CN105544577B - A kind of method blocked up using the quick grappling caisson of Rocket anchor - Google Patents

A kind of method blocked up using the quick grappling caisson of Rocket anchor Download PDF

Info

Publication number
CN105544577B
CN105544577B CN201510894835.0A CN201510894835A CN105544577B CN 105544577 B CN105544577 B CN 105544577B CN 201510894835 A CN201510894835 A CN 201510894835A CN 105544577 B CN105544577 B CN 105544577B
Authority
CN
China
Prior art keywords
caisson
anchor
rocket
rocket anchor
towboat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510894835.0A
Other languages
Chinese (zh)
Other versions
CN105544577A (en
Inventor
江召兵
邵鲁中
洪娟
陈徐均
徐晓玲
李志刚
王建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PLA University of Science and Technology
Original Assignee
PLA University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PLA University of Science and Technology filed Critical PLA University of Science and Technology
Priority to CN201510894835.0A priority Critical patent/CN105544577B/en
Publication of CN105544577A publication Critical patent/CN105544577A/en
Application granted granted Critical
Publication of CN105544577B publication Critical patent/CN105544577B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/16Jointing caissons to the foundation soil, specially to uneven foundation soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of method blocked up using the quick grappling caisson of Rocket anchor, by remote control demolition caisson, Rocket anchor anchorage force is provided to caisson, the problem of caisson can not be fixed in deceleration decompression process is solved, rapidity, accuracy and the security blocked up is realized.

Description

A kind of method blocked up using the quick grappling caisson of Rocket anchor
Technical field
Block up method, more particularly to a kind of entered using the quick grappling caisson of Rocket anchor the present invention relates to a kind of rivers, lake The method that row is blocked up.
Background technology
Caisson technology is analogous to a kind of emergence technology for slowing down the mouth door flow of water of shipwreck.Box fin glance boom is a large amount of in China Possess, such as civilian container, the boat body of buoyancy tank equipment and pontoon bridge, these box things all have good watertightness, outside Type is regular, on the water load weight after floatability to mouth door certain position after implementation explosion sinking form dash dam body.Caisson skill Art is to realize the product zero of large-scale dash dam body to be whole than the sharpest edges of shipwreck, lightweight by caisson sinking because of small volume, Waterborne to have preferable controllability, drift control carries out explosion caisson to required position, in addition caisson technology because box shape is regular can be real Existing lamination, therefore higher dash dam body can be formed, overcome the deeper depth of water.The formation of caisson dam body certainly will slow down Kou Menshui Gesture is follow-up various technologies of blocking up with creating conditions.
Existing caisson blocks up technology in the presence of two fatal drawbacks, and one is that task difficulty is too big, after launching caisson, is easy to Short time is washed away by mighty torrent, does not have the effect slowed down and blocked up;Two be after caisson frame is blocked up successfully, due to the enormous impact of mighty torrent Power, caisson easily produces huge concentrated stress with residual dike contact position, jeopardizes the general safety of dam.
In view of above-mentioned defect, the design people is actively subject to research and innovation, to found a kind of caisson technology and rocket The connected applications of anchor technology, make it with more the value in industry.
The content of the invention
In order to solve the above technical problems, being blocked up it is an object of the invention to provide one kind using the quick grappling caisson of Rocket anchor Mouthful method, by the combination of caisson technology and Rocket anchor technology, breach position is reached in caisson, and performance block up depressurization it Before, anchor of firing a rocket, using anchorage force, by the connection of anchor chain, the resistance with mighty torrent is provided for caisson, to play resistance flood Stream, protects the effect of residual dike.
The method blocked up using the quick grappling caisson of Rocket anchor of the present invention, including step:
(1) towboat is connected with caisson using drag-line, Rocket anchor and its emitter is set on the caisson side plate, and The immersion angle degree of the emitter is pre-set, one end of the Rocket anchor is connected and taken by anchor chain with the caisson and is buckled in On the emitter, remote control demolition device is set inside the caisson;
(2) towboat draws the caisson to enter work waters close to bursting, and makes the towboat, drag-line and the caisson be in One line and perpendicular to the flow direction of current;
(3) drag-line is unclamped, the towboat is separated with the caisson, makes the caisson close to bursting;
(4) igniting starts the emitter transmitting Rocket anchor, and the Rocket anchor is according to the immersion angle pre-set Degree enters river bed and carries out grappling, and the caisson continues close to bursting;
(5) when the caisson arrives at explosion position set in advance, the remote control being fixed on the caisson is started Demolition set;
(6) the caisson broken hole is intake and sinks to drifting about to breach, and the anchor chain is tightened up applies anchor to the caisson Determine power, the caisson sinking is simultaneously contacted with breach dykes and dams;
(7) Kou Men, Kou Men are attacked and occupied and closes up operation.
Further, also some sink that be circular layout can be carried out around the caisson of explosion before the step (7) Case.
Further, the length of the anchor chain is determined previously according to the depth in river and the flow velocity of current.
By such scheme, the present invention solves the problem of caisson can not be fixed in deceleration decompression process, at least with Lower advantage:
1st, change the pattern of blocking up of traditional decompression of slowing down only according to weight of jettisoninging, introduce anchorage force as fixed heavy Body resistance mighty torrent, the main stress for protecting dykes and dams, Rocket anchor can provide enough anchorage forces, the need for meeting flood fighting enough;
2nd, the required equipment degree of modularity is high, can in time be called when flood situation occurs, can timely and effectively reduce calamity Feelings;
3rd, security reliability is strong, disclosure satisfy that the need for fighting flood and relieve victims, and does not need personnel to participate in substantially in operating process, Improve security;
4th, also caisson Rocket anchor technology can be applied to build disaster relief job platform waterborne, be used as the interim safety in mighty torrent Island etc..
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Brief description of the drawings
Fig. 1 is towboat traction caisson schematic diagram;
Fig. 2 is that caisson surrounds annular schematic diagram;
Fig. 3 is the structural representation of Rocket anchor in the present invention;
Fig. 4 a are the front views that Rocket anchor is connected with caisson;Fig. 4 b are the top views that Rocket anchor is connected with caisson;
Fig. 5 a are the top views that remote control demolition device is connected with caisson;Fig. 5 b are that remote control demolition device is connected on caisson Side view;Fig. 5 c are the top views that remote control demolition device is connected on caisson.
Embodiment
With reference to the accompanying drawings and examples, the embodiment to the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
A kind of method blocked up using the quick grappling caisson of Rocket anchor described in a preferred embodiment of the present invention, according to Following step is realized:
Step 1: setting single ears connecting elements in the afterbody of towboat 10 and the side of caisson 20, the towing for caisson 20 is made Industry, sets Rocket anchor 30 and its emitter in the side plate middle and upper part of caisson 20, and by one end anchor chain and caisson of Rocket anchor 30 20 connections, the length of anchor chain need to carry out calculating determination previously according to the depth and flow velocity in river, set distant inside caisson 20 Control demolition set, check each connecting elements whether fix in position, prepare lower water.
Step 2:After lower water, caisson 20 steps into assigned work waters under the traction of towboat 10, in caisson 20 Side plate middle and upper part position, equipped with Rocket anchor 30 and its emitter, is fixed on the casing of caisson 20 by single ears type of attachment, Rocket anchor 30 is not completely fixed extremely with caisson 20, but the anchor chain that relaxed state is in by being currently in is linked with, and is taken and is buckled in hair On injection device.
Step 3:Caisson 20 continues 50 close to bursting under the draw of towboat 10, and towboat 10 is according to mighty torrent water to entering Scanning frequency degree and the adjustment in direction so that " 10-drag-line of towboat-line of the three of caisson 20 " one approximately perpendicular to mighty torrent flow velocity direction, Now, operating personnel that can be by the afterbody of towboat 10 or remote control, control accommodation connecting elements, unclamp connection drag-line, by The drag of towboat 10 is lost in caisson 20, it is close to breach 50 in the presence of mighty torrent, as shown in Figure 1.
Step 4:The emitter of Rocket anchor 30 prepares igniting transmitting, in transmitting according to the immersion angle degree pre-set Before, operating personnel should be noted the inclination conditions that jolt of caisson 20 on the bank, and caisson 20 need to be avoided, which to tilt, causes Rocket anchor immersion angle degree Change.The emitter of Rocket anchor 30 carries out launching into water, because now after igniting starts according to the immersion angle degree pre-set Caisson 20 is apart from the 50 also segment distances that burst, so Rocket anchor 30 is after launching water and entering river bed, anchor chain is not complete Tense, Rocket anchor 30 does not now produce pulling force to caisson.
Step 5:Rocket anchor 30 is after grappling is completed, and caisson continues close to bursting under the impact of mighty torrent, now anchor chain Also retain a part not yet to tense, when caisson 20 arrives at explosion position set in advance, person on shore, which starts, is fixed on caisson Remote control demolition device on 20, broken hole water inlet is carried out by caisson 20.
Step 6:Fixed fried point is after explosion on caisson 20, and caisson 20 starts to seep water and gradually sink, now, Caisson 20 drift about forward and gradually arrive at breach 50 at, anchor chain tense, caisson 20 by Rocket anchor 30 huge anchorage force no longer Advance, but continue to sink in the original location, with the sinking of caisson 20, caisson 20 can be near with the distance of anterior displacement sub-fraction Contacted like with 50 dykes and dams 40 that burst.
Step 7:Caisson 20 has been fixed at the breach of dykes and dams 40 50 after above-mentioned flow, and the mighty torrent of huge mighty torrent is produced Resistant function has been given birth to, the effect for decompression of slowing down is served, meanwhile, the huge anchorage force that Rocket anchor 30 is produced can hold caisson 20, prevent it from producing compressing to residual dike.Caisson 20 in place after, in order to further resist mighty torrent, slow down and depressurize and be below its His operation such as attacks and occupies Kou Men, Kou Men and closes up the good operating condition of construction, can continue to call caisson or military pontoon bridge Equipment combination Rocket anchor, the caisson 20 around explosion carries out annular laying, as shown in Figure 2.
Specifically, the Rocket anchor 30 being related in the present invention is as shown in figure 3, its solid propellant rocket is sprayed using a kind of two The combined engine of gas, it is coaxially in series by two performance identical solid propellant rockets, and the two combustion gas is communicated.Work as fire After the incendiary agent of arrow anchor is ignited, Rocket anchor is pushed into stratum depths by the reaction of burning gases injection, while anchor chain is brought into Underground, Rocket anchor can provide anchorage force when tensing anchor chain.The weight of Rocket anchor is general in tens of kilograms to hundreds of kilograms, depth of burying 5~20m is spent, produced anchorage force generally 5~100 tons, can meet stationary caisson when blocking up according to the difference of soil property situation 20 requirement.
In use, as shown in figures 4 a and 4b, Rocket anchor 30 is arranged on caisson 20 by support 31, the two ends of anchor chain 32 point Not Lian Jie anchor chain retainer ring 33, the two ends of anchor chain 32 are connected with caisson 20 with Rocket anchor 30 respectively by anchor chain retainer ring 33. The setting of remote control demolition device 34 is specific shown as shown in Figure 5 a to 5 c, and multiple remote control demolition devices 34 are separately mounted into caisson 20 On each fried point on, remote control demolition device 34 includes receiver of remote-control sytem and TNT explosives, and TNT explosives are fixed on by fixture 35 On caisson 20.After Rocket anchor is installed with remote control demolition device, according to above-mentioned steps one to seven, operation of blocking up is carried out.
Described above is only the preferred embodiment of the present invention, is not intended to limit the invention, it is noted that for this skill For the those of ordinary skill in art field, without departing from the technical principles of the invention, can also make it is some improvement and Modification, these improvement and modification also should be regarded as protection scope of the present invention.

Claims (3)

1. a kind of method blocked up using the quick grappling caisson of Rocket anchor, it is characterised in that including step:
(1) towboat is connected with caisson using drag-line, Rocket anchor and its emitter is set on the caisson side plate, and in advance The immersion angle degree of the emitter is set, one end of the Rocket anchor be connected with the caisson by anchor chain and take be buckled in it is described On emitter, remote control demolition device is set inside the caisson;
(2) the towboat traction caisson is close to bursting into work waters, and it is in a line to make the towboat, drag-line and caisson And perpendicular to the flow direction of current;
(3) drag-line is unclamped, the towboat is separated with the caisson, makes the caisson close to bursting;
(4) igniting starts the emitter transmitting Rocket anchor, and the Rocket anchor enters according to the immersion angle degree pre-set Enter river bed and carry out grappling, the caisson continues close to bursting;
(5) when the caisson arrives at explosion position set in advance, the remote control demolition being fixed on the caisson is started Device;
(6) the caisson broken hole is intake and sinks to drifting about to breach, and the anchor chain is tightened up applies anchorage force to the caisson, The caisson sinking is simultaneously contacted with breach dykes and dams;
(7) Kou Men, Kou Men are attacked and occupied and closes up operation.
2. the method according to claim 1 blocked up using the quick grappling caisson of Rocket anchor, it is characterised in that:Institute The caisson that explosion is also about before stating step (7) carries out some caissons that are circular layout.
3. the method according to claim 1 blocked up using the quick grappling caisson of Rocket anchor, it is characterised in that:It is described The length of anchor chain is determined previously according to the depth in river and the flow velocity of current.
CN201510894835.0A 2015-12-08 2015-12-08 A kind of method blocked up using the quick grappling caisson of Rocket anchor Expired - Fee Related CN105544577B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510894835.0A CN105544577B (en) 2015-12-08 2015-12-08 A kind of method blocked up using the quick grappling caisson of Rocket anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510894835.0A CN105544577B (en) 2015-12-08 2015-12-08 A kind of method blocked up using the quick grappling caisson of Rocket anchor

Publications (2)

Publication Number Publication Date
CN105544577A CN105544577A (en) 2016-05-04
CN105544577B true CN105544577B (en) 2017-07-28

Family

ID=55824098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510894835.0A Expired - Fee Related CN105544577B (en) 2015-12-08 2015-12-08 A kind of method blocked up using the quick grappling caisson of Rocket anchor

Country Status (1)

Country Link
CN (1) CN105544577B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059905A (en) * 2017-03-22 2017-08-18 中国人民解放军理工大学 It is a kind of from grappling caisson
CN107447728B (en) * 2017-07-28 2020-02-07 华北水利水电大学 River breach blockage grabbing method based on array rocket drill ground anchor

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5559226A (en) * 1978-10-21 1980-05-02 Kumagai Gumi Ltd Caisson fabricating and launching method
CN1173572A (en) * 1996-08-12 1998-02-18 姚慧根 Construction method of caisson cut-off dam
CN102155001A (en) * 2011-03-09 2011-08-17 邱世军 System for quickly plugging burst part during dike bursting
CN103615016A (en) * 2013-11-28 2014-03-05 中交一航局第三工程有限公司 Oversized caisson installation process
CN104164885A (en) * 2014-08-06 2014-11-26 中国海洋石油总公司 Caisson towing method

Also Published As

Publication number Publication date
CN105544577A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105544577B (en) A kind of method blocked up using the quick grappling caisson of Rocket anchor
CN102277853B (en) Novel quick and reliable underwater arrangement technology
US7234897B2 (en) Area earthquake defense system
CN103134403B (en) Underwater energy-gathered blasting device and blasting method
CN104890841A (en) Equipment for submarine to overcome blocking layer meeting sinking, breakdown sinking and submergence and to realize fast floating self rescue
CN102877446B (en) A kind of precast caisson formula marine city, airport, harbour and attacking and defending facility construction method
CN113063823A (en) Multi-ship linkage offshore explosion test method
Baird et al. The design of breakwaters using quarried stones
KR20140005836A (en) Peace retained reclamation construction machinery processing unit which is equipped with
CN103388324A (en) Construction technology for prefabricated caisson-type marine city, airport, wharf and ocean law enforcement device
KR20150138130A (en) The dual structure of a nuclear waste disposal facility for nuclear power plants switch to the new nuclear power plant reactors
CN218179773U (en) Portable underwater blasting shock wave suppression device
KR20180062008A (en) Multifunctional Buoyancy Module for Wave Cancellation, Breakout Structure using it and Construction Method thereof
RU2786124C1 (en) Mobile gas generating unit for non-lethal counteraction to violators of the boundaries of maritime spaces
JP2006249914A (en) Tidal wave breakwater
TW201328747A (en) Floating shelter
JP2016084691A (en) Control method for volcanic eruption
RU2308058C2 (en) Method for seismic sea wave control
CN203240969U (en) Underwater cumulative blasting device
Harrelson et al. Canals, Cutoffs, and the Vicksburg Campaign
RU2552753C1 (en) Method of ice cover destruction and device for ice cover destruction
CN107780389B (en) Concealed cut-off dam for military defense
RU202572U1 (en) Gas generator unit for reducing buoyancy and stopping ships that violate the boundaries of sea spaces
US4167357A (en) Rapid construction of deep international ports, at shallow seashores, without dredging
CN202155650U (en) Inner cutting device for underwater cumulative explosion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728

Termination date: 20171208

CF01 Termination of patent right due to non-payment of annual fee