CN105574709A - Process skip method and device for rapid design of high speed train - Google Patents

Process skip method and device for rapid design of high speed train Download PDF

Info

Publication number
CN105574709A
CN105574709A CN201510925400.8A CN201510925400A CN105574709A CN 105574709 A CN105574709 A CN 105574709A CN 201510925400 A CN201510925400 A CN 201510925400A CN 105574709 A CN105574709 A CN 105574709A
Authority
CN
China
Prior art keywords
flow process
redirect
free
demand
bullet train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510925400.8A
Other languages
Chinese (zh)
Inventor
张士存
赵宇波
孙华
蔡育冰
王腾飞
郭斌
张忠敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Qingdao Sifang Co Ltd
Original Assignee
CSR Qingdao Sifang Locomotive and Rolling Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Qingdao Sifang Locomotive and Rolling Stock Co Ltd filed Critical CSR Qingdao Sifang Locomotive and Rolling Stock Co Ltd
Priority to CN201510925400.8A priority Critical patent/CN105574709A/en
Publication of CN105574709A publication Critical patent/CN105574709A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/15Vehicle, aircraft or watercraft design

Abstract

The invention discloses a process skip method and device for rapid design of a high speed train. The method comprises following steps: acquiring a demand of a user for free process skip; setting a skip control according to the demand, storing data in a skip type field; receiving the operation instruction of the user to the free process skip; and executing a free process skip instruction. According to the process skip method and device for rapid design of the high speed train, skip among the process nodes is controlled freely; and the demand for researching, developing and manufacturing vehicles rapidly and efficiently is satisfied.

Description

A kind of flow process jump method of bullet train rapid Design and device
Technical field
The invention belongs to public transportation vehicle technical field, particularly relate to a kind of flow process jump method and device of bullet train rapid Design.
Background technology
In existing bullet train exploitation, after Vehicle manufacturers receives order, need artificially to decompose the train demand of order, decompose each component module, as carried component, walking component and car body component etc., research and development department's data according to demand that each component is corresponding afterwards, in conjunction with the design experiences of oneself, design the vehicle meeting technical requirement.Wherein, demand data comprises polytype, as design 100 cattle cars or 75 first-class seats, train running speeds are greater than 250km/h in a joint compartment, meet and runs etc. at low ambient temperatures.For the demand, research staff can directly obtain designing the quantity of inner seat position, compartment and grade, the power of vehicle and weight indicator when being met car speed by converting, or rule of thumb sets the air-conditioning quantity etc. of train.
But there is certain defect in the above-mentioned mode that relates to: different developers is for same demand, the parameter that may design the production vehicles obtained is inconsistent, such as: power A watt can meet the demand of train 250km/h with B watt, or seat layouts different in railway car can both meet the demand for amount of seats, owing to there is no unified design rule, the rule that different personnel or same personnel adopt in different times or project is different, the product designed is caused not have fixed standard, production maintenance is made to produce difficulty, and the level of different personnel is variant, cause product quality uneven, high-caliber research and development technical ability cannot be shared, and, the design of current most of train is not completely again develop new product, but present mode still needs after the fractionation of the demand order of car load, independently researched and developed by each department, therefore there is a large amount of repetition R&D works, as the seat in motor-car vehicle or air-conditioning window are arranged, can without the need to changing or being transplanted to after only doing less change in high ferro vehicle, in research and development high ferro product process, can without the need to repeating seat and air-conditioning in research and development vehicle, the setting of window, directly utilize existing product set-up mode and parameter, and emphasis development resources should be used for the obvious assemblies of difference such as power.
Due in the software development process of prior art, usually can only according to the redirect rule preset or according to level redirect to the redirect between flow nodes, function singleness, cannot meet the demand of rapidly and efficiently carrying out vehicle research and development and manufacturing.
Summary of the invention
For solving the problem, the invention provides a kind of flow process jump method and device of bullet train rapid Design, free control can be carried out to the redirect between flow nodes, meet the demand of rapidly and efficiently carrying out vehicle research and development and manufacturing.
The flow process jump method of a kind of bullet train rapid Design provided by the invention, comprising:
Obtain the demand of user for the free redirect of flow process;
According to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
Receive the operational order of user for the free redirect of flow process;
Perform the free skip command of flow process.
Preferably, in the flow process jump method of above-mentioned bullet train rapid Design, described acquisition user comprises for the demand of the free redirect of flow process:
Obtain user by arranging at least one rule on node, and in described execution flow process, perform the demand of described rule.
Preferably, in the flow process jump method of above-mentioned bullet train rapid Design, described according to the free redirect control of described demand setting procedure, by deposit data at redirect type field be: the option that the free redirect control of described flow process is set according to described demand, by deposit data at redirect type field.
Preferably, in the flow process jump method of above-mentioned bullet train rapid Design, also comprise after the free skip command of described execution flow process:
Jump on the node determined according to described rule.
Preferably, in the flow process jump method of above-mentioned bullet train rapid Design, the free skip command of described execution flow process is:
Utilize the class regular com.hotent.platform.service.bpm.JumpRule that executes the task to carry out computing, recycle the operation result obtained and carry out redirect.
The flow process redirect device of a kind of bullet train rapid Design provided by the invention, comprising:
Acquiring unit, for obtaining the demand of user for the free redirect of flow process;
Setting unit, for according to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
Receiving element, for receiving the operational order of user for the free redirect of flow process;
Performance element, for performing the free skip command of flow process.
Preferably, in the flow process redirect device of above-mentioned bullet train rapid Design, described acquiring unit for obtaining user by arranging at least one rule on node, and performs the demand of described rule in described execution flow process.
Preferably, in the flow process redirect device of above-mentioned bullet train rapid Design, described setting unit is used for the option arranging the free redirect control of described flow process according to described demand, by deposit data at redirect type field.
Preferably, in the flow process redirect device of above-mentioned bullet train rapid Design, also comprise:
Jump-transfer unit, for jumping to the node determined according to described rule.
Preferably, in the flow process redirect device of above-mentioned bullet train rapid Design, described performance element is used for utilizing the class regular com.hotent.platform.service.bpm.JumpRule that executes the task to carry out computing, recycles the operation result obtained and carries out redirect.
The flow process jump method of above-mentioned bullet train rapid Design provided by the invention and device, owing to comprising: obtain the demand of user for the free redirect of flow process; According to the free redirect control of described demand setting procedure, by deposit data at redirect type field; Receive the operational order of user for the free redirect of flow process; Perform the free skip command of flow process, therefore, it is possible to carry out free control to the redirect between flow nodes, meet the demand of rapidly and efficiently carrying out vehicle research and development and manufacturing.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
The schematic diagram of the flow process jump method of the first bullet train rapid Design that Fig. 1 provides for the embodiment of the present application;
The schematic diagram of the flow process jump method of the second bullet train rapid Design that Fig. 2 provides for the embodiment of the present application;
The schematic diagram of the flow process jump method of the third bullet train rapid Design that Fig. 3 provides for the embodiment of the present application;
The schematic diagram of the flow process jump method of the 4th kind of bullet train rapid Design that Fig. 4 provides for the embodiment of the present application;
The schematic diagram of the flow process redirect device of the first bullet train rapid Design that Fig. 5 provides for the embodiment of the present application;
The schematic diagram of the flow process redirect device of the 4th kind of bullet train rapid Design that Fig. 6 provides for the embodiment of the present application.
Embodiment
Core concept of the present invention is the flow process jump method and the device that provide a kind of bullet train rapid Design, can carry out free control to the redirect between flow nodes, meets the demand of rapidly and efficiently carrying out vehicle research and development and manufacturing.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
The flow process jump method of the first bullet train rapid Design that the embodiment of the present application provides as shown in Figure 1, the schematic diagram of the flow process jump method of the first bullet train rapid Design that Fig. 1 provides for the embodiment of the present application.The method comprises the steps:
S1: obtain the demand of user for the free redirect of flow process;
S2: according to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
S3: receive the operational order of user for the free redirect of flow process;
S4: perform the free skip command of flow process.
The flow process jump method of the above-mentioned bullet train rapid Design that the embodiment of the present application provides, owing to comprising: obtain the demand of user for the free redirect of flow process; According to the free redirect control of described demand setting procedure, by deposit data at redirect type field; Receive the operational order of user for the free redirect of flow process; Perform the free skip command of flow process, therefore, it is possible to carry out free control to the redirect between flow nodes, meet the demand of rapidly and efficiently carrying out vehicle research and development and manufacturing.
The flow process jump method of the second bullet train rapid Design that the embodiment of the present application provides as shown in Figure 2, the schematic diagram of the flow process jump method of the second bullet train rapid Design that Fig. 2 provides for the embodiment of the present application.The method comprises the steps:
A1: obtain user for the demand of the free redirect of flow process, be specially: obtain user by arranging at least one rule on node, and perform the demand of described rule in described execution flow process;
A2: according to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
A3: receive the operational order of user for the free redirect of flow process;
A4: perform the free skip command of flow process.
The flow process jump method of the third bullet train rapid Design that the embodiment of the present application provides as shown in Figure 3, the schematic diagram of the flow process jump method of the third bullet train rapid Design that Fig. 3 provides for the embodiment of the present application.The method comprises the steps:
B1: obtain user for the demand of the free redirect of flow process, be specially: obtain user by arranging at least one rule on node, and perform the demand of described rule in described execution flow process;
B2: according to the free redirect control of described demand setting procedure, by deposit data at redirect type field, be specially: the option that the free redirect control of described flow process is set according to described demand, by deposit data at redirect type field;
B3: receive the operational order of user for the free redirect of flow process;
B4: perform the free skip command of flow process.
The flow process jump method of the 4th kind of bullet train rapid Design that the embodiment of the present application provides as shown in Figure 4, the schematic diagram of the flow process jump method of the 4th kind of bullet train rapid Design that Fig. 4 provides for the embodiment of the present application.The method comprises the steps:
C1: obtain user for the demand of the free redirect of flow process, be specially: obtain user by arranging at least one rule on node, and perform the demand of described rule in described execution flow process;
C2: according to the free redirect control of described demand setting procedure, by deposit data at redirect type field, be specially: the option that the free redirect control of described flow process is set according to described demand, by deposit data at redirect type field;
C3: receive the operational order of user for the free redirect of flow process;
C4: perform the free skip command of flow process;
C5: jump on the node determined according to described rule.
In above-mentioned steps C4, can be specially:
Utilize the class regular com.hotent.platform.service.bpm.JumpRule that executes the task to carry out computing, recycle the operation result obtained and carry out redirect.
The flow process redirect device of the first bullet train rapid Design that the embodiment of the present application provides as shown in Figure 5, the schematic diagram of the flow process redirect device of the first bullet train rapid Design that Fig. 5 provides for the embodiment of the present application.This device comprises:
Acquiring unit 501, for obtaining the demand of user for the free redirect of flow process;
Setting unit 502, for according to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
Receiving element 503, for receiving the operational order of user for the free redirect of flow process;
Performance element 504, for performing the free skip command of flow process.
The flow process redirect device of the above-mentioned bullet train rapid Design that the embodiment of the present application provides, can carry out free control to the redirect between flow nodes, meets the demand of rapidly and efficiently carrying out vehicle research and development and manufacturing.
The flow process redirect device of the second bullet train rapid Design that the embodiment of the present application provides, except having the technical characteristic identical with the first device above-mentioned, also comprises following technical characteristic:
Described acquiring unit for obtaining user by arranging at least one rule on node, and performs the demand of described rule in described execution flow process.
The flow process redirect device of the third bullet train rapid Design that the embodiment of the present application provides, except having the technical characteristic identical with above-mentioned the second device, also comprises following technical characteristic:
Described setting unit is used for the option arranging the free redirect control of described flow process according to described demand, by deposit data at redirect type field.
The flow process redirect device of the 4th kind of bullet train rapid Design that the embodiment of the present application provides as shown in Figure 6, the schematic diagram of the flow process redirect device of the 4th kind of bullet train rapid Design that Fig. 6 provides for the embodiment of the present application.This device comprises:
Acquiring unit 601, for obtaining the demand of user for the free redirect of flow process;
Setting unit 602, for according to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
Receiving element 603, for receiving the operational order of user for the free redirect of flow process;
Performance element 604, for performing the free skip command of flow process;
Jump-transfer unit 605, for jumping to the node determined according to described rule.
As a preferred version, described performance element 604 carries out computing for utilizing the class regular com.hotent.platform.service.bpm.JumpRule that executes the task, recycle the operation result obtained and carry out redirect, need to use ProcessCmd object in code, make with the following method:
importcom.hotent.platform.service.bpm.thread.TaskThreadService;
importcom.hotent.core.bpm.model.ProcessCmd;
ProcessCmdcmd=TaskThreadService.getProcessCmd();
intvoteAgree=cmd.getVoteAgree()。
Arrange the control of free redirect in configuration after, user can choose or arrange control option according to demand, performs flow process skip operation by receiving user operation.Such as, flow process is rejected in example, supports to reject operation, namely support flow process to be rejected a upper approver in platform.And reject situation about not supporting and comprise: rejecting of synchronization node.If node namely is above synchronization node or conditional synchronization joint; Node is above sub-process; Node is above automatic node.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. a flow process jump method for bullet train rapid Design, is characterized in that, comprising:
Obtain the demand of user for the free redirect of flow process;
According to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
Receive the operational order of user for the free redirect of flow process;
Perform the free skip command of flow process.
2. the flow process jump method of bullet train rapid Design according to claim 1, is characterized in that, described acquisition user comprises for the demand of the free redirect of flow process:
Obtain user by arranging at least one rule on node, and in described execution flow process, perform the demand of described rule.
3. the flow process jump method of bullet train rapid Design according to claim 2, it is characterized in that, described according to the free redirect control of described demand setting procedure, by deposit data at redirect type field be: the option that the free redirect control of described flow process is set according to described demand, by deposit data at redirect type field.
4. the flow process jump method of the bullet train rapid Design according to any one of claim 1-3, is characterized in that, also comprises after the free skip command of described execution flow process:
Jump on the node determined according to described rule.
5. the flow process jump method of bullet train rapid Design according to claim 4, is characterized in that, the free skip command of described execution flow process is:
Utilize the class regular com.hotent.platform.service.bpm.JumpRule that executes the task to carry out computing, recycle the operation result obtained and carry out redirect.
6. a flow process redirect device for bullet train rapid Design, is characterized in that, comprising:
Acquiring unit, for obtaining the demand of user for the free redirect of flow process;
Setting unit, for according to the free redirect control of described demand setting procedure, by deposit data at redirect type field;
Receiving element, for receiving the operational order of user for the free redirect of flow process;
Performance element, for performing the free skip command of flow process.
7. the flow process redirect device of bullet train rapid Design according to claim 6, is characterized in that, described acquiring unit for obtaining user by arranging at least one rule on node, and performs the demand of described rule in described execution flow process.
8. the flow process redirect device of bullet train rapid Design according to claim 7, is characterized in that, described setting unit is used for the option arranging the free redirect control of described flow process according to described demand, by deposit data at redirect type field.
9. the flow process redirect device of the bullet train rapid Design according to any one of claim 6-8, is characterized in that, also comprise:
Jump-transfer unit, for jumping to the node determined according to described rule.
10. the flow process redirect device of bullet train rapid Design according to claim 9, it is characterized in that, described performance element is used for utilizing the class regular com.hotent.platform.service.bpm.JumpRule that executes the task to carry out computing, recycles the operation result obtained and carries out redirect.
CN201510925400.8A 2015-12-10 2015-12-10 Process skip method and device for rapid design of high speed train Pending CN105574709A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510925400.8A CN105574709A (en) 2015-12-10 2015-12-10 Process skip method and device for rapid design of high speed train

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510925400.8A CN105574709A (en) 2015-12-10 2015-12-10 Process skip method and device for rapid design of high speed train

Publications (1)

Publication Number Publication Date
CN105574709A true CN105574709A (en) 2016-05-11

Family

ID=55884812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510925400.8A Pending CN105574709A (en) 2015-12-10 2015-12-10 Process skip method and device for rapid design of high speed train

Country Status (1)

Country Link
CN (1) CN105574709A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286212A (en) * 2007-04-12 2008-10-15 国际商业机器公司 Business flow path execution method, business flow path engines and its deployment method
CN101714230A (en) * 2009-11-20 2010-05-26 广东金宇恒科技有限公司 User-defined workflow management method and system
CN103353957A (en) * 2013-06-19 2013-10-16 浙江中烟工业有限责任公司 Realization method of human-centered cooperative workflow system and apparatus thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101286212A (en) * 2007-04-12 2008-10-15 国际商业机器公司 Business flow path execution method, business flow path engines and its deployment method
CN101714230A (en) * 2009-11-20 2010-05-26 广东金宇恒科技有限公司 User-defined workflow management method and system
CN103353957A (en) * 2013-06-19 2013-10-16 浙江中烟工业有限责任公司 Realization method of human-centered cooperative workflow system and apparatus thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
LCH169: "ccflow工作流引擎-流程设计器操作手册", 《HTTPS://WENKU.BAIDU.COM/VIW/70803CB9F121DD36A32D82AE》 *

Similar Documents

Publication Publication Date Title
CN105760180B (en) A kind of workflow engine expands and develops method
WO2000028451A3 (en) Automated finite capacity scheduler
Jain et al. Multi-resolution modeling for supply chain sustainability analysis
CN105450684B (en) Cloud computing resource scheduling method and system
EP2402229A1 (en) Method and system for simulating, planning and/or controlling operating processes in a track guided transportation system
GB2492012A (en) Operation management support system and apparatus, and method of computing train operation plan
CN106325887A (en) Service process management method based on Activiti
Muffatto Evolution of production paradigms: the Toyota and Volvo cases
CN109242134A (en) Consider the more workshop integrated dispatch methods of two targets of migration
CN105574709A (en) Process skip method and device for rapid design of high speed train
CN105512393A (en) PDM (product data management) connection method and device for rapid design of high-speed train
CN102082737A (en) Method for replacing Web services based on service priority
CN105550411A (en) Rapid design process event monitoring method and device of high speed train
CN108388230A (en) A kind of method for scheduling task, task scheduling system, Vehicle Electronic Control Unit and vehicle
CA3023381A1 (en) Traffic management method and traffic management system
Hosnedl et al. Cooperation of engineering & industrial designers on industrial projects
Pouryousef et al. Track maintenance scheduling and its interactions with operations: Dedicated and mixed high-speed rail (HSR) scenarios
CN103971225A (en) Workflow dynamic expanding method and system
CN105589992A (en) Process control method and device for rapid design of high speed train
CN109902403A (en) A kind of integrated dispatch method based on Petri network and heuristic value
CN102063333A (en) Recursive structure workflow model and dispatching method thereof
Ross Architect your company for agility
Ginelli et al. Regenerative urban space: a box for public space use
Kojima et al. The total quality assurance networking model for preventing defects: Building an effective quality assurance system using a total QA network
Janthong Using Axiomatic Design and TRIZ in (re) designing of product architecture toward upgradable products

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
CB02 Change of applicant information

Address after: Chengyang District of Shandong city of Qingdao province Jinhong road 266111 No. 88

Applicant after: CRRC QINGDAO SIFANG CO., LTD.

Address before: Chengyang District of Shandong city of Qingdao province Jinhong road 266111 No. 88

Applicant before: CSR Qingdao Sifang Locomotive and Rolling Stock Co., Ltd.

COR Change of bibliographic data
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511