CN105569384A - 核电站单堆核岛主厂房的布置结构 - Google Patents
核电站单堆核岛主厂房的布置结构 Download PDFInfo
- Publication number
- CN105569384A CN105569384A CN201510933529.3A CN201510933529A CN105569384A CN 105569384 A CN105569384 A CN 105569384A CN 201510933529 A CN201510933529 A CN 201510933529A CN 105569384 A CN105569384 A CN 105569384A
- Authority
- CN
- China
- Prior art keywords
- building
- reactor
- nuclear
- workshop
- power station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种核电站单堆核岛主厂房的布置结构,其包括:位于整个核岛主厂房中心的反应堆厂房、自反应堆厂房一侧围绕反应堆厂房设置并均与反应堆厂房连接的三列紧邻的安全厂房,以及自反应堆厂房另一侧围绕反应堆厂房布置的燃料厂房和核辅助厂房。相对于现有技术,本发明核电站单堆核岛主厂房的布置结构中,核电站核岛主厂房采用单堆布局,易于适应复杂的场地条件,可大幅度减少厂房设计的工作难度;三列安全厂房区域分隔,内部灾害防护能力强,主蒸汽、主给水从反应堆厂房两侧引出,其断裂事故后果仅限定在蒸汽/给水阀站的机械区,不会对电、仪敏感设施造成危害;反应堆厂房、三列安全厂房、燃料厂房共用筏基,核岛主厂房布置紧凑,具有优异的抗震性能,有利于结构抗震设计和减少土建工程量。
Description
技术领域
本发明属于核电站设计领域,更具体地说,本发明涉及一种核电站单堆核岛主厂房的布置结构。
背景技术
目前,一些已建或在建核电站的核电机组采用二代加技术,都是双堆布置结构,在一定程度上增加了核岛主厂房布置、结构、设备等设计难度,不利于工程建设快速推进。
在安全系统布置和厂房抵御大型商用飞机撞击等外部灾害方面,二代加技术也和三代主流技术存在着一些设计理念差异,尤其在厂房、设备抗震设计方面。
有鉴于此,确有必要提供一种核电站单堆核岛主厂房的布置结构,以减少核岛厂房设备布置、厂房结构、设备设计等设计难度,缩短设计周期。
发明内容
本发明的目的在于:提供一种核电站单堆核岛主厂房的布置结构,以减少核岛厂房设备布置、厂房结构、设备设计等设计难度,缩短设计周期。
为了实现上述发明目的,本发明提供了一种核电站单堆核岛主厂房的布置结构,其包括:位于核岛主厂房中心的反应堆厂房、自反应堆厂房一侧围绕反应堆厂房设置并均与反应堆厂房连接的三列紧邻的安全厂房,以及自反应堆厂房另一侧围绕反应堆厂房设置的燃料厂房和核辅助厂房。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述三列安全厂房与反应堆厂房、燃料厂房共处同一筏基上。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述三列安全厂房中的一个位于外侧的安全厂房与燃料厂房、核辅助厂房和进出厂房均连接。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述核辅助厂房分别与燃料厂房、三列安全厂房中的一个位于外侧的安全厂房相连,临近反应堆厂房但不与反应堆厂房相连。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述燃料厂房与反应堆厂房、核辅助厂房和三列安全厂房中的一个位于外侧的安全厂房均相连。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述三列安全厂房整体呈方形排布。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述三列安全厂房中的位于中间位置的一个安全厂房设有防大型飞机撞击防护壳。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述三列安全厂房为三个实体及空间隔离的安全厂房。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述反应堆厂房设有安全壳,安全壳采用双层结构。
作为本发明核电站单堆核岛主厂房的布置结构的一种改进,所述反应堆厂房设有反应堆和主设备,反应堆和主设备采用低位布置。
相对于现有技术,本发明核电站单堆核岛主厂房的布置结构具有以下优点:
1)核电站核岛主厂房采用单堆布局,易于适应复杂的场地条件,具有较强的场地适应性,可大幅度减少厂房设计的工作难度。
2)具有极强的抗灾害能力:三列安全厂房区域分隔,内部灾害防护能力强,主蒸汽、主给水从反应堆厂房两侧引出,其断裂事故后果仅限定在蒸汽/给水阀站的机械区,不会对电、仪敏感设施造成危害。
3)反应堆厂房、三列安全厂房、燃料厂房采用共用筏基,核岛主厂房布置紧凑,具有优异的抗震性能,有利于结构抗震设计和减少土建工程量。
附图说明
下面结合附图和具体实施方式,对本发明核电站单堆核岛主厂房的布置结构进行详细说明,其中:
图1为本发明核电站单堆核岛主厂房的布置结构的示意图。
具体实施方式
为了使本发明的发明目的、技术方案及其技术效果更加清晰,以下结合附图和具体实施方式,对本发明进一步详细说明。应当理解的是,本说明书中描述的具体实施方式仅仅是为了解释本发明,并非为了限定本发明。
请参阅图1所示,本发明核电站单堆核岛主厂房的布置结构包括:位于核岛主厂房中心的反应堆厂房1、自反应堆厂房1一侧围绕反应堆厂房1设置并均与反应堆厂房1连接的三列紧邻的安全厂房2-4,以及自反应堆厂房1另一侧围绕反应堆厂房1设置的燃料厂房5和核辅助厂房6。
反应堆厂房1位于整个核岛主厂房的中心,内部结构刚度均匀,传力路径合理,结构整体抗震性能优越。反应堆厂房1内设有安全壳(未图示),安全壳采用双层结构,外壳满足抗大型商用飞机撞击的要求。此外,反应堆厂房1内还设有反应堆和主设备(未图示),反应堆和主设备采用低位布置,以提高反应堆的抗震能力,
安全厂房2-4为三个实体及空间隔离的厂房,自反应堆厂房1的一侧环绕反应堆厂房1布置且均与反应堆厂房1连接,三列安全厂房2-4整体呈方形排布。三列安全厂房2-4紧邻布置且分别对应相应的三个安全系列,其包括位于中间位置的安全厂房3和位于两侧的安全厂房2、4,其中,位于两侧的安全厂房2、4空间上相互隔离,两者的间距约为40m。位于中间位置的安全厂房3处于防大型飞机撞击防护壳(APC壳)的保护之下,如此设计,可使安全厂房满足防大型商用飞机撞击的要求。
请继续参阅图1所示,三列安全厂房2-4中的一个位于外侧的安全厂房2与燃料厂房5相连,三列安全厂房2-4中的另一个位于外侧的安全厂房4与燃料厂房5、核辅助厂房6和进出厂房(未图示)均相连。此外,三列安全厂房2-4与反应堆厂房1、燃料厂房5共处同一筏基上。
三列安全厂房2-4区域分隔,对于内部灾害利用实体隔离边界结构设计,可保证一个分区内发生的内部灾害不会影响另外两个分区,内部灾害防护能力强:三列安全设施各自位于一个安全厂房内,彼此灾害隔离,独立性强,事件后果仅限于一个安全设施系列,可有效降低冗余设备共模/共因失效风险,保证发生任一内部事件后仍有两列安全设施可用。此外,主蒸汽、主给水从反应堆厂房1的两侧引出,其断裂事故后果仅限定在蒸汽/给水阀站的机械区,不会对电、仪敏感设施造成危害。
燃料厂房5位于反应堆厂房1的一侧,紧邻反应堆厂房1和核辅助厂房6,并与安全厂房2、4相连。燃料厂房5正对着燃料输送管,燃料输送管位于反应堆冷却剂系统两环路之间,燃料厂房的布置充分考虑了内部灾害防护要求,保证安全相关系统实体隔离。
核辅助厂房6分别与燃料厂房5和三列安全厂房2-4中的一个位于外侧的安全厂房4相连,临近反应堆厂房1但不与反应堆厂房1相连。
相对于现有技术,本发明核电站单堆核岛主厂房的布置结构具有以下优点:
1)核电站核岛主厂房采用单堆布局,易于适应复杂的场地条件,具有较强的场地适应性,可大幅度减少厂房设计的工作难度。
2)具有极强的抗灾害能力:三列安全厂房区域分隔,内部灾害防护能力强,主蒸汽、主给水从反应堆厂房两侧引出,其断裂事故后果仅限定在蒸汽/给水阀站的机械区,不会对电、仪敏感设施造成危害。
3)反应堆厂房1、安全厂房2-4、燃料厂房5采用共用筏基,核岛主厂房布置紧凑,具有优异的抗震性能,有利于结构抗震设计和减少土建工程量。
根据上述原理,本发明还可以对上述实施方式进行适当的变更和修改。因此,本发明并不局限于上面揭示和描述的具体实施方式,对本发明的一些修改和变更也应当落入本发明的权利要求的保护范围内。此外,尽管本说明书中使用了一些特定的术语,但这些术语只是为了方便说明,并不对本发明构成任何限制。
Claims (10)
1.一种核电站单堆核岛主厂房的布置结构,其特征在于,所述核电站单堆核岛主厂房的布置结构包括:位于核岛主厂房中心的反应堆厂房、自反应堆厂房一侧围绕反应堆厂房设置并均与反应堆厂房连接的三列紧邻的安全厂房,以及自反应堆厂房另一侧围绕反应堆厂房设置的燃料厂房和核辅助厂房。
2.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述三列安全厂房与反应堆厂房、燃料厂房共处同一筏基上。
3.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述三列安全厂房中的一个位于外侧的安全厂房与燃料厂房、核辅助厂房和进出厂房均连接。
4.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述核辅助厂房分别与燃料厂房、三列安全厂房中的一个位于外侧的安全厂房相连,临近反应堆厂房但不与反应堆厂房相连。
5.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述燃料厂房与反应堆厂房、核辅助厂房和三列安全厂房中的一个位于外侧的安全厂房均相连。
6.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述三列安全厂房整体呈方形排布。
7.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述三列安全厂房中的位于中间位置的一个安全厂房设有防大型飞机撞击防护壳。
8.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述三列安全厂房为三个实体及空间隔离的安全厂房。
9.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述反应堆厂房设有安全壳,安全壳采用双层结构。
10.根据权利要求1所述的核电站单堆核岛主厂房的布置结构,其特征在于,所述反应堆厂房设有反应堆和主设备,反应堆和主设备采用低位布置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510933529.3A CN105569384A (zh) | 2015-12-15 | 2015-12-15 | 核电站单堆核岛主厂房的布置结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510933529.3A CN105569384A (zh) | 2015-12-15 | 2015-12-15 | 核电站单堆核岛主厂房的布置结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105569384A true CN105569384A (zh) | 2016-05-11 |
Family
ID=55879954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510933529.3A Pending CN105569384A (zh) | 2015-12-15 | 2015-12-15 | 核电站单堆核岛主厂房的布置结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105569384A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106024081A (zh) * | 2016-05-27 | 2016-10-12 | 中国核电工程有限公司 | 一种多堆核电站布置结构 |
CN108597629A (zh) * | 2018-03-22 | 2018-09-28 | 中国核电工程有限公司 | 一种核电站安全厂房的布置结构 |
CN108756335A (zh) * | 2018-04-25 | 2018-11-06 | 中国核电工程有限公司 | 一种快堆核岛主厂房群布置结构 |
CN108868219A (zh) * | 2018-06-15 | 2018-11-23 | 中国核电工程有限公司 | 一种多回路核电机组厂房布置结构 |
CN109505431A (zh) * | 2018-10-15 | 2019-03-22 | 中国核电工程有限公司 | 一种新型快堆燃料厂房布置结构 |
CN109898900A (zh) * | 2019-02-28 | 2019-06-18 | 中国核电工程有限公司 | 一种核反应堆厂房及其布置方法 |
CN115478721A (zh) * | 2022-09-27 | 2022-12-16 | 中广核工程有限公司 | 核电厂单堆布置核岛厂房结构 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09218288A (ja) * | 1996-02-08 | 1997-08-19 | Toshiba Corp | 原子炉建屋 |
CN102121250A (zh) * | 2011-03-21 | 2011-07-13 | 中广核工程有限公司 | 核电站安全壳筏基钢筋笼的施工方法 |
CN102287062A (zh) * | 2011-07-05 | 2011-12-21 | 中国电力工程顾问集团华东电力设计院 | 核电站布置结构 |
CN103850483A (zh) * | 2013-04-02 | 2014-06-11 | 中国核电工程有限公司 | 一种核电厂主厂房群布置方法 |
CN104064233A (zh) * | 2014-06-13 | 2014-09-24 | 长江勘测规划设计研究有限责任公司 | 核岛洞室群l形布置地下核电站 |
-
2015
- 2015-12-15 CN CN201510933529.3A patent/CN105569384A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09218288A (ja) * | 1996-02-08 | 1997-08-19 | Toshiba Corp | 原子炉建屋 |
CN102121250A (zh) * | 2011-03-21 | 2011-07-13 | 中广核工程有限公司 | 核电站安全壳筏基钢筋笼的施工方法 |
CN102287062A (zh) * | 2011-07-05 | 2011-12-21 | 中国电力工程顾问集团华东电力设计院 | 核电站布置结构 |
CN103850483A (zh) * | 2013-04-02 | 2014-06-11 | 中国核电工程有限公司 | 一种核电厂主厂房群布置方法 |
CN104064233A (zh) * | 2014-06-13 | 2014-09-24 | 长江勘测规划设计研究有限责任公司 | 核岛洞室群l形布置地下核电站 |
Non-Patent Citations (1)
Title |
---|
郑明光、杜圣华: "《压水堆核电站工程设计》", 31 January 2013, 上海科学技术出版社 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106024081A (zh) * | 2016-05-27 | 2016-10-12 | 中国核电工程有限公司 | 一种多堆核电站布置结构 |
CN108597629A (zh) * | 2018-03-22 | 2018-09-28 | 中国核电工程有限公司 | 一种核电站安全厂房的布置结构 |
CN108756335A (zh) * | 2018-04-25 | 2018-11-06 | 中国核电工程有限公司 | 一种快堆核岛主厂房群布置结构 |
CN108756335B (zh) * | 2018-04-25 | 2021-08-24 | 中国核电工程有限公司 | 一种快堆核岛主厂房群布置结构 |
CN108868219A (zh) * | 2018-06-15 | 2018-11-23 | 中国核电工程有限公司 | 一种多回路核电机组厂房布置结构 |
CN108868219B (zh) * | 2018-06-15 | 2022-01-18 | 中国核电工程有限公司 | 一种多回路核电机组厂房布置结构 |
CN109505431A (zh) * | 2018-10-15 | 2019-03-22 | 中国核电工程有限公司 | 一种新型快堆燃料厂房布置结构 |
CN109898900A (zh) * | 2019-02-28 | 2019-06-18 | 中国核电工程有限公司 | 一种核反应堆厂房及其布置方法 |
CN115478721A (zh) * | 2022-09-27 | 2022-12-16 | 中广核工程有限公司 | 核电厂单堆布置核岛厂房结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105569384A (zh) | 核电站单堆核岛主厂房的布置结构 | |
CN103850483B (zh) | 一种核电厂主厂房群布置方法 | |
JP5683912B2 (ja) | 非常用炉心冷却系および沸騰水型原子力プラント | |
CN103985422A (zh) | 基于177堆芯的能动加非能动核蒸汽供应系统及其核电站 | |
CN107369483A (zh) | 一种空间减震核电厂结构体系 | |
CN108597629A (zh) | 一种核电站安全厂房的布置结构 | |
CN108868219B (zh) | 一种多回路核电机组厂房布置结构 | |
CN202526992U (zh) | 核电站用地坑过滤器 | |
WO2017100998A1 (zh) | 核电站单堆核岛主厂房的布置结构 | |
CA2982818A1 (en) | Transportable sub-critical modules for power generation and related methods | |
CN103953210A (zh) | 一种小型压水堆核电厂的核岛布置结构 | |
CN104134477A (zh) | 核岛洞室群环形布置地下核电站 | |
CN104064234B (zh) | 核岛洞室群长廊形布置地下核电站 | |
CN105609504B (zh) | 一种阱隔离型抗seu多节点翻转存储单元版图结构 | |
EP3631815B1 (en) | Very simplified boiling water reactors for commercial electricity generation | |
CN103485554B (zh) | 一种半埋式双堆核岛厂房布置 | |
JP3739868B2 (ja) | 原子力プラント | |
CN103050157A (zh) | 一种优化辅助给水系统给水隔离的装置 | |
Forni et al. | Seismic-Initiated events risk mitigation in LEad-cooled Reactors: the SILER Project | |
CN106898392B (zh) | 一种全压设计的主蒸汽系统 | |
CN203026153U (zh) | 一体化反应堆可控压力释放系统 | |
CN110067428B (zh) | 一种核电厂抵御商用大飞机撞击的防护方法及系统 | |
JP7232164B2 (ja) | 原子力プラント | |
CN110043099B (zh) | 一种核电厂抵御商用大飞机撞击的简化防护方法及系统 | |
Kang et al. | Preliminary Analysis of Interfacing Systems LOCA from a Fire Event PSA Perspective |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160511 |