CN105564605B - Oil gas platform life building method of construction - Google Patents

Oil gas platform life building method of construction Download PDF

Info

Publication number
CN105564605B
CN105564605B CN201610093905.7A CN201610093905A CN105564605B CN 105564605 B CN105564605 B CN 105564605B CN 201610093905 A CN201610093905 A CN 201610093905A CN 105564605 B CN105564605 B CN 105564605B
Authority
CN
China
Prior art keywords
construction
life building
layer
deck
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610093905.7A
Other languages
Chinese (zh)
Other versions
CN105564605A (en
Inventor
代春阳
丰军华
徐梦雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bomesc Offshore Engineering Co Ltd
Original Assignee
Bomesc Offshore Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bomesc Offshore Engineering Co Ltd filed Critical Bomesc Offshore Engineering Co Ltd
Priority to CN201610093905.7A priority Critical patent/CN105564605B/en
Publication of CN105564605A publication Critical patent/CN105564605A/en
Application granted granted Critical
Publication of CN105564605B publication Critical patent/CN105564605B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/4426Stationary floating buildings for human use, e.g. floating dwellings or floating restaurants

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses oil gas platform life building method of construction, it includes following methods:Step 1: the build the side foundation construction of life building and the construction in component processing region;Step 2: support column, leg and the deck of building life building are transported to Component storage area domain;Step 3: assembled prefabricated first layer structure;Step 4, first Rotating fields of assembled prefabricated completion are hung to transit domain by using area straddle truck, reuse place transport vehicle to transport to life building build the side, then on integral hoisting to first layer deck and be adjusted to behind setting position, the first Rotating fields are welded and fixed with first layer deck;Step 5, repeat step three and step 4, until completing the construction in life building.Work quality is improved using this method, it is ensured that the required precision of construction.

Description

Oil gas platform life building method of construction
Technical field
The present invention relates to a kind of method of construction of building manufacture method, more particularly, to oil gas platform life building.
Background technology
In the construction in oil gas platform life building, the method for construction typically used is divided into upright method of hull section construction and upside-down method of hull-section construction.Upright method of hull section construction It is that after the completion of beam lattice welding, theoretical measure is pressed on deck, is directly layered on layout on the top flange plate of beam and welds, install After in place, support and leg are installed on this basis, then carry out the lifting of its upper deck.This method major defect is, work People's labor intensity is big, efficiency is low.Substantial amounts of pipe, electricity, instrument, HVAC work are all concentrated on ceiling or room top, due to interior Portion's narrow space, along with when upper strata is built, construction tool transport is not convenient, this difficulty for all increasing construction and workman's Labor intensity, causes being greatly reduced for operating efficiency.
Upside-down method of hull-section construction is first to splice the deck on upper strata on operation platform, then schemes reverse group above deck according to deck line To beam lattice, and support and leg below this layer are reversely installed on beam lattice, finally managed, the prefabricated work such as electricity, instrument, HVAC Make.After the completion of prefabricated, turnover hoisting is in place.This method major defect is that chunk volume, the weight of prefabricated completion are larger, Vibrations and impact and own wt when standing up upside-down mounting are affected greatly to integral constructing precision.
The content of the invention
Constructed it is an object of the invention to the defect for overcoming prior art there is provided one kind more convenient, operating efficiency is higher, The higher oil gas platform life building method of construction of construction precision.
The oil gas platform life building method of construction of the present invention, it includes following methods:
Step 1: the build the side foundation construction of life building and the construction in component processing region, described life building are built The step of place foundation construction is:The pile foundation in life building and the construction of bottom support are completed in the life building build the side of setting, Then first layer deck is welded in the horizontal direction in the support of bottom;The specific steps of the construction in described component processing region For:Region selected part machining area outside life building build the side, in the horizontally spaced paving in component processing region If twice track, one end set parts storage area between described twice track, close to described Component storage area Inner side between two tracks in domain sets horizontal preform region, between the twice track close to described horizontal preform region Transit domain, the fabricating yard straddle truck on two described tracks are set;
Step 2: support column, leg and the deck of building life building are transported to Component storage area domain;
Step 3: assembled prefabricated first layer structure, is comprised the following steps that:The first step, in horizontal preform region, using complete Instrument of standing marks assembled position according to the support column of first layer and the design coordinate of leg;Second step, uses what is orbited Place straddle truck, is hung to what is marked in horizontal preform region successively by the support column and leg of the first layer in the domain of Component storage area Assembled position, and the interim positioning fixation of temporary fastening device progress is respectively adopted;3rd step, using total powerstation, to what is placed The support column of first layer and the position of leg carry out calibration adjustment until consistent with design coordinate position;4th step, using area Second deck in the domain of Component storage area is hung on the support column and leg of first layer by straddle truck, is seated to correct position Afterwards, constructed on described temporary fastening device, the top of the support column of first layer and leg and second deck are welded Connect fixation;5th step, carries out the welding procedure of sorts of systems on second deck on described temporary fastening device;
First Rotating fields of assembled prefabricated completion are hung to transit domain by step 4, using area straddle truck, reuse field Ground transport vehicle is transported to life building build the side, then on integral hoisting to first layer deck and is adjusted to behind setting position, will First Rotating fields are welded and fixed with first layer deck;
Step 5, repeat step three and step 4, until completing the construction in life building.
Can be made using the method for the present invention deck of sub-cellar lifting welding, support column and leg and upper deck it is prefabricated Carried out simultaneously Deng work, greatly improve operating efficiency.Managing in upper deck, electricity, instrument, HVAC etc. are carried out on operation platform pre- Work processed, reduces operation difficulty, so as to improve work quality, construction tool etc. is frequently transported over long distances while decreasing Unnecessary work.Process avoids stand up work after prefabricated, it is ensured that the required precision of construction.
Brief description of the drawings
Fig. 1 is lower layer support post and the progress of leg and upper deck in the oil gas platform life building method of construction of the present invention The prefabricated build the side distribution map of integral assembling;
Fig. 2 is the lower layer support post and cripple arrangement in the oil gas platform life building method of construction of the present invention Front view;
Fig. 3 is the top view of lower layer support post shown in Fig. 2 and cripple arrangement;
Fig. 4 is the lower floor's leg and cripple arrangement in the oil gas platform life building method of construction of the present invention Front view;
Fig. 5 is the side view of lower floor's leg shown in Fig. 4 and cripple arrangement.
Embodiment
The invention will be further described with reference to the accompanying drawings and detailed description.
The oil gas platform life building method of construction of the present invention, it comprises the following steps:
Step 1: the build the side foundation construction of life building and the construction in component processing region, described life building are built The step of place foundation construction is:The pile foundation in life building and the construction of bottom support are completed in the life building build the side of setting, Then first layer deck is welded in the horizontal direction in the support of bottom;The specific steps of the construction in described component processing region For:Region selected part machining area outside life building build the side, in the horizontally spaced paving in component processing region If twice track 1, one end set parts storage area 5 between described twice track 1 is deposited close to described part Inner side between two tracks 1 in region 5 sets horizontal preform region 3, in two tracks close to described horizontal preform region 3 Transit domain 2, the fabricating yard straddle truck 4 on two described tracks 1 are set between road 1;
Step 2: support column, leg and the deck of building life building are transported to Component storage area domain 5;
Step 3: assembled prefabricated first layer structure, is comprised the following steps that:The first step, in horizontal preform region 3, is used Total powerstation marks assembled position according to the support column of first layer and the design coordinate of leg;Second step, using running on path 1 Place straddle truck 4, the support column 6 and leg 8 of the first layer in Component storage area domain 5 are hung to horizontal preform region 3 successively The assembled position of middle mark, and temporary fastening device is respectively adopted carries out interim positioning and fix, fixing device can be with as shown in the figure Using the cripple 7,9 built;3rd step, using total powerstation, to the support column 6 of first layer that places and leg 8 Position carries out calibration adjustment until consistent with design coordinate position;4th step, using area straddle truck 4 is by Component storage area domain 5 In second deck, be hung on the support column 6 and leg 8 of first layer, be seated to behind correct position, in described interim fixation Constructed on device, the top of the support column 6 of first layer and leg 8 is welded and fixed with second deck;5th step, in institute The welding procedure of sorts of systems on second deck is carried out on the temporary fastening device stated.Sorts of systems can include pipe, electricity, The systems such as instrument, HVAC.
First Rotating fields of assembled prefabricated completion are hung to transit domain 2 by step 4, using area straddle truck 4, are reused Place transport vehicle is transported to life building build the side, then on integral hoisting to first layer deck and is adjusted to behind setting position, First Rotating fields are welded and fixed with first layer deck.
Step 5, repeat step three and step 4, until completing the construction in life building.
Embodiment 1
Step 1: the build the side foundation construction of life building and the construction in component processing region, described life building are built The step of place foundation construction is:The pile foundation in life building and the construction of bottom support are completed in the life building build the side of setting, Then first layer deck is welded in the horizontal direction in the support of bottom;The specific steps of the construction in described component processing region For:Region selected part machining area outside life building build the side, in the horizontally spaced paving in component processing region If twice track 1, one end set parts storage area 5 between described twice track 1 is deposited close to described part Inner side between two tracks 1 in region 5 sets horizontal preform region 3, in two tracks close to described horizontal preform region 3 Transit domain 2, the fabricating yard straddle truck 4 on two described tracks 1 are set between road 1;
Step 2: support column, leg and the deck of building life building are transported to Component storage area domain 5;
Step 3: assembled prefabricated first layer structure, is comprised the following steps that:The first step, in horizontal preform region 3, is used Total powerstation marks assembled position according to the support column of first layer and the design coordinate of leg;Second step, using running on path 1 Place straddle truck 4, the support column 6 and leg 8 of the first layer in Component storage area domain 5 are hung to horizontal preform region 3 successively The assembled position of middle mark, and the interim positioning fixation of the progress of cripple 7,9 is respectively adopted;3rd step is right using total powerstation The support column 6 of the first layer placed and the position of leg 8 carry out calibration adjustment until consistent with design coordinate position;4th Second deck in Component storage area domain 5 is hung on the support column 6 and leg 8 of first layer by step, using area straddle truck 4, It is seated to behind correct position, is constructed on described cripple 7,9, by the top of the support column 6 of first layer and leg 8 Portion is welded and fixed with second deck;5th step, on described cripple 7,9 carry out second deck on manage, electricity, The construction of instrument, HVAC etc..
First Rotating fields of assembled prefabricated completion are hung to transit domain 2 by step 4, using area straddle truck 4, are reused Place transport vehicle is transported to life building build the side, then on integral hoisting to first layer deck and is adjusted to behind setting position, First Rotating fields are welded and fixed with first layer deck.
Step 5, repeat step three and step 4, until completing the construction in life building.
The integral assembling work in life building can simultaneously be carried out with the prefabricated work of structure, be greatly enhanced using this method Utilization of area rate and operating efficiency;Top welding job in each layer is included the weldering of support column and upper deck by this method Connect, the welding job of the system such as pipe, electricity, instrument, HVAC has all been put into component processing region to complete, has optimized construction environment, drop Low difficulty of construction, so that construction quality greatly improved, and also reduces the transport of a large amount of construction tools, improves work Make efficiency;This method is directly to be lifted the structure of prefabricated completion, and impact of the process to structure is smaller, it is ensured that life The construction precision in building.

Claims (1)

1. oil gas platform life building method of construction, it is characterised in that it includes following methods:
Step 1: the build the side foundation construction of life building and the construction in component processing region, described life building build the side The step of foundation construction is:The pile foundation in life building and the construction of bottom support are completed in the life building build the side of setting, then First layer deck is welded in the horizontal direction in the support of bottom;The construction in described component processing region is concretely comprised the following steps: Region selected part machining area outside life building build the side, in the horizontally spaced laying twice in component processing region Track, one end set parts storage area between described twice track, close to the two of described Component storage area domain Inner side between individual track sets horizontal preform region, and fortune is set between the twice track close to described horizontal preform region Defeated region, the fabricating yard straddle truck on two described tracks;
Step 2: support column, leg and the deck of building life building are transported to Component storage area domain;
Step 3: assembled prefabricated first layer structure, is comprised the following steps that:The first step, in horizontal preform region, uses total powerstation Assembled position is marked according to the design coordinate of the support column of first layer and leg;Second step, uses the place orbited Straddle truck, the support column and leg of the first layer in the domain of Component storage area is hung to successively the assembly marked in horizontal preform region Position, and the interim positioning fixation of temporary fastening device progress is respectively adopted;3rd step, using total powerstation, to place first The support column of layer and the position of leg carry out calibration adjustment until consistent with design coordinate position;4th step, using area gantry Hang the second deck in the domain of Component storage area, be hung on the support column and leg of first layer, be seated to behind correct position, Constructed on described temporary fastening device, the top of the support column of first layer and leg and second deck are welded solid It is fixed;5th step, carries out the welding procedure of sorts of systems on second deck on described temporary fastening device;
First Rotating fields of assembled prefabricated completion are hung to transit domain by step 4, using area straddle truck, reuse place fortune Defeated car is transported to life building build the side, then on integral hoisting to first layer deck and is adjusted to behind setting position, by first Rotating fields are welded and fixed with first layer deck;
Step 5, repeat step three and step 4, until completing the construction in life building.
CN201610093905.7A 2016-02-19 2016-02-19 Oil gas platform life building method of construction Active CN105564605B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610093905.7A CN105564605B (en) 2016-02-19 2016-02-19 Oil gas platform life building method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610093905.7A CN105564605B (en) 2016-02-19 2016-02-19 Oil gas platform life building method of construction

Publications (2)

Publication Number Publication Date
CN105564605A CN105564605A (en) 2016-05-11
CN105564605B true CN105564605B (en) 2017-07-28

Family

ID=55875355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610093905.7A Active CN105564605B (en) 2016-02-19 2016-02-19 Oil gas platform life building method of construction

Country Status (1)

Country Link
CN (1) CN105564605B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109279508B (en) * 2018-09-27 2020-04-21 广船国际有限公司 Integral hoisting positioning device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5577454A (en) * 1996-01-26 1996-11-26 Metro Machine Corp. Tank vessel subassembly for equipment, piping and other nonstructural components
CN102442407A (en) * 2011-11-08 2012-05-09 南通华凯重工有限公司 Production line and method for building superstructures of ships
CN103786842A (en) * 2014-03-03 2014-05-14 中国矿业大学 Floating building structure and construction method
CN204323656U (en) * 2014-11-17 2015-05-13 博迈科海洋工程股份有限公司 Platform life building aircraft deck bottom new construction
CN104787236A (en) * 2015-03-16 2015-07-22 南京东泽船舶制造有限公司 Integral hoisting technology of upper layer building of ship

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5577454A (en) * 1996-01-26 1996-11-26 Metro Machine Corp. Tank vessel subassembly for equipment, piping and other nonstructural components
CN102442407A (en) * 2011-11-08 2012-05-09 南通华凯重工有限公司 Production line and method for building superstructures of ships
CN103786842A (en) * 2014-03-03 2014-05-14 中国矿业大学 Floating building structure and construction method
CN204323656U (en) * 2014-11-17 2015-05-13 博迈科海洋工程股份有限公司 Platform life building aircraft deck bottom new construction
CN104787236A (en) * 2015-03-16 2015-07-22 南京东泽船舶制造有限公司 Integral hoisting technology of upper layer building of ship

Also Published As

Publication number Publication date
CN105564605A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN101691787B (en) Converse construction process for middle-high steel structure building
CN103485360B (en) A kind of steel platform tower crane foundation and construction method thereof
CN105421586A (en) Profile steel concrete column for urban mass transit elevated railway station and preparing method thereof
CN115162182B (en) Cantilever type steel box girder high-precision cable hoisting construction method
CN110878530B (en) Installation and construction method of steel box girder of steel structure bridge
CN101440667A (en) Mounting method for wide span single layer rain shed reticulated shell structure
CN103669218B (en) Novel toughened internal stress steel box-girder module and spelling method thereof
CN108675126B (en) Landing leg door frame assembling process of intelligent equipment of container yard
CN105937264A (en) Construction process of removable special-shaped three-dimensional steel-frame structure
CN105564605B (en) Oil gas platform life building method of construction
CN104180658B (en) A kind of installation method of sintering machine dust pelletizing system
JP6379128B2 (en) Tunnel work table and tunnel work set
JP2020002778A (en) Bridge pier construction method
CN205152802U (en) Improve structure of arched bridge strength nature skeleton building -site preparation precision
CN112580135A (en) Steel column sectional hoisting method based on BIM application
CN101875163B (en) Assembling and welding jig frame used for bracket of bridge fabrication machine and method for fabricating bracket by using same
CN116290809A (en) Modularized construction method for super high-rise pipe well vertical pipe
CN104563525A (en) Overall horizontal assembly method for box-type steel arched girder
JP2017137700A (en) Repairing device of existing waterway and its repairing method
CN108951430B (en) Road and bridge field installation structure and method and crane
CN106978929B (en) Steel structure system of stereo garage for parallelly storing and taking cars
CN104060838A (en) Grouping and air-pairing installation method for corridor
CN106988581B (en) Steel structure stereo garage and assembling method thereof
CN102392550A (en) Reverse installation method for flue gas desulfurization and absorption tower
CN110318798A (en) Crawler belt carries the mobile air crossing system of formula and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant