CN105525925A - 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法 - Google Patents

在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法 Download PDF

Info

Publication number
CN105525925A
CN105525925A CN201510727549.5A CN201510727549A CN105525925A CN 105525925 A CN105525925 A CN 105525925A CN 201510727549 A CN201510727549 A CN 201510727549A CN 105525925 A CN105525925 A CN 105525925A
Authority
CN
China
Prior art keywords
shield machine
stratum
cutterhead
compound stratum
cutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510727549.5A
Other languages
English (en)
Other versions
CN105525925B (zh
Inventor
刘永
武铁路
蔡连利
沈水龙
任栋杰
张健
顾长明
王涛
白艳峰
杨成
郝钢
胡俊杰
赵阳
宿伟
华有岳
熊涛
李永刚
赵永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
China Railway 16th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Shanghai Jiaotong University
China Railway 16th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University, China Railway 16th Bureau Group Co Ltd, Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Shanghai Jiaotong University
Priority to CN201510727549.5A priority Critical patent/CN105525925B/zh
Publication of CN105525925A publication Critical patent/CN105525925A/zh
Application granted granted Critical
Publication of CN105525925B publication Critical patent/CN105525925B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield

Abstract

本发明提供了一种在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,包括:第一步,根据盾构机掘进路线和地层分布情况,确定盾构机在某单一地层中掘进时的刀盘合理转速及通过复合地层时掌子面范围内较硬地层所占面积与掌子面面积之比的最大值;第二步,确定盾构机在通过上软下硬地层时的刀盘设计转速;第三步,根据地层分布情况计算平均刀盘扭矩,判断是否已经进入复合地层,从而调整刀盘转速。本发明方法技术简单,操作容易,能有效减少上软下硬地层造成的刀具损坏,显著延长刀具的使用期限,极大地提高了施工效率和经济效益。

Description

在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法
技术领域
本发明涉及一种盾构隧道技术领域中的技术方法,具体地,涉及一种在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法。
背景技术
随着城市地铁建设的快速发展,盾构隧道技术得到日益广泛的采用,同时也不断遇到新的技术挑战。如在广州、深圳等地,盾构隧道在强风化地层掘进过程中常碰到由微风化或中风化地层侵入形成上软下硬复合地层的情况。盾构机在强风化地层中掘进时一般掘进速度较快,刀盘转速较高。当盾构机刚进入到复合地层时,这种掌子面内地层的变化会对处于快速转动的刀盘上的刀具施加巨大的冲击荷载,极易造成刀具的瞬间崩坏;当盾构机在复合地层掘进时,由于掌子面内存在多种地层,使得刀盘合理转速的确定存在一定难度,存在刀具过快损坏的风险。刀具作为盾构机掘进的最终执行部件,刀具的使用寿命将直接关系到盾构机的掘进效率。因此,有必要针对复合地层,提出一种减小盾构机刀具损坏的施工方法。
经对现有技术文献检索发现,申请号为:201010251601.1,公布号为CN101899981A,专利名称为:应用于盾构机在隧道掘进过程中减少滚刀异常损坏的方法,该专利提出通过调整刀盘推力来减少盾构机在砂土地层掘进中的滚刀异常损坏。然而,调整刀盘推力主要解决了刀具过载的问题。在复合地层中,高频率的地层变化,使得刀具受到持续、较大的冲击荷载是造成刀具断裂和过快磨损的主要原因,而调整刀盘的推力并不能有效减少这种冲击荷载,无法降低刀具断裂和过快磨损的风险。事实上,在复合地层中掘进时,刀具受到过大的冲击荷载主要由不合理的刀盘转速引起。因此,急需提出一种根据复合地层的地层特点确定合理刀盘转速的盾构隧道施工方法。
发明内容
针对现有技术中的缺陷,本发明的目的是提供一种在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,减小在掘进中遇到复合地层时盾构机刀具的损坏。
为实现以上目的,本发明提供一种在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,包括如下步骤:
第一步,根据盾构机掘进路线和地层分布情况,确定盾构机在掘进过程中将遇到的地层及遇到上软下硬复合地层的位置;由以下计算公式确定盾构机在某单一地层中掘进时的刀盘合理转速ni为:
n i = K α · D 1.2 q u i v , ( i = 1 , 2 )
式中:ni——复合地层中某类地层对应的刀盘合理转速,r/min;Kα——相对于刀盘直径的扭矩系数,优选取土压平衡盾构Kα=14~23;泥水盾构Kα=9~18;D——刀盘直径,m;qui——复合地层中某类地层土体或岩体的无侧限抗压强度,kPa;v——盾构机推进速度,m/h;
并确定盾构机在通过复合地层时掌子面范围内硬地层所占面积与掌子面面积之比的最大值K,其中以隧道底部为原点建立坐标系:
K = 0.5 + 4 πD 2 · ∫ D 2 h 4 y D - 4 y 2 d y ,
式中:h——掌子面内硬地层侵入软地层的最大距离,m;y——掌子面内硬地层侵入软地层的距离,m;d为数学中微分的符号。
第二步,确定盾构机在通过上软下硬复合地层时的刀盘设计转速
由得到的ni和K,引入安全系数H,利用以下计算公式得到盾构机在通过上软下硬复合地层时的刀盘设计转速nd为:
nd=H(1-K)n1+Kn2
式中:nd——上软下硬复合地层刀盘设计转速,r/min;H——安全系数,优选取0.8;n1——上软下硬复合地层中软地层的刀盘合理转速,r/min;n2——上软下硬复合地层中硬地层的刀盘合理转速,r/min;
第三步,根据地层分布情况,当盾构机掘进到距离进入复合地层还有30环时,开始每掘进1环观察记录盾构机刀盘扭矩xj,(j=1,2,3……),每掘进5环后计算平均刀盘扭矩Xi,(i=1,2,3,4,5,6),计算公式为:
X ‾ i = 1 5 Σ j = 5 i - 4 5 i x j
根据计算公式:
A i + 1 = X ‾ i + 1 - X ‾ i X ‾ i × 100 %
判断Ai+1≥50.0%是否成立:
如果Ai+1≥50.0%成立,则认为盾构机已经进入复合地层,将刀盘的转速调整至设计转速;
如果Ai+1连续3次大于等于20%,则认为盾构机已经进入复合地层,将刀盘的转速调整至设计转速;
如果盾构机掘进到复合地层时,以上两个条件Ai+1一个都不满足,则立即将刀盘的转速调整至设计转速;当盾构机前端通过并重新掘进到单一地层时,将刀盘转速调整至盾构机前端所处单一地层的刀盘合理转速。
优选地,在上述第一步之前,可以进行准备工作,即工程地质勘察:根据隧道埋深,选择探测范围为隧道埋深5倍的探地雷达型号;利用探地雷达进行探测,每前进1m记录1次地层信息;根据探地雷达记录的地层信息,确定隧道沿线的地层分布情况;根据地层分布情况,利用钻孔取土方法获取各类地层土样,利用采集的土样进行无侧限抗压试验,确定各地层土体或岩体的无侧限抗压强度;
更优选地,所述的地层分布状况是指:从地表至深度为隧道底部深度3~5倍范围内分布的地层类型及各地层厚度。
更优选地,所述的钻孔取土方法是指:用厚壁取土设备,在已由探地雷达确定的各地层中取土,用于做抗压强度试验,取样量根据试件量确定,以每地层不少于三个试件为宜。
更优选地,所述的无侧限抗压试验是指:试验时,将直径为150.0mm、高为150.0mm的圆柱形试样放在无侧限压力仪中,在不加任何侧向压力的情况下施加垂直压力,直到使试件剪切破坏为止,剪切破坏时试样所能承受的最大轴向压力称为无侧限抗压强度,该试验过程称为无侧限抗压试验。
优选地,第一步中,所述的刀盘合理转速是指:在保证盾构机掘进速度可接受的前提下,尽量减少刀具损坏的刀盘转速。
优选地,第二步中,所述的刀盘设计转速是指:盾构机在上软下硬地层中掘进时,在保证盾构机掘进速度可接受的前提下,能有效减少刀具损坏的刀盘转速。
与现有技术相比,本发明具有如下的有益效果:
本发明采用根据上软下硬地层各地层面积比确定刀盘设计转速,并根据刀盘扭矩变化提前针对复合地层调整刀盘转速的方法,避免盾构机在强风化地层高速掘进时由于高转速刀盘突然遇到复合地层而发生的刀具损坏。本发明方法技术简单,操作容易,能有效减少上软下硬地层造成的刀具损坏,显著延长刀具的使用期限,极大地提高了施工效率和经济效益。
附图说明
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明的其它特征、目的和优点将会变得更明显:
图1为本发明一实施例距A号车站100环~200环区段地层分布图;
图2为本发明一实施例距复合地层30环区段刀盘扭矩变化图:
图3为本发明一实施例距离A号车站169环处隧道横截面坐标示意图。
具体实施方式
下面结合具体实施例对本发明进行详细说明。以下实施例将有助于本领域的技术人员进一步理解本发明,但不以任何形式限制本发明。应当指出的是,对本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进。这些都属于本发明的保护范围。
实施例:
某广州地铁区间内隧道盾构工程涉及人工填土层、粉质粘土层、强风化层和中风化等地层,同时也涉及复杂的褶曲等地质构造,所以盾构机在掘进过程中将不可避免地遇到复合地层。该区间位于A号车站和B号车站之间,隧道全长约1676m,共1136环,管片长度为1.5m,隧道的直径为6.0m;隧道顶部所在深度为-3.0m,隧道底部所在深度为-9.0m;采用土压平衡盾构机,刀盘直径D=6.0m,取相对于刀盘直径的扭矩系数Kα=20.0;现以距离A号车站100环~200环区段为例进行说明。
如图1-图3所示,本实施例提供一种在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,包括如下步骤:
第一步,根据隧道所在深度选择UtilityScanDF市政管线多频数字化地质雷达系统作为探地雷达;在地表沿隧道前进方向,每前进1m记录1次地层信息,根据各点地层信息确定整个地铁区间从地表到深度为30m范围内的地层分布情况,并通过钻孔取土采集各地层土样进行无侧限抗压强度试验,确定各地层土体或岩体的无侧限抗压强度;隧道沿线的地层主要有:
人工填土层,厚度为0.5~12.6m,无侧限抗压强度为95.0kPa;
粉质粘土层,厚度为0.5~9.5m,无侧限抗压强度为120.0kPa;
强风化地层,厚度为5.3m~11.1m,无侧限抗压强度为690.0kPa;
中风化带地层,厚度为1.2~15.1m,无侧限抗压强度为7500.0kPa。
第二步,根据盾构机掘进路线和地层分布情况,确定盾构机在掘进过程中将遇到的地层以及在距离A号车站145环至197环范围内盾构机将遇到复合地层,如图1所示。由图1可知,盾构机在掘进过程中将遇到由强风化地层和中风化带地层构成的复合地层;其中:
强风化地层中,盾构机推进速度设v1=0.3m/h,则强风化地层刀盘合理转速n1为:
n 1 = K α · D 1.2 q u 1 v 1 = 20.0 × 6.0 1.2 × 690.0 × 0.3 = 0.69 r / m , ;
中风化带地层中,盾构机推进速度设v2=0.2m/h,则碳质灰岩中风化带地层刀盘合理转速n2为:
n 2 = K α · D 1.2 q u 2 v 2 = 20.0 × 6.0 1.2 × 7500.0 × 0.2 = 0.26 r / m ;
又由图1可知,预计盾构机通过复合地层时在距离A号车站169环处,掌子面范围内中风化带地层侵入强风化地层达到最大距离h=3.9m;以隧道横截面中点为原点建立如图3所示坐标系,确定碳质灰岩中风化带地层所占面积与掌子面面积之比的最大值K为:
K = 0.5 + 4 πD 2 · ∫ D 2 h 4 y D - 4 y 2 d y = 0.5 + 4 π × 6 2 × ∫ 3 3.9 4 × 6 y - 4 y 2 d y = 0.688.
第三步,根据第二步中得到的强风化地层刀盘合理转速n1、中风化带地层刀盘合理转速n2和中风化带地层所占面积与掌子面面积之比的最大值K,确定盾构机在通过上软下硬复合地层时的刀盘设计转速nd为:
nd=H(1-K)n1+Kn2=0.8×(1-0.688)×0.69+0.688×0.26=0.35r/m;
式中:nd—上软下硬地层刀盘设计转速,r/min;H—安全系数,取0.8。
第四步,根据地层分布情况,当盾构机掘进到距离上软下硬地层30环时,开始每掘进1环观察记录盾构机刀盘扭矩xj,(j=1,2,3……),每掘进5环后计算平均刀盘扭矩(i=1,2,3,4,5,6),计算公式为:根据计算公式:判断Ai+1≥50.0%是否成立:具体的:
x1=850kN·m,x2=700kN·m,x3=1080kN·m,x4=750kN·m,x5=800kN·m,
X ‾ 1 = 1 5 Σ j = 1 5 x j = 1 5 × ( 850 + 700 + 1080 + 750 + 800 ) = 836 k N · m ;
x6=800kN·m,x7=850kN·m,x8=850kN·m,x9=800kN·m,x10=850kN·m,
X ‾ 2 = 1 5 Σ j = 6 10 x j = 1 5 × ( 800 + 850 + 850 + 800 + 850 ) = 830 k N · m ,
A 2 = X &OverBar; 2 - X &OverBar; 1 X &OverBar; 1 &times; 100 % = 830 - 836 836 &times; 100 % = - 0.7 % < 50 % ;
x11=830kN·m,x12=830kN·m,x13=850kN·m,x14=890kN·m,x15=900kN·m,
X &OverBar; 3 = 1 5 &Sigma; j = 10 15 x j = 1 5 &times; ( 830 + 830 + 850 + 890 + 900 ) = 860 k N &CenterDot; m ,
A 3 = X &OverBar; 3 - X &OverBar; 2 X &OverBar; 2 &times; 100 % = 860 - 830 830 &times; 100 % = 3.6 % < 50 % ;
x16=900kN·m,x17=1100kN·m,x18=1100kN·m,x19=1200kN·m,x20=1500kN·m,
X &OverBar; 4 = 1 5 &Sigma; j = 16 20 x j = 1 5 &times; ( 900 + 1100 + 1100 + 1200 + 1500 ) = 1160 k N &CenterDot; m ,
A 4 = X &OverBar; 4 - X &OverBar; 3 X &OverBar; 3 &times; 100 % = 1160 - 860 860 &times; 100 % = 34.9 % < 50 % ;
x21=1200kN·m,x22=2000kN·m,x23=2100kN·m,x24=1900kN·m,x25=2300kN·m,
X &OverBar; 5 = 1 5 &Sigma; j = 21 25 x j = 1 5 &times; ( 1200 + 2000 + 2100 + 1900 + 2300 ) = 1900 k N &CenterDot; m ,
A 5 = X &OverBar; 5 - X &OverBar; 4 X &OverBar; 4 &times; 100 % = 1900 - 1160 1160 &times; 100 % = 63.8 % > 20 % ;
此时,认为盾构机已经进入复合地层,将刀盘的转速调整至设计转速nd=0.35r/m;根据图1判断盾构机前段是否通过复合地层,当盾构机前端通过并重新掘进到强风化地层时,将刀盘转速调整至强风化地层的刀盘合理转速n1
本发明上述实施例利用探地雷达探测盾构隧道沿线方向地层分布,由地层分布确定掘进过程中掌子面内各地层所占面积,进而确定刀盘设计转速;同时考虑到探地雷达存在一定误差,采用根据盾构机掘进过程中刀盘扭矩的变化确定刀盘转速调整时间点的方法,通过刀盘转速的调整有效减少刀具在遇到复合地层时的损坏,明显延长刀具的使用期限。本发明方法技术简单,操作容易,能有效减少上软下硬地层造成的刀具损坏,显著延长刀具的使用期限,极大地提高了施工效率和经济效益。
以上对本发明的具体实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,本领域技术人员可以在权利要求的范围内做出各种变形或修改,这并不影响本发明的实质内容。

Claims (9)

1.一种在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,包括如下步骤:
第一步,根据盾构机掘进路线和地层分布情况,确定盾构机在掘进过程中将遇到的地层及遇到上软下硬复合地层的位置,由以下计算公式确定盾构机在某单一地层中掘进时的刀盘合理转速ni为:
n i = K &alpha; &CenterDot; D 1.2 q u i v
式中:i=1,2;ni—复合地层中某类地层对应的刀盘合理转速,r/min;Kα—相对于刀盘直径的扭矩系数;D—刀盘直径,m;qui—复合地层中某类地层土体或岩体的无侧限抗压强度,kPa;v—盾构机推进速度,m/h;
并确定盾构机在通过复合地层时掌子面范围内硬地层所占面积与掌子面面积之比的最大值K,其中以隧道底部为原点建立坐标系:
K = 0.5 + 4 &pi;D 2 &CenterDot; &Integral; D 2 h 4 y D - 4 y 2 d y ,
式中:h—掌子面内硬地层侵入软地层的最大距离,m;y——掌子面内硬地层侵入软地层的距离,m;D为刀盘直径,m;d为数学中微分的符号;
第二步,确定盾构机在通过上软下硬复合地层时的刀盘设计转速
由得到的ni和K,引入安全系数H,利用以下计算公式得到盾构机在通过上软下硬复合地层时的刀盘设计转速nd为:
nd=H(1-K)n1+Kn2
式中:nd——上软下硬复合地层刀盘设计转速,r/min;H——安全系数,取0.8;n1——上软下硬复合地层中软地层的刀盘合理转速,r/min;n2——上软下硬复合地层中硬地层的刀盘合理转速,r/min;
第三步,根据地层分布情况,当盾构机掘进到距离进入复合地层还有30环时,开始每掘进1环观察记录盾构机刀盘扭矩xj,j=1,2,3……,每掘进5环后计算平均刀盘扭矩i=1,2,3,4,5,6,计算公式为:
X &OverBar; i = 1 5 &Sigma; j = 5 i - 4 5 i x j
根据计算公式:
A i + 1 = X &OverBar; i + 1 - X &OverBar; i X &OverBar; i &times; 100 %
判断Ai+1≥50.0%是否成立:
如果Ai+1≥50.0%成立,则认为盾构机已经进入复合地层,将刀盘的转速调整至设计转速;
如果Ai+1连续3次大于等于20%,则认为盾构机已经进入复合地层,将刀盘的转速调整至设计转速;
如果盾构机掘进到复合地层时,以上两个条件Ai+1一个都不满足,则立即将刀盘的转速调整至设计转速;当盾构机前端通过并重新掘进到单一地层时,将刀盘转速调整至盾构机前端所处单一地层的刀盘合理转速。
2.根据权利要求1所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,第一步中,所述的刀盘合理转速是指:在保证盾构机掘进速度可接受的前提下,尽量减少刀具损坏的刀盘转速。
3.根据权利要求1所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,第二步中,所述的刀盘设计转速是指:盾构机在上软下硬地层中掘进时,在保证盾构机掘进速度可接受的前提下,能有效减少刀具损坏的刀盘转速。
4.根据权利要求1所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,相对于刀盘直径的扭矩系数Kα的取值为:对于土压平衡盾构Kα=14~23,对于泥水盾构Kα=9~18。
5.根据权利要求1所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,所述安全系数H,取0.8。
6.根据权利要求1-5任一项所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,在上述第一步之前,进行准备工作,即工程地质勘察:
根据隧道埋深,选择探测范围为隧道埋深5倍的探地雷达型号;利用探地雷达进行探测,每前进设定距离记录1次地层信息;根据探地雷达记录的地层信息,确定隧道沿线的地层分布情况;根据地层分布情况,利用钻孔取土方法获取各类地层土样,利用采集的土样进行无侧限抗压试验,确定各地层土体或岩体的无侧限抗压强度。
7.根据权利要求6所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,所述的地层分布状况是指:从地表至深度为隧道底部深度3~5倍范围内分布的地层类型及各地层厚度。
8.根据权利要求6所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,所述的钻孔取土方法是指:用厚壁取土设备,在已由探地雷达确定的各地层中取土,用于做抗压强度试验,取样量根据试件量确定,每地层不少于三个试件。
9.根据权利要求6所述的在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法,其特征在于,所述的无侧限抗压试验是指:试验时,将直径为150.0mm、高为150.0mm的圆柱形试样放在无侧限压力仪中,在不加任何侧向压力的情况下施加垂直压力,直到使试件剪切破坏为止,剪切破坏时试样所能承受的最大轴向压力称为无侧限抗压强度。
CN201510727549.5A 2015-10-30 2015-10-30 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法 Active CN105525925B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510727549.5A CN105525925B (zh) 2015-10-30 2015-10-30 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510727549.5A CN105525925B (zh) 2015-10-30 2015-10-30 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法

Publications (2)

Publication Number Publication Date
CN105525925A true CN105525925A (zh) 2016-04-27
CN105525925B CN105525925B (zh) 2017-09-29

Family

ID=55768409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510727549.5A Active CN105525925B (zh) 2015-10-30 2015-10-30 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法

Country Status (1)

Country Link
CN (1) CN105525925B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761788A (zh) * 2016-12-31 2017-05-31 中铁二十局集团第五工程有限公司 一种复合地层盾构掘进施工方法
US11208771B2 (en) 2019-11-20 2021-12-28 Caterpillar Paving Products Inc. System and method for controlling plunge velocity for milling and reclaiming machines

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1054193A (ja) * 1996-08-08 1998-02-24 Taisei Corp トンネル掘削機の掘進方法
JP2004169367A (ja) * 2002-11-19 2004-06-17 Shimizu Corp 部分硬質地盤用シールド掘進機及び部分硬質地盤の掘削方法並びに部分硬質地盤のトンネル築造方法
CN101899981A (zh) * 2010-08-10 2010-12-01 广州市盾建地下工程有限公司 应用于盾构机在隧道掘进过程中减少滚刀异常损坏的方法
CN102996135A (zh) * 2012-12-11 2013-03-27 上海市基础工程有限公司 超深覆土盾构穿越复杂地层施工方法
CN104265307A (zh) * 2014-08-19 2015-01-07 山东大学 软硬不均地层土压平衡盾构隧道下穿铁路既有线施工方法
CN104632236A (zh) * 2014-12-26 2015-05-20 中铁二局股份有限公司 Tbm-epb双模式盾构在复合地层中的施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1054193A (ja) * 1996-08-08 1998-02-24 Taisei Corp トンネル掘削機の掘進方法
JP2004169367A (ja) * 2002-11-19 2004-06-17 Shimizu Corp 部分硬質地盤用シールド掘進機及び部分硬質地盤の掘削方法並びに部分硬質地盤のトンネル築造方法
CN101899981A (zh) * 2010-08-10 2010-12-01 广州市盾建地下工程有限公司 应用于盾构机在隧道掘进过程中减少滚刀异常损坏的方法
CN102996135A (zh) * 2012-12-11 2013-03-27 上海市基础工程有限公司 超深覆土盾构穿越复杂地层施工方法
CN104265307A (zh) * 2014-08-19 2015-01-07 山东大学 软硬不均地层土压平衡盾构隧道下穿铁路既有线施工方法
CN104632236A (zh) * 2014-12-26 2015-05-20 中铁二局股份有限公司 Tbm-epb双模式盾构在复合地层中的施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761788A (zh) * 2016-12-31 2017-05-31 中铁二十局集团第五工程有限公司 一种复合地层盾构掘进施工方法
US11208771B2 (en) 2019-11-20 2021-12-28 Caterpillar Paving Products Inc. System and method for controlling plunge velocity for milling and reclaiming machines

Also Published As

Publication number Publication date
CN105525925B (zh) 2017-09-29

Similar Documents

Publication Publication Date Title
CN111058855B (zh) 一种盾构下穿的结构物的形变控制方法及评估系统
Standing et al. Unexpected tunnelling volume losses in the Westminster area, London
CN109299578A (zh) 基坑开挖引起下卧既有盾构隧道隆起变形的计算方法
CN106157181B (zh) 一种基于随钻参数对土质围岩快速实时分级的方法
CN107676100A (zh) 基于盾构掘进参数的不良地层预测方法
CN104569352A (zh) 奥灰顶部充填带结构判别指标及确定方法
Masset et al. Quantitative hydraulic analysis of pre-drillings and inflows to the Gotthard Base Tunnel (Sedrun Lot, Switzerland)
CN108241772A (zh) 考虑多重因素的裂隙承压含水层中隧道涌水量的确定方法
CN106285776A (zh) 一种基于定向钻进技术的顶板水疏放方法
CN102538741B (zh) 考虑注浆压力的顶管施工引起土体变形的确定方法
CN105257307B (zh) 一种在上软下硬地层中减小盾构机刀具损坏的施工方法
Gao et al. Water detection within the working face of an underground coal mine using 3D electric resistivity tomography (ERT)
CN105525925A (zh) 在含有靡棱岩复合地层中减小盾构机刀具损坏的施工方法
CN103742143A (zh) 采动覆岩破坏水平变形的双探头探测方法
CN103867208B (zh) 控制隧道及地下工程施工过程中地表、管线变形的方法
Xu et al. Study of the damage mechanics and dewatering recovery programs for the shield tunnel under the Yangtze River
CN106194185B (zh) 水压作用下厚松散含水层防砂安全煤岩柱的留设方法
Stiros et al. Interpretations of Reservoir‐Induced Seismicity May Not Always Be Valid: The Case of Seismicity during the Impoundment of the Kremasta Dam (Greece, 1965–1966)
CN115355008B (zh) 一种冲击地压矿井掘进巷道煤岩穿层期间立体式卸压方法
CN106761804A (zh) 一种搭载于tbm上实时超前水压探测装置与方法
Linde-Arias et al. Engineering geology and tunnelling in the Limmo Peninsula, East London
CN107966733B (zh) 一种用于大孔隙率巨型松散体岩堆与基岩交接面综合地质勘探的方法
Long et al. Retaining wall behaviour in Dublin's fluvio-glacial gravel, Ireland
CN103206216B (zh) 一种延长地表土地使用时间的地下工作面采序优化方法
WU et al. Correlation between surface deformation and construction parameters in silty clay ground tunneling with super large diameter slurry shield TBM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant