CN105508814B - Prefabricated direct-buried jet chimney nano heat-insulating fixing bracket - Google Patents
Prefabricated direct-buried jet chimney nano heat-insulating fixing bracket Download PDFInfo
- Publication number
- CN105508814B CN105508814B CN201610099102.2A CN201610099102A CN105508814B CN 105508814 B CN105508814 B CN 105508814B CN 201610099102 A CN201610099102 A CN 201610099102A CN 105508814 B CN105508814 B CN 105508814B
- Authority
- CN
- China
- Prior art keywords
- outer tube
- layer
- heat
- outside
- core pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L59/00—Thermal insulation in general
- F16L59/12—Arrangements for supporting insulation from the wall or body insulated, e.g. by means of spacers between pipe and heat-insulating material; Arrangements specially adapted for supporting insulated bodies
- F16L59/135—Hangers or supports specially adapted for insulated pipes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Thermal Insulation (AREA)
Abstract
The present invention relates to a kind of prefabricated direct-buried jet chimney nano heat-insulating fixing brackets, including the first layer outer tube being sheathed in core pipe and the second layer outer tube being sheathed on the outside of first layer outer tube, it is characterized in that:The first layer outer tube is formed by connecting by outer tube on the inside of outer tube on the outside of the first layer at both ends and intermediate first layer, is located at outer tube on the outside of the first layer at both ends and is connect respectively by the first concentric reducer with second layer outer tube;The second concentric reducer is connected in the core pipe, the second concentric reducer connects outer tube on the inside of core pipe and first layer;Inner side baffle is welded between outer tube and the second concentric reducer on the inside of the first layer, the outer side shield of welding on outer tube, is arranged heat-barrier material between inner side baffle and outer side shield on the outside of the first layer.The present invention solves the problems, such as the support bracket fastened heat bridge of conventional direct-buried steam pipeline, in equilibrium vapor pipe network while pipeline heat expansion stress, effectively reduces the generation of heat bridge.
Description
Technical field
The present invention relates to a kind of heat-insulated fixing bracket of direct-buried steam pipeline, especially a kind of prefabricated direct-buried jet chimney is received
The heat-insulated fixing bracket of rice.
Background technology
Currently, direct-buried steam pipeline fixing bracket mostly uses the structure that core pipe is directly connected to the effective concentric reducer of set, heat
It can directly spread out of, increase pipe network heat waste, destroy the outer anti-corrosion of pipeline, the heat pair for reducing the service life of pipe network, and shedding
Surrounding vegetation causes detrimental effects, so generally requiring buried, increases earth excavation and construction period.
Invention content
The purpose of the present invention is overcoming the deficiencies in the prior art, provide a kind of prefabricated direct-buried jet chimney nanometer every
Thermosetting fixed rack solves the problems, such as the support bracket fastened heat bridge of conventional direct-buried steam pipeline, the pipeline heat expansion in equilibrium vapor pipe network
While stress, the generation of heat bridge is effectively reduced.
According to technical solution provided by the invention, the prefabricated direct-buried jet chimney nano heat-insulating fixing bracket, including set
First layer outer tube in core pipe and the second layer outer tube being sheathed on the outside of first layer outer tube, it is characterized in that:It is described
First layer outer tube is formed by connecting by outer tube on the inside of outer tube on the outside of the first layer at both ends and intermediate first layer, is located at both ends
First layer on the outside of outer tube connect respectively by the first concentric reducer with second layer outer tube;It is connected in the core pipe second largest
Microcephaly, the second concentric reducer connect outer tube on the inside of core pipe and first layer;Outer tube and the second concentric reducer on the inside of the first layer
Between weld inner side baffle, the outer side shield of welding on outer tube, is arranged between inner side baffle and outer side shield on the outside of the first layer
Heat-barrier material.
Further, nanometer cotton is filled between the first layer outer tube and core pipe.
Further, nanometer cotton is filled between magnetic tube outside the first layer outer tube and the second layer.
Further, the heat-barrier material uses 2 layers of asbestos board and 3 layers of nanometer cotton.
Further, the inner side baffle and outer side shield are annular shape.
Further, the internal diameter of the annulus is more than the outer diameter of core pipe, is less than the outer diameter of first layer outer tube;Outside annulus
Diameter is more than the outer diameter of first layer outer tube, is less than the outer diameter of second layer outer tube.
Further, reinforced using side of body plate between the outer side shield and first layer outer tube.
It is solid to solve conventional direct-buried steam pipeline for prefabricated direct-buried jet chimney nano heat-insulating fixing bracket of the present invention
The heat bridge problem of fixed rack effectively reduces the generation of heat bridge in equilibrium vapor pipe network while pipeline heat expansion stress.
Description of the drawings
Fig. 1 is the prefabricated direct-buried support bracket fastened structural schematic diagram of jet chimney nano heat-insulating of the present invention.
Specific implementation mode
With reference to specific attached drawing, the invention will be further described.
As shown in Figure 1:The prefabricated direct-buried jet chimney nano heat-insulating fixing bracket includes core pipe 1, outer on the outside of first layer
Casing 2, the first concentric reducer 3, outer side shield 4, second layer outer tube 5, heat-barrier material 6, inner side baffle 7, first layer inside housing
Pipe 8, second concentric reducer 9 etc..
As shown in Figure 1, prefabricated direct-buried jet chimney nano heat-insulating fixing bracket of the present invention, including it is sheathed on core pipe 1
On first layer outer tube and the second layer outer tube 5 that is sheathed on the outside of first layer outer tube, first layer outer tube is by both ends
Outer tube 2 and intermediate first layer inside outer tube 8 are formed by connecting on the outside of first layer, are located at outer tube on the outside of the first layer at both ends
2 are connect by the first concentric reducer 3 respectively with second layer outer tube 5;The second concentric reducer 9, the second size are connected in the core pipe 1
Outer tube 8 on the inside of first 9 connection core pipe 1 and first layer;It is welded between outer tube 8 and the second concentric reducer 9 on the inside of the first layer
Inner side baffle 7, the outer side shield 4 of welding on outer tube 2, is arranged heat-insulated between inner side baffle 4 and outer side shield 7 on the outside of the first layer
Material 6;The second layer outer tube 5 is stepping up the heat-barrier material 6 between outer side shield 4 and inner side baffle 7.
Nanometer cotton, the magnetic tube 5 outside first layer outer tube and the second layer are filled between the first layer outer tube and core pipe 1
Between fill nanometer cotton.
The heat-barrier material 6 uses 2 layers of asbestos board and 3 layers of nanometer cotton.
The inner side baffle 7 and outer side shield 4 are annular shape, and the internal diameter of annulus is more than the outer diameter of core pipe 1, is less than first
The outer diameter of layer outer tube;The outer diameter of annulus is more than the outer diameter of first layer outer tube, is less than the outer diameter of second layer outer tube 5.
Reinforced using side of body plate between the outer side shield 4 and first layer outer tube.
Prefabricated direct-buried jet chimney nano heat-insulating fixing bracket of the present invention, is installed in high-temperature steam pipe network, second
Concentric reducer 9, outer tube 8 on the inside of first layer, inner side baffle 7, outer side shield 4, outer tube 2 and second layer outer tube on the outside of first layer
5 weld clamp structure ensures that at fixing bracket with first layer outer tube relative displacement does not occur for core pipe 1, has blocked pipeline
The transmission of middle heat expansion stress makes its heat expansion amount prolong compensation direction transmission, and the heat-insulated material between outer side shield 4 and inner side baffle 7
Material ensure that the heat of steam pipe network will not be transmitted to by steel construction on casing, reduce pipe network heat waste, and it is whole to promote pipe network
Service life, it is ensured that pipe network operation safety, while pipeline can reduce earth excavation with shallow embedding, pipeline upper layer vegetation will not be by
It influences.
Claims (4)
1. a kind of prefabricated direct-buried jet chimney nano heat-insulating fixing bracket, including it is sheathed on core pipe(1)On first layer outer tube
With the second layer outer tube being sheathed on the outside of first layer outer tube(5), it is characterized in that:The first layer outer tube is by the of both ends
One layer of outside outer tube(2)With outer tube on the inside of intermediate first layer(8)It is formed by connecting, is located at housing on the outside of the first layer at both ends
Pipe(2)With second layer outer tube(5)Pass through the first concentric reducer respectively(3)Connection;In the core pipe(1)The second concentric reducer of upper connection
(9), the second concentric reducer(9)Connect core pipe(1)With outer tube on the inside of first layer(8);The outer tube on the inside of the first layer(8)With
Second concentric reducer(9)Between weld inner side baffle(7), the outer tube on the outside of first layer(2)The outer side shield of upper welding(4), inside
Baffle(4)With outer side shield(7)Between heat-barrier material is set(6);The inner side baffle(7)With outer side shield(4)It is annulus
Shape;The internal diameter of the annulus is more than core pipe(1)Outer diameter, be less than first layer outer tube outer diameter;The outer diameter of annulus is more than first
The outer diameter of layer outer tube, is less than second layer outer tube(5)Outer diameter;The outer side shield(4)It is adopted between first layer outer tube
Reinforced with side of body plate.
2. prefabricated direct-buried jet chimney nano heat-insulating fixing bracket as described in claim 1, it is characterized in that:In the first layer
Outer tube and core pipe(1)Between fill nanometer cotton.
3. prefabricated direct-buried jet chimney nano heat-insulating fixing bracket as described in claim 1, it is characterized in that:In the first layer
Outer tube and second layer outer tube(5)Between fill nanometer cotton.
4. prefabricated direct-buried jet chimney nano heat-insulating fixing bracket as described in claim 1, it is characterized in that:The heat-barrier material
(6)Using 2 layers of asbestos board and 3 layers of nanometer cotton.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610099102.2A CN105508814B (en) | 2016-02-23 | 2016-02-23 | Prefabricated direct-buried jet chimney nano heat-insulating fixing bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610099102.2A CN105508814B (en) | 2016-02-23 | 2016-02-23 | Prefabricated direct-buried jet chimney nano heat-insulating fixing bracket |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105508814A CN105508814A (en) | 2016-04-20 |
CN105508814B true CN105508814B (en) | 2018-08-10 |
Family
ID=55717006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610099102.2A Active CN105508814B (en) | 2016-02-23 | 2016-02-23 | Prefabricated direct-buried jet chimney nano heat-insulating fixing bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105508814B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4852831A (en) * | 1987-09-23 | 1989-08-01 | Sandstrom Wayne R | Pipe support system |
DE19837317C1 (en) * | 1998-08-18 | 2000-01-13 | Fernwaerme Technik Gmbh | Piping system with a steel jacket pipe for underground remote heat transmission |
CN201425122Y (en) * | 2009-06-20 | 2010-03-17 | 周明刚 | Double-sleeve inner fixed support |
CN202660159U (en) * | 2012-05-30 | 2013-01-09 | 北京豪特耐管道设备有限公司 | Prefabricated directly-buried high-temperature steam pipe fixing bracket |
CN202914975U (en) * | 2012-11-28 | 2013-05-01 | 江苏德威节能有限公司 | Novel steam straight-buried pipe fixed knot |
CN103104785A (en) * | 2013-02-11 | 2013-05-15 | 中国能源建设集团山西省电力勘测设计院 | Inner fixing knot arranged on 200 DEG C direct burial heat supply pipeline and used for preventing heat bridge from transferring heat |
CN103912763A (en) * | 2014-04-18 | 2014-07-09 | 辽宁久大管业有限公司 | Reflection heat insulation based straightly-buried prefabricated heat-insulating steam tube with internal guide supports and production method of reflection heat insulation based straightly-buried prefabricated heat-insulating steam tube |
CN205560131U (en) * | 2016-02-23 | 2016-09-07 | 江苏明江机械制造有限公司 | Thermal -insulated fixed bolster of prefabricated directly -buried steam pipe nanometer |
-
2016
- 2016-02-23 CN CN201610099102.2A patent/CN105508814B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4852831A (en) * | 1987-09-23 | 1989-08-01 | Sandstrom Wayne R | Pipe support system |
DE19837317C1 (en) * | 1998-08-18 | 2000-01-13 | Fernwaerme Technik Gmbh | Piping system with a steel jacket pipe for underground remote heat transmission |
CN201425122Y (en) * | 2009-06-20 | 2010-03-17 | 周明刚 | Double-sleeve inner fixed support |
CN202660159U (en) * | 2012-05-30 | 2013-01-09 | 北京豪特耐管道设备有限公司 | Prefabricated directly-buried high-temperature steam pipe fixing bracket |
CN202914975U (en) * | 2012-11-28 | 2013-05-01 | 江苏德威节能有限公司 | Novel steam straight-buried pipe fixed knot |
CN103104785A (en) * | 2013-02-11 | 2013-05-15 | 中国能源建设集团山西省电力勘测设计院 | Inner fixing knot arranged on 200 DEG C direct burial heat supply pipeline and used for preventing heat bridge from transferring heat |
CN103912763A (en) * | 2014-04-18 | 2014-07-09 | 辽宁久大管业有限公司 | Reflection heat insulation based straightly-buried prefabricated heat-insulating steam tube with internal guide supports and production method of reflection heat insulation based straightly-buried prefabricated heat-insulating steam tube |
CN205560131U (en) * | 2016-02-23 | 2016-09-07 | 江苏明江机械制造有限公司 | Thermal -insulated fixed bolster of prefabricated directly -buried steam pipe nanometer |
Also Published As
Publication number | Publication date |
---|---|
CN105508814A (en) | 2016-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202203581U (en) | Nonmetal expansion joint | |
CN105508814B (en) | Prefabricated direct-buried jet chimney nano heat-insulating fixing bracket | |
CN109058635A (en) | Prefabricated thermal insulation bilayer bend pipe and preparation method thereof | |
CN205560131U (en) | Thermal -insulated fixed bolster of prefabricated directly -buried steam pipe nanometer | |
CN107701829A (en) | One kind slips into self-anchored type socket joint connecting tube | |
CN204785269U (en) | Vacuum insulation bellows | |
CN206268691U (en) | A kind of low energy consumption heat supply network special steam direct-burried factory pipe bend | |
CN201255291Y (en) | Combination insulating pipes for Steel coated steel prefabricated direct-burried thermal insulation pipeline | |
CN205278677U (en) | Take vacuum insulation's pipe -line system | |
CN211344463U (en) | Flexible mouthpiece and pipeline for town heating | |
CN202469378U (en) | Prefabricated directly buried steam diameter-varying flat bottom heat-insulating pipe | |
CN201382236Y (en) | Curved tube pressure balance compensator | |
CN201425122Y (en) | Double-sleeve inner fixed support | |
CN217603621U (en) | Two-way compensation expansion joint with straight-section outer protective pipe structure for direct-buried steam | |
CN110630829B (en) | Assembly type oil-gas multiphase conveying flat cavity intelligent heat insulation pipeline structure and construction method | |
CN206592659U (en) | Wall water stop device for wall-passing well | |
CN211779693U (en) | Heat-insulation type direct-buried steam pipeline fixing support | |
CN201259025Y (en) | Sealing device for buried pipe protection well | |
CN206656063U (en) | A kind of powder material is blown transmission pipeline component | |
CN216447571U (en) | High-temperature-resistant insulating ppr pipe | |
CN110630825B (en) | Oil-gas multiphase flow multi-cavity intelligent heat-insulation pipeline structure and construction method | |
CN210716343U (en) | High-strength pressure pipeline | |
CN203421310U (en) | Heating pipe mechanism capable of preventing stand column from thermal expansion displacement | |
CN208651969U (en) | A kind of jacketed type direct-buried thermal insulation pipe fixed knot | |
CN204083515U (en) | A kind of high/low temperature pipeline extension bearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Prefabricated nano thermal insulation fixed support for directly buried steam pipeline Effective date of registration: 20200821 Granted publication date: 20180810 Pledgee: Wuxi Xishan sub branch of Bank of China Ltd. Pledgor: JIANGSU MINGJIANG MACHINERY MANUFACTURING Co.,Ltd. Registration number: Y2020320010124 |