CN105522331B CN201410523146.4A CN201410523146A CN105522331B CN 105522331 B CN105522331 B CN 105522331B CN 201410523146 A CN201410523146 A CN 201410523146A CN 105522331 B CN105522331 B CN 105522331B
Authority
CN
China
Prior art keywords
metal cap
diameter
shaping
blank
mrow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410523146.4A
Other languages
Chinese (zh)
Other versions
CN105522331A (en
Inventor
徐倚山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DONGQI STANDARD PARTS Co Ltd
Original Assignee
JIANGSU DONGQI STANDARD PARTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DONGQI STANDARD PARTS Co Ltd filed Critical JIANGSU DONGQI STANDARD PARTS Co Ltd
Priority to CN201410523146.4A priority Critical patent/CN105522331B/en
Publication of CN105522331A publication Critical patent/CN105522331A/en
Application granted granted Critical
Publication of CN105522331B publication Critical patent/CN105522331B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of moulding process of metal cap, the metal cap is by top, bending and molding in the bending part one bending and molding of top edge, the height of the metal cap is h, wall thickness is t, a diameter of d at the top, the top is provided with the through hole of an a diameter of d ', and the moulding process comprises the following steps:Selection, shear, blanking, first shaping, shaping, punching, face work deburring, inspection, galvanizing, service check, packaging.The moulding process of metal cap disclosed by the invention, processing technology is simple, through multiple manufacturing procedures such as blanking, pre-profiling, shaping in process, metal cap dimensional accuracy after machine-shaping is high, shaping is zinc-plated after metal cap medial and lateral, the ageing-resistant of metal cap, corrosion resistant, decay resistance are improved, the high-voltage switch gear for being adapted to work under open-air conditions uses.

Description

A kind of moulding process of metal cap
Technical field
The present invention relates to a kind of metal working process, and in particular to a kind of moulding process of metal cap.
Background technology
Outdoor equipment use condition is harsh, strict in waterproof, antirust, anti-aging etc. requirement, especially exhausted in SF6 gases In the outdoor application of edge metal enclosed switchgear, require high for water resistancees such as flange connection, mechanism case, cover plates, use Amount is big.The waterproof at these positions is mainly reflected at bolted connection and flange, cover plate joint face.
Chinese utility model patent CN203670423U discloses a kind of bolt water proof type sealing structure, including bolt and Nut, bolt coordinate through vessel flange and nut, are equipped with metal cap and rubber blanket successively on bolt, metal cap is bowl Shape, the shape of rubber blanket are adapted with the bowl-shape vacancy shape of metal cap, and rubber blanket insertion is arranged in bowl-shape vacancy.This reality With new structure is simple, practical function, good water-proof effect, resistance to ag(e)ing is strong, and processing cost is low, is adapted to make under a large amount of open-air conditions With.Because in the utility model, the thickness value of rubber blanket is more than the height value of the bowl-shape vacancy of metal cap, and the mesopore of rubber blanket Diameter is adapted with the diameter of bolt, so the dimension precision requirement height of metal cap of the present utility model is, it is necessary to there is unified technique Processing standard limits the processing of metal cap.
The content of the invention
It is an object of the present invention to provide a kind of moulding process of metal cap, processing technology is simple, the metal cap chi of machine-shaping Very little precision is high, and ageing-resistant, corrosion resistant, decay resistance are strong, and the high-voltage switch gear for being adapted to work under open-air conditions uses.
To reach above-mentioned purpose, the technical solution adopted by the present invention is:A kind of moulding process of metal cap, the metal cap By top, bending and molding in the bending part one bending and molding of top edge, the height of the metal cap is h, wall thickness t, institute A diameter of d at top is stated, the top is provided with the through hole of an a diameter of d ', and the moulding process comprises the following steps:
(1) selection:Choose the rectangle cold-rolled steel sheet that the wide * thickness of long * is a*b*t;
(2) shear:Bar steel plate using plate shearing machine by cold-rolled steel sheet position shearing into the wide * thickness of m block lengths * for a ' * b*t, Wherein, (m+1) * a '>a>m*a′;
(3) blanking:The n a diameter of D set in two separate ranks material-dropping hole is provided with blanking die, is then put in blanking die On 80T punch presses, one of bar steel plate is put on blanking die, starts punch press, n a diameter of D of blanking forming circular steel Plate, wherein, D>D+2h, 3D>a′>2D,
(4) first shaping:First shaping mould is put on 80T punch presses, then circular steel plate is put on first shaping mould Carry out bending and strike out blank of metal cap, and ensure bending part external arc initial radium<R+1.5, blank of metal cap Top diameter be d, height>h;
(5) shaping:Sizing die is put on 80T punch presses, metal cap blank is then put in punching press shaping on sizing die, obtained The secondary blank of metal cap, and ensure bending part outer arc radius R in place, the inside/outside diameter size of the secondary blank of metal cap, top and The angle of bending part meets design size;
(6) punching:Perforating die is put on 25T punch presses, then the secondary blank of metal cap is placed on perforating die, starts punching Bed, is d ' in punching aperture on the top of the secondary blank of metal cap, obtains metal cap blank three times;
(7) face work deburring:By metal cap, blank is placed on numerically controlled lathe three times, and is clamped with special fixture, car folding The end face of turn of bilge to the height of metal cap is h, obtains metal cap finished product;
(8) examine:Examine the size everywhere of metal cap by drawing using slide measure, dial gauge, R rule, if qualified, Carry out next step;If unqualified, repeat step (5)~(8), or directly scrap;
(9) galvanizing:Metal cap is placed on galvanization production line and carries out galvanizing, and zinc layers thickness is detected with calibrator Degree, ensure zinc coating thickness between 50~100 μm;
(10) service check:The performance of metal cap is examined by figure using universal testing machine and special gauge, if qualified, is carried out Next step;If unqualified, directly scrap;
(11) pack:Packed and cased through metal cap by protocol requirement using baling press, storage, treat shipment.
Preferably, the height h=9.7 of the metal cap, the diameter d=35 at the top,
Diameter d '=22.4 for the through hole that the top is provided with;
The long a=2000 of the rectangle cold-rolled steel sheet, wide b=1200;
Long a '=115 of the bar steel plate, wide b=1200;
The m=17, n=41, D=54.7.
Need to set positioning hole on bar steel plate in above-mentioned step (3), during blanking, bar steel plate is positioned at Expect on mould, therefore be the Working position for reserving positioning hole, the quantity n for being typically designed material-dropping hole on blanking die is odd number.
Because above-mentioned technical proposal is used, the present invention has following advantages compared with prior art:
The moulding process of metal cap disclosed by the invention, processing technology is simple, through blanking, pre-profiling, whole in process Multiple manufacturing procedures such as shape, the metal cap dimensional accuracy after machine-shaping is high, is molded, raising zinc-plated after metal cap medial and lateral The ageing-resistant of metal cap, corrosion resistant, decay resistance, the high-voltage switch gear for being adapted to work under open-air conditions use.
Brief description of the drawings
Fig. 1 is the structural representation of metal cap in the embodiment of the present invention one.
Description of reference numerals:
1st, top;
2nd, bending part.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described:
Embodiment one:A kind of moulding process of metal cap, as shown in figure 1, the metal cap by top 1, bending and molding in The 2 integral bending and molding of bending part at the edge of top 1, the height of the metal cap are h, wall thickness t, a diameter of d at the top, The top is provided with the through hole of an a diameter of d ', and the moulding process comprises the following steps:
(1) selection:Choose the rectangle cold-rolled steel sheet that the wide * thickness of long * is a*b*t;
(2) shear:Bar steel plate using plate shearing machine by cold-rolled steel sheet position shearing into the wide * thickness of m block lengths * for a ' * b*t, Wherein, (m+1) * a '>a>m*a′;
(3) blanking:The n a diameter of D set in two separate ranks material-dropping hole is provided with blanking die, is then put in blanking die On 80T punch presses, one of bar steel plate is put on blanking die, starts punch press, n a diameter of D of blanking forming circular steel Plate, wherein, D>D+2h, 3D>a′>2D,
Need to set positioning hole on bar steel plate when wherein, due to blanking, bar steel plate be positioned on blanking die, Therefore it is the Working position for reserving positioning hole, the quantity n for being typically designed material-dropping hole on blanking die is odd number.
(4) first shaping:First shaping mould is put on 80T punch presses, then circular steel plate is put on first shaping mould Carry out bending and strike out blank of metal cap, and ensure bending part external arc initial radium<R+1.5, blank of metal cap Top diameter be d, height>h;
(5) shaping:Sizing die is put on 80T punch presses, metal cap blank is then put in punching press shaping on sizing die, obtained The secondary blank of metal cap, and ensure bending part outer arc radius R in place, the inside/outside diameter size of the secondary blank of metal cap, top and The angle of bending part meets design size;
(6) punching:Perforating die is put on 25T punch presses, then the secondary blank of metal cap is placed on perforating die, starts punching Bed, is d ' in punching aperture on the top of the secondary blank of metal cap, obtains metal cap blank three times;
(7) face work deburring:By metal cap, blank is placed on numerically controlled lathe three times, and is clamped with special fixture, car folding The end face of turn of bilge to the height of metal cap is h, obtains metal cap finished product;
(8) examine:Examine the size everywhere of metal cap by drawing using slide measure, dial gauge, R rule, if qualified, Carry out next step;If unqualified, repeat step (5)~(8), or directly scrap;
(9) galvanizing:Metal cap is placed on galvanization production line and carries out galvanizing, and zinc layers thickness is detected with calibrator Degree, ensure zinc coating thickness between 50~100 μm;
(10) service check:The performance of metal cap is examined by figure using universal testing machine and special gauge, if qualified, is carried out Next step;If unqualified, directly scrap;
(11) pack:Packed and cased through metal cap by protocol requirement using baling press, storage, treat shipment.
In the present embodiment, the height h=9.7 of the metal cap, the diameter d=35 at the top, the top is provided with Through hole diameter d '=22.4.
The long a=2000 of the rectangle cold-rolled steel sheet, wide b=1200.
Long a '=115 of the bar steel plate, wide b=1200.
The m=17, n=41, D=54.7.
Further, it is to adapt to processing technology requirement, each size need to have a margin of tolerance, in the present embodiment, the metal Height h=9.7 ± 0.1 of cap, diameter d '=22.4 ± 0.2 for the through hole that the top is provided with.
The moulding process of metal cap disclosed by the invention, processing technology is simple, through blanking, pre-profiling, whole in process Multiple manufacturing procedures such as shape, the metal cap dimensional accuracy after machine-shaping is high, is molded, raising zinc-plated after metal cap medial and lateral The ageing-resistant of metal cap, corrosion resistant, decay resistance, the high-voltage switch gear for being adapted to work under open-air conditions use.
Described above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, on the premise of principle of the present invention is not departed from, some improvement or replacement can also be made, these improve or replaced It should be regarded as protection scope of the present invention.

Claims (2)

1. a kind of moulding process of metal cap, it is characterised in that the metal cap is by top, bending and molding in the folding of top edge Turn of bilge one bending and molding, the height of the metal cap is h, and wall thickness t, a diameter of d at the top, the top is provided with One a diameter of d ' through hole, the moulding process comprise the following steps:
(1) selection:Choose the rectangle cold-rolled steel sheet that the wide * thickness of long * is a*b*t;
(2) shear:Using plate shearing machine by cold-rolled steel sheet position shearing into the bar steel plate that the wide * thickness of m block lengths * is a ' * b*t, wherein, (m+1)*a′>a>m*a′;
(3) blanking:The n a diameter of D set in two separate ranks material-dropping hole is provided with blanking die, blanking die is then put in 80T On punch press, one of bar steel plate is put on blanking die, startup punch press, n a diameter of D of blanking forming circular steel plate, Wherein, D>D+2h, 3D>a′>2D, <mrow> <mo>(</mo> <mfrac> <mrow> <mi>n</mi> <mo>+</mo> <mn>1</mn> </mrow> <mn>2</mn> </mfrac> <mo>+</mo> <mn>1</mn> <mo>)</mo> </mrow> <mrow> <mo>*</mo> <mi>D</mi> <mo>></mo> <mi>b</mi> <mo>></mo> <mfrac> <mrow> <mi>n</mi> <mo>+</mo> <mn>1</mn> </mrow> <mn>2</mn> </mfrac> <mo>*</mo> <mi>D</mi> <mo>;</mo> </mrow>
(4) first shaping:First shaping mould is put on 80T punch presses, then circular steel plate is put on first shaping mould and carried out Bending strikes out blank of metal cap, and ensures bending part external arc initial radium<R+1.5, the top of blank of metal cap The a diameter of d in portion, height>h;
(5) shaping:Sizing die is put on 80T punch presses, metal cap blank is then put in punching press shaping on sizing die, obtains metal The secondary blank of cap, and ensure bending part outer arc radius R in place, inside/outside diameter size, top and the bending of the secondary blank of metal cap The angle in portion meets design size;
(6) punching:Perforating die is put on 25T punch presses, then the secondary blank of metal cap is placed on perforating die, starts punch press, It is d ' in punching aperture on the top of the secondary blank of metal cap, obtains metal cap blank three times;
(7) face work deburring:By metal cap, blank is placed on numerically controlled lathe three times, and is clamped with special fixture, car bending part End face to the height of metal cap be h, obtain metal cap finished product;
(8) examine:Examine the size everywhere of metal cap by drawing using slide measure, dial gauge, R rule, if qualified, carry out Next step;If unqualified, repeat step (5)~(8), or directly scrap;
(9) galvanizing:Metal cap is placed on galvanization production line and carries out galvanizing, and zinc coating thickness is detected with calibrator, is protected Zinc coating thickness is demonstrate,proved between 50~100 μm;
(10) service check:The performance of metal cap is examined by figure using universal testing machine and special gauge, if qualified, is carried out next Step;If unqualified, directly scrap;
(11) pack:Packed and cased through metal cap by protocol requirement using baling press, storage, treat shipment.
2. the moulding process of metal cap according to claim 1, it is characterised in that the height h=9.7 of the metal cap, The diameter d=35 at the top, diameter d '=22.4 for the through hole that the top is provided with;
The long a=2000 of the rectangle cold-rolled steel sheet, wide b=1200;
Long a '=115 of the bar steel plate, wide b=1200;
The m=17, n=41, D=54.7.
CN201410523146.4A 2014-09-30 2014-09-30 A kind of moulding process of metal cap Active CN105522331B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410523146.4A CN105522331B (en) 2014-09-30 2014-09-30 A kind of moulding process of metal cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410523146.4A CN105522331B (en) 2014-09-30 2014-09-30 A kind of moulding process of metal cap

Publications (2)

Publication Number Publication Date
CN105522331A CN105522331A (en) 2016-04-27
CN105522331B true CN105522331B (en) 2017-11-21

Family

ID=55765038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410523146.4A Active CN105522331B (en) 2014-09-30 2014-09-30 A kind of moulding process of metal cap

Country Status (1)

Country Link
CN (1) CN105522331B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111756008A (en) * 2020-06-23 2020-10-09 江苏双汇电力发展股份有限公司 Core-shaped ring for pre-twisted strain clamp and manufacturing process thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3705396A1 (en) * 1987-02-20 1988-09-08 Ferrostaal Ag Method and installation for the production of angled or u-shaped handle elements
JPH11221641A (en) * 1998-02-03 1999-08-17 Nisshinbo Ind Inc Method for press forming of brake shoe
CN101954429B (en) * 2010-06-17 2012-12-19 无锡曙光模具有限公司 Processing method and special processing mould of cover plate of refrigerator temperature controller
CN102319830A (en) * 2011-07-14 2012-01-18 江苏海迅实业集团股份有限公司 Manufacturing device and manufacturing method of wavy sheet for steel structure of heat exchange system
CN102909526B (en) * 2012-08-28 2015-06-10 上海奥豪金属制品有限公司 Method for manufacturing trench cover plate
CN103551454B (en) * 2013-10-26 2015-07-01 广西科技大学 Stamping method for automobile crankshaft signal panel
CN103752690B (en) * 2014-01-23 2016-05-18 东莞虹日金属科技有限公司 A kind of clutch case moulding process and former thereof
CN103934359A (en) * 2014-04-23 2014-07-23 靖江三鹏汽车模具制造有限公司 Blanking and punching process for cover board of flywheel vibration reducing system

Also Published As

Publication number Publication date
CN105522331A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN109909375A (en) A kind of metal tile shaping mould group and its moulding process
CN105522331B (en) A kind of moulding process of metal cap
CN101850380A (en) High flanging hole forming method
CN201994354U (en) Integral type anti-explosion cover plate of power battery
CN206550293U (en) The inspection frock of negative-pressure los mould casting gear box spray
CN101412179A (en) Processing technique of thin wall fillet iron rack
CN106734487A (en) A kind of mutiprogramming design manufacturing process of deep frustum type part
CN203316583U (en) Automobile head cover skylight anti-collapse stamping die
CN203401011U (en) Drawing die positioning mechanism
CN102544711B (en) The production method of antenna oscillator, antenna oscillator and communication equipment
CN201884609U (en) Double-threaded plate for speed reduction gear box support of car
CN112676464A (en) Hopper stamping die
CN203351430U (en) Full-tantalum insulator cover
CN207069835U (en) A kind of rotor progressive die
CN103934341A (en) Metal plate stamping method
CN202683747U (en) Two-hole symmetrically punching die for tube stocks
CN103611795B (en) A kind of square washer progressive die production technology
CN205436783U (en) Stamping die&#39;s turn -ups deep -drawing compound die
CN102784832B (en) The forming method of a kind of combustion chamber casing
CN204877801U (en) A sealed lid for wind power generation equipment
CN105598314B (en) It is a kind of without the fiery welding Sheet Metal Forming Technology of metal circular tube locking ring
CN203725594U (en) Stamping die for tractor stopping brake plate
CN204638829U (en) The air-cylinder type of battery case flanging fast reclaims safe crimping unit
CN204186984U (en) A kind of pressure water storage barrel exterior bowl
CN205147092U (en) Punching press mould of buckling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant