- CN105515186A CN105515186A CN201510900326.4A CN201510900326A CN105515186A CN 105515186 A CN105515186 A CN 105515186A CN 201510900326 A CN201510900326 A CN 201510900326A CN 105515186 A CN105515186 A CN 105515186A
- Authority
- CN
- China
- Prior art keywords
- remote
- equipment
- communication protocol
- tour
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000004891 communication Methods 0.000 claims abstract description 28
- 238000007689 inspection Methods 0.000 claims abstract description 11
- 230000003044 adaptive effect Effects 0.000 claims abstract description 5
- 238000012544 monitoring process Methods 0.000 claims description 16
- 230000008569 process Effects 0.000 claims description 13
- 238000005516 engineering process Methods 0.000 claims description 11
- 230000000007 visual effect Effects 0.000 claims description 2
- 230000005856 abnormality Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 description 19
- 230000006870 function Effects 0.000 description 8
- 238000004458 analytical method Methods 0.000 description 4
- 230000002159 abnormal effect Effects 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 235000006719 Cassia obtusifolia Nutrition 0.000 description 2
- 235000014552 Cassia tora Nutrition 0.000 description 2
- 244000201986 Cassia tora Species 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 201000004569 Blindness Diseases 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 230000004807 localization Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000002688 persistence Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 230000002195 synergetic effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000017105 transposition Effects 0.000 description 1
Classifications
-
- H02J13/0006—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00007—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00007—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
- H02J13/00009—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission using pulsed signals
-
- H02J13/0013—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/121—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Human Computer Interaction (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510900326.4A CN105515186B (zh) | 2011-10-28 | 2011-10-28 | 一种远程管控系统的工作方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510900326.4A CN105515186B (zh) | 2011-10-28 | 2011-10-28 | 一种远程管控系统的工作方法 |
CN201110332686.0A CN102361354B (zh) | 2011-10-28 | 2011-10-28 | 无人值班变电站自动化系统的远程集约化管控系统 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110332686.0A Division CN102361354B (zh) | 2011-10-28 | 2011-10-28 | 无人值班变电站自动化系统的远程集约化管控系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105515186A true CN105515186A (zh) | 2016-04-20 |
CN105515186B CN105515186B (zh) | 2018-11-02 |
Family
ID=45586619
Family Applications (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110332686.0A Active CN102361354B (zh) | 2011-10-28 | 2011-10-28 | 无人值班变电站自动化系统的远程集约化管控系统 |
CN201510901438.1A Active CN105429298B (zh) | 2011-10-28 | 2011-10-28 | 远程管控系统的工作方法 |
CN201510901548.8A Active CN105429299B (zh) | 2011-10-28 | 2011-10-28 | 无人值班变电站自动化系统的远程管控系统的工作方法 |
CN201510901439.6A Active CN105553097B (zh) | 2011-10-28 | 2011-10-28 | 一种无人值班变电站自动化系统的远程管控系统的工作方法 |
CN201510900327.9A Active CN105515187B (zh) | 2011-10-28 | 2011-10-28 | 变电站自动化系统的远程管控系统的工作方法 |
CN201510900326.4A Active CN105515186B (zh) | 2011-10-28 | 2011-10-28 | 一种远程管控系统的工作方法 |
Family Applications Before (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110332686.0A Active CN102361354B (zh) | 2011-10-28 | 2011-10-28 | 无人值班变电站自动化系统的远程集约化管控系统 |
CN201510901438.1A Active CN105429298B (zh) | 2011-10-28 | 2011-10-28 | 远程管控系统的工作方法 |
CN201510901548.8A Active CN105429299B (zh) | 2011-10-28 | 2011-10-28 | 无人值班变电站自动化系统的远程管控系统的工作方法 |
CN201510901439.6A Active CN105553097B (zh) | 2011-10-28 | 2011-10-28 | 一种无人值班变电站自动化系统的远程管控系统的工作方法 |
CN201510900327.9A Active CN105515187B (zh) | 2011-10-28 | 2011-10-28 | 变电站自动化系统的远程管控系统的工作方法 |
Country Status (1)
Country | Link |
---|---|
CN (6) | CN102361354B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108767851A (zh) * | 2018-06-14 | 2018-11-06 | 深圳供电局有限公司 | 一种变电站运维智能作业指挥方法及系统 |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105356597B (zh) * | 2011-10-28 | 2018-11-23 | 国网江苏省电力有限公司常州供电分公司 | 无人值班变电站的集约化管控系统 |
CN103227811A (zh) * | 2012-12-27 | 2013-07-31 | 富阳市供电局 | 电力作业现场管控系统的外网服务端管控方法 |
CN104320467A (zh) * | 2014-10-29 | 2015-01-28 | 国家电网公司 | 基于远程虚拟终端的变电站访问系统 |
CN104377817A (zh) * | 2014-11-11 | 2015-02-25 | 国家电网公司 | 变电站运维一体化现场工作信息采集系统 |
CN105810274A (zh) * | 2014-12-31 | 2016-07-27 | 国核电站运行服务技术有限公司 | 一种用于核电设备供电的远程控制系统 |
CN107547639B (zh) * | 2017-08-24 | 2020-07-28 | 江苏北泰电气设备有限公司 | 配电房集中运维托管系统 |
CN109428397A (zh) * | 2017-08-25 | 2019-03-05 | 上海置信电气股份有限公司 | 一种营配一体化智能台区 |
CN107703858A (zh) * | 2017-11-08 | 2018-02-16 | 苏州林华通信科技有限公司 | 通信机房监控系统 |
CN109376509A (zh) * | 2018-10-25 | 2019-02-22 | 上海哥瑞利软件有限公司 | 一种kvm任务自动派发系统以及自动派发方法 |
CN109698554A (zh) * | 2019-01-03 | 2019-04-30 | 国网山东省电力公司平邑县供电公司 | 变电站设备调度监控系统及方法 |
CN109802490A (zh) * | 2019-02-21 | 2019-05-24 | 国网山东省电力公司临沂供电公司 | 一种变电站带电运检智能化平台 |
CN110530419A (zh) * | 2019-07-03 | 2019-12-03 | 上海电器科学研究所(集团)有限公司 | 一种无人值守下的综合管廊自控设备管理系统 |
CN110531690A (zh) * | 2019-08-27 | 2019-12-03 | 南瑞集团有限公司 | 一种无人值班变电站远程消防集中监控系统 |
CN111061989A (zh) * | 2019-12-19 | 2020-04-24 | 国网江西省电力有限公司 | 一种配电网继电保护装置综合评价系统及方法 |
CN113140975B (zh) * | 2020-01-18 | 2023-03-17 | 南京榕树自动化系统有限公司 | 一种变配电站智能巡视系统及方法 |
CN111369230A (zh) * | 2020-04-07 | 2020-07-03 | 国家电网有限公司 | 变电站自动化设备定值一键管控系统 |
CN112186899B (zh) * | 2020-09-27 | 2022-11-18 | 国网山东省电力公司青州市供电公司 | 一种环网柜主动巡检系统及方法 |
CN116090494A (zh) * | 2023-04-10 | 2023-05-09 | 中铁电气化勘测设计研究院有限公司 | 一种融合ar码状态识别的供电设备展示系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006014492A (ja) * | 2004-06-25 | 2006-01-12 | Hitachi Ltd | 電力系統監視制御システム及び情報管理方法 |
CN200950557Y (zh) * | 2006-09-18 | 2007-09-19 | 中国南方电网有限责任公司超高压输电公司 | 500kV变电站无人值班远程监控系统 |
CN102194262A (zh) * | 2011-03-21 | 2011-09-21 | 安徽省电力公司阜阳供电公司 | 变电站智能巡检系统及巡视方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2305355C1 (ru) * | 2006-05-02 | 2007-08-27 | Федеральное государственное образовательное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) | Способ контроля успешного срабатывания выключателя пункта автоматического включения резерва в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции |
CN101562600A (zh) * | 2008-04-18 | 2009-10-21 | 东莞市腾华电子技术有限公司 | 基于特征码的电力自动化通讯规约自适应方法 |
CN101329564B (zh) * | 2008-07-25 | 2010-06-30 | 北京劲源信科技有限公司 | 一种机房管理系统 |
CN201837026U (zh) * | 2010-09-30 | 2011-05-18 | 江苏省电力公司江阴市供电公司 | 调度自动化系统远程控制机房温度装置 |
CN105356597B (zh) * | 2011-10-28 | 2018-11-23 | 国网江苏省电力有限公司常州供电分公司 | 无人值班变电站的集约化管控系统 |
-
2011
- 2011-10-28 CN CN201110332686.0A patent/CN102361354B/zh active Active
- 2011-10-28 CN CN201510901438.1A patent/CN105429298B/zh active Active
- 2011-10-28 CN CN201510901548.8A patent/CN105429299B/zh active Active
- 2011-10-28 CN CN201510901439.6A patent/CN105553097B/zh active Active
- 2011-10-28 CN CN201510900327.9A patent/CN105515187B/zh active Active
- 2011-10-28 CN CN201510900326.4A patent/CN105515186B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006014492A (ja) * | 2004-06-25 | 2006-01-12 | Hitachi Ltd | 電力系統監視制御システム及び情報管理方法 |
CN200950557Y (zh) * | 2006-09-18 | 2007-09-19 | 中国南方电网有限责任公司超高压输电公司 | 500kV变电站无人值班远程监控系统 |
CN102194262A (zh) * | 2011-03-21 | 2011-09-21 | 安徽省电力公司阜阳供电公司 | 变电站智能巡检系统及巡视方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108767851A (zh) * | 2018-06-14 | 2018-11-06 | 深圳供电局有限公司 | 一种变电站运维智能作业指挥方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN105515187B (zh) | 2018-11-23 |
CN105515187A (zh) | 2016-04-20 |
CN105429298A (zh) | 2016-03-23 |
CN102361354B (zh) | 2015-12-16 |
CN105429298B (zh) | 2019-01-08 |
CN105553097A (zh) | 2016-05-04 |
CN105429299A (zh) | 2016-03-23 |
CN102361354A (zh) | 2012-02-22 |
CN105553097B (zh) | 2018-11-23 |
CN105515186B (zh) | 2018-11-02 |
CN105429299B (zh) | 2018-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102361354B (zh) | 无人值班变电站自动化系统的远程集约化管控系统 | |
CN101329564B (zh) | 一种机房管理系统 | |
CN102023627B (zh) | 高压子模块试验监控系统 | |
CN102403796B (zh) | 无人值班变电站的集约化管控系统的规约自适应接入方法 | |
CN109918936A (zh) | 基于b/s架构的分布式配电网运维方法和系统 | |
Wu et al. | Enterprise Digital Intelligent Remote Control System Based on Industrial Internet of Things | |
CN111047143A (zh) | 一种基于电网oms的地、县班组指标管理系统 | |
CN111741089B (zh) | 一种基于工业物联网的智能安全操作管控系统及方法 | |
Zhang et al. | Research on operation mechanism, information collection and compliance model of hydropower monitoring system | |
Ivanković et al. | SCADA maintenance and refurbishment with security issue in modern IT and OT environment | |
Xiangqian et al. | Model design for big data clustering analysis of power dispatch automation system based on cloud computing platform | |
CN113949533A (zh) | 一种调度数据网络离线审计平台 | |
CN105023125A (zh) | 一种分布式电站数据管理的方法及系统 | |
Yongzhao et al. | Design and Research of Distribution Network Intelligent Gateway and Visual Monitoring Platform Based on Power Internet of Things | |
Sun et al. | Research on the architecture of modern radar support information management system | |
Özçelik et al. | Testbed Infrastructure Proposal (Center Energy) for Electricity Power Grid and Defence in Depth Practice on The Proposal | |
Wenhuan et al. | Relay protection service support platform architecture and data flow based on big data technology | |
CN112350891A (zh) | 一种基于一键顺控的变电站远程网络测试系统及控制方法 | |
Tian | Study on the Application of Microcomputer Remote Control Technology in Unattended Substation | |
CN117477779A (zh) | 一种变电站监控系统的多业务组态配置器及配置方法 | |
CN117277204A (zh) | 一种智能录波器远方不停电传动建模方法 | |
Cheng et al. | The Research on Production Operation Risk Management of the Power Supply Enterprises | |
Hou et al. | Development strategy of grid security and reliability in the new period | |
Dong et al. | The research on safe reliability of remote control system of relay protection device | |
Hu et al. | An application framework design of Smart Grid IT integrated dispatching operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No. 27, front street, Changzhou Municipal Bureau, Jiangsu Province, Jiangsu Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. CHANGZHOU POWER SUPPLY BRANCH Applicant after: JIANGSU FANGTIAN POWER TECHNOLOGY Co.,Ltd. Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. Applicant after: State Grid Corporation of China Address before: No. 27, front street, Changzhou Municipal Bureau, Jiangsu Province, Jiangsu Applicant before: STATE GRID CHANG ZHOU CURRENT SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co. Applicant before: JIANGSU FANGTIAN POWER TECHNOLOGY Co.,Ltd. Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant before: State Grid Corporation of China Address after: No. 27, front street, Changzhou Municipal Bureau, Jiangsu Province, Jiangsu Applicant after: STATE GRID CHANG ZHOU CURRENT SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co. Applicant after: JIANGSU FANGTIAN POWER TECHNOLOGY Co.,Ltd. Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant after: State Grid Corporation of China Address before: No. 27, Tianning District Bureau, front street, Changzhou, Jiangsu Province Applicant before: CHANG ZHOU CURRENT SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co. Applicant before: JIANGSU FANGTIAN POWER TECHNOLOGY Co.,Ltd. Applicant before: JIANGSU ELECTRIC POWER Co. Applicant before: State Grid Corporation of China |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Jianming Inventor after: Dong Zuchen Inventor after: Ni Qian Inventor after: Cao Liang Inventor after: Cao Danyi Inventor before: Dong Zuchen |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Jianming Inventor after: Dong Zuchen Inventor after: Ni Jing Inventor after: Cao Liang Inventor after: Cao Danyi Inventor before: Xu Jianming Inventor before: Dong Zuchen Inventor before: Ni Qian Inventor before: Cao Liang Inventor before: Cao Danyi |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |