CN105549418B - The SCD of intelligent substation communicates debugging system - Google Patents

The SCD of intelligent substation communicates debugging system Download PDF

Info

Publication number
CN105549418B
CN105549418B CN201510906423.4A CN201510906423A CN105549418B CN 105549418 B CN105549418 B CN 105549418B CN 201510906423 A CN201510906423 A CN 201510906423A CN 105549418 B CN105549418 B CN 105549418B
Authority
CN
China
Prior art keywords
file
value
observing
event
controlling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510906423.4A
Other languages
Chinese (zh)
Other versions
CN105549418A (en
Inventor
吴仲超
李建泽
沈卫兵
王欣悦
路坦
孙建连
盛华艳
孙智慧
薛立军
方芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510906423.4A priority Critical patent/CN105549418B/en
Publication of CN105549418A publication Critical patent/CN105549418A/en
Application granted granted Critical
Publication of CN105549418B publication Critical patent/CN105549418B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The SCD of intelligent substation communicates debugging system, is related to intelligent substation signal debugging platform, it is characterised in that: including determining SCD analysis, determining communication form, definitive result.Structure of the invention is reasonable, transmission is convenient, easy to use.

Description

The SCD of intelligent substation communicates debugging system
Technical field:
The present invention relates to intelligent substation signals to debug platform, and in particular to the SCD of intelligent substation communicates debugging system.
Background technique:
Dispatch automated system in terms of operation management or is confined to the configuration management to equipment at present, or shortage has The management means of effect, main O&M are still dependence manual mode.Although manual management can also safeguard that the basis of automated system is set Apply and operation system, but management workload is huge, and for various unexpected incidents cannot effective early warning, considerably increase pipe Manage difficulty;The huge but administrative staff of simultaneity factor can not grasp the overall situation, be difficult to accurate judgement on network and operation system Bottleneck can not maximize the efficiency for playing automated system;To the management of all automated systems due to being all labor management, nothing Method effectively accumulates operation management experience, forms fixed knowledge base, and the influence to human factor cannot reduce, this is right Form procedure, the management of systematization brings very big obstruction.
Existing industrial personal computer is all general electric Ethernet interface, is designed based on computer motherboard, although can expand More network interface, but intelligent substation is network-based communication, interface requirement fiber optic Ethernet mouth, and SV, GOOSE Packet capturing debugging is very high to requirement of real-time, and time precision requires to reach Microsecond grade.
Existing computer motherboard can be only applied to common calculating network, although cpu system is multi-job operation, but It is not parallel, therefore the requirement of real-time is not achieved in its hardware configuration and treatment mechanism, and network interface quantity is very few.
Summary of the invention:
Technical problem to be solved by the present invention lies in overcoming existing technological deficiency to provide, one kind is structurally reasonable, transmits just The SCD of intelligent substation prompt, easy to use communicates debugging system.
The following technical solution is employed for the technical problems to be solved by the invention to realize:
The SCD of intelligent substation communicates debugging system, it is characterised in that: includes the following steps,
Step 1: determining SCD analysis: to SCD file normalization inspection test and visual analyzing, check IED line, Data set, information point table, the definite value point table etc. that GOOSE/SMV void end line, extraction MMS communication use;
Step 2: determining communication form:
I selection wall monitoring, alarm: selection SV or GOOSE mode;
Correlating event can show all kinds of communication messages between each association IED that this system detects according to timing (GOOSE, SV), event and alarm are associated with IED, for the IED occurred in Inputs in SCD file, that is to say, that have each other The IED of message transmitting;
II selection station level communication simulation: selection setting simulation, device parameter are shockproof, analog quantity emulation, pressing plate emulation, open Measure emulation, event simulation, file emulation in pass;
III determines station level debugging: the station level data of main debugging apparatus are device parameter, definite value, telemetry value, remote signalling Value, pressing plate, failure file, event of failure;
Step 3: definitive result: being analyzed in real time by step 2, obtain temporal information and warning information;
Described device parameter: the parameter of the intelligent apparatus such as protection, observing and controlling can be called and it can be modified;
Definite value: can call the definite value of the intelligent apparatus such as protection, observing and controlling, recording, and modify its definite value;
Telemetry value: it is capable of the telemetry value of the intelligent apparatus such as real-time display protection, observing and controlling;
Remote signalling value: it is capable of the remote signalling value of the intelligent apparatus such as real-time display protection, observing and controlling;
Pressing plate: capableing of the pressing plate of the intelligent apparatus such as real-time display protection, observing and controlling, and can carry out throwing and move back;
Failure file: the transient fault recorder file of protection, observing and controlling can be called, and fault wave recording device can be called Transient state, stable state file;Path and time are called when file calling can issue different;
Event of failure: it is capable of the event of failure report of real-time displaying device.
The invention has the benefit that I this patent uses the received FPGA of parallel mode, when so that process layer message receiving It is very high to mark precision, reaches Microsecond grade.
Collecting part is fabricated to acquisition unit plate by II this patent, according to different user configuration arbitrary extensions.
III this patent shows the connection of virtual terminator with patterned way, and user is made not to be used in complicated, cumbersome xml text The connection of virtual terminator is searched in part.
The MMS communication of the relay protection device of IV this patent simulating realistic, convenient for test substation, backstage, oscillograph networking Etc. systems communication it is whether normal.
Whether the MMS communication that V this patent can test the relay protection device of station level is normal.
Detailed description of the invention:
Fig. 1 is the structural diagram of the present invention.
Specific embodiment:
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Conjunction is specifically illustrating, and the present invention is further explained.
As shown in Figure 1, the following technical solution is employed to realize for the technical problems to be solved by the invention:
The SCD of intelligent substation communicates debugging system, it is characterised in that: includes the following steps,
Step 1: determining SCD analysis: to SCD file normalization inspection test and visual analyzing, check IED line, Data set, information point table, the definite value point table etc. that GOOSE/SMV void end line, extraction MMS communication use;
Step 2: determining communication form:
I selection wall monitoring, alarm: selection SV or GOOSE mode;
Correlating event can show all kinds of communication messages between each association IED that this system detects according to timing (GOOSE, SV), event and alarm are associated with IED, for the IED occurred in Inputs in SCD file, that is to say, that have each other The IED of message transmitting;
II selection station level communication simulation: selection setting simulation, device parameter are shockproof, analog quantity emulation, pressing plate emulation, open Measure emulation, event simulation, file emulation in pass;
III determines station level debugging: the station level data of main debugging apparatus are device parameter, definite value, telemetry value, remote signalling Value, pressing plate, failure file, event of failure;
Step 3: definitive result: being analyzed in real time by step 2, obtain temporal information and warning information;
Described device parameter: the parameter of the intelligent apparatus such as protection, observing and controlling can be called and it can be modified;
Definite value: can call the definite value of the intelligent apparatus such as protection, observing and controlling, recording, and modify its definite value;
Telemetry value: it is capable of the telemetry value of the intelligent apparatus such as real-time display protection, observing and controlling;
Remote signalling value: it is capable of the remote signalling value of the intelligent apparatus such as real-time display protection, observing and controlling;
Pressing plate: capableing of the pressing plate of the intelligent apparatus such as real-time display protection, observing and controlling, and can carry out throwing and move back;
Failure file: the transient fault recorder file of protection, observing and controlling can be called, and fault wave recording device can be called Transient state, stable state file;Path and time are called when file calling can issue different;
Event of failure: it is capable of the event of failure report of real-time displaying device.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (1)

1. the SCD of intelligent substation communicates adjustment method, it is characterised in that: include the following steps,
Step 1: determining SCD analysis: to SCD file carry out it is normative check test and visual analyzing, check IED line, Data set, information point table, the definite value point table etc. that GOOSE/SMV void end line, extraction MMS communication use;
Step 2: determining communication form:
I selection wall monitoring, alarm: selection SV or GOOSE mode;
Correlating event can be shown according to timing GOOSE communication message between each association IED for detecting, SV communication message, Event and alarm, association IED are the IED occurred in Inputs in SCD file, that is to say, that have message to transmit each other IED;
II selection station level communication simulation: selection setting simulation, device parameter emulation, analog quantity emulation, pressing plate emulation, switching value Emulation, event simulation, file emulation;
III determines station level debugging: the station level data of main debugging apparatus are device parameter, definite value, telemetry value, remote signalling value, pressure Plate, failure file, event of failure;
Step 3: definitive result: being analyzed in real time by step 2, obtain temporal information and warning information;
Described device parameter: the parameter of the intelligent apparatus such as protection, observing and controlling can be called and it can be modified;
Definite value: can call the definite value of the intelligent apparatus such as protection, observing and controlling, recording, and modify its definite value;
Telemetry value: it is capable of the telemetry value of the intelligent apparatus such as real-time display protection, observing and controlling;
Remote signalling value: it is capable of the remote signalling value of the intelligent apparatus such as real-time display protection, observing and controlling;
Pressing plate: capableing of the pressing plate of the intelligent apparatus such as real-time display protection, observing and controlling, and can carry out throwing and move back;
Failure file: the transient fault recorders file such as protection, observing and controlling can be called, and the temporary of fault wave recording device can be called State, stable state file;Path and time are called when file calling can issue different;
Event of failure: it is capable of the event of failure report of real-time displaying device.
CN201510906423.4A 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system Active CN105549418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510906423.4A CN105549418B (en) 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510906423.4A CN105549418B (en) 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system

Publications (2)

Publication Number Publication Date
CN105549418A CN105549418A (en) 2016-05-04
CN105549418B true CN105549418B (en) 2019-01-22

Family

ID=55828668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510906423.4A Active CN105549418B (en) 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system

Country Status (1)

Country Link
CN (1) CN105549418B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105978152B (en) * 2016-06-21 2018-05-04 国网福建省电力有限公司 A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN106982235B (en) * 2017-06-08 2021-01-26 江苏省电力试验研究院有限公司 IEC 61850-based electric power industry control network intrusion detection method and system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277B (en) * 2011-08-09 2013-06-19 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN103200051B (en) * 2013-04-27 2015-12-09 国家电网公司 Intelligent substation message emulating is tested and is associated message analysis system and method
CN103414251B (en) * 2013-08-26 2016-02-24 南京匹瑞电气科技有限公司 A kind of substation network communication analogue system based on IEC61850
CN103744422B (en) * 2014-01-06 2016-04-06 国家电网公司 A kind of to the protective relaying device automatic test approach based on IEC61850 standard
CN104935079A (en) * 2015-06-05 2015-09-23 天津送变电工程公司 Station-domain protection system of intelligent transformer station and function debugging method of system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
北川110KV智能变电站监控系统调试工作研究与分析;李成鑫;《四川电力技术》;20110430;第34卷(第2期);第14-17页
智能变电站SCD文件管控策略完备性分析;孙一民 等;《电力系统自动化》;20140825;第38卷(第16期);第105-109页
智能变电站二次调试方法研究;李岩 等;《东北电力技术》;20121231(第7期);第42-45页

Also Published As

Publication number Publication date
CN105549418A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN106327355A (en) Secondary equipment simulation and debugging system for transformer substation reconstruction and expansion project and implementation method
CN106921522B (en) Networking information model detection device of intelligent substation network message recording and analyzing device
CN104935079A (en) Station-domain protection system of intelligent transformer station and function debugging method of system
CN105160864A (en) Operating data monitoring system and method for intelligent ammeters
CN104578408A (en) State monitoring and tendency estimation device for secondary equipment of intelligent substation
CN104539047A (en) Intelligent substation fault diagnosing and positioning method based on multi-factor comparison visualization
CN103235217B (en) Dual protection act consistance monitoring device and monitoring method
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN103545934A (en) Substation distribution room full-view inspection-tour monitoring system and management method thereof
CN104077934A (en) Integrated training platform for intelligent substation secondary system
CN112804106A (en) Intelligent operation and maintenance fault diagnosis and management method based on IMS
CN105549418B (en) The SCD of intelligent substation communicates debugging system
CN106487004B (en) One electrical secondary system of intelligent substation runs hidden danger Intelligent drainage checking method
CN104392603B (en) A kind of live power information collecting device intelligent diagnosis system
CN203849393U (en) Function and performance detection system of distribution line fault indication integrated apparatus
CN202661863U (en) Remote monitoring system for reliability test
CN110763937A (en) Intelligent substation test platform and method based on electromagnetic transient real-time simulation
CN109361267A (en) Failure wave-recording networked system
CN106340963A (en) Electric power distribution room intelligent commission maintenance monitoring system
CN103576014A (en) Clock monitoring device and monitoring method of transformer substation
CN203178385U (en) Doubling protection action consistency monitoring device
CN208571705U (en) A kind of 500kV substation fault recording teletransmission data monitoring system
CN203455678U (en) Electric network scheduling automation equipment clock monitoring system
CN109193616A (en) A kind of substation's telecontrol information distribution acceptance method and system
CN109495166A (en) A kind of fiber failure positioning analysis system based on communication data link analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant