CN105543518A - Production method for 5182 aluminum alloy tab stock base material - Google Patents

Production method for 5182 aluminum alloy tab stock base material Download PDF

Info

Publication number
CN105543518A
CN105543518A CN201510968349.9A CN201510968349A CN105543518A CN 105543518 A CN105543518 A CN 105543518A CN 201510968349 A CN201510968349 A CN 201510968349A CN 105543518 A CN105543518 A CN 105543518A
Authority
CN
China
Prior art keywords
rolling
cold
thickness
hot
production method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510968349.9A
Other languages
Chinese (zh)
Other versions
CN105543518B (en
Inventor
吕正风
隋信栋
曲大保
顾华锋
杨立民
赵晓红
喻翠平
徐虎厚
王龙
李涛
郭宝丰
罗虎
刘清雨
李志中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangxin Material Technology Co ltd
Longkou Nanshan Aluminum Rolling New Material Co ltd
Shandong Nanshan Aluminium Co Ltd
Yantai Nanshan University
Original Assignee
Shandong Nanshan Aluminium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Nanshan Aluminium Co Ltd filed Critical Shandong Nanshan Aluminium Co Ltd
Priority to CN201510968349.9A priority Critical patent/CN105543518B/en
Publication of CN105543518A publication Critical patent/CN105543518A/en
Application granted granted Critical
Publication of CN105543518B publication Critical patent/CN105543518B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C1/00Making non-ferrous alloys
    • C22C1/02Making non-ferrous alloys by melting
    • C22C1/026Alloys based on aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C21/00Alloys based on aluminium
    • C22C21/06Alloys based on aluminium with magnesium as the next major constituent
    • C22C21/08Alloys based on aluminium with magnesium as the next major constituent with silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/04Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon
    • C22F1/047Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon of alloys with magnesium as the next major constituent

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Metal Rolling (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)
  • Continuous Casting (AREA)

Abstract

The invention discloses a production method for a 5182 aluminum alloy tab stock base material. The production method includes the production processes of fusion casting, saw cutting, surface milling, soaking, (1+4) hot continuous rolling, cold continuous rolling with three machine frames, cleaning and trimming, and cold continuous rolling with one machine frame. According to the production method, the effect that the mechanical properties of the 5182 aluminum alloy tab stock base material are stable and qualified is guaranteed, the production processes are shortened, and the production efficiency is improved.

Description

A kind of production method of 5182 aluminium alloy draw ring material base materials
Technical field
The present invention relates to aluminium alloy and manufacture field, specifically relate to a kind of production method of 5182 aluminium alloy draw ring material base materials.
Background technology
Draw ring material 5052 and 5182 alloys, 5052 alloys magnesium content are lower, and be early stage a kind of alloy, 5182 alloys are alloys that a kind of Mg content is high, and by the loop product of 5182 alloy production, stability and the use range of its performance are wider.In draw ring material produce, reducing sheet thickness to greatest extent, improve extension property and the intensity of product, improve the utilization ratio of material, reduce production cost, is the target that lid industry processed is pursued.Current draw ring material thickness is 0.267mm, 0.279mm, 0.29mm, 0.305mm, 0.36mm, 0.38mm, 0.405mm, 0.457mm, 0.46mm, along with constantly widening of draw ring materials application scope, proposes requirements at the higher level to the mechanical property of draw ring base material; Simultaneously along with domestic lid industry development processed, the demand of draw ring material constantly increases.
The Production Flow Chart of 5182 traditional alloy draw ring material base materials is: founding → sawing → milling face → soaking → hot rolling → single stand cold mill 1 passage → single stand cold mill 2 passages → single stand cold mill 3 passage → middle trimming → single stand cold mill 4 passages → single stand cold mill 5 passage.Aluminium alloy is at cold rolling point of five passes, and in the operation of rolling, not only consumes time is long, inefficiency, and adds machine number of times, also just adds the damage probability of defect generation and the risk of surface quality defect; Simultaneously owing to repeatedly getting rid of in cold-rolled process except expecting end to end, causing waste of material, reducing the yield rate of draw ring material.
Summary of the invention
The object of the invention is for prior art Problems existing, a kind of production method of 5182 aluminium alloy draw ring material base materials is provided.
Above-mentioned purpose is realized by following proposal:
A kind of 5182 aluminium alloy draw ring material base materials, it is characterized in that, the alloying element percentage composition of described base material is: Si :≤0.2%, Fe :≤0.35%, Cu :≤0.15%, Mn:0.2 ~ 0.5%, Mg:4.0 ~ 5.0%, Cr :≤0.1%, Zn :≤0.25%, other single impurity≤0.03%, total≤0.15%, all the other are Al.
A production method for above-mentioned base material, is characterized in that, described method comprises the steps: melting, refining, casting, sawing, milling face, soaking, 1+4 hot continuous rolling, three frame cold continuous rollings, cleaning trimming, single stand cold mill.
According to above-mentioned production method, it is characterized in that, smelting temperature: 720 ~ 760 DEG C, refining temperature: 740 ~ 780 DEG C, casting temp 690 ~ 710 DEG C.
According to above-mentioned production method, it is characterized in that, during ingot casting soaking, ingot casting temperature: 470 ~ 490 DEG C; Ingot casting soaking time: 2 ~ 3 hours.
According to above-mentioned production method, it is characterized in that, Hot Strip Rolling uses 1+4 hot continuous rolling, first uses reversing rougher rolling 21 ~ 25 passage, ingot casting is processed into slab.Slab is sheared after material removal head through stub bar, re-uses 4 frame hot continuous mill rollings, hot rolling blank exit thickness: 2.5 ~ 3.5mm; Hot rolling finishing temperature: 320 ~ 350 DEG C.
According to above-mentioned production method, it is characterized in that, described cold-rolling process step comprises: be that the hot rolling blank of 2.5 ~ 3.5mm is rolled to through three frame cold continuous rolling a time the work in-process that thickness is 0.6 ~ 0.85mm by thickness, work in-process after cleaning trimming, then are rolled to through three frame cold continuous rolling a time the finished product that thickness is 0.267 ~ 0.46mm.
According to above-mentioned production method, it is characterized in that, described cold-rolling process step comprises: be that the hot rolling blank of 2.5 ~ 3.5mm is rolled to through three frame cold continuous rolling a time the work in-process that thickness is 0.6 ~ 0.85mm by thickness, work in-process after cleaning trimming, then are rolled to through single stand cold mill two passage the finished product that thickness is 0.267 ~ 0.46mm.
According to above-mentioned production method, it is characterized in that, cleaning trimming re-uses deionized water and carries out rinsing after using alkali lye to carry out degreasing, decontamination process to product surface.
According to above-mentioned production method, it is characterized in that, three frame cold continuous rolling roll speed >=900m/min; Three frame cold continuous rolling product outlet temperature: 80 ~ 130 DEG C.
According to above-mentioned production method, it is characterized in that, three frame cold continuous rollings use full oil base ROLLING OIL as cooling-lubricant.
Beneficial effect of the present invention:
1) adopt three frame cold continuous rollings to shorten the production operation time, enhance productivity.And because cold deformation is extremely short for turnaround time, almost do not reply sclerosis, so it is fewer than identical single stand cold mill three passes power consumption to produce actual energy consumption.
2) adopt three frame cold continuous rollings that single stand cold mill can be avoided to produce in three passage processes, getting rid of for three times except expecting end to end, reducing waste of material, improve yield rate.
3) adopt three frame cold continuous rollings to decrease machine number of times, compared with single chassis, decrease product flow when producing under equal conditions and turn over the probability be bruised in journey.
4) three frame cold continuous rollings have employed full oil base ROLLING OIL as cooling-lubricant, compare the product using the cold rolling mill equipment of oil-water mixture to produce, greatly reduce the probability that corrosion appears in product, it also avoid because oil mixing with water is more unbalance than row or be separated the insufficient lubrication thoroughly do not caused simultaneously, cause the problem of product surface aberration.
Embodiment
The alloying element percentage composition of 5182 aluminium alloy draw ring material base materials of the present invention is: Si :≤0.2%, Fe :≤0.35%, Cu :≤0.15%, Mn:0.2 ~ 0.5%, Mg:4.0 ~ 5.0%, Cr :≤0.1%, Zn :≤0.25%, other single impurity≤0.03%, total≤0.15%, all the other are Al.
The production method of this base material comprises the steps: melting, refining, casting, sawing, milling face, soaking, 1+4 hot continuous rolling, three frame cold continuous rollings, cleaning trimming, single stand cold mill.Smelting temperature: 720 ~ 760 DEG C, refining temperature: 740 ~ 780 DEG C, casting temp 690 ~ 710 DEG C.During ingot casting soaking, ingot casting temperature: 470 ~ 490 DEG C; Ingot casting soaking time: 2 ~ 3 hours.Hot Strip Rolling uses 1+4 hot continuous rolling, first uses reversing rougher rolling 21 ~ 25 passage, ingot casting is processed into slab.Slab is sheared after material removal head through stub bar, re-uses 4 frame hot continuous mill rollings, hot rolling blank exit thickness: 2.5 ~ 3.5mm; Hot rolling finishing temperature: 320 ~ 350 DEG C.Cold-rolling process step is optional, a kind of cold-rolling process step comprises: be that the hot rolling blank of 2.5 ~ 3.5mm is rolled to through three frame cold continuous rolling a time the work in-process that thickness is 0.6 ~ 0.85mm by thickness, work in-process after cleaning trimming, then are rolled to through three frame cold continuous rolling a time the finished product that thickness is 0.267 ~ 0.46mm.Another kind of cold-rolling process step comprises: be that the hot rolling blank of 2.5 ~ 3.5mm is rolled to through three frame cold continuous rolling a time the work in-process that thickness is 0.6 ~ 0.85mm by thickness, work in-process after cleaning trimming, then are rolled to through single stand cold mill two passage the finished product that thickness is 0.267 ~ 0.46mm.Cleaning trimming re-uses deionized water and carries out rinsing after using alkali lye to carry out degreasing, decontamination process to product surface.Three frame cold continuous rolling roll speed >=900m/min; Three frame cold continuous rolling product outlet temperature: 80 ~ 130 DEG C.Three frame cold continuous rollings use full oil base ROLLING OIL as cooling-lubricant.
Below in conjunction with specific embodiment, describe the present invention in detail.
Embodiment 1
The alloy state of 5182 aluminium alloy draw ring material base materials: 5182/H19 described in the present embodiment, finished product thickness: 0.267mm, its Production Flow Chart comprises: founding → sawing → milling face → soaking → (1+4) hot continuous rolling → tri-frame cold continuous rolling a time → cleaning trimming → tri-frame cold continuous rolling a time → stretch bending rectifys → finished product shearing.
1) founding: aluminium Hydrochemical Composition: Si:0.1181%, Fe:0.2328%, Cu:0.0546%, Mn:0.3593%, Mg:4.6379%, Cr:0.0256%, Zn:0.0309%, other single impurity≤0.03%, total≤0.15% after founding, all the other are Al, smelting temperature: 755 ~ 760 DEG C, refining temperature: 776 ~ 780 DEG C, casting temp: 708 ~ 710 DEG C.
2) soaking: ingot casting temperature 490 DEG C, soaking time: 2 hours.
3) (1+4) hot continuous rolling: use 1+4 hot continuous rolling, roughing 21 passage, then through 4 frame tandem mill rollings, coiled material exit thickness 2.5mm, temperature out: 320 DEG C.
4) three frame cold continuous rollings: use three frame cold continuous rollings hot rolling blank to be rolled to the work in-process of 0.60mm from the coiled material that thickness is 2.5mm, cold rolling pass distributes: 2.5 → 1.295 (48.2%) → 0.86 (33.6%) → 0.60 (30.2%), cold rolling work in-process are through trimming, caustic dip, after removing surperficial grease, re-use three frame cold continuous rollings and work in-process coiled material is rolled to 0.267mm from thickness 0.60mm, cold continuous rolling distributes passage 0.60 → 0.44 (26.7%) → 0.33 (25%) → 0.267 (19.1%).Cold continuous rolling roll speed: 900m/min, cold rolling temperature out 80 DEG C, cold rolling general working rate: 89.3%.
Stretch bending is rectified: the finished product after cold rolling exists the defect such as wave and warpage, is repaired product plate shape by stretch bending-straightening machine, balanced material internal residual stress, controls wavelength, wave height, longitudinal warpage.
Finished product is sheared: the product after stretch bending is rectified, and shears according to order width specification.
The end properties of the 5182 draw ring material base materials adopting embodiment 1 to produce is as shown in table 1.
Table 1 adopts embodiment 1 to produce the end properties of the 5182 aluminium alloy draw ring material obtained.
Contrast experiment's example 1
The alloy state of 5182 aluminium alloy draw ring material base materials: 5182/H19 described in this experimental example, finished product thickness: 0.267mm, its Production Flow Chart comprises: founding → sawing → milling face → soaking → (1+4) hot continuous rolling → single stand cold mill a time → single stand cold mill two passages → single chassis three passage → cleaning trimming → single stand cold mill four-pass → single stand cold mill five passages → stretch bending rectifys → finished product shearing.
1) founding: aluminium Hydrochemical Composition: Si:0.088%, Fe:0.244%, Cu:0.054%, Mn:0.344%, Mg:4.576%, Cr:0.024%, Zn:0.0260.25%, other single impurity≤0.03%, total≤0.15% after founding, all the other are Al, smelting temperature: 755 ~ 760 DEG C, refining temperature: 776 ~ 780 DEG C, casting temp: 708 ~ 710 DEG C.
2) soaking: with embodiment 1.
3) (1+4) hot continuous rolling: with embodiment 1.
4) single stand cold mill: use single stand cold mill three passage that hot rolling blank is rolled to from the coiled material that thickness is 2.5mm the work in-process that thickness is 0.6mm, cold rolling pass distributes: 2.5 → 1.5 (40%) → 0.95 (36.7%) → 0.6 (36.8%), cold rolling work in-process are through trimming, caustic dip, after removing surperficial grease, re-use single stand cold mill two passage and work in-process coiled material is rolled to from thickness 0.6mm the finished product that thickness is 0.267mm, cold rolling distribution passage 0.6 → 0.39 (35%) → 0.267 (31.5%).Single stand cold mill roll speed: 900m/min, cold rolling temperature out 80 DEG C, cold rolling general working rate: 89.3%.
Stretch bending is rectified: with experimental example 1.
Finished product is sheared: with experimental example 1.
The end properties of the 5182 draw ring material base materials adopting contrast experiment's example 1 to produce is as shown in table 2.
Table 2 adopts contrast experiment's example 1 to produce the end properties of the 5182 aluminium alloy draw ring material obtained.
Compare with comparative experimental example 1, the maximum difference of embodiment 1 is cold rolling process.Embodiment 1 and contrast experiment's example 1 terminate to consume at that time from founding to hot-rolled process, energy consumption and yield rate approximately consistent, the coil weight after hot-rolled process is 20215Kg, and thickness is 2.5mm, and width is 1560mm.Table 3 be embodiment 1 with contrast experiment's example 1 cold rolling process time consume and cold rolling rear yield rate correlation data.
Table 3 embodiment 1 and contrast experiment's example 1 cold rolling process time consume and cold rolling rear yield rate contrasts
Embodiment 2
The alloy state of 5182 aluminium alloy draw ring material base materials: 5182/H19 described in the present embodiment, finished product thickness: 0.38mm, its Production Flow Chart comprises: founding → sawing → milling face → soaking → (1+4) hot continuous rolling → tri-frame cold continuous rolling a time → cleaning trimming → single chassis a time → single chassis two passages → stretch bending rectifys → finished product shearing.
1) founding: aluminium Hydrochemical Composition: Si:0.0941%, Fe:0.2539%, Cu:0.0507%, Mn:0.3591%, Mg:4.6225%, Cr:0.0287%, Zn:0.027%, other single impurity≤0.03%, total≤0.15% after founding, all the other are Al, smelting temperature: 734 ~ 741 DEG C, refining temperature: 741 ~ 746 DEG C, casting temp: 693 ~ 695 DEG C.
2) soaking: ingot casting temperature 470 DEG C, soaking time: 3 hours.
3) (1+4) hot continuous rolling: use 1+4 hot continuous rolling, roughing 21 passage, then through 4 frame tandem mill rollings, coiled material exit thickness 2.7mm, temperature out: 323 DEG C.
4) three frame cold continuous rollings: use three frame cold continuous rollings that hot rolling blank is rolled the work in-process of a time to 0.75mm from the coiled material that thickness is 2.7mm, cold rolling pass distributes: 2.7 → 1.75 (35.2%) → 1.15 (34.3%) → 0.75 (34.8%), cold rolling work in-process are through trimming, caustic dip, after removing surperficial grease, re-use single stand cold mill and work in-process coiled material is rolled to 0.38mm from thickness 0.75mm, cold rolling distribution passage 0.75 → 0.52 (30.7%) → 0.38 (27%).Cold continuous rolling roll speed: 1104m/min, cold rolling temperature out 96 DEG C, cold rolling general working rate: 90%.
Stretch bending is rectified: with example 1.
Finished product is sheared: with example 1.
The end properties of the 5182 draw ring material base materials adopting embodiment 2 to produce is as shown in table 4.
Table 4 adopts embodiment 2 to produce the end properties of the 5182 aluminium alloy draw ring material obtained.
Embodiment 3
The alloy state of 5182 aluminium alloy draw ring material base materials: 5182/H19 described in the present embodiment, finished product thickness: 0.46mm, its Production Flow Chart comprises: founding → sawing → milling face → soaking → (1+4) hot continuous rolling → tri-frame cold continuous rolling a time → cleaning trimming → single chassis a time → single chassis two passages → stretch bending rectifys → finished product shearing.
1) founding: aluminium Hydrochemical Composition: Si:0.1064%, Fe:0.2439%, Cu:0.0628%, Mn:0.2015%, Mg:4.6920%, Cr:0.0306%, Zn:0.026%, other single impurity≤0.03%, total≤0.15% after founding, all the other are Al, smelting temperature: 720 ~ 726 DEG C, refining temperature: 740 ~ 745 DEG C, casting temp: 690 ~ 693 DEG C.
2) soaking: ingot casting temperature 480 DEG C, soaking time: 3 hours.
3) (1+4) hot continuous rolling: use 1+4 hot continuous rolling, roughing 25 passage, then through 4 frame tandem mill rollings, coiled material exit thickness 3.5mm, temperature out: 350 DEG C.
4) three frame cold continuous rollings: use three frame cold continuous rollings that hot rolling blank is rolled the work in-process of a time to 0.85mm from the coiled material that thickness is 3.5mm, cold rolling pass distributes: 3.5 → 2.09 (40.3%) → 1.31 (37.3%) → 0.85 (35.1%), cold rolling work in-process are through trimming, caustic dip, after removing surperficial grease, re-use single stand cold mill and work in-process coiled material is rolled to 0.46mm from thickness 0.85mm, cold rolling distribution passage 0.85 → 0.55 (35.3%) → 0.406 (26.2%).Cold continuous rolling roll speed: 1060m/min, cold rolling temperature out 130 DEG C, cold rolling general working rate: 88.4%.
Stretch bending is rectified: with example 1.
Finished product is sheared: with example 1.
The end properties of the 5182 draw ring material base materials adopting embodiment 2 to produce is as shown in table 5.
Table 5 adopts embodiment 2 to produce the end properties of the 5182 aluminium alloy draw ring material obtained.
Can find out from embodiment 1, embodiment 2, embodiment 3 the 5182 aluminium alloy draw ring material produced with three frame cold continuous rollings with produce with 6 roller single stand cold mills mechanical property extremely surface quality in same level, all reach industry standard, and meet the service requirements of client, and produce with three frame cold continuous rollings and improve a lot in consuming time and yield rate, can produce to enterprise and bring larger economic benefit.
Above-described embodiment only have expressed several embodiment of the present invention; it describes comparatively concrete and detailed; but therefore can not be interpreted as the restriction to the scope of the claims of the present invention; it should be noted that; for the person of ordinary skill of the art; without departing from the inventive concept of the premise, can also make some distortion and improvement, these are all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (9)

1. a production method for 5182 aluminium alloy draw ring material base materials, is characterized in that, described method comprises the steps: melting, refining, casting, sawing, milling face, soaking, 1+4 hot continuous rolling, cold rolling.
2. production method according to claim 1, is characterized in that, smelting temperature: 720 ~ 760 DEG C, refining temperature: 740 ~ 780 DEG C, casting temp 690 ~ 710 DEG C.
3. production method according to claim 1, is characterized in that, during ingot casting soaking, and ingot casting temperature: 470 ~ 490 DEG C; Ingot casting soaking time: 2 ~ 3 hours.
4. production method according to claim 1, is characterized in that, Hot Strip Rolling uses 1+4 hot continuous rolling, first uses reversing rougher rolling 21 ~ 25 passage, ingot casting is processed into slab.Slab is sheared after material removal head through stub bar, re-uses 1 frame hot continuous mill rolling, hot rolling blank exit thickness: 2.5 ~ 3.5mm; Hot rolling finishing temperature: 320 ~ 350 DEG C.
5. method according to claim 1, it is characterized in that, described cold-rolling process step comprises: be that the hot rolling blank of 2.5 ~ 3.5mm is rolled to through three frame cold continuous rolling a time the work in-process that thickness is 0.6 ~ 0.85mm by thickness, work in-process after cleaning trimming, then are rolled to through three frame cold continuous rolling a time the finished product that thickness is 0.267 ~ 0.46mm.
6. method according to claim 1, it is characterized in that, described cold-rolling process step comprises: be that the hot rolling blank of 2.5 ~ 3.5mm is rolled to through three frame cold continuous rolling a time the work in-process that thickness is 0.6 ~ 0.85mm by thickness, work in-process after cleaning trimming, then are rolled to through single stand cold mill two passage the finished product that thickness is 0.267 ~ 0.46mm.
7. the production method according to claim 5 or 6, is characterized in that, cleaning trimming re-uses deionized water and carries out rinsing after using alkali lye to carry out degreasing, decontamination process to product surface.
8. method according to claim 1, is characterized in that, three frame cold continuous rolling roll speed >=900m/min; Three frame cold continuous rolling product outlet temperature: 80 ~ 130 DEG C.
9. production method according to claim 1, is characterized in that, three frame cold continuous rollings use full oil base ROLLING OIL as cooling-lubricant.
CN201510968349.9A 2015-12-21 2015-12-21 A kind of production method of 5182 aluminium alloy draw ring material base material Active CN105543518B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510968349.9A CN105543518B (en) 2015-12-21 2015-12-21 A kind of production method of 5182 aluminium alloy draw ring material base material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510968349.9A CN105543518B (en) 2015-12-21 2015-12-21 A kind of production method of 5182 aluminium alloy draw ring material base material

Publications (2)

Publication Number Publication Date
CN105543518A true CN105543518A (en) 2016-05-04
CN105543518B CN105543518B (en) 2018-04-17

Family

ID=55823073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510968349.9A Active CN105543518B (en) 2015-12-21 2015-12-21 A kind of production method of 5182 aluminium alloy draw ring material base material

Country Status (1)

Country Link
CN (1) CN105543518B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106399772A (en) * 2016-12-12 2017-02-15 山东南山铝业股份有限公司 Aluminum alloy sheet, production method and application
CN106583450A (en) * 2016-12-27 2017-04-26 中铝瑞闽股份有限公司 Production technology for 5182 alloy wide-range thin strip
CN106834825A (en) * 2016-11-16 2017-06-13 广西南南铝加工有限公司 5182 aluminium alloys and the aluminium alloy are prepared into the process of cover material strip material
CN113462936A (en) * 2021-09-02 2021-10-01 山东宏桥新型材料有限公司 Aluminum alloy ring-pull can pull ring and processing technology thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103014452A (en) * 2012-12-27 2013-04-03 亚洲铝业(中国)有限公司 5182 aluminum alloy tab stock substrate and production method thereof
CN103014445A (en) * 2012-12-27 2013-04-03 亚洲铝业(中国)有限公司 5052 aluminum alloy end stock substrate and production method thereof
CN103014451A (en) * 2012-12-27 2013-04-03 亚洲铝业(中国)有限公司 Aluminum material of zip-top two-sheet can body and production method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103014452A (en) * 2012-12-27 2013-04-03 亚洲铝业(中国)有限公司 5182 aluminum alloy tab stock substrate and production method thereof
CN103014445A (en) * 2012-12-27 2013-04-03 亚洲铝业(中国)有限公司 5052 aluminum alloy end stock substrate and production method thereof
CN103014451A (en) * 2012-12-27 2013-04-03 亚洲铝业(中国)有限公司 Aluminum material of zip-top two-sheet can body and production method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106834825A (en) * 2016-11-16 2017-06-13 广西南南铝加工有限公司 5182 aluminium alloys and the aluminium alloy are prepared into the process of cover material strip material
CN106399772A (en) * 2016-12-12 2017-02-15 山东南山铝业股份有限公司 Aluminum alloy sheet, production method and application
CN106399772B (en) * 2016-12-12 2018-06-26 龙口南山铝压延新材料有限公司 A kind of aluminum alloy plate materials, production method and application
CN106583450A (en) * 2016-12-27 2017-04-26 中铝瑞闽股份有限公司 Production technology for 5182 alloy wide-range thin strip
CN113462936A (en) * 2021-09-02 2021-10-01 山东宏桥新型材料有限公司 Aluminum alloy ring-pull can pull ring and processing technology thereof

Also Published As

Publication number Publication date
CN105543518B (en) 2018-04-17

Similar Documents

Publication Publication Date Title
CN103014452B (en) 5182 aluminum alloy tab stock substrate and production method thereof
CN103014445B (en) 5052 aluminum alloy end stock substrate and production method thereof
RU2746876C1 (en) System and method for continuous production of cold-rolled stainless steel sheets
CN105537870A (en) Production method of 5052 aluminum alloy tank cover base material
CN103009010B (en) 1100-H14 aluminum alloy plate-strip and production method thereof
CN109628803B (en) Aluminum alloy checkered plate in 4017-H2X state and preparation method thereof
CN103433319B (en) A kind of manufacture method of stainless steel Side fascia used for rail vehicle
CN103014426B (en) 1050-H14 aluminum alloy plate strip and production method thereof
CN104060132A (en) Novel aluminum alloy and method for manufacturing aluminum foil with high deep-drawing performance by continuous cast-rolling
CN103436780B (en) Production method of steel for LED bracket
CN103014425B (en) 1050-H16 aluminum alloy plate strip and production method thereof
CN105568085A (en) 3104 Aluminum alloy can lid material and production method thereof
CN102319734B (en) Method for effectively controlling small pockmark defects on surface of medium plate
CN103014451B (en) Aluminum material of zip-top two-sheet can body and production method thereof
CN105543518B (en) A kind of production method of 5182 aluminium alloy draw ring material base material
CN101476067A (en) Aluminum alloy strip assembly for umbrella framework and machining technique thereof
CN109468505B (en) 6061-H2X state aluminum alloy checkered plate and preparation method thereof
CN105506414A (en) Aluminum alloy material of two-piece can body of pop-top can and production method for aluminum alloy material
CN103060621A (en) 1100-H16 aluminum alloy plate/strip and production method thereof
CN102719770A (en) Method for producing aluminum tape for self-cleaning solar absorber plate substrate
CN109825746B (en) Anodic alumina base material for aluminum veneer curtain wall and preparation method thereof
CN116787170A (en) Production method of reflow tinned copper strip with residual stress lower than 50MPa
CN114525391B (en) Production process of high-carbon tool steel cold-rolled sheet
CN105618482A (en) Production method for 5182 aluminum alloy cover base material
CN103752609A (en) Method for rolling current-conducting copper bar or plate by using hot rolling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cheng Rence

Inventor after: Li Tao

Inventor after: Guo Baofeng

Inventor after: Liu Qingyu

Inventor after: Li Zhizhong

Inventor after: Shi Chunli

Inventor after: Zhang Qidong

Inventor after: Zhu Zhenfeng

Inventor after: Li Hui

Inventor after: Pan Rongkai

Inventor after: Lv Zhengfeng

Inventor after: Shun Dong Su

Inventor after: Gu Huafeng

Inventor after: Qu Dabao

Inventor after: Yang Limin

Inventor after: Zhao Xiaohong

Inventor after: Yu Cuiping

Inventor after: Xu Huhou

Inventor before: Lv Zhengfeng

Inventor before: Li Tao

Inventor before: Guo Baofeng

Inventor before: Luo Hu

Inventor before: Liu Qingyu

Inventor before: Li Zhizhong

Inventor before: Shun Dong Su

Inventor before: Qu Dabao

Inventor before: Gu Huafeng

Inventor before: Yang Limin

Inventor before: Zhao Xiaohong

Inventor before: Yu Cuiping

Inventor before: Xu Huhou

Inventor before: Wang Long

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180314

Address after: 265700 front Song Village, Dongjiang Town, Yantai, Shandong, Longkou City

Applicant after: Shandong Nanshan Aluminium Co.,Ltd.

Applicant after: LONGKOU NANSHAN ALUMINUM ROLLING NEW MATERIAL CO.,LTD.

Applicant after: HANGXIN MATERIAL TECHNOLOGY CO.,LTD.

Applicant after: Yantai Nanshan University

Address before: 265706 front Song Village, Dongjiang Town, Yantai, Shandong, Longkou City

Applicant before: Shandong Nanshan Aluminium Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Production method of 5182 aluminum alloy pull ring material base material

Effective date of registration: 20211117

Granted publication date: 20180417

Pledgee: Yantai Donghai aluminum foil Co.,Ltd.

Pledgor: Shandong Nanshan Aluminium Co.,Ltd.

Registration number: Y2021980012518

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221031

Granted publication date: 20180417

Pledgee: Yantai Donghai aluminum foil Co.,Ltd.

Pledgor: Shandong Nanshan Aluminium Co.,Ltd.

Registration number: Y2021980012518