CN105499879A - Fixture used for carrying out quick welding on heat collector tube support - Google Patents
Fixture used for carrying out quick welding on heat collector tube support Download PDFInfo
- Publication number
- CN105499879A CN105499879A CN201610004321.8A CN201610004321A CN105499879A CN 105499879 A CN105499879 A CN 105499879A CN 201610004321 A CN201610004321 A CN 201610004321A CN 105499879 A CN105499879 A CN 105499879A
- Authority
- CN
- China
- Prior art keywords
- collector tube
- carrying
- heat collector
- tube support
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K2101/00—Articles made by soldering, welding or cutting
- B23K2101/24—Frameworks
Abstract
The invention discloses a fixture used for carrying out quick welding on a heat collector tube support. The fixture used for carrying out quick welding on the heat collector tube support comprises a body, wherein a baffle plate is vertically arranged on one end of the upper surface of the body, and two mounting holes are formed in the baffle plate; three supporting columns distributed at equal distances are vertically arranged at the other end of the upper surface of the body; one fixing bar is arranged at each of the two ends of the upper surface of the body, and each fixing bar is composed of two vertical plates which are arranged in parallel; and three inclined bar are arranged at the middle part of the body at equal distances, and each inclined bar is composed of two inclined plates which are arranged in parallel. The fixture disclosed by the invention can realize quick welding on the heat collector tube support, does not need to be calibrated and can carry out direct welding forming, so that yield and production efficiency are greatly improved.
Description
Technical field
The present invention relates to a kind of fixture for carrying out rapid welding to collector tube holder, be specifically related to a kind of fixture for carrying out rapid welding to groove type solar collector tube holder.
Background technology
Groove type solar collector tube holder as shown in Figure 1, it is surrounded by four frames 1, one of them frame 1 is provided with two screws 2, end is provided with fixed block 3, fixed block 3 is provided with position, hole 4, and middle part is provided with bearing diagonal 5, needs to calibrate one by one during welding, not only easily there is welding mistake, and waste production efficiency.
Summary of the invention
For existing issue, the invention discloses a kind of fixture for carrying out rapid welding to collector tube holder, the rapid welding of collector tube holder can be realized, and do not need calibration, can direct welding fabrication, substantially increase product percent of pass and production efficiency.
Technical scheme of the present invention is as follows:
For carrying out a fixture for rapid welding to collector tube holder, comprise a body, upper surface one end of described body is vertically provided with a baffle plate, and this baffle plate is provided with two installing holes; The upper surface other end of described body is vertically provided with three support columns be equally spaced; Described body upper surface two is respectively provided with a fixed hurdle, and each fixed hurdle is by two the vertical plate compositions be arranged in parallel; The middle part of described body is provided with and is equidistantly provided with three oblique hurdles, and described oblique hurdle is made up of two swash plates be arranged in parallel.
The invention discloses a kind of fixture for carrying out rapid welding to collector tube holder, the rapid welding of collector tube holder can be realized, and do not need calibration, can direct welding fabrication, substantially increase product percent of pass and production efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described.
Fig. 1 is the structural representation of collector tube holder in prior art;
Fig. 2 is the scheme of installation of the fixture for carrying out rapid welding to collector tube holder provided by the present invention.
Numeral in figure:
1, frame 2, screw 3, fixed block 4, position, hole 5, bearing diagonal 6, body 7, baffle plate 8, installing hole 9, support column 10, vertical plate 11, swash plate.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described.
Shown in Fig. 2, a kind of fixture for carrying out rapid welding to collector tube holder, comprises a body 6, and upper surface one end of described body 6 is vertically provided with a baffle plate 7, and this baffle plate 7 is provided with two installing holes 8; The upper surface other end of described body 6 is vertically provided with three support columns be equally spaced 9; Described body 6 upper surface two is respectively provided with a fixed hurdle, and each fixed hurdle forms by two vertical plates 10 be arranged in parallel; The middle part of described body 6 is provided with and is equidistantly provided with three oblique hurdles, and each described oblique hurdle is made up of two swash plates 11 be arranged in parallel.
During enforcement: see figures.1.and.2, collector tube holder entirety is placed on body 6, and the top frame 1 of support withstands baffle plate 7, installing hole 8 is offered in position with reference to screw 2, the frame 1 of both sides snaps in fixed hurdle respectively, and the bearing diagonal 5 at middle part is placed in oblique hurdle, and position, hole 4 is offered in the position with reference to support column 9; This fixture can carry out quick position welding to support, and does not need calibration, can direct welding fabrication, substantially increases product percent of pass and production efficiency.
To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.
Claims (1)
1. for carrying out a fixture for rapid welding to collector tube holder, it is characterized in that, comprise a body, upper surface one end of described body is vertically provided with a baffle plate, and this baffle plate is provided with two installing holes; The upper surface other end of described body is vertically provided with three support columns be equally spaced; Described body upper surface two is respectively provided with a fixed hurdle, and each fixed hurdle is by two the vertical plate compositions be arranged in parallel; The middle part of described body is provided with and is equidistantly provided with three oblique hurdles, and each described oblique hurdle is made up of two swash plates be arranged in parallel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610004321.8A CN105499879A (en) | 2016-01-06 | 2016-01-06 | Fixture used for carrying out quick welding on heat collector tube support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610004321.8A CN105499879A (en) | 2016-01-06 | 2016-01-06 | Fixture used for carrying out quick welding on heat collector tube support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105499879A true CN105499879A (en) | 2016-04-20 |
Family
ID=55708379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610004321.8A Pending CN105499879A (en) | 2016-01-06 | 2016-01-06 | Fixture used for carrying out quick welding on heat collector tube support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105499879A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201792147U (en) * | 2010-09-20 | 2011-04-13 | 浙江师范大学 | Clamping device for welding front triangular frame of bicycle |
CN102380735A (en) * | 2011-11-01 | 2012-03-21 | 郑州宇通客车股份有限公司 | Welding clamping fixture for midpiece of monocoque bus frame |
KR20120007320U (en) * | 2011-04-15 | 2012-10-24 | 현대중공업 주식회사 | Evenness jig for car deck |
CN203779045U (en) * | 2014-04-25 | 2014-08-20 | 成都博昱新能源有限公司 | Heat collection pipe bracket tool mechanism |
CN203791895U (en) * | 2014-04-11 | 2014-08-27 | 南京雷尔伟新技术有限公司 | Assembly welding tooling for headwall |
CN104028931A (en) * | 2014-05-22 | 2014-09-10 | 苏州卓诚钛设备有限公司 | Folded support welding jig |
CN104476055A (en) * | 2014-09-28 | 2015-04-01 | 南通振华重型装备制造有限公司 | Pile leg manufacturing method for *-shaped supporting pipe |
CN205290229U (en) * | 2016-01-06 | 2016-06-08 | 江苏京展能源科技有限公司 | A anchor clamps for being directed at heat collection tube bracket carries out faster welding |
-
2016
- 2016-01-06 CN CN201610004321.8A patent/CN105499879A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201792147U (en) * | 2010-09-20 | 2011-04-13 | 浙江师范大学 | Clamping device for welding front triangular frame of bicycle |
KR20120007320U (en) * | 2011-04-15 | 2012-10-24 | 현대중공업 주식회사 | Evenness jig for car deck |
CN102380735A (en) * | 2011-11-01 | 2012-03-21 | 郑州宇通客车股份有限公司 | Welding clamping fixture for midpiece of monocoque bus frame |
CN203791895U (en) * | 2014-04-11 | 2014-08-27 | 南京雷尔伟新技术有限公司 | Assembly welding tooling for headwall |
CN203779045U (en) * | 2014-04-25 | 2014-08-20 | 成都博昱新能源有限公司 | Heat collection pipe bracket tool mechanism |
CN104028931A (en) * | 2014-05-22 | 2014-09-10 | 苏州卓诚钛设备有限公司 | Folded support welding jig |
CN104476055A (en) * | 2014-09-28 | 2015-04-01 | 南通振华重型装备制造有限公司 | Pile leg manufacturing method for *-shaped supporting pipe |
CN205290229U (en) * | 2016-01-06 | 2016-06-08 | 江苏京展能源科技有限公司 | A anchor clamps for being directed at heat collection tube bracket carries out faster welding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20140215734A1 (en) | Clamping device and washing device using same | |
WO2016084242A1 (en) | Holding frame, solar cell module, and solar cell system | |
CN103950683A (en) | Conveyor belt with lifting structure | |
CN104384785B (en) | A kind of assembling installation method of express delivery cabinet | |
CN105499879A (en) | Fixture used for carrying out quick welding on heat collector tube support | |
CN205290229U (en) | A anchor clamps for being directed at heat collection tube bracket carries out faster welding | |
CN103906396A (en) | Equipment cabinet | |
CN203895783U (en) | Assembled control cabinet | |
CN102691985B (en) | Rubber frame and liquid crystal display | |
CN203863255U (en) | Optical module PCB welding clamp | |
JP2015177682A (en) | Solar panel installation tool and solar panel installation structure | |
CN103939673A (en) | Blocking plate type fixed heat-insulated pipe support | |
CN210689679U (en) | A general test fixture for on test machine | |
CN103612057A (en) | Dust remover support tooling platform | |
CN102241184A (en) | Screen print jig | |
CN202242950U (en) | Radiator supporting frame | |
CN210435714U (en) | Machine tool base convenient to use | |
CN203701714U (en) | Fast plug-in type construction retaining wall | |
CN205335780U (en) | Simple and easy support of dismouting | |
CN105007029A (en) | Solar energy bracket | |
CN202335118U (en) | Electric control cabinet of steel wire winding machine | |
CN102480903A (en) | Cooling device and electronic device with cooling device | |
CN203180453U (en) | A horizontal support fitting for rectangular bus-bars | |
CN103541469A (en) | Sectional material of building curtain wall | |
CN203804837U (en) | Manufacturing assisting device for membrane water-cooling wall of gasifier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160420 |
|
RJ01 | Rejection of invention patent application after publication |