CN105584601B - Semi-submersible type hoisting load of platform water system and its operating method - Google Patents

Semi-submersible type hoisting load of platform water system and its operating method Download PDF

Info

Publication number
CN105584601B
CN105584601B CN201510963713.2A CN201510963713A CN105584601B CN 105584601 B CN105584601 B CN 105584601B CN 201510963713 A CN201510963713 A CN 201510963713A CN 105584601 B CN105584601 B CN 105584601B
Authority
CN
China
Prior art keywords
ballast
water
ballast tank
column
compressed air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510963713.2A
Other languages
Chinese (zh)
Other versions
CN105584601A (en
Inventor
钟文军
康为夏
杨辉
毛建辉
张永发
周健
刘瑞华
冯庆斌
王倩
羊卫
杨青
邹雯
缪燕华
刘佳
程峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
708th Research Institute of CSIC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
708th Research Institute of CSIC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, 708th Research Institute of CSIC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201510963713.2A priority Critical patent/CN105584601B/en
Publication of CN105584601A publication Critical patent/CN105584601A/en
Application granted granted Critical
Publication of CN105584601B publication Critical patent/CN105584601B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • B63B39/02Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by displacement of masses
    • B63B39/03Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by displacement of masses by transferring liquids

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The present invention provides a kind of Semi-submersible type hoisting load of platform water system and its operating method, and system includes lower floating body, symmetrical column and upper mounting plate, and upper mounting plate sets central control system;It is in place of its feature:Float downward and set several ballast tanks, water pump ballasting system in vivo, ballast tank sets water-inflow and drain valve and the opening connected with compressed air ballasting system;Ballast tank is set in column, ballast tank sets draining valve;Water pump ballasting system sets sea cock and valve and is connected by pipeline with column ballast tank water inlet;Compressed air ballasting system, ballast level measurement unit, emergent emission control unit and drinking water measuring unit are set in upper mounting plate;Operating method includes floating downward internal ballast tank gravity feed and compressed air draining and column internal ballast tanks water pump ballasting system enters draining;Simplify ballast pipe system and adjust and carry speed soon, meet the requirement of platform stabilization and crane job safety.

Description

Semi-submersible type hoisting load of platform water system and its operating method
Technical field
The present invention relates to ocean engineering, more particularly to a kind of Semi-submersible type hoisting load of platform water system and its operating method.
Background technology
Semi-submersible type hoisting platform, so that its capacity of anti-storm is strong, floor space is big, deck changing load is big, useful load is big, suitable Answer the advantages of depth of water scope is big, personnel's accommodation is more, the optimum carrier as ultra-large type crane.Semi-submersible type hoisting platform one As have dispatch navigation, hoisting operation, storm oneself the various working such as deposit, its special operation function demand is set to ballasting system Meter proposes higher requirement.
Boat form Semi-submersible type hoisting platform is generally upper flat by two lower floating bodies, three~five pairs of symmetrical columns and one Platform is constituted.When dispatching navigation, to reduce resistance, waterline is located at lower floating body;In hoisting operation, to ensure that it is good that operation has Good seakeeping capacity, waterline is located at column middle;When depositing operating mode certainly, to improve the weatherliness of platform, now waterline Positioned at column bottom.Platform drinking water and displacement difference due to three kinds of operating modes is huge, therefore passes through the lower floating body in main hull It is interior that substantial amounts of ballast tank and ballast water injection and discharge system are set, to meet the conversion needs under these three operating modes.
Because Semi-submersible type hoisting platform needs to lift by crane thousands of up to ten thousand tons of weight within the extremely short time in hoisting operation, And sling load will produce huge tilting moment to platform, significant impact is produced to platform floading condition and stability.To ensure safety Operation, it is necessary to the tilting moment produced in the substantial amounts of ballast water of Opposite side loading with partial offset lift heavy.In addition, being carried in crane band During revolution, the direction for the tilting moment that huge hoisting heavy is produced changes in a short time, it is also necessary to pass through ballast water Fast velocity modulation carry to balance the change of tilting moment, otherwise platform inclination can be caused to aggravate, and slew gear is in descending fortune Turn state, this is breakneck.Therefore to ensure hoisting operation safety, substantial amounts of pressure is set in the column domestic demand of main platform body Cabin and the anti-tune loading system that inclines are carried, the fast velocity modulation for ballast water is refuted, and this is that conventional Semi-submersible type hoisting platform is unexistent, Hou Zheyou In adjusting, carrying capacity is small, adjust load rate request not high and the pump pressure loading system single typically using function, and it can not meet semi-submersible type and rise Huge quick, the efficient tune adjusted under carrying capacity conditions of demand of galassing platform, which carries function, to be needed.
The content of the invention
It is a primary object of the present invention to overcome the disadvantages mentioned above that existing product is present, and a kind of Semi-submersible type hoisting is provided and put down The ballast system and its operating method of platform, it uses the Combined press that two kinds of ballast modes of ballast pump and compressed air are combined Loading system, i.e. Semi-submersible type hoisting platform float downward internal ballast water by the way of gravity injection, compressed air draining, simplify pressure Carry water pipe system and adjust load speed fast;Resist the tune that inclines to carry during hoisting operation applies ballast pump to adjust using between specific ballast tank in column Carry, be easy to control to adjust water carrying capacity, accurate guarantee ballast water capacity is adjusted between associated ballast tank refutes, and meets platform stabilization and crane Job safety requirement;Lose suddenly in the case of the urgent hoisting operation such as hook, emptied using compressed air and resist tune load pressure of inclining in column Water is carried, reduces platform angle of heel, platform security is improved.
The purpose of the present invention is realized by following technical scheme.
Semi-submersible type hoisting load of platform water system of the present invention, including two lower floating bodies, three to five pairs of symmetrical columns With a upper mounting plate, the upper mounting plate is provided with central control system;Characterized in that, this two is floated downward and sets number from head to tail respectively in vivo Individual ballast tank, one of them is floated downward sets water pump ballasting system in vivo, float downward each ballast tank in vivo set respectively water-inflow and drain valve and with The opening of compressed air ballasting system connection;Left column ballast tank is set in each left column, the left column ballast tank is provided with left height Position draining valve;Right column ballast tank is set in each right column, the right column ballast tank is provided with right high-order draining valve;Water pump ballast system System is provided with sea cock and valve, and the sea cock and valve is connected with left column ballast tank and right column ballast tank bottom water inlet respectively by pipeline; The pipeline communication of ballast water is refuted between left column ballast tank and right column ballast tank by phase intermodulation;It is provided with upper mounting plate by pipe Road with float downward in vivo and left and right pillar in ballast tank be connected and monitored by central control system compressed air ballasting system, For measuring the ballast level measurement unit of each ballast tank ballast water liquid level and for the emergent discharge pressure of control operation The emergent emission control unit of water is carried, be additionally provided with upper mounting plate is used for measuring table draft amount by what central control system was monitored Absorb water measuring unit.
Foregoing Semi-submersible type hoisting load of platform water system, wherein, what is be provided with the upper mounting plate eats for measuring table The drinking water measuring unit of water, the ballast level measurement unit for measuring each ballast tank ballast water liquid level and it is used for The emergent emission control unit of the emergent discharge ballast water of control operation is prior art.
The operating method of Semi-submersible type hoisting load of platform water system of the present invention, it is characterised in that including floating downward internal ballast The gravity feed and compressed air drain operation in cabin;The water pump ballasting system of column internal ballast tanks carries out water inlet and draining behaviour Make;
Floating downward the gravity feed operating process of internal ballast tank includes:
A, the air started in compressed air ballasting system, lower floating body ballast tank are arranged on via compressed air ballasting system The pipeline tapping discharge of compartment roof;B, opening water-inflow and drain valve, outboard water enter lower floating body ballast by gravity from water-inflow and drain valve In cabin;C, to ballast level measurement unit and drinking water measuring unit measured accordingly, until reach drauht require, Ballast manipulation is completed, as shown in Figure 3;
Floating downward the compressed air drain operation process of internal ballast tank includes:A, startup compressed air ballasting system, air The pipeline tapping being arranged at the top of lower floating body ballast tank by compressed air ballasting system is flowed through to enter in lower floating body ballast tank; B, open water-inflow and drain valve, the ballast water in lower floating body ballast tank under the effect of the pressure-air of compressed air ballasting system, Ballast tank is discharged by water-inflow and drain valve;C, to ballast level measurement unit and drinking water measuring unit measured accordingly, directly To drauht requirement is reached, drain operation is completed, as shown in Figure 3;
The water inlet Job Operations process of column internal ballast tanks includes:A, startup water pump ballasting system;B, opening sea cock and valve, ship The ballast tank that outer water is squeezed into column through water pump ballasting system;C, measured by ballast level measurement unit, until reaching To desired liquid level, ballast manipulation is completed, as shown in Figure 4;
The draining operating process of column internal ballast tanks includes:A, startup water pump ballasting system;B, opening sea cock and valve, stand Ballast water in post ballast tank discharges outboard under the effect of water pump ballasting system by sea cock and valve;C, surveyed by ballast tank liquid level Amount unit is measured, until reaching the liquid level of requirement, drain operation is completed, as shown in Figure 4.
The operating method of foregoing Semi-submersible type hoisting load of platform water system, wherein, the water pump of the column internal ballast tanks Ballasting system is intake and draining is used for ballast water between left column internal ballast tanks and right column internal ballast tanks and adjusts load side Formula carries out the anti-tune that inclines and carries operation, and its step is as follows:When crane carries out hoisting operation in larboard, start water pump ballasting system, The ballast water of left column ballast tank is got in right column ballast tank via ballast pipeline, while being opened by central control system control Open ballast level measurement unit to measure, until when reaching the liquid level of requirement, adjusting and carrying operation completion;When crane astarboard When carrying out hoisting operation, start water pump ballasting system, the ballast water of right column ballast tank is got into left column via ballast pipeline In ballast tank, measured while opening ballast level measurement unit by central control system control, until reaching requirement During liquid level, adjust and carry operation completion, as shown in Figure 5.
The operating method of foregoing Semi-submersible type hoisting load of platform water system, wherein, the water pump of the column internal ballast tanks When the anti-tune that inclines for losing lifted load when ballasting system carries out water inlet and draining for crane job suddenly is carried, when a side of a ship Lifted load is lost during crane job in emergency circumstances suddenly, is quickly discharged to resist in another side of a ship column using compressed air and is inclined Load is adjusted to be carried out with the mode of ballast water, its step is as follows:When the crane that larboard carries out hoisting operation loses sling load suddenly When, the emergent emission control unit controlled by central control system sends right column ballast tank to compressed air ballasting system rapidly Quick drainage is instructed, and the high-order draining valve positioned at the right column ballast tank of starboard is opened, while compressed air enters right column pressure Carry ballast water in cabin, the right column ballast tank and under compressed air and self gravitation effect, quickly discharge outboard;When starboard is carried out When the crane of hoisting operation loses sling load suddenly, the emergent emission control unit controlled by central control system is right rapidly Ballast air ballasting system sends the instruction of left column ballast tank Quick drainage, positioned at the high-order row of the left column ballast tank of larboard Water valve is opened, while compressed air enters in left column ballast tank, cabin, ballast water is under compressed air and self gravitation effect, soon Speed discharge outboard, reaches the anti-heel effect of ship, as shown in Figure 6.
The beneficial effect of the ballast system of Semi-submersible type hoisting platform of the present invention, the ballast system of Semi-submersible type hoisting platform Ballast water should be injected to ballast tank, ballast water is drained into outboard again;When adjusting load, in addition it is also necessary to by one or more ballast tanks Water barge be transported to another or multiple ballast tanks.The present invention is provided with several ballast tanks in Semi-submersible type hoisting platform, optimizes ballast Water system is designed, it is ensured that simple system, function are reliable;Using setting that two kinds of ballasting systems of ballast pump and compressed air are combined Meter, that is, float downward internal ballast water and inject and discharge by the way of gravity feed and compressed air draining, its advantage is can be big It is big to simplify ballast piping, and adjust load speed fast;Resist during hoisting operation the tune that inclines carry using between specific ballast tank in column by Ballast pump adjust the mode of load, and its advantage is to adjust carrying capacity easy to control, can accurately ensure certain ballast water capacity in correlation Adjust and refute between ballast tank, meet the safety requirements of platform stability and crane job;In hoisting operation emergency, (sling load is dashed forward So lose) under, it can also reduce platform angle of heel using the tune load ballast water that inclines is resisted in compressed air rapid deflation column, enter one Step improves the security of platform operations.
Brief description of the drawings
Fig. 1 implements view for the ballast system of partly latent lifting platform of the present invention.
Fig. 2 is the ballast system operation principle block diagram of Semi-submersible type hoisting platform of the present invention.
The gravity feeds of floating downward internal ballast tank and compression of the Fig. 3 for the ballast system of Semi-submersible type hoisting platform of the present invention Air drain operation schematic flow sheet.
Column internal ballast tanks water inlets and draining of the Fig. 4 for the ballast system of Semi-submersible type hoisting platform of the present invention are operated Schematic flow sheet.
Fig. 5 carries operating process schematic diagram for the anti-tune that inclines of ballast system of Semi-submersible type hoisting platform of the present invention.
Fig. 6 carries operating process for the tune that the ballast system of Semi-submersible type hoisting platform of the present invention loses lifted load suddenly and shown It is intended to.
Major Symbol explanation in figure:
1 time floating body ballast tank, 2 left column ballast tanks, 3 right column ballast tanks, 4 compressed air ballasting systems, 5 water pump ballasts System, 6 water-inflow and drain valves, 7 sea cock and valves, 8 left high-order draining valves, 9 right high-order draining valves, 10 emergent emission control units, 11 drinking water Measuring unit, 12 ballast level measurement units, 13 times floating bodies, 14 columns, 15 upper mounting plates.
Embodiment
Semi-submersible type hoisting load of platform water system integral arrangement of the present invention as shown in figure 1, set respectively in two lower floating bodies 13 Ballast tank is set in ballast tank 1, three pairs of symmetrical columns 14, each column;Ballast tank 2, right column are wherein set in left column Inside set ballast tank 3.Lower floating body ballast tank bottom sets water-inflow and drain valve 6, and top is provided with and opening that compressed air ballasting system 4 is connected Mouthful.Compressed air system 4 is set in upper mounting plate 15, the compressed air system 4 by pipeline respectively with lower floating body ballast tank 1, Zuo Li Post ballast tank 2 and right column ballast tank 3 are connected, for carrying out draining or left column ballast tank 2, the right side to lower floating body ballast tank 1 Column ballast tank 3 carries out emergency and quickly arranges load.Left and right pillar ballast tank is under nonemergency by being arranged on lower floating body Interior water pump ballasting system 5 press/arrange load and adjust carrying.Water pump ballasting system (5) is provided with sea cock and valve (7), and the sea cock and valve (7) leads to Bottom water inlet of the piping respectively with left column ballast tank (2), right column ballast tank (3) is connected;Left column ballast tank (2), The pipeline that can be used for ballast water phase intermodulation to refute is set between right column ballast tank (3).
It is provided with and is connected and by center control with floating downward the ballast tank in vivo and in left and right pillar by pipeline in upper mounting plate 15 The compressed air ballasting system 4 of system monitoring processed, the ballast level measurement for measuring each ballast tank ballast water liquid level It is additionally provided with unit 12 and the emergent emission control unit 10 for the emergent discharge ballast water of control operation, upper mounting plate 15 in Entreat the drinking water measuring unit 11 for measuring table draft amount of control system monitoring.
Ballast system workflow of the present invention is as shown in Fig. 2 wherein:
Floating downward the gravity feed operating process of internal ballast tank includes:A, startup compressed air ballasting system 4, lower floating body pressure Carry the pipeline tapping discharge that the air in cabin 1 is arranged on compartment roof via compressed air ballasting system 4;B, open into draining Valve 6, outboard water enters in lower floating body ballast tank 1 by gravity from water-inflow and drain valve 6;C, to ballast level measurement unit 12 and drinking water Measuring unit 11 is measured accordingly, until reaching drauht requirement, ballast manipulation is completed;Float downward the pressure of internal ballast tank Contracting air drain operation process includes:A, startup compressed air ballasting system 4, air stream is set via compressed air ballasting system 4 The pipeline tapping at the lower top of floating body ballast tank 1 is put to enter in lower floating body ballast tank 1;B, opening water-inflow and drain valve 6, lower floating body Ballast water in ballast tank 1 is discharged by water-inflow and drain valve 6 and pressed under the effect of the pressure-air of compressed air ballasting system 4 Carry cabin;C, ballast level measurement unit 12 and drinking water measuring unit 11 are measured accordingly, until reach drauht It is required that, drain operation is completed;
The water inlet Job Operations process of column internal ballast tanks includes:A, startup water pump ballasting system 5;B, opening sea cock and valve 7, The ballast tank that outboard water is squeezed into column through water pump ballasting system;C, measured by ballast level measurement unit 12, directly To the liquid level for reaching requirement, ballast manipulation is completed;The draining operating process of column internal ballast tanks includes:A, startup water pump pressure Loading system 5;Ballast water in B, opening sea cock and valve 7, column ballast tank passes through the row of sea cock and valve 7 under the effect of water pump ballasting system Go out outboard;C, measured by ballast level measurement unit 12, until reaching the liquid level of requirement, drain operation is completed.
Embodiment one:The pressure of lower floating body ballast tank/row carries operating process, as shown in Figure 3.
Semi-submersible type hoisting platform dispatch navigation, hoisting operation, storm from deposit etc. changed under operating mode when, it usually needs It is quick to carry out pressing/arrange load operation to carry out drinking water adjustment.When platform needs quick ballast increase drinking water, start compressed air first Air in ballasting system 4, lower floating body ballast tank 1 acts on configured at the top of ballast tank 1 by compressed air ballasting system 4 Pipeline tapping is discharged;Then water-inflow and drain valve 6 is opened, outboard water enters in lower floating body ballast tank 1 by gravity from water-inflow and drain valve 6;It is logical Cross and ballast level measurement unit 12 and drinking water measuring unit 11 are measured accordingly, until drauht requirement is reached, Ballast manipulation is completed.
When platform needs quick row to carry reduction drinking water, start compressed air ballasting system 4 first, air stream is empty by compression Air pressure loading system 4 is entered in lower floating body ballast tank 1 through piping by the pipeline tapping for being arranged on the lower top of floating body ballast tank 1; Then the ballast water opened in water-inflow and drain valve 6, lower floating body ballast tank 1 is made in the pressure-air from compressed air ballasting system 4 Under, ballast tank 1 is discharged by water-inflow and drain valve 6;By being carried out to ballast level measurement unit 12 and drinking water measuring unit 11 Corresponding measurement, until reaching drauht requirement, drain operation is completed.
Embodiment two:Pressure/row under column ballast tank nonemergency carries operating process, as shown in Figure 4.
Semi-submersible type hoisting platform dispatch navigation, hoisting operation, storm from deposit etc. changed under operating mode when, pass through implementation Lower floating body ballast tank 1 is quickly carried out in example one to press/arrange load operation to carry out after drinking water adjustment, the column to platform is often also needed to Ballast tank further carries out pressing/arrange load operation to carry out precise fine-adjustment to platform drinking water.Ballast is carried out when needing column ballast tank When, start water pump ballasting system 5 first;Then sea cock and valve 7, the ballast that outboard water is squeezed into column through water pump ballasting system are opened Cabin;Measured by ballast level measurement unit 12, until reaching the liquid level of requirement, ballast manipulation is completed.
When needing column internal ballast tanks to carry out draining, start water pump ballasting system 5 first;Then seabed is opened Ballast water in valve 7, column ballast tank discharges outboard under the effect of water pump ballasting system by sea cock and valve 7;Pass through ballast tank liquid Position measuring unit 12 is measured, until reaching the liquid level of requirement, drain operation is completed.
Embodiment three:Anti- incline tune of the column ballast tank under lifting operating mode carries operating process, as shown in Figure 5.
When Semi-submersible type hoisting platform carries out hoisting operation, certain to platform generation it can incline because arm suspending belt weight rotates Torque is covered, to keep the balance of platform, needs to carry out tune load to the ballast tank of platform in the process.When crane enters in larboard During row hoisting operation, start water pump ballasting system 5, ballast water gets to right column pressure from left column ballast tank 2 via ballast pipeline Cabin 3 is carried, while ballast level measurement unit 12 is measured, until when reaching the liquid level of requirement, adjusting load operation to complete;When rise When heavy-duty machine astarboard carries out hoisting operation, start water pump ballasting system 5, ballast water is from right column ballast tank 3 via ballast pipeline Left column ballast tank 2 is got to, while ballast level measurement unit 12 is measured, until when reaching the liquid level of requirement, adjusting and carrying Operation is completed.
Example IV:Column ballast tank is losing the quick row load operating process in emergency circumstances such as hook suddenly, such as Fig. 6 institutes Show.
In Semi-submersible type hoisting platform during hoisting operation, such as occur suddenly lose hook emergency when, it is necessary to pass through Pressure/row carries operation and makes quick adjustment to platform floading condition.Lose the urgent feelings of lifted load suddenly when a side of a ship crane job Under condition, start compressed air ballasting system 4, quickly discharge to resist to incline in another side of a ship column using compressed air and adjust load ballast water Mode carries out the anti-tune that inclines and carried, and its step is as follows:, should when larboard loses sling load suddenly in the crane for carrying out hoisting operation The sensor and associated control signal that anxious emission control unit 10 has by itself are sent rapidly to compressed air ballasting system 4 The instruction of right column ballast tank Quick drainage, starboard high position draining valve 9 is opened, while compressed air enters right column ballast tank 3, Ballast water quickly discharges outboard under compressed air and self gravitation effect in the right column ballast tank;When starboard is being risen When the crane of heavy work loses sling load suddenly, sensor and correlation that emergent emission control unit 10 has by itself Control signal sends rapidly the instruction of left column ballast tank Quick drainage, larboard high position draining valve 8 to ballast air ballasting system 4 Open, make while compressed air enters ballast water in left column ballast tank 2, left column ballast tank in compressed air and self gravitation Under, outboard is quickly discharged, the anti-heel effect of ship is reached, reduces platform angle of heel, it is ensured that the security of platform.
The content not illustrated in the embodiment of the present invention is prior art, therefore is no longer repeated.
The operation principle of Semi-submersible type hoisting load of platform water system and its operating method of the present invention:Adjustment is needed to eat in platform In the case of water, by adjusting the turnover for carrying seawater to complete in lower floating body ballast tank and left and right pillar ballast tank.
When the anti-tune that inclines is carried (crane lifting rotary phase), the ballast water of left and right pillar internal ballast tanks needs to carry out phase Intermodulation refutes to keep platform in balance, and the total Water in the case of this in load of platform cabin keeps constant, adjusts and carries by being pumped load mode Carry out;In the case of losing hook suddenly, to keep the balance of platform, it is necessary to by the ballast water in the column ballast tank of the reverse side of lifting Quick discharge outboard, such a tune carries mode and carries out operation completion by compressed air ballasting system.
Lower floating body ballast tank carries out gravity feed and can quickly adjust platform drinking water by compressed air draining.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, it is all It is any simple modification, equivalent variations and the modification made according to the technical spirit of the present invention to above example, still falls within In the range of technical solution of the present invention.

Claims (4)

1. a kind of Semi-submersible type hoisting load of platform water system, including two lower floating bodies (13), three to five pairs of symmetrical columns (14) and a upper mounting plate (15), the upper mounting plate is provided with central control system;Characterized in that,
This two is floated downward and sets several ballast tanks (1) from head to tail respectively in vivo, and one of them is floated downward sets water pump ballasting system in vivo (5), float downward each ballast tank in vivo and set water-inflow and drain valve (6) and the opening connected with compressed air ballasting system (4) respectively;
Left column ballast tank (2) is set in each left column, the left column ballast tank (2) is provided with left high-order draining valve (8);It is each right Right column ballast tank (3) is set in column, the right column ballast tank (3) is provided with right high-order draining valve (9);
Water pump ballasting system (5) be provided with sea cock and valve (7), the sea cock and valve (7) by pipeline respectively with left column ballast tank (2) and the right side Column ballast tank (3) bottom water inlet is connected;Refuted between left column ballast tank (2) and right column ballast tank (3) by phase intermodulation The pipeline communication of ballast water;
It is provided with upper mounting plate (15) by pipeline and floats downward the ballast tank in internal and left and right pillar and be connected and by central control The compressed air ballasting system (4) of system monitoring, the ballast level measurement for measuring each ballast tank ballast water liquid level Also set in unit (12) and the emergent emission control unit (10) for the emergent discharge ballast water of control operation, upper mounting plate (15) There is the drinking water measuring unit (11) for measuring table draft amount monitored by central control system.
2. a kind of operating method of Semi-submersible type hoisting load of platform water system as claimed in claim 1, it is characterised in that including Float downward the gravity feed and compressed air drain operation of internal ballast tank;The water pump ballasting system of column internal ballast tanks is intake With draining operation;
Floating downward the gravity feed operating process of internal ballast tank includes:
Air in A, startup compressed air ballasting system (4), lower floating body ballast tank (1) is via compressed air ballasting system (4) It is arranged on the pipeline tapping discharge of compartment roof;
B, opening water-inflow and drain valve (6), outboard water enter in lower floating body ballast tank (1) by gravity from water-inflow and drain valve (6);
C, ballast level measurement unit (12) and drinking water measuring unit (11) are measured accordingly, up to reaching that ship is eaten Water requirement, ballast manipulation is completed;
Floating downward the compressed air drain operation process of internal ballast tank includes:
A, startup compressed air ballasting system (4), air stream are arranged on lower floating body ballast tank via compressed air ballasting system (4) (1) pipeline tapping at the top of is entered in lower floating body ballast tank (1);
Ballast water in B, opening water-inflow and drain valve (6), lower floating body ballast tank (1) is in the height from compressed air ballasting system (4) Press under air effect, ballast tank is discharged by water-inflow and drain valve (6);
C, ballast level measurement unit (12) and drinking water measuring unit (11) are measured accordingly, up to reaching that ship is eaten Water requirement, drain operation is completed;
The water inlet Job Operations process of column internal ballast tanks includes:
A, startup water pump ballasting system (5);
B, opening sea cock and valve (7), the ballast tank that outboard water is squeezed into column through water pump ballasting system;
C, measured by ballast level measurement unit (12), until reaching the liquid level of requirement, ballast manipulation is completed;
The draining operating process of column internal ballast tanks includes:
A, startup water pump ballasting system (5);
Ballast water in B, opening sea cock and valve (7), column ballast tank passes through sea cock and valve (7) and arranged under the effect of water pump ballasting system Go out outboard;
C, measured by ballast level measurement unit (12), until reaching the liquid level of requirement, drain operation is completed.
3. the operating method of Semi-submersible type hoisting load of platform water system according to claim 2, it is characterised in that described vertical The water pump ballasting system of post internal ballast tanks, which carries out water inlet and draining, is used for left column internal ballast tanks and right column internal ballast tanks Between ballast water adjust load mode to carry out the anti-tune that inclines to carry operation, its step is as follows:When crane carries out hoisting operation in larboard, open Dynamic water pump ballasting system (5), the ballast water of left column ballast tank (2) is got in right column ballast tank (3) via ballast pipeline, Open ballast level measurement unit (12) by central control system control simultaneously to measure, until reaching the liquid level of requirement When, adjust and carry operation completion;When crane astarboard carries out hoisting operation, start water pump ballasting system (5), by right column ballast The ballast water in cabin (3) is got in left column ballast tank (2) via ballast pipeline, while opening ballast by central control system control Cabin measuring unit of liquid level (12) is measured, until when reaching the liquid level of requirement, adjusting and carrying operation completion.
4. the operating method of Semi-submersible type hoisting load of platform water system according to claim 2, it is characterised in that described vertical The water pump ballasting system of post internal ballast tanks, which carries out water inlet and draining, to be used to lose lifted load suddenly during crane job When the anti-tune that inclines is carried, lose lifted load in emergency circumstances suddenly when a side of a ship crane job, quickly arranged using compressed air The tune load that goes out in another side of a ship column to resist to incline is carried out with the mode of ballast water, and its step is as follows:When larboard carries out the lifting of hoisting operation When machine loses sling load suddenly, the emergent emission control unit (10) controlled by central control system is rapid to compressed air pressure Loading system (4) sends the instruction of right column ballast tank Quick drainage, and the high-order draining valve (9) positioned at the right column ballast tank of starboard is opened Open, while compressed air enters right column ballast tank (3), right column ballast tank (3) the interior ballast water is in compressed air and itself Under Action of Gravity Field, outboard is quickly discharged;When the crane that starboard carries out hoisting operation loses sling load suddenly, by center control It is quick that the emergent emission control unit (10) of system control processed sends left column ballast tank to ballast air ballasting system (4) rapidly The instruction of draining, the high-order draining valve (8) positioned at the left column ballast tank of larboard is opened, while compressed air enters left column pressure Carry cabin (2), ballast water quickly discharges outboard under compressed air and self gravitation effect in cabin, reach the anti-heel effect of ship.
CN201510963713.2A 2015-12-21 2015-12-21 Semi-submersible type hoisting load of platform water system and its operating method Active CN105584601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510963713.2A CN105584601B (en) 2015-12-21 2015-12-21 Semi-submersible type hoisting load of platform water system and its operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510963713.2A CN105584601B (en) 2015-12-21 2015-12-21 Semi-submersible type hoisting load of platform water system and its operating method

Publications (2)

Publication Number Publication Date
CN105584601A CN105584601A (en) 2016-05-18
CN105584601B true CN105584601B (en) 2017-08-25

Family

ID=55924579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510963713.2A Active CN105584601B (en) 2015-12-21 2015-12-21 Semi-submersible type hoisting load of platform water system and its operating method

Country Status (1)

Country Link
CN (1) CN105584601B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107685838A (en) * 2016-08-05 2018-02-13 中集海洋工程研究院有限公司 The ballasting system and its ballast method of Semi-submersible type hoisting platform
CN107419654A (en) * 2017-07-28 2017-12-01 江苏科技大学 A kind of variable load-carrying pontoon bridge
CN107933847A (en) * 2017-12-19 2018-04-20 苏州远征魂车船技术有限公司 A kind of device for ships
CN108001638A (en) * 2017-12-19 2018-05-08 苏州远征魂车船技术有限公司 A kind of Anti-inclining device for ships
CN107933846A (en) * 2017-12-19 2018-04-20 苏州远征魂车船技术有限公司 A kind of device preventing tilting peculiar to vessel
CN108058791A (en) * 2017-12-19 2018-05-22 苏州远征魂车船技术有限公司 A kind of steady device peculiar to vessel
CN110053730B (en) * 2018-01-18 2020-12-04 烟台中集来福士海洋工程有限公司 Semi-submersible platform and ballast system thereof
CN111422311B (en) * 2020-04-02 2021-07-06 中国海洋石油集团有限公司 Floating platform pilot test ballast water system and control method thereof
CN113636026B (en) * 2020-12-04 2022-05-20 招商局重工(江苏)有限公司 Rapid ballast system of semi-submersible type hoisting and dismantling platform and operation method thereof
CN113086112A (en) * 2021-03-05 2021-07-09 海洋石油工程股份有限公司 Pressure discharge loading system of column-stabilized semi-submersible production oil storage platform and semi-submersible platform
CN113212670B (en) * 2021-06-10 2022-09-20 海南浙江大学研究院 Cross-water-surface shuttle type unmanned ship capable of flexibly switching operation forms
CN113460259A (en) * 2021-07-27 2021-10-01 广船国际有限公司 Anti-rolling tank system and ship
CN113879473B (en) * 2021-09-30 2024-03-01 中国船舶重工集团公司第七0四研究所 X-type active anti-rolling water tank device and method
CN114261486A (en) * 2021-12-07 2022-04-01 海洋石油工程股份有限公司 Pressure-discharging-loading system and method suitable for floating wind power platform

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101490537B1 (en) * 2010-07-13 2015-02-05 현대중공업 주식회사 Anti Heeling function on Ship's Alarm Monitoring System
CN202541800U (en) * 2012-04-06 2012-11-21 扬帆集团股份有限公司 Automatic transverse inclination preventing system using ballast pumps
CN203614519U (en) * 2013-12-16 2014-05-28 无锡市海联舰船附件有限公司 Liquid level control device for hydraulic pump station with anti-rolling tank
CN203921155U (en) * 2014-03-31 2014-11-05 浙江海洋学院 Novel ballast pumping system
CN104494788A (en) * 2014-12-03 2015-04-08 大连船舶重工集团有限公司 Lifting balance compensation system of semi-submersible platform lifting machine

Also Published As

Publication number Publication date
CN105584601A (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN105584601B (en) Semi-submersible type hoisting load of platform water system and its operating method
EP2214955B1 (en) System and method for the active and passive stabilization of a vessel
CN113636026B (en) Rapid ballast system of semi-submersible type hoisting and dismantling platform and operation method thereof
CN101980917A (en) Liquid storing and offloading device and drilling and production installations on the sea based thereon
CN102328733B (en) Semi-submersible lifting living platform
US4207828A (en) Stabilizing system for a crane vessel
CN203372365U (en) Underwater floating body
CN107685838A (en) The ballasting system and its ballast method of Semi-submersible type hoisting platform
US20110088608A1 (en) Ballast-free ship
CN1317160C (en) Self-installed suction anchor
CN101362557A (en) Slippage shipment method for large scale structure object
CN202201145U (en) Semi-submersible type hoisting accommodation platform
CN104960644A (en) Auxiliary lifting pontoon and method for lifting underwater object by using the same
CN103895828A (en) Double-curved-surface floating type production oil storage platform
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
CN104386209A (en) Sand cabin type self-loading sand carrier
CN110155262A (en) A kind of dry tree semisubmersible platform with self installation function
CN104760665A (en) Energy saving system used for adjusting floating state of waterborne floating body and use method thereof
SG181581A1 (en) Vessel with submersible hulls
CN203902799U (en) Double-curved-surface-shaped floating oil production and storage platform
CN206141785U (en) Platform of transferring
GB2385564A (en) Semi-submersible vessel having a concrete storage tank
CN110510271B (en) Underwater large-scale oil-water replacement oil storage and discharge device suitable for offshore oil development and operation method thereof
CN111252205B (en) Shallow water self-installation platform and installation method
CN105947123A (en) Double-body semi-submerged ship with submersible deck

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: Offshore Oil Engineering Co., Ltd.

Patentee after: China Offshore Oil Group Co., Ltd.

Co-patentee after: No.708 Research Institute, China State Shipbuilding Corporation

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: Offshore Oil Engineering Co., Ltd.

Patentee before: China National Offshore Oil Corporation

Co-patentee before: No.708 Research Institute, China State Shipbuilding Corporation