In front chamber.When the waste water liquid level in settling tank reached liquid indentation, there, waste water will be flowed into from liquid notch is crossed in lautertuns,
Therefore liquid level does not exceed the upper edge of filter plate always, and the larger suspended impurity of volume cannot be entered by crossing liquid notch
In filter pocket, filtering is realized with this.Filtration can also use strainer, and the liquid in settling tank flows into transitional water case front chamber
When through filter screen, and pass through strainer realize filtering.
In the water intake mechanism of above-mentioned sewage treatment equipment, the flow liquid channel is through settling tank side wall and transitional water
The through-hole of case side wall, the through-hole are connected to the lautertuns and front chamber.Flow liquid channel can also be to be connected in settling tank side wall
On water pipe, one end of water pipe stretches into lautertuns, and the other end stretches into front chamber.
In the water intake mechanism of above-mentioned sewage treatment equipment, the liquid notch of crossing is opening up V-shaped notch.
Designing in this way is advantageous in that, when liquid level reached the bottom of liquid notch, waste water just can pass through liquid notch and flow into lautertuns,
The bottom opening very little of V-shaped notch, not only ensure that the circulation of waste water in this way, but also filter out the suspension of small volume as much as possible
Impurity, to promote filter effect.
In the water intake mechanism of above-mentioned sewage treatment equipment, the lautertuns is an annular groove, described to cross liquid notch edge
Lautertuns is provided at circumferentially spaced.Plate, the outer periphery fitting of bottom plate are connected in settling tank in a ring for bottom plate and filter plate
On madial wall, the lower edge of filter plate and the inner edge of bottom plate are fixedly connected with so that bottom plate, filter plate and settling tank side wall surrounded
Lautertuns is an annular groove, and design is advantageous in that in this way:The quantity of liquid notch was increased, therefore need to only keep lower liquid
Position just can realize required flow, just can filter out smaller suspended impurity in this way, promote filter effect.
In the water intake mechanism of above-mentioned sewage treatment equipment, the top of the precipitation box cavity is installed with tubular lead
Flow cartridge, the guide shell is vertically arranged and the lower end of guide shell has opening, and cone is additionally provided with below the guide shell
The drainage plate of shape, the conical surface of the drainage plate upward and the opening of face guide shell lower end, the outlet end of the water inlet pipe with lead
The inner cavity of flow cartridge is connected.Waste water enters water conservancy diversion tube inner chamber by water inlet pipe, then flows down downwards, from guide shell lower ending opening
Discharge is fallen on the conical surface of drainage plate, and waste water dispersion is made to flow down, and is reduced impact of the flow to waste water in settling tank, can be increased in this way
Sedimentation effect ensures that settling tank supernatant liquid is more clarified.
In the water intake mechanism of above-mentioned sewage treatment equipment, the water inlet is opened on the side wall of transition water tank, institute
The side for stating transition water tank is provided with overflow plate and water-accepting board, and a side edge of the overflow plate is connected in settling tank and transitional water
On the lateral wall of case, the lower edge of the overflow plate is connected on water-accepting board, the overflow plate, water-accepting board, settling tank lateral wall
Water receiving tank is surrounded jointly with transition water tank lateral wall, and the water inlet is communicated with water receiving tank, and the upper edge of the overflow plate opens up
It is opening up V-shaped notch to have overflow port, the overflow port.Waste water in transition water tank flows into water receiving tank from water inlet,
Overflow port is as liquid notch excessively, it may have filtration carries out three-stage filtration to waste water, further increases filter effect.
Overflow port is designed as opening up V-shaped notch with crossing as liquid notch, and with can filter out as much as possible volume compared with
The effect of small suspended impurity.
In the water intake mechanism of above-mentioned sewage treatment equipment, the water-accepting board and the elongated plate of the overflow plate
Shape, the overflow port are that multiple and length direction intervals along overflow plate is arranged.It is the environment of high temperature in the vaporization chamber of the present apparatus,
If being provided with dried layer deflector in vaporization chamber, the waste water of overflow port discharge flow to one end of top layer's deflector first, then gives up
From top to bottom S-shaped mode of moving towards flows through each deflector to water successively, finally flow to the bottom air deflector of vaporization chamber bottom.
Waste water is evaporated when flowing through each deflector, is made to form the hot wind with vapor at the top of vaporization chamber, be flowed after hot wind discharge
Pure water is formed to condenser to be recycled.Overflow port is that multiple and length direction intervals along overflow plate is arranged, and is made
Waste water in water receiving tank dispersedly flows on deflector, and waste water integrally covers deflector upper face and forms one layer of simple liquid
Body is conducive to promote disengagement area and evaporation efficiency.
In the water intake mechanism of above-mentioned sewage treatment equipment, this water intake mechanism further includes water tank, the transition water tank
Bottom is also associated with return pipe, and valve, liquid feeding end and the transition water tank bottom phase of the return pipe are connected on the return pipe
Connection, the outlet end of the return pipe extend in water tank.With the accumulation of time, contain in the waste water in transition water tank
A small amount of impurity still can be deposited in transition water tank bottom, at this point, valve can be opened, the waste water of transition water tank bottom is passed through back
Water pipe drains into water tank, to keep the impurity that the waste water into vaporization chamber contains less.
Compared with prior art, the water intake mechanism of this sewage treatment equipment has the following advantages:
1, the water intake mechanism of this sewage treatment equipment can precipitate the solid impurity in waste water, and settling tank outflow
Waste water needs, by three-stage filtration, to get in vaporization chamber so that and entering the indoor waste water of evaporation has higher degree of purity,
The evaporation effect for largely improving waste water efficiently recycles waste water to have.
2, guide shell and drainage plate are provided in the settling tank of the water intake mechanism of this sewage treatment equipment so that waste water enters
It is smaller to the waste water impact in settling tank when settling tank, be conducive to the sedimentation effect for promoting waste water in settling tank, make on settling tank
The liquid of layer is flowed into more clear state in transition water tank.
Description of the drawings
Fig. 1 is the dimensional structure diagram of this sewage treatment equipment.
Fig. 2 is the schematic cross-sectional view of this sewage treatment equipment.
Fig. 3 is the dimensional structure diagram one of this water intake mechanism.
Fig. 4 is the dimensional structure diagram two of this water intake mechanism.
Fig. 5 is the dimensional structure diagram of settling tank and transition water tank.
Fig. 6 is the enlarged drawing at A in Fig. 5.
Fig. 7 is the vertical view of this water intake mechanism.
Fig. 8 is the schematic cross-sectional view of A-A in Fig. 7.
In figure, 1, babinet;2, vaporization chamber;3, settling tank;31, discharge port;4, transition water tank;41, front chamber;42, back cavity
Room;43, liquid channel is crossed;44, water inlet;5, water inlet pipe;6, partition board;7, lautertuns;71, bottom plate;72, filter plate;72a, liquid is crossed
Notch;8, through-hole;9, guide shell;10, drainage plate;11, water receiving tank;111, overflow plate;111a, overflow port;112, water-accepting board;
12, return pipe;13, valve;14, water tank;15, water pump;16, deflector;17, air inlet;18, air outlet.
Specific implementation mode
Following is a specific embodiment of the present invention in conjunction with the accompanying drawings, technical scheme of the present invention will be further described,
However, the present invention is not limited to these examples.
Embodiment one
The water intake mechanism of this sewage treatment equipment is used to waste water being delivered in vaporization chamber 2, while during conveying
Waste water is pre-processed.
As depicted in figs. 1 and 2, sewage treatment equipment includes babinet 1, and 1 bottom of babinet is provided with water tank 14, in babinet 1
With can be to waste water into the vaporization chamber 2 of evaporation process, vaporization chamber 2 be enclosed construction, is led if being provided with dried layer in vaporization chamber 2
The lower part of flowing plate 16, vaporization chamber 2 has air inlet 17, and the top of vaporization chamber 2 has the air outlet 18 of hot gas discharge, originally into water dispenser
Waste water is delivered to from water tank 14 from top deflector 16 by structure, and then waste water is S-shaped successively from top to bottom moves towards mode stream
Through each deflector 16, finally it flow at the bottom deflector 16 of 2 bottom of vaporization chamber.And hot wind enters upwards from air inlet 17
Flowing makes the waste water in vaporization chamber 2 by thermal evaporation, is discharged, flow to later cold through air outlet 18 eventually with the hot wind of vapor
Condenser forms pure water and is recycled, and the waste water at bottom deflector 16 flows back to water tank 14 and carries out at cycle again
Reason, realizes the zero-emission of waste water.
As shown in Fig. 3, Fig. 4 and Fig. 8, this water intake mechanism includes water tank 14, settling tank 3, transition water tank 4 and water inlet pipe 5,
Transition water tank 4 is located at 3 side of settling tank, and 3 bottom of settling tank offers the discharge port 31 being discharged for sediment, set at discharge port 31
The valve of the discharge port 31 can be blocked or open by having.The top of 3 inner cavity of settling tank is installed with tubular guide shell 9, guide shell 9
Vertically there is opening, the lower section of guide shell 9 to be additionally provided with the drainage plate 10 of taper for the lower end of setting and guide shell 9, drain
The conical surface of plate 10 is upward and the opening of 9 lower end of face guide shell, the outlet end of water inlet pipe 5 are connected with the inner cavity of guide shell 9.Into
The water inlet end of water pipe 5 stretches into water tank 14, and 9 inner cavity of guide shell is stretched into the water outlet of water inlet pipe 5, is connected on water inlet pipe 5
Water pump 15, the water pump 15 are located in water tank 14, and power is provided by water pump 15, and waste water is pumped into guide shell 9 from water tank 14
Then inner cavity flows into settling tank 3 and is precipitated, solid impurity forms sediment and is discharged from discharge port 31, and 3 upper layer of settling tank
For more clear waste water.From when falling on the conical surface of drainage plate 10 from the discharge of 9 lower ending opening of guide shell, drainage plate 10 makes waste water
Waste water dispersion flows down, and reduces impact of the flow to waste water in settling tank 3, can increase sedimentation effect in this way, ensures 3 upper layer of settling tank
Liquid is more clarified.
As shown in Figure 5 and Figure 6,3 top of settling tank has the filtration that can be filtered to the waste water in settling tank 3.
The filtration includes bottom plate 71 and filter plate 72, and bottom plate 71 is connected in the top of 3 madial wall of settling tank, and filter plate 72 is connected in
On bottom plate 71 and filter plate 72, bottom plate 71 and 3 madial wall of settling tank surround opening up lautertuns 7, the top of filter plate 72
Along several liquid notch 72a excessively are offered, it is opening up V-shaped notch to cross liquid notch 72a.It is additionally provided on 3 side wall of settling tank
It is connected to the flow liquid channel of lautertuns 7 and front chamber 41.Flow liquid channel is through the logical of 4 side wall of 3 side wall of settling tank and transition water tank
Hole 8.Certainly, flow liquid channel can also be the water pipe being connected on 3 side wall of settling tank, and one end of water pipe is stretched into lautertuns 7, separately
One end is stretched into front chamber 41.
Filtration realizes the by-pass filtration to waste water.Specifically, the waste water in settling tank 3 can only pass through liquid notch
72a is flowed into lautertuns 7, then is flowed into front chamber 41 from flow liquid channel.When the waste water liquid level in settling tank 3 reached liquid notch
When at 72a, waste water will be flowed into from liquid notch 72a is crossed in lautertuns 7, therefore liquid level does not exceed the top of filter plate 72 always
Edge, and the larger suspended impurity of volume cannot be entered by crossing liquid notch 72a in lautertuns 7, and filtering is realized with this.And V-shaped
The bottom opening very little of notch, not only ensure that the circulation of waste water in this way, but also filter out the suspended impurity of small volume as much as possible,
To promote filter effect.It, can be by the suspended impurity of most of impurity especially large grained in waste water by by-pass filtration
It filters out.
As shown in figure 5, plate, the outer periphery fitting of bottom plate 71 are connected in settling tank in a ring for bottom plate 71 and filter plate 72
On 3 madial wall, the lower edge and the inner edge of bottom plate 71 of filter plate 72 are fixedly connected with, and make bottom plate 71, filter plate 72 and settling tank 3
The lautertuns 7 that madial wall surrounds is an annular groove, crosses liquid notch 72a being provided at circumferentially spaced along lautertuns 7.Such design energy
The quantity of liquid notch 72a was increased, therefore lower liquid level need to only be kept just to realize required flow, just can be filtered in this way
Fall smaller suspended impurity, promotes filter effect.Alternatively scheme, bottom plate 71 and filter plate 72 or vertical bar
Shape surrounds the lautertuns 7 of strip.
As shown in Fig. 3, Fig. 4, Fig. 5 and Fig. 8, partition board 6 is provided in transition water tank 4, partition board 6 is vertically arranged, every
6 liang of vertical sides of plate are respectively fixedly connected on the opposite two side of transition water tank 4, before 4 inner cavity of transition water tank is separated by partition board 6
Chamber 41 and rear chamber 42, the waste water in settling tank 3 flow into front chamber 41 by filtration, and being provided in rear chamber 42 will be useless
Water is drained to the water inlet 44 in vaporization chamber 2, spaced between 4 bottom wall of lower edge and transition water tank of partition board 6 to form liquid
Channel 43, front chamber 41 and rear chamber 42 are connected by crossing liquid channel 43, and the upper edge of partition board 6 is higher than water inlet 44, crosses liquid
Channel 43 is less than the upper edge of partition board 6.The bottom of transition water tank 4 is also associated with return pipe 12, the liquid feeding end and mistake of return pipe 12
It crosses 4 bottom of water tank to be connected, the outlet end of return pipe 12 extends in water tank 14, and valve 13 is connected on return pipe 12.
Transition water tank 4 realizes the secondary filtration to waste water.Specifically, 6 liang of vertical sides of partition board are opposite with transition water tank 4
Two side between formed sealing.When the waste water liquid level in rear chamber 42 reaches water inlet 44, waste water is just from 44 row of water inlet
Go out, flows into vaporization chamber 2 and be evaporated processing.The upper edge of partition board 6 is higher than water inlet 44, can prevent waste water from flooding partition board 6
Upper edge so that the waste water in 4 front chamber 41 of transition water tank can only flow into rear chamber 42 by the liquid channel 43 of crossing of 6 lower section of partition board
It is interior.And the upper edge less than partition board 6 in liquid channel 43 is crossed, therefore the suspended impurity blocking in 6 energy waste water of partition board, it prevents from suspending miscellaneous
Matter enters in rear chamber 42.
As shown in Figure 5 and Figure 6, water inlet 44 is opened on the side wall of 4 rear chamber 42 of transition water tank, and the one of transition water tank 4
Side is provided with the overflow plate 111 and water-accepting board 112 of strip, and a side edge of water-accepting board 112 is connected in settling tank 3 and transitional water
On the lateral wall of case 4, the lower edge of overflow plate 111 is connected on water-accepting board 112, overflow plate 111, water-accepting board 112, settling tank 3
Lateral wall and 4 lateral wall of transition water tank surround water receiving tank 11 jointly, and water inlet 44 is communicated with water receiving tank 11, overflow plate 111 it is upper
Edge offers overflow port 111a, and overflow port 111a is opening up V-shaped notch, and overflow port 111a is multiple and along overflow
The length direction interval of plate 111 is arranged.Waste water in transition water tank 4 flows into water receiving tank 11 from water inlet 44, overflow port 111a and
It is the same to cross liquid notch 72a, it may have filtration, therefore three-stage filtration is formed to waste water, further increase filter effect.It overflows
Head piece 111a is that multiple and length direction intervals along overflow plate 111 is arranged, and the waste water in water receiving tank 11 is made dispersedly to flow into steaming
On the deflector 16 for sending out room 2, be conducive to promote disengagement area and evaporation efficiency.
This water intake mechanism is sent in waste water to before the processing of vaporization chamber 2, can in the settling tank 3 by the solid impurity in waste water into
Row precipitation, then passes through the three-stage filtration of filtration, transition water tank 4, water receiving tank 11, to remove the suspended impurity in waste water,
Waste water is set to enter in vaporization chamber 2 with more pure state, the evaporation effect of lifting waste water.
Embodiment two
The present embodiment is essentially identical with the structure and principle of embodiment one, and different place is:Cross liquid channel 43
Following scheme replacement may be used in structure, and partition board 6 is vertically arranged, and 6 liang of vertical sides of partition board are respectively fixedly connected in transition
On the opposite two side of water tank 4, the lower edge of partition board 6 is connected on the bottom wall of transition water tank 4, cross liquid channel 43 for be opened in every
The liquid pass hole of 6 lower part of plate.
Embodiment three
The present embodiment is essentially identical with the structure and principle of embodiment one and embodiment two, and different place is:It crosses
Following scheme replacement may be used in filter structure, and filtration includes strainer.Liquid in settling tank 3 flows into transitional water through filter screen
In 4 front chamber 41 of case, and is realized and filtered by strainer.
Specific embodiment described herein is only an example for the spirit of the invention.Technology belonging to the present invention is led
The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method
In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.
Although 1, babinet is used more herein;2, vaporization chamber;3, settling tank;31, discharge port;4, transition water tank;41、
Front chamber;42, rear chamber;43, liquid channel is crossed;44, water inlet;5, water inlet pipe;6, partition board;7, lautertuns;71, bottom plate;72, mistake
Filter plate;72a, liquid notch is crossed;8, through-hole;9, guide shell;10, drainage plate;11, water receiving tank;111, overflow plate;111a, overflow port;
112, water-accepting board;12, return pipe;13, valve;14, water tank;15, water pump;16, deflector;17, air inlet;18, air outlet
Equal terms, but it does not preclude the possibility of using other terms.The use of these items is only for more easily describe to conciliate
Release the essence of the present invention;Any one of the additional limitations is construed as all to disagree with spirit of that invention.
Claims (10)
1. a kind of water intake mechanism of sewage treatment equipment, the sewage treatment equipment includes babinet (1), tool in the babinet (1)
Waste water can be evaporated the vaporization chamber (2) of processing by having, which is characterized in that the water intake mechanism includes settling tank (3), transitional water
Case (4) and for settling tank (3) interior transport wastewater water inlet pipe (5), settling tank (3) bottom offer for sediment arrange
The discharge port (31) gone out, settling tank (3) top have the filtration that can be filtered to the waste water in settling tank (3),
Be provided with partition board (6) in the transition water tank (4), the partition board (6) by transition water tank (4) inner cavity be separated into front chamber (41) and
Rear chamber (42), the waste water in the settling tank (3) flow into front chamber (41) by filtration, are set on the rear chamber (42)
Be equipped with the water inlet (44) being drained to waste water in vaporization chamber (2), have in the transition water tank (4) make front chamber (41) and after
What chamber (42) was connected crosses liquid channel (43), and the upper edge of the partition board (6) is higher than the water inlet (44), described to cross liquid
Channel (43) is less than the upper edge of partition board (6).
2. the water intake mechanism of sewage treatment equipment according to claim 1, which is characterized in that the partition board (6) is along vertical
Direction is arranged, and (6) two vertical side of partition board is respectively fixedly connected on the opposite two side of transition water tank (4), the partition board (6)
It is spaced between lower edge and transition water tank (4) bottom wall to form liquid channel (43).
3. the water intake mechanism of sewage treatment equipment according to claim 1 or 2, which is characterized in that the transition water tank (4)
Positioned at settling tank (3) side, the filtration includes bottom plate (71) and filter plate (72), and it is heavy that the bottom plate (71) is connected in
The top of shallow lake case (3) madial wall, the filter plate (72) is connected on bottom plate (71) and filter plate (72), bottom plate (71) and precipitation
Case (3) madial wall surrounds opening up lautertuns (7), and the upper edge of the filter plate (72) offers several liquid notches excessively
(72a) is additionally provided with the flow liquid channel of connection lautertuns (7) and the front chamber (41) on settling tank (3) side wall.
4. the water intake mechanism of sewage treatment equipment according to claim 3, which is characterized in that the flow liquid channel be through
The through-hole (8) of settling tank (3) side wall and transition water tank (4) side wall, the through-hole (8) are connected to the lautertuns (7) and front chamber
(41)。
5. the water intake mechanism of sewage treatment equipment according to claim 3, which is characterized in that described crosses liquid notch
(72a) is opening up V-shaped notch.
6. the water intake mechanism of sewage treatment equipment according to claim 3, which is characterized in that the lautertuns (7) is one
Annular groove, it is described to cross liquid notch (72a) being provided at circumferentially spaced along lautertuns (7).
7. the water intake mechanism of sewage treatment equipment according to claim 1 or 2, which is characterized in that in the settling tank (3)
The top of chamber is installed with tubular guide shell (9), and the guide shell (9) is vertically arranged and the lower end of guide shell (9)
With opening, be additionally provided with the drainage plate (10) of taper below the guide shell (9), the conical surface of the drainage plate (10) upward and
The outlet end of the opening of face guide shell (9) lower end, the water inlet pipe (5) is connected with the inner cavity of guide shell (9).
8. the water intake mechanism of sewage treatment equipment according to claim 1 or 2, which is characterized in that the water inlet (44)
It is opened on the side wall of transition water tank (4), the side of the transition water tank (4) is provided with overflow plate (111) and water-accepting board
(112), a side edge of the water-accepting board (112) is connected on the lateral wall of settling tank (3) and transition water tank (4), described to overflow
The lower edge of flowing plate (111) is connected on water-accepting board (112), and the overflow plate (111), water-accepting board (112), settling tank (3) are outside
Side wall and transition water tank (4) lateral wall surround water receiving tank (11) jointly, and the water inlet (44) communicates with water receiving tank (11), described
The upper edge of overflow plate (111) offers overflow port (111a), and the overflow port (111a) is opening up V-shaped notch.
9. the water intake mechanism of sewage treatment equipment according to claim 8, which is characterized in that the water-accepting board (112) and
The elongated plate of overflow plate (111), the overflow port (111a) are multiple and along the length directions of overflow plate (111)
Interval setting.
10. the water intake mechanism of sewage treatment equipment according to claim 1 or 2, which is characterized in that this water intake mechanism also wraps
Water tank (14) is included, the bottom of the transition water tank (4) is also associated with return pipe (12), valve is connected on the return pipe (12)
Door (13), the liquid feeding end of the return pipe (12) are connected with transition water tank (4) bottom, and the outlet end of the return pipe (12) prolongs
It extends in water tank (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511023920.6A CN105585193B (en) | 2015-12-30 | 2015-12-30 | A kind of water intake mechanism of sewage treatment equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511023920.6A CN105585193B (en) | 2015-12-30 | 2015-12-30 | A kind of water intake mechanism of sewage treatment equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105585193A CN105585193A (en) | 2016-05-18 |
CN105585193B true CN105585193B (en) | 2018-09-25 |
Family
ID=55925140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511023920.6A Active CN105585193B (en) | 2015-12-30 | 2015-12-30 | A kind of water intake mechanism of sewage treatment equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105585193B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107875703B (en) * | 2017-11-24 | 2023-06-16 | 北京欧美中科学技术研究院 | Efficient waste water extraction device |
CN113059398B (en) * | 2021-03-24 | 2022-08-02 | 珠海格力智能装备有限公司 | Water tank of processing equipment and processing equipment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3819054A (en) * | 1971-09-08 | 1974-06-25 | H Long | Sewage treatment system |
CN101233084A (en) * | 2005-06-01 | 2008-07-30 | 卡明斯科普有限公司 | Modular water treatment unit |
CN203648260U (en) * | 2013-12-17 | 2014-06-18 | 浙江帕瓦传动设备有限公司 | Waste oil recovery device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3183546B2 (en) * | 1991-11-19 | 2001-07-09 | フジクリーン工業株式会社 | Dispensing and measuring device for treated water |
-
2015
- 2015-12-30 CN CN201511023920.6A patent/CN105585193B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3819054A (en) * | 1971-09-08 | 1974-06-25 | H Long | Sewage treatment system |
CN101233084A (en) * | 2005-06-01 | 2008-07-30 | 卡明斯科普有限公司 | Modular water treatment unit |
CN203648260U (en) * | 2013-12-17 | 2014-06-18 | 浙江帕瓦传动设备有限公司 | Waste oil recovery device |
Also Published As
Publication number | Publication date |
---|---|
CN105585193A (en) | 2016-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206138868U (en) | A device for separating granule in tombarthite waste liquid | |
CN107522342A (en) | A kind of sewage treatment unit | |
CN107938750A (en) | A kind of environment-friendly type rainwater purification collection device | |
CN105585193B (en) | A kind of water intake mechanism of sewage treatment equipment | |
CN205699540U (en) | A kind of condenser water separator of energy-conserving and environment-protective | |
CN105536412B (en) | A kind of water saving fixtures system of efficient water-removing mist recovery industrial water | |
CN206109128U (en) | Environment -friendly processing device | |
CN208667365U (en) | A kind of energy conservation solventing-out evaporated crystallization device | |
CN208960466U (en) | A kind of QPQ technique production environment-friendly processing unit of wastewater zero discharge | |
RU161443U1 (en) | FLOATING UNIT FOR CRYSTALLIZING SOLUTIONS | |
CN215462081U (en) | A multistage purification device for chemical industry is synthetic | |
CN205138250U (en) | Improved cooling tower | |
CN203908146U (en) | Novel oil removal separator for ammonia refrigeration | |
CN107551580A (en) | A kind of vertical falling-film heat exchanger | |
CN204447373U (en) | The water circulation system that a kind of medicinal plants cooling condensation is extracted | |
CN2936373Y (en) | Evaporator for preventing acicular separating out on heating pipe wall | |
CN106196731B (en) | Heat pump unit and the dead-beat source crude sewage heating system for using the heat pump unit | |
CN101462016A (en) | Return sludge flow type metafiltration pool for precipitating sludge | |
CN206924890U (en) | Vertical multi-stage wet-esp/day with fog | |
CN209322645U (en) | A kind of novel wastewater purification recycling device | |
CN220507739U (en) | Waste heat recovery mechanism for slag flushing water of blast furnace | |
CN207671846U (en) | A kind of sewage treatment unit | |
CN220811937U (en) | Wastewater flash tank | |
CN207383312U (en) | A kind of easy cleaning water filtering device of ornamental water body | |
CN208688076U (en) | Cooling water recirculation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180110 Address after: 317600 Tianhe Road, Yucheng street, Yuhuan, Zhejiang Province, No. 57 Applicant after: Ruan Boqin Address before: 317600 Taizhou City, Taizhou, Zhejiang, Zhuhai port town, Yuhuan County Applicant before: Taizhou Shengshi Environmental Engineering Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |