CN105525572A - Method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using jack - Google Patents

Method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using jack Download PDF

Info

Publication number
CN105525572A
CN105525572A CN201410573815.9A CN201410573815A CN105525572A CN 105525572 A CN105525572 A CN 105525572A CN 201410573815 A CN201410573815 A CN 201410573815A CN 105525572 A CN105525572 A CN 105525572A
Authority
CN
China
Prior art keywords
jack
carry out
negative moment
replacing
prestressing tendon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410573815.9A
Other languages
Chinese (zh)
Inventor
徐刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CN201410573815.9A priority Critical patent/CN105525572A/en
Publication of CN105525572A publication Critical patent/CN105525572A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using a jack. Constructors use pneumatic picks to chisel off concrete on the surfaces of continuous sections at the tops of piers until corrugated pipes are exposed, and then the constructors use blades to cut the corrugated pipes so as to check the damaged conditions of prestressed steel strands and make marks. By using the jack for replacing the hogging moment prestressed tendons of the T-shaped beams, the construction is convenient and fast, the manpower and material resources are saved, the construction period is shortened, and the damage to beam bodies is greatly reduced. Therefore, the method has wide popularization significance in the aspects of maintenance and removal of old bridges. The method provided by the invention also has the advantages of simple and compact structure, low manufacturing cost and simplicity and convenience in use.

Description

T negative moment of girder prestressing tendon changed by skilful use jack
Technical field
The present invention relates to a kind of T negative moment of girder prestressing tendon, specifically T negative moment of girder prestressing tendon changed by a kind of skilful use jack.
Background technology
In bridge periodic detection process, be detected T negative moment of girder prestressing force and be badly damaged, owner arranges my unit to launch maintenance work immediately, must possess train-passing through conditions before requiring October 1.Because the duration is tight, task weight, group company issues an order, and sends experienced personnel and forms group of helping build temporarily, keep in repair old bridge from project management department belonging to the company of Sichuan-chongqing Region.Traditional T negative moment of girder prestressing tendon changes construction, adopts the construction of longitudinal grooved method, larger to the steel concrete damage of beam body.Jack is used to remove T negative moment of girder prestressed strand, convenient and swift, save a large amount of human and material resources, and shorten the construction period greatly, task of making group company give my unit is advanced by 8 days and completes, and obtains the accreditation of group company and associate organization, and promotes the use immediately.
Summary of the invention
The object of this invention is to provide a kind of skilful use jack and change T negative moment of girder prestressing tendon, can solve the problem.
The present invention for achieving the above object, be achieved through the following technical solutions: T negative moment of girder prestressing tendon changed by a kind of skilful use jack, construction operation personnel adopt pneumatic pick to cut pier top continuous segment surface concrete, until expose bellows, with blade, bellows is cut open, check prestress wire damage situations, and carry out mark.
In order to realize object of the present invention further, can also by the following technical solutions: construction operation personnel, under the precondition carrying out security protection, set foot on working platform and formerly before perform tooth block end at the bottom of the beam changing mark, remove intermediate plate and ground tackle.After intermediate plate and ground tackle are removed, at continuous segment top, pier top, steel strand are cut off, carry out putting and open, put a process and carry out safety precautions.Because of prestressed pore passage mud jacking, tear open to tighten and cannot extract steel strand by manpower, traditional measure is the method adopting longitudinal grooved, through interim group personnel research of helping build temporarily, finally maked decision by group leader Chen Dengyu, adopt jack method to carry out tearing bundle open, and install baffle plate within the scope of 10 meters, front and back, carry out safety prevention measure.
The invention has the advantages that: adopt jack method to change bundle, convenient and quick construction to T negative moment of girder prestressing force, saved human and material resources, shortened the construction period, and substantially reduced the damage to beam body.Therefore, in old bridge maintaining and dismounting, there is dissemination widely.The present invention also has advantage compact, cheap for manufacturing cost and easy to use simple for structure.
Accompanying drawing explanation
Fig. 1 is construction sequence first step schematic diagram of the present invention; Fig. 2 is construction sequence second step schematic diagram of the present invention; Fig. 3 is construction sequence of the present invention 3rd step schematic diagram; Fig. 4 is construction sequence of the present invention 4th step schematic diagram.
Detailed description of the invention
T negative moment of girder prestressing tendon changed by skilful use jack, and as shown in Figure 1, Figure 2, Figure 3 and Figure 4, construction operation personnel adopt pneumatic pick to cut pier top continuous segment surface concrete, until expose bellows, with blade, bellows is cut open, check prestress wire damage situations, and carry out mark.
In order to realize object of the present invention further, can also by the following technical solutions: construction operation personnel, under the precondition carrying out security protection, set foot on working platform and formerly before perform tooth block end at the bottom of the beam changing mark, remove intermediate plate and ground tackle.After intermediate plate and ground tackle are removed, at continuous segment top, pier top, steel strand are cut off, carry out putting and open, put a process and carry out safety precautions.Because of prestressed pore passage mud jacking, tear open to tighten and cannot extract steel strand by manpower, traditional measure is the method adopting longitudinal grooved, through interim group personnel research of helping build temporarily, finally maked decision by group leader Chen Dengyu, adopt jack method to carry out tearing bundle open, and install baffle plate within the scope of 10 meters, front and back, carry out safety prevention measure.
The invention has the advantages that: adopt jack method to change bundle, convenient and quick construction to T negative moment of girder prestressing force, saved human and material resources, shortened the construction period, and substantially reduced the damage to beam body.Therefore, in old bridge maintaining and dismounting, there is dissemination widely.The present invention also has advantage compact, cheap for manufacturing cost and easy to use simple for structure.
Technical scheme of the present invention is not restricted in the scope of embodiment of the present invention.The technology contents of the not detailed description of the present invention is known technology.

Claims (4)

1. skilfully use jack and change T negative moment of girder prestressing tendon, it is characterized in that: construction operation personnel adopt pneumatic pick to cut pier top continuous segment surface concrete, until expose bellows, are cut open by bellows with blade, check prestress wire damage situations, and carry out mark.
2. T negative moment of girder prestressing tendon changed by skilful use jack according to claim 1, it is characterized in that: construction operation personnel are under the precondition carrying out security protection, set foot on working platform and formerly before perform tooth block end at the bottom of the beam changing mark, remove intermediate plate and ground tackle.
3. T negative moment of girder prestressing tendon changed by skilful use jack according to claim 1, it is characterized in that: after intermediate plate and ground tackle are removed, cut off by steel strand at continuous segment top, pier top, carries out putting and opens, put a process and carry out safety precautions.
4. T negative moment of girder prestressing tendon changed by skilful use jack according to claim 1, it is characterized in that: because of prestressed pore passage mud jacking, tear open to tighten and cannot extract steel strand by manpower, traditional measure is the method adopting longitudinal grooved, through interim group personnel research of helping build temporarily, finally maked decision by group leader Chen Dengyu, adopt jack method to carry out tearing bundle open, and baffle plate is installed within the scope of 10 meters, front and back, carry out safety prevention measure.
CN201410573815.9A 2014-10-24 2014-10-24 Method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using jack Pending CN105525572A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410573815.9A CN105525572A (en) 2014-10-24 2014-10-24 Method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410573815.9A CN105525572A (en) 2014-10-24 2014-10-24 Method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using jack

Publications (1)

Publication Number Publication Date
CN105525572A true CN105525572A (en) 2016-04-27

Family

ID=55768067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410573815.9A Pending CN105525572A (en) 2014-10-24 2014-10-24 Method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using jack

Country Status (1)

Country Link
CN (1) CN105525572A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862601A (en) * 2016-05-13 2016-08-17 铁道第三勘察设计院集团有限公司 Method for reducing negative bending moment of T-type rigid bridge
CN112982188A (en) * 2021-02-10 2021-06-18 同济大学 Method for rebuilding or adding vertical prestress to active concrete bridge
CN112982187A (en) * 2021-02-10 2021-06-18 同济大学 Method for replacing curve prestressed steel beam in damaged bridge body and reinforcing bridge structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862601A (en) * 2016-05-13 2016-08-17 铁道第三勘察设计院集团有限公司 Method for reducing negative bending moment of T-type rigid bridge
CN112982188A (en) * 2021-02-10 2021-06-18 同济大学 Method for rebuilding or adding vertical prestress to active concrete bridge
CN112982187A (en) * 2021-02-10 2021-06-18 同济大学 Method for replacing curve prestressed steel beam in damaged bridge body and reinforcing bridge structure
CN112982188B (en) * 2021-02-10 2022-06-14 同济大学 Method for rebuilding or adding vertical prestress to active concrete bridge
CN112982187B (en) * 2021-02-10 2022-06-21 同济大学 Method for replacing curve prestressed steel beam in damaged bridge body and reinforcing bridge structure

Similar Documents

Publication Publication Date Title
CN106978784B (en) A kind of Long span highway suspension bridge Demolition Construction method
CN204491425U (en) A kind of external prestressing strengthening structure of T-shaped bridge diaphragm
CN105926470B (en) Elevated bridge remodeling method
CN105525572A (en) Method for replacing hogging moment prestressed tendons of T-shaped beams by artfully using jack
CN103233424A (en) Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN106758820A (en) A kind of continuous Cast-in-situ Beam prestressing tendon stretch-draw construction method of minor radius
CN113931073A (en) Asymmetric ultra-wide cable-stayed bridge steel box girder large cantilever flange construction method
CN103590299A (en) Reusable temporary road plate construction method
CN203174510U (en) Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction
CN104947604A (en) Rapid beam-replacing construction method for high speed railway 900 t concrete box beam
CN103924528A (en) Overall long-distance pushing slippage construction method for large-span bridge box girder structure of large-span bridge
CN105568856A (en) Synchronous construction method for sparse-cable-stayed bridge cable beam
CN113957802A (en) Construction method for long-span upper beam of single-tower asymmetric cable-stayed bridge high tower
CN102392416A (en) Pier-beam temporary consolidation post-installed fastening system construction method
CN106320192A (en) Beam section replacement reinforcement method for large-span concrete continuous beam bridge
CN204533963U (en) A kind of foundation ditch built-in pipe overhead device
CN106836000B (en) Curve via holes Summarized Account of Bridge Erection Construction method based on DJ series Bridge Erectors
CN202450780U (en) Combined threaded rod
CN112609584A (en) Prefabricated small box girder installation construction method for intelligent express way
CN110055905B (en) Reinforcing method for novel assembled masonry arch
CN104372746B (en) The prefabricated post stretching Simple T-Girders note concrete form support of railroad bridge and mounting process thereof
RU139739U1 (en) DEVICE FOR REINFORCING REINFORCED CONCRETE BEAMS
CN115256615A (en) Intelligent shower maintenance standard construction system for prefabricated box girder of expressway
CN105196405B (en) Supporting equipment for bridge precast hollow slab lateral mould and using method of supporting equipment
CN208009182U (en) A kind of prefabricated assembled Cement Concrete Pavement Slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160427