CN105550823A - Front and back field immediate interaction and communication platform system based on mobile internet - Google Patents

Front and back field immediate interaction and communication platform system based on mobile internet Download PDF

Info

Publication number
CN105550823A
CN105550823A CN201610010505.5A CN201610010505A CN105550823A CN 105550823 A CN105550823 A CN 105550823A CN 201610010505 A CN201610010505 A CN 201610010505A CN 105550823 A CN105550823 A CN 105550823A
Authority
CN
China
Prior art keywords
information
unit
time
mixing plant
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610010505.5A
Other languages
Chinese (zh)
Inventor
张建喜
肖聪
夏凯伟
蔡丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610010505.5A priority Critical patent/CN105550823A/en
Publication of CN105550823A publication Critical patent/CN105550823A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a front and back field immediate interaction and communication platform system based on a mobile internet, comprising a server, multiple material reporting ends in which software is installed, a mixing plant information platform, multiple transport ends in which software is installed, multiple checking ends in which software is installed and a data analysis processing platform; the material reporting ends, the mixing plant information platform, the transport ends, the checking ends and the data analysis processing platform are all connected to the server. According to the front and back field immediate interaction and communication platform system based on the mobile internet provided by the invention, the whole construction actual flow is simulated truly; all data are recorded in real time; the whole communication process is recorded; the existing front and back field communication mode is changed fundamentality, therefore, the communication mode of the system has incomparable advantages over the existing front and back field communication mode.

Description

A kind of field, front and back immediate interactive intercourse platform system based on mobile Internet
Technical field
The present invention relates to a kind of field, front and back immediate interactive intercourse platform system based on mobile Internet, be specifically related to a kind of for engineering construction field, the distant intercourse platform system needing immediate interactive in field before and after it.
Background technology
So-called front court, refers to working-yard; So-called back court, refers to mixing plant location.At present, in work progress, front and back field links up the main mode adopting telephonic communication.Because this communication way exists more defect, thus cause working-yard to there is various problem, so some people proposes various way, solve the relevant issues in " disclose, produce, transport, construct " process, but all produce little effect.At present, link up because of front and back field the problem caused and mainly contain 5 points, specific as follows:
1, etc. the material time is oversize.Workman and machinery at the construction field (site) all set, but blending station but slowly non-discharging.Its basic reason, be exactly the communication of field, front and back not in time.And in the process waited for, waste more manpower and mechanical one-shift, and then cause construction team to contingency questions such as mixing plant claims, and have impact on the enthusiasm that workman works;
2, expected front court, and workman does not arrive.At present, on-the-spot construction is produced, and organizes and coordinates primarily of builder.Sometimes, blending station issuance of materials out, and builder not know.So just occurred the situation of " material waits people ", key is once waits for too long, and cement concrete has crossed initial set or final setting time, and consequence and loss are very serious;
3 once go wrong, and responsibility cannot define clearly.After telephonic communication, do not leave the evidence that can for review, once the problems such as larger economic loss appear in scene, phenomenon of disputing over trifles is very general, and at this moment, how defining attribution of liability, is the key of dealing with problems;
4, on-the-spot leader to the working-yard condition of production, cannot carry out real-time monitor and managment.Due to working-yard mainly builder tissue produce.So on-the-spot leader by the report of builder or other indirectly modes, can only go the understanding working-yard condition of production, " second-hand " data due to what obtain, so and actual conditions, often there are some deviations, decision-making management is carried out to scene leader, very unfavorable;
5, the loss situation of material, cannot obtain real-time statistics and tracking.Some projects, only in project complete man-hour, just know concrete final consumption, and this final consumption often has multiple version, has the version of mixing plant, the version of site operation person, also have the version of materialman, each version, data are different, when causing final budget needed for the completion of projects, there is more disagreement; More frighteningly, because the loss of material cannot obtain real-time statistics, on-the-spot leader is in the face of the control of material cost, often feel simply helpless, because the key of cost control controls work progress, for mega project, material cost is particularly outstanding on the impact of whole cost.
In sum, we obtain as drawn a conclusion: if thoroughly will solve above-mentioned five problems, just must solve field, existing front and back communication problem; Want the communication problem of field before and after solving, its key existing communication way is carried out to the change of essence.
Summary of the invention
The object of the invention is to solve the shortcoming existed in prior art, and one one kinds of field, the front and back immediate interactive intercourse platform systems based on mobile Internet proposed.
To achieve these goals, present invention employs following technical scheme:
A kind of field, front and back immediate interactive intercourse platform system based on mobile Internet, comprise server, multiple be provided with in it software disclose end, mixing plant information platform, multiple software is installed in it transport end, multiple software is installed in it check end and Data Analysis Services platform, described in disclose end, mixing plant information platform, transport end, check to hold and be all connected with server with Data Analysis Services platform; (deleting many places to connect)
Describedly disclose end, mainly use artificial site construction management personnel etc., it comprises: 1. information input unit: for inputting job location, construction part, strength grade, demanding party of institute amount, intending building the information such as time; 2. disclose unit: after inputting above-mentioned information, click is disclosed, namely complete and disclose information processing work; 3. feedback links up unit: the information communication being mainly used in field, front and back, can adopt the modes such as voice, picture, word to link up, can link up one to one, also can one-to-many people link up; 4. emergence message bulletin unit: cause cannot normal dnockout as emergency condition, need be announced in time;
Described mixing plant information platform, the artificial mixing plant related personnel of main use, comprise mixing plant managerial personnel, mixing plant tractor driver etc., this platform comprises: 1. disclose information collection unit: mainly the information of disclosing of working-yard gathered, and waits auto-sequencing according to engineering time priority; 2. information adjustment unit: the situation of disclosing is adjusted according to the feedback of field data and mixing plant self reason; 3. information issue unit: mainly give corresponding site administrator etc. by the discharging information notification of confirmation; 4. status indicator unit: after per car material sends, the attribute-bit of this car material can be " sending " by system automatically; 5. feedback links up unit: the information communication being mainly used in field, front and back, can adopt the modes such as voice, picture, word to link up, can link up one to one, also can one-to-many people link up; 6. emergence message bulletin unit: cause cannot normal feed as mixing plant mechanical fault etc., need be announced in time;
Described transport end, the artificial transport vehicle driver of main use, it comprises: 1. GPS positioning unit, checks haulage track by GPS location; 2. information inspection unit: by information inspection unit, checks relevant haul information; 3. feedback links up unit: be mainly used in the information communication in transportation, the modes such as voice, picture, word can be adopted to link up, can link up one to one, also can one-to-many people link up; 4. emergence message bulletin unit: cause cannot normal feed as Transport Machinery fault, traffic hazard etc., need be announced in time;
Describedly check end, main use artificial on-the-spot leader, site construction management personnel etc., it comprises: 1. normal information unit: comprise strength grade, issuance of materials time, time of arrival, the deadline of building, this car side amount, accumulative side amount, license plate number, the building position, design the contents such as Fang Liang of correspondence; 2. abnormal information unit: the contents such as exception, time of arrival be abnormal are measured by the side of comprising; 3. status indicator unit: after per car material completes construction, is identified the state of this vehicle by site construction management personnel, clicks " completing "; 4. emergence message bulletin unit: cause cannot normal feed as Transport Machinery fault, traffic hazard etc., need be announced in time;
Described Data Analysis Services platform, main uses artificial site construction management personnel, leadership etc., analyzes actual progress situation, cost control situation etc. mainly through the temporal information of record and square amount information etc.; This platform mainly comprises: 1. haulage time unit: can calculate haulage time by discharging time and time of arrival, if phase perigee haulage time differs greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 2. build time quantum: can the time of building be calculated by time of arrival and deadline, if same area builds time difference comparatively greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 3. difference unit is measured by side: design side's amount of construction part is searched by design drawing, the actual side of building amount calculates by the accumulative side of building, same position amount, design side's amount measures difference with the difference side of being that the actual side of building measures, as side's amount differs greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 4. difference unit is measured by accumulative side: within the scope of certain hour, accumulative design side amount and actual the building of having built position add up just to measure difference, calculate by software, as differed greatly, can directly color tips such as " redness " be used to be " abnormal information ", require that administration and supervision authorities are paid close attention to, thus prompting administration and supervision authorities strengthen cost control; 5. today scheduling unit, by this day concreting situation, concreting side's amount can be calculated, thus draw progress today; 6. today cost-element, measured by concreting side, input unit price, can cost be calculated; 7. the progress accumulated unit of certain time period, by casting concrete side's amount every day being added up on a time period, just can learn the progress situation of certain time period; 8. the cost control unit of certain time period, by every day-rate cost situation being added up on a time period, just can learn the cost control situation of certain time period.
Preferably, the output terminal of described server is also connected with a priority assignation unit, can set the authority of relevant user of service, can fulfil one's own duty to make the personnel in different post by corresponding post.
Preferably, described mixing plant information platform, Data Analysis Services platform, transport are held, are checked the relevant user of service holding and disclose end, all need to add chat message group, similar " micro-letter group ", relevant information to be fed back shared in time, thus realize the unimpeded of information transmission.
Preferably, the output terminal of described server is also connected with a data lead-out unit: the data of every day and information are derived by " excel " form or " word " document, print, file in time, with the situation avoiding accident to cause loss of data.
Preferably, described mixing plant information platform, Data Analysis Services platform are the desktop computer or portable computer that are provided with application software, and described discloses end, transport end and check that end is the smart mobile phone being provided with application software.
The invention allows for a kind of field, front and back immediate interactive communication method based on mobile Internet, comprise the steps:
S1, to disclose: after the person of disclosing passes through to disclose that end is disclosed, system can by this communicating information to mixing plant; Mixing plant, by mixing plant information platform, by disclosing that information is mixed total unit and disclosed that situation gathers to corresponding, and according to dnockout time order and function auto-sequencing, being intended the dnockout time the most at last and being announced by information issue unit; Now, the related personnel of system can by smart mobile phone checks that end can see this information; If mixing plant can not discharging on time, mixing plant is announced in time by emergence message bulletin unit, then the discharging time after adjustment is linked up unit by feedback is informed the person of disclosing in time by information adjustment unit;
S2, production: concrete is after mixing plant has been produced, system is by the control operation software on mixing plant computer, the data of automatic extraction per car material, i.e. the attribute of per car material: strength grade, issuance of materials time, build position, license plate number, this car side amount, accumulative side amount; Meanwhile, the attribute of per car material, will check that the information inspection unit of end shows on everyone smart mobile phone, and gives corresponding site construction management personnel by this communicating information, and does special prompting; Automatic Logos are " sending " by the attribute of this car material;
S3, transport: the car material in S2 is transported away, concrete is in transportation, and Problems existing, can link up unit and feed back, and haulage track is shared by GPS positioning unit by the feedback of transport end;
S4, checking: site construction management personnel, by checking end, checking the real time position of concrete delivery truck; As there is mechanical fault or traffic hazard in transportation, announcing by emergence message bulletin unit, related personnel need not be informed by telephone one by one;
S5, construction: after concrete is reached the spot, workmen can by concrete quality problem, by checking that end feeds back; After this car concreting completes, at oneself mobile phone, workmen need check that end points hits " completing ", according to the car number of having built, with the quantity of dispatching a car of mixing plant, such mixing plant just can know that Lu Shangyou how many " empty wagons " is in the way returned, and workmen can know there is how many car material on " on road ";
S6, statistical study are summed up: after having constructed every day, can to the construction data of every day as haulage time, today progress, today cost, difference is measured by side, the progress of certain time period adds up, the control status of certain time period carries out statistical study, thus Problems existing in summary work progress, accomplish to process problem targetedly.
A kind of field, front and back immediate interactive intercourse platform system based on mobile Internet provided by the invention, owing to simulating the actual flow process of whole construction truly, and real-time record is carried out to all data, and also record is carried out to the whole process linked up, owing to having carried out the change of essence to field, existing front and back communication way, so have the advantage incomparable with field, existing front and back communication way, its advantage is specific as follows: 1, leadership can monitor working-yard actual conditions whenever and wherever possible, as long as because leader logs in this system, just can see whole project construction situation, and the promptness to feed, clearly can analyze and draw, 2 once in work progress, the problems such as economic loss occurs, can define attribution of liability clearly, because whole construction production run and communication process are obtained for real-time record, leadership can according to the firsthand information, the person that defines attribution of liability, 3, can follow the tracks of and add up concrete loss situation timely, because the actual amount of building at each position obtains truly and record timely, as long as contrast with the design amount of building, just immediately can know concrete loss situation, 4, the situation of " people such as material " and " material such as people ", can be controlled effectively, because after per car material sends, site operation personnel can check on end at the mobile phone of oneself, see the time of departure timely, according to the distance of road, the haulage time on road can be calculated, thus the time that will arrive can be known, and then effectively arrange workman and site machinery, 5, construction cost can effectively control, because the utilization factor of personnel and mechanical one-shift can obtain raising to a certain extent, because the instantaneity linked up is resolved, workman and machinery can in the processes waiting material, the thing doing other can be gone, thus the utilization ratio of the time of raising, 6, material cost can implementation procedure control, real-time control, because concrete loss can real-time reflecting on this plateform system, at this moment a proportion of goods damageds higher limit can be defined, once the proportion of goods damageds exceed higher limit, this platform software can remind related personnel in time, and then takes corresponding measure immediately, controls the loss of material, 7, be the realization of work progress fine-grained management, provide practicable approach, the fine-grained management of work progress, be a difficult point always, how realizing the fine-grained management of work progress, is the major issue that construction enterprises exist.In fact, carefully analyze whole work progress, its key problem is exactly two " feed and dnockouts ", this two problems has been done a good job of it, the fine-grained management of work progress, just can substantially realize; Due to this plateform system, effectively can reflect whole concrete production casting process, so can be the fine-grained management of work progress, provide the road that feasible.
Accompanying drawing explanation
Fig. 1 is module diagram of the present invention.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with specific embodiment, the present invention is further elaborated.Specific embodiment described herein only in order to explain the present invention, is not intended to limit the present invention.
A kind of field, front and back immediate interactive intercourse platform system based on mobile Internet, comprise server, multiple be provided with in it software disclose end, mixing plant information platform, multiple software is installed in it transport end, multiple software is installed in it check end and Data Analysis Services platform, described in disclose end, mixing plant information platform, transport end, check to hold and be all connected with server with Data Analysis Services platform; The output terminal of described server is also connected with a priority assignation unit, can set the authority of relevant user of service, can fulfil one's own duty to make the personnel in different post by corresponding post; Described mixing plant information platform, Data Analysis Services platform, transport are held, are checked the relevant user of service holding and disclose end, all need to add chat message group, similar " micro-letter group ", relevant information to be fed back shared in time, thus realizes the unimpeded of information transmission; The output terminal of described server is also connected with a data lead-out unit: the data of every day and information are derived by " excel " form or " word " document, print, file in time, with the situation avoiding accident to cause loss of data; Described mixing plant information platform, Data Analysis Services platform are the desktop computer or portable computer that are provided with application software, and described discloses end, transport end and check that end is the smart mobile phone being provided with application software;
Describedly disclose end, mainly use artificial site construction management personnel etc., it comprises: 1. information input unit: for inputting job location, construction part, strength grade, demanding party of institute amount, intending building the information such as time; 2. disclose unit: after inputting above-mentioned information, click is disclosed, namely complete and disclose information processing work; 3. feedback links up unit: the information communication being mainly used in field, front and back, can adopt the modes such as voice, picture, word to link up, can link up one to one, also can one-to-many people link up; 4. emergence message bulletin unit: cause cannot normal dnockout as emergency condition, need be announced in time;
Described mixing plant information platform, the artificial mixing plant related personnel of main use, comprise mixing plant managerial personnel, mixing plant tractor driver etc., this platform comprises: 1. disclose information collection unit: mainly the information of disclosing of working-yard gathered, and waits auto-sequencing according to engineering time priority; 2. information adjustment unit: the situation of disclosing is adjusted according to the feedback of field data and mixing plant self reason; 3. information issue unit: mainly give corresponding site administrator etc. by the discharging information notification of confirmation; 4. status indicator unit: after per car material sends, the attribute-bit of this car material can be " sending " by system automatically; 5. feedback links up unit: the information communication being mainly used in field, front and back, can adopt the modes such as voice, picture, word to link up, can link up one to one, also can one-to-many people link up; 6. emergence message bulletin unit: cause cannot normal feed as mixing plant mechanical fault etc., need be announced in time;
Described transport end, the artificial transport vehicle driver of main use, it comprises: 1. GPS positioning unit, checks haulage track by GPS location; 2. information inspection unit: by information inspection unit, checks relevant haul information; 3. feedback links up unit: be mainly used in the information communication in transportation, the modes such as voice, picture, word can be adopted to link up, can link up one to one, also can one-to-many people link up; 4. emergence message bulletin unit: cause cannot normal feed as Transport Machinery fault, traffic hazard etc., need be announced in time;
Describedly check end, main use artificial on-the-spot leader, site construction management personnel etc., it comprises: 1. normal information unit: comprise strength grade, issuance of materials time, time of arrival, the deadline of building, this car side amount, accumulative side amount, license plate number, the building position, design the contents such as Fang Liang of correspondence; 2. abnormal information unit: the contents such as exception, time of arrival be abnormal are measured by the side of comprising; 3. status indicator unit: after per car material completes construction, is identified the state of this vehicle by site construction management personnel, clicks " completing "; 4. emergence message bulletin unit: cause cannot normal feed as Transport Machinery fault, traffic hazard etc., need be announced in time;
Described Data Analysis Services platform, main uses artificial site construction management personnel, leadership etc., analyzes actual progress situation, cost control situation etc. mainly through the temporal information of record and square amount information etc.; This platform mainly comprises: 1. haulage time unit: can calculate haulage time by discharging time and time of arrival, if phase perigee haulage time differs greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 2. build time quantum: can the time of building be calculated by time of arrival and deadline, if same area builds time difference comparatively greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 3. difference unit is measured by side: design side's amount of construction part is searched by design drawing, the actual side of building amount calculates by the accumulative side of building, same position amount, design side's amount measures difference with the difference side of being that the actual side of building measures, as side's amount differs greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 4. difference unit is measured by accumulative side: within the scope of certain hour, accumulative design side amount and actual the building of having built position add up just to measure difference, calculate by software, as differed greatly, can directly color tips such as " redness " be used to be " abnormal information ", require that administration and supervision authorities are paid close attention to, thus prompting administration and supervision authorities strengthen cost control; 5. today scheduling unit, by this day concreting situation, concreting side's amount can be calculated, thus draw progress today; 6. today cost-element, measured by concreting side, input unit price, can cost be calculated; 7. the progress accumulated unit of certain time period, by casting concrete side's amount every day being added up on a time period, just can learn the progress situation of certain time period; 8. the cost control unit of certain time period, by every day-rate cost situation being added up on a time period, just can learn the cost control situation of certain time period.
The invention allows for a kind of field, front and back immediate interactive communication method based on mobile Internet, comprise the steps:
S1, to disclose: after the person of disclosing passes through to disclose that end is disclosed, system can by this communicating information to mixing plant; Mixing plant, by mixing plant information platform, by disclosing that information is mixed total unit and disclosed that situation gathers to corresponding, and according to dnockout time order and function auto-sequencing, being intended the dnockout time the most at last and being announced by information issue unit; Now, the related personnel of system can by smart mobile phone checks that end can see this information; If mixing plant can not discharging on time, mixing plant is announced in time by emergence message bulletin unit, then the discharging time after adjustment is linked up unit by feedback is informed the person of disclosing in time by information adjustment unit;
S2, production: concrete is after mixing plant has been produced, system is by the control operation software on mixing plant computer, the data of automatic extraction per car material, i.e. the attribute of per car material: strength grade, issuance of materials time, build position, license plate number, this car side amount, accumulative side amount; Meanwhile, the attribute of per car material, will check that the information inspection unit of end shows on everyone smart mobile phone, and gives corresponding site construction management personnel by this communicating information, and does special prompting; Automatic Logos are " sending " by the attribute of this car material;
S3, transport: the car material in S2 is transported away, concrete is in transportation, and Problems existing, can link up unit and feed back, and haulage track is shared by GPS positioning unit by the feedback of transport end;
S4, checking: site construction management personnel, by checking end, checking the real time position of concrete delivery truck; As there is mechanical fault or traffic hazard in transportation, announcing by emergence message bulletin unit, related personnel need not be informed by telephone one by one;
S5, construction: after concrete is reached the spot, workmen can by concrete quality problem, by checking that end feeds back; After this car concreting completes, at oneself mobile phone, workmen need check that end points hits " completing ", according to the car number of having built, with the quantity of dispatching a car of mixing plant, such mixing plant just can know that Lu Shangyou how many " empty wagons " is in the way returned, and workmen can know there is how many car material on " on road ".
S6, statistical study are summed up: after having constructed every day, can to the construction data of every day as haulage time, today progress, today cost, difference is measured by side, the progress of certain time period adds up, the control status of certain time period carries out statistical study, thus Problems existing in summary work progress, accomplish to process problem targetedly.
In sum: a kind of field, front and back immediate interactive intercourse platform system based on mobile Internet provided by the invention, owing to simulating the actual flow process of whole construction truly, and real-time record is carried out to all data, and also record is carried out to the whole process linked up, owing to having carried out the change of essence to field, existing front and back communication way, so have the advantage incomparable with field, existing front and back communication way, its advantage is specific as follows: 1, leadership can monitor working-yard actual conditions whenever and wherever possible, as long as because leader logs in this system, just can see whole project construction situation, and the promptness to feed, clearly can analyze and draw, 2 once in work progress, the problems such as economic loss occurs, can define attribution of liability clearly, because whole construction production run and communication process are obtained for real-time record, leadership can according to the firsthand information, the person that defines attribution of liability, 3, can follow the tracks of and add up concrete loss situation timely, because the actual amount of building at each position obtains truly and record timely, as long as contrast with the design amount of building, just immediately can know concrete loss situation, 4, the situation of " people such as material " and " material such as people ", can be controlled effectively, because after per car material sends, site operation personnel can check on end at the mobile phone of oneself, see the time of departure timely, according to the distance of road, the haulage time on road can be calculated, thus the time that will arrive can be known, and then effectively arrange workman and site machinery, 5, construction cost can effectively control, because the utilization factor of personnel and mechanical one-shift can obtain raising to a certain extent, because the instantaneity linked up is resolved, workman and machinery can in the processes waiting material, the thing doing other can be gone, thus the utilization ratio of the time of raising, 6, material cost can implementation procedure control, real-time control, because concrete loss can real-time reflecting on this plateform system, at this moment a proportion of goods damageds higher limit can be defined, once the proportion of goods damageds exceed higher limit, this platform software can remind related personnel in time, and then takes corresponding measure immediately, controls the loss of material, 7, be the realization of work progress fine-grained management, provide practicable approach, the fine-grained management of work progress, be a difficult point always, how realizing the fine-grained management of work progress, is the major issue that construction enterprises exist.In fact, carefully analyze whole work progress, its key problem is exactly two " feed and dnockouts ", this two problems has been done a good job of it, the fine-grained management of work progress, just can substantially realize; Due to this plateform system, effectively can reflect whole concrete production casting process, so can be the fine-grained management of work progress, provide the road that feasible.
The above; be only the present invention's preferably embodiment; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.

Claims (6)

1. field, the front and back immediate interactive intercourse platform system based on mobile Internet, comprise server, multiple be provided with in it software disclose end, mixing plant information platform, multiple software is installed in it transport end, multiple software is installed in it check end and Data Analysis Services platform, it is characterized in that: described in disclose end, mixing plant information platform, transport end, check to hold and be all connected with server with Data Analysis Services platform;
Describedly disclose end, mainly use artificial site construction management personnel etc., it comprises: 1. information input unit: for inputting job location, construction part, strength grade, demanding party of institute amount, intending building the information such as time; 2. disclose unit: after inputting above-mentioned information, click is disclosed, namely complete and disclose information processing work; 3. feedback links up unit: the information communication being mainly used in field, front and back, can adopt the modes such as voice, picture, word to link up, can link up one to one, also can one-to-many people link up; 4. emergence message bulletin unit: cause cannot normal dnockout as emergency condition, need be announced in time;
Described mixing plant information platform, the artificial mixing plant related personnel of main use, comprise mixing plant managerial personnel, mixing plant tractor driver etc., this platform comprises: 1. disclose information collection unit: mainly the information of disclosing of working-yard gathered, and waits auto-sequencing according to engineering time priority; 2. information adjustment unit: the situation of disclosing is adjusted according to the feedback of field data and mixing plant self reason; 3. information issue unit: mainly give corresponding site administrator etc. by the discharging information notification of confirmation; 4. status indicator unit: after per car material sends, the attribute-bit of this car material can be " sending " by system automatically; 5. feedback links up unit: the information communication being mainly used in field, front and back, can adopt the modes such as voice, picture, word to link up, can link up one to one, also can one-to-many people link up; 6. emergence message bulletin unit: cause cannot normal feed as mixing plant mechanical fault etc., need be announced in time;
Described transport end, the artificial transport vehicle driver of main use, it comprises: 1. GPS positioning unit, checks haulage track by GPS location; 2. information inspection unit: by information inspection unit, checks relevant haul information; 3. feedback links up unit: be mainly used in the information communication in transportation, the modes such as voice, picture, word can be adopted to link up, can link up one to one, also can one-to-many people link up; 4. emergence message bulletin unit: cause cannot normal feed as Transport Machinery fault, traffic hazard etc., need be announced in time;
Describedly check end, main use artificial on-the-spot leader, site construction management personnel etc., it comprises: 1. normal information unit: comprise strength grade, issuance of materials time, time of arrival, the deadline of building, this car side amount, accumulative side amount, license plate number, the building position, design the contents such as Fang Liang of correspondence; 2. abnormal information unit: the contents such as exception, time of arrival be abnormal are measured by the side of comprising; 3. status indicator unit: after per car material completes construction, is identified the state of this vehicle by site construction management personnel, clicks " completing "; 4. emergence message bulletin unit: cause cannot normal feed as Transport Machinery fault, traffic hazard etc., need be announced in time;
Described Data Analysis Services platform, main uses artificial site construction management personnel, leadership etc., analyzes actual progress situation, cost control situation etc. mainly through the temporal information of record and square amount information etc.; This platform mainly comprises: 1. haulage time unit: can calculate haulage time by discharging time and time of arrival, if phase perigee haulage time differs greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 2. build time quantum: can the time of building be calculated by time of arrival and deadline, if same area builds time difference comparatively greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 3. difference unit is measured by side: design side's amount of construction part is searched by design drawing, the actual side of building amount calculates by the accumulative side of building, same position amount, design side's amount measures difference with the difference side of being that the actual side of building measures, as side's amount differs greatly, can directly use color tips such as " redness " to be " abnormal information ", require administration and supervision authorities to be paid close attention to; 4. difference unit is measured by accumulative side: within the scope of certain hour, accumulative design side amount and actual the building of having built position add up just to measure difference, calculate by software, as differed greatly, can directly color tips such as " redness " be used to be " abnormal information ", require that administration and supervision authorities are paid close attention to, thus prompting administration and supervision authorities strengthen cost control; 5. today scheduling unit, by this day concreting situation, concreting side's amount can be calculated, thus draw progress today; 6. today cost-element, measured by concreting side, input unit price, can cost be calculated; 7. the progress accumulated unit of certain time period, by casting concrete side's amount every day being added up on a time period, just can learn the progress situation of certain time period; 8. the cost control unit of certain time period, by every day-rate cost situation being added up on a time period, just can learn the cost control situation of certain time period.
2. a kind of field, front and back immediate interactive intercourse platform system based on mobile Internet according to claim 1, it is characterized in that: the output terminal of described server is also connected with a priority assignation unit, can set the authority of relevant user of service, one's own duty can be fulfiled by corresponding post to make the personnel in different post.
3. a kind of field, front and back immediate interactive intercourse platform system based on mobile Internet according to claim 1, it is characterized in that: described mixing plant information platform, Data Analysis Services platform, transport are held, checked the relevant user of service holding and disclose end, all need to add chat message group, similar " micro-letter group ", relevant information to be fed back shared in time, thus realize the unimpeded of information transmission.
4. a kind of field, front and back immediate interactive intercourse platform system based on mobile Internet according to claim 1, it is characterized in that: the output terminal of described server is also connected with a data lead-out unit: the data of every day and information are derived by " excel " form or " word " document, print, timely file, with the situation avoiding accident to cause loss of data.
5. a kind of field, front and back immediate interactive intercourse platform system based on mobile Internet according to claim 1, it is characterized in that: described mixing plant information platform, Data Analysis Services platform are the desktop computer or portable computer that are provided with application software, described discloses end, transport end and checks that end is the smart mobile phone being provided with application software.
6. described in claim 1 based on field, a front and back immediate interactive communication method for mobile Internet, it is characterized in that: comprise the steps:
S1, to disclose: after the person of disclosing passes through to disclose that end is disclosed, system can by this communicating information to mixing plant; Mixing plant, by mixing plant information platform, by disclosing to corresponding, information collection unit (wrongly written or mispronounced characters is revised) discloses that situation gathers, and according to dnockout time order and function auto-sequencing, being intended the dnockout time the most at last and being announced by information issue unit; Now, the related personnel of system can by smart mobile phone checks that end can see this information; If mixing plant can not discharging on time, mixing plant is announced in time by emergence message bulletin unit, then the discharging time after adjustment is linked up unit by feedback is informed the person of disclosing in time by information adjustment unit;
S2, production: concrete is after mixing plant has been produced, system is by the control operation software on mixing plant computer, the data of automatic extraction per car material, i.e. the attribute of per car material: strength grade, issuance of materials time, build position, license plate number, this car side amount, accumulative side amount; Meanwhile, the attribute of per car material, will check that the information inspection unit of end shows on everyone smart mobile phone, and gives corresponding site construction management personnel by this communicating information, and does special prompting; Automatic Logos are " sending " by the attribute of this car material;
S3, transport: the car material in S2 is transported away, concrete is in transportation, and Problems existing, can link up unit and feed back, and haulage track is shared by GPS positioning unit by the feedback of transport end;
S4, checking: site construction management personnel, by checking end, checking the real time position of concrete delivery truck; As there is mechanical fault or traffic hazard in transportation, announcing by emergence message bulletin unit, related personnel need not be informed by telephone one by one;
S5, construction: after concrete is reached the spot, workmen can by concrete quality problem, by checking that end feeds back; After this car concreting completes, at oneself mobile phone, workmen need check that end points hits " completing ", according to the car number of having built, with the quantity of dispatching a car of mixing plant, such mixing plant just can know that Lu Shangyou how many " empty wagons " is in the way returned, and workmen can know there is how many car material on " on road ";
S6, statistical study are summed up: after having constructed every day, can to the construction data of every day as haulage time, today progress, today cost, difference is measured by side, the progress of certain time period adds up, the control status of certain time period carries out statistical study, thus Problems existing in summary work progress, accomplish to process problem targetedly.
CN201610010505.5A 2016-01-08 2016-01-08 Front and back field immediate interaction and communication platform system based on mobile internet Pending CN105550823A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610010505.5A CN105550823A (en) 2016-01-08 2016-01-08 Front and back field immediate interaction and communication platform system based on mobile internet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610010505.5A CN105550823A (en) 2016-01-08 2016-01-08 Front and back field immediate interaction and communication platform system based on mobile internet

Publications (1)

Publication Number Publication Date
CN105550823A true CN105550823A (en) 2016-05-04

Family

ID=55830003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610010505.5A Pending CN105550823A (en) 2016-01-08 2016-01-08 Front and back field immediate interaction and communication platform system based on mobile internet

Country Status (1)

Country Link
CN (1) CN105550823A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761629A (en) * 2014-02-19 2014-04-30 徐州徐工施维英机械有限公司 Management system and method used for concrete batching plant
CN103957260A (en) * 2014-05-05 2014-07-30 哈尔滨工业大学深圳研究生院 Assembly type concrete whole-process monitoring system based on Internet of Things
CN104573941A (en) * 2014-12-26 2015-04-29 湖南万物工业软件有限公司 Cloud control method and system for mixing plants

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761629A (en) * 2014-02-19 2014-04-30 徐州徐工施维英机械有限公司 Management system and method used for concrete batching plant
CN103957260A (en) * 2014-05-05 2014-07-30 哈尔滨工业大学深圳研究生院 Assembly type concrete whole-process monitoring system based on Internet of Things
CN104573941A (en) * 2014-12-26 2015-04-29 湖南万物工业软件有限公司 Cloud control method and system for mixing plants

Similar Documents

Publication Publication Date Title
CN105564465B (en) A kind of railway electric signal plant maintenance operation control system and method
Farradyne Traffic incident management handbook
WO2021056791A1 (en) Smart management platform for integrated construction and maintenance of rail transport engineering, and method
US6919865B2 (en) Display device for work machine
CN106570673A (en) Commercial concrete online ordering system based on intelligent mobile phone application
CN106302815A (en) Highway emergency management system and application thereof
CN103390218A (en) Three-chain coupling integrated emergency security system and method for emergencies
CN104850928A (en) Passenger station safety management information system and method
KR102269793B1 (en) System for controlling heavy equipment in construction site using iot
CN111738559A (en) Method, equipment and medium for performing emergency scheduling management and control based on hypergraph technology
CN111967621A (en) Work order management system
CN105550823A (en) Front and back field immediate interaction and communication platform system based on mobile internet
CN109972572A (en) A kind of maintenance sweeper monitor supervision platform system
Muya et al. Infrastructure Watch Culture: Zambia's Infrastructure Report Card
US20220351115A1 (en) Supplemental Safety System and Method for Use of Same
CN114022125A (en) Engineering quantity calculation method, storage medium, and apparatus
Ullman et al. Use of technology and data for effective work zone management: Work zone ITS implementation guide
WO2020264477A1 (en) Board signage safety system and method for use of same
CN112016841A (en) ERP mine production control management system
Bye A pre-event recovery planning guide for transportation
CN204537220U (en) Passenger station safety management information equipment
Mahdi et al. Performance of electronic devices for bridging existing information gaps at construction sites: the case of a developing country
CN112966839B (en) Information model management system applied to construction waste management
CN106203759A (en) A set of management software getting spare and accessory parts for manufacturing enterprise
Corbin et al. Welcome and introduction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160504

RJ01 Rejection of invention patent application after publication