A kind of vacuum glass auxiliary production line
Technical field
The invention belongs to vacuum glass manufacturing fields more particularly to a kind of vacuum glass to assist production line.
Background technique
In the production process of vacuum glass, the glass plate after edge sealing, which can be sent in pumped vacuum systems, to be exhausted, seals
Process ultimately forms finished product vacuum glass after sealing.But before entering pumped vacuum systems, need to carry out glass plate multiple
The processing of link needs a tinuous production to improve the automation processing stage of vacuum glass come before realizing and vacuumizing
Various working processes.
Summary of the invention
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide a kind of vacuum glass to assist production line,
The upstream of pumped vacuum systems is arranged in the auxiliary production line, is able to carry out the processing of multiple processes before vacuum glass vacuumizes,
Technology and equipment guarantee is provided for the continuous and automatic production of vacuum glass.
In order to achieve the above object, a kind of vacuum glass of the present invention assists production line, which includes by first
The sequentially connected metalization layer Preparation equipment of conveying device, solder deployment device close sheet devices and welding edge banding apparatus;Described
The side of first conveying device is provided with the second conveying device, and first conveying device is for transporting the first glass substrate, institute
State the second conveying device for transport the second glass substrate, the conjunctions sheet devices including be arranged the first, second conveying device it
Between shaft, with the shaft be connected with along the second conveying device gap be inserted into the second glass substrate below swing arm, the pendulum
Vacuum chuck or clamping device are installed on arm;When work, the vacuum chuck or clamping device grab the second glass substrate, around
Shaft overturns swing arm, and the second glass substrate is placed in the first glass substrate in the first conveying device, completes to close piece.
Further, when the glass substrate is film-coated glass substrate, the auxiliary production line further includes being arranged in metal
Before changing layer Preparation equipment, for the film removing device for carrying out membrane removal to edge sealing region to film-coated glass substrate.
Further, which further includes glass fibre reinforced plastic equipment, and the glass fibre reinforced plastic equipment is arranged in the metal
Change on the station between layer Preparation equipment and the solder deployment device.
Further, which is additionally provided with supporter installation aiding device, and above support installation aiding device is arranged in institute
It states on the station between metalization layer Preparation equipment and the welding edge banding apparatus.
Further, which is additionally provided with supporter installation aiding device, and above support installation aiding device is in setting institute
It states in solder deployment device and the station closed between sheet devices.
Further, which is additionally provided with supporter installation aiding device, above support installation aiding device and the conjunction
Sheet devices are integral equipment.
Further, the metalization layer Preparation equipment includes printing equipment, drying equipment and agglomerating plant.
Further, the drying equipment and agglomerating plant are integral equipment.
Further, the agglomerating plant is glass fibre reinforced plastic equipment.
Further, several welding edge banding apparatus are provided on the auxiliary production line.
Further, when the welding edge banding apparatus is one, which is arranged in the conveying device
Side, the conveying direction of the welding edge banding apparatus and the conveying direction of conveying device are vertical.
Further, when the welding edge banding apparatus is one, the conveying direction of the welding edge banding apparatus and the conveying
The conveying direction of device is consistent.
Further, when the welding edge banding apparatus is multiple, which is arranged in the conveying device
One or both sides, the conveying direction of the welding edge banding apparatus are vertical with the conveying direction of the conveying device.
A kind of vacuum glass auxiliary production line, which includes by the sequentially connected metallization of the first conveying device
Layer Preparation equipment, solder deployment device, closes sheet devices and welding edge banding apparatus at glass fibre reinforced plastic equipment;In the first conveying dress
The side set is provided with the second conveying device, and first conveying device is for transporting the first glass substrate, second conveying
Device for transport the second glass substrate, it is described close sheet devices include be arranged between the first, second conveying device mostly freely
Mechanical arm is spent, vacuum chuck or clamping device are installed on the mechanical arm;When work, the vacuum chuck or clamping dress
The second glass substrate of crawl is set, the second glass substrate is placed in the first glass substrate in the first conveying device, completes to close
Piece.
In vacuum glass auxiliary production line of the invention, metalization layer Preparation equipment is used to metal paste being printed on glass
Metalization layer is constituted after the edge sealing region of glass substrate and cured processing;Glass fibre reinforced plastic equipment is used for will be at glass substrate tempering
Reason forms tempered glass;Solder deployment device is used to lay the solder of edge sealing and be fixed on the edge sealing region of glass substrate
It is interior;Supporter deployment device is used to intermediate supports cloth being placed on lower layer's glass substrate;Sheet devices are closed to be used for upper layer glass
Substrate is placed on lower layer's glass base;Edge banding apparatus is welded to be used for the edge sealing region of upper layer glass substrate and lower layer's glass substrate
Welded seal.
When upper glass substrate and/or lower glass substrate are coated glass, film removing device for remove glass substrate and/
Or lower glass substrate to the film plating layer in edge sealing region.
When being only equipped with a welding edge banding apparatus on production line, the conveying side of conveying device is arranged in welding edge banding apparatus
Upwards, the carriage direction of glass substrate is parallel with it;Or the side of conveying device is set, the carriage direction of glass substrate with
It is vertical.It can be improved edge sealing efficiency when several are arranged and welds edge banding apparatus, welding edge banding apparatus, which can be set, to be conveyed
The same side of device can also be disposed on the two sides of conveying device.The upper of pumped vacuum systems is arranged in the auxiliary production line
Trip, is able to carry out the processing of multiple processes before vacuum glass vacuumizes, provides for the continuous and automatic production of vacuum glass
Technology and equipment guarantee.
Detailed description of the invention
Fig. 1 is the first connection schematic diagram that vacuum glass of the present invention assists production line;
The schematic diagram of 1 metalization layer equipment of number in Fig. 2 Fig. 1;
Fig. 3 is second of connection schematic diagram that vacuum glass of the present invention assists production line;
Fig. 4 is the third connection schematic diagram that vacuum glass of the present invention assists production line;
Fig. 5 is the 4th kind of connection schematic diagram that vacuum glass of the present invention assists production line;
Fig. 6 is the 5th kind of connection schematic diagram that vacuum glass of the present invention assists production line;
Fig. 7 is the 6th kind of connection schematic diagram that vacuum glass of the present invention assists production line;
Fig. 8 is the structural schematic diagram for closing sheet devices;
Fig. 9 is the 7th kind of connection schematic diagram that vacuum glass of the present invention assists production line.
Specific embodiment
With reference to the accompanying drawing, the specific embodiment that the present invention will be described in detail.
Embodiment 1
The first specific embodiment for assisting production line for a kind of vacuum glass of the present invention as shown in fig. 1, fig. 2 and fig. 8,
In the present embodiment, at least a piece of in upper layer glass substrate and lower layer's glass substrate is coated glass, and film plating layer can be heat
Reflectance coating, low-radiation film or conductive film.The auxiliary production line includes by the sequentially connected metalization layer preparation of the first conveying device 7
Equipment 1, solder deployment device 3 close sheet devices 4 and welding edge banding apparatus 5;It is provided in the side of first conveying device 7
Second conveying device 8, first conveying device 7 are used for for transporting the first glass substrate 101, second conveying device 8
The second glass substrate 100 is transported, the sheet devices 4 that close include the shaft 41 being arranged between the first, second conveying device, with institute
It states shaft 41 and is connected with the swing arm 42 for being inserted into 100 lower section of the second glass substrate along 8 gap of the second conveying device, pacify in the swing arm
Equipped with vacuum chuck 43;When work, the vacuum chuck 43 grabs the second glass substrate 100, around the shaft 41 overturning swing arm 42, the
Two glass substrates 100 are placed in the first glass substrate 101 in the first conveying device 7, complete to close piece.In the present embodiment,
The clamping device known can be used to substitute the crawl that vacuum chuck completes upper layer glass substrate;
Wherein, when the glass substrate is film-coated glass substrate, the auxiliary production line further includes that setting is being metallized
Before layer Preparation equipment, for the film removing device (not shown) for carrying out membrane removal to edge sealing region to the film-coated glass substrate.Membrane removal
Device be used to remove glass substrate and/or lower glass substrate to the film plating layer in edge sealing region, in favor of in the region system
Standby metalization layer;When upper layer glass substrate and all common white glass of lower layer's glass substrate, then no setting is required in production line removes
Film device.
Metalization layer Preparation equipment 1 includes: printing equipment 1-1, for the metal paste for constituting metalization layer to be placed in
Layer glass substrate and four side of lower layer's glass substrate to which in edge sealing region, printing equipment is specially silk-screen printing in the present embodiment
Equipment or spraying printing equipment;Drying equipment 1-2, for drying the metal paste in edge sealing region;Agglomerating plant 1-3 is used
Metal paste high temperature sintering after it will dry forms metalization layer, and at the same time completing the tempering processing of glass substrate.In addition,
Drying equipment 1-2 and agglomerating plant 1-3 can be integral equipment, functionally can successively carry out metal paste drying and gold
Belong to slurry high temperature sintering.
Solder deployment device 3 is used to that the solder of edge sealing to be laid and is fixed in the edge sealing region of upper layer glass substrate;
Sheet devices 4 are closed to be used to upper layer glass substrate being placed on lower layer's glass substrate;Edge banding apparatus 5 is welded to be used for upper layer glass base
The edge sealing region welded seal of piece and lower layer's glass substrate.Wherein, it is only equipped with a welding edge banding apparatus 5, weldering in the production line
The conveying direction (see arrow direction in figure) of the conveying direction and the first conveying device 7 that connect edge banding apparatus 5 is consistent.
Embodiment 2
It is illustrated in figure 3 a kind of second of specific embodiment of vacuum glass auxiliary production line of the present invention, in the present embodiment
It is essentially identical with the first embodiment, the difference is that, which further includes glass fibre reinforced plastic equipment 2, the glass
Tempering apparatus 2 is arranged on the station between the metalization layer Preparation equipment and the solder deployment device.Glass tempering is set
Standby 2 for handling glass substrate tempering, so as to make toughened vacuum glass.At this point, agglomerating plant 1-3 is only used for dry
Metal paste high temperature sintering after dry forms metalization layer.
Embodiment 3
It is illustrated in figure 4 a kind of the third specific embodiment of vacuum glass auxiliary production line of the present invention, in the present embodiment
In, it is essentially identical with the first embodiment, the difference is that, the auxiliary production line of the present embodiment is additionally provided with supporter laying
Device 6, the setting of supporter installation aiding device 6 are any one between the metalization layer Preparation equipment 1 and the welding edge banding apparatus 5
On a station.Preferably, as shown in figure 4, supporter installation aiding device 6 is arranged in solder deployment device 3 and closes between sheet devices 4
On station.In addition, supporter installation aiding device 6 and the conjunction sheet devices 4 can be integral equipment, functionally can successively into
Piece operation is laid and closed to row supporter.
Embodiment 4
It is illustrated in figure 5 a kind of 4th kind of specific embodiment of vacuum glass auxiliary production line of the present invention, with the first reality
It is essentially identical to apply example, the difference is that, the side of the first conveying device 7 is arranged in the welding edge banding apparatus 5 in the present embodiment,
The conveying direction for welding edge banding apparatus 5 is vertical with conveying direction (see the arrow in figure) of the first conveying device 7.It can use one
Lateral conveying device is realized.
Embodiment 5
It is illustrated in figure 6 a kind of 5th kind of specific embodiment of vacuum glass auxiliary production line of the present invention, with the first reality
It is essentially identical to apply example, the difference is that, be equipped on the auxiliary production line in the present embodiment three welding edge banding apparatus 5a,
5b, 5c, these three welding edge banding apparatus 5a, 5b, 5c are located at the same side of the first conveying device 7, weld edge banding apparatus 5a, 5b,
The conveying direction of 5c is vertical with conveying direction (see the arrow in figure) of the first conveying device 7.
Embodiment 6
It is illustrated in figure 7 a kind of 6th kind of specific embodiment of vacuum glass auxiliary production line of the present invention, with the first reality
It is essentially identical to apply example, the difference is that, be equipped on the auxiliary production line in the present embodiment three welding edge banding apparatus 5a,
5b, 5c, these three welding edge banding apparatus 5a, 5b, 5c are arranged in the two sides of the first conveying device 7, welding edge banding apparatus 5a, 5b,
The conveying direction of 5c is vertical with conveying direction (see the arrow in figure) of the first conveying device 7.
Embodiment 7
It is illustrated in figure 9 a kind of 7th kind of specific embodiment of vacuum glass auxiliary production line of the present invention, with the first reality
It is essentially identical to apply example, the difference is that, the conjunction sheet devices of the auxiliary production line in the present embodiment include setting in the first conveying
Multi-freedom-degreemanipulator manipulator arm 10 between device 7 and the second conveying device 8 is equipped with vacuum chuck on the mechanical arm 10
11;When work, the vacuum chuck 11 grabs the second glass substrate, and the second glass substrate is placed in the first conveying device 7
The first glass substrate on, complete close piece.In the present embodiment, it is known that clamping device can be used to substitute vacuum chuck 11 completion
The crawl of upper layer glass substrate.
The first conveying device 7 and/or the second conveying device 8 in above-described embodiment 1 to 7 can be specifically using well known defeated
Roller-way, conveyer belt or air-flotation type conveying device are sent, conveyor surface can be parallel to the horizontal plane, can also be horizontal by a setting
Angle obliquely conveys glass substrate.Both first conveying device 7 is parallel with the conveying direction of the second conveying device 8, can also
Conveying direction is in a certain angle.
Above-mentioned example is only intended to illustrate that the present invention, embodiments of the present invention are not limited to these examples, this field skill
What art personnel were made meets the various specific embodiments of inventive concept all within protection scope of the present invention.