CN105492396A - Method and apparatus for separating a glass sheet from a moving ribbon of glass - Google Patents

Method and apparatus for separating a glass sheet from a moving ribbon of glass Download PDF

Info

Publication number
CN105492396A
CN105492396A CN201480046865.XA CN201480046865A CN105492396A CN 105492396 A CN105492396 A CN 105492396A CN 201480046865 A CN201480046865 A CN 201480046865A CN 105492396 A CN105492396 A CN 105492396A
Authority
CN
China
Prior art keywords
glass ribbon
glass
along
tripping device
ribbon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201480046865.XA
Other languages
Chinese (zh)
Other versions
CN105492396B (en
Inventor
J·C·麦克雷里
D·G·萨科纳
L·王
N·周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Corning Inc
Original Assignee
Corning Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Corning Inc filed Critical Corning Inc
Publication of CN105492396A publication Critical patent/CN105492396A/en
Application granted granted Critical
Publication of CN105492396B publication Critical patent/CN105492396B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B33/00Severing cooled glass
    • C03B33/02Cutting or splitting sheet glass or ribbons; Apparatus or machines therefor
    • C03B33/0215Cutting or splitting sheet glass or ribbons; Apparatus or machines therefor the ribbon being in a substantially vertical plane
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2249/00Aspects relating to conveying systems for the manufacture of fragile sheets
    • B65G2249/04Arrangements of vacuum systems or suction cups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G49/00Conveying systems characterised by their application for specified purposes not otherwise provided for
    • B65G49/05Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles
    • B65G49/06Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles for fragile sheets, e.g. glass
    • B65G49/067Sheet handling, means, e.g. manipulators, devices for turning or tilting sheet glass
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B33/00Severing cooled glass
    • C03B33/02Cutting or splitting sheet glass or ribbons; Apparatus or machines therefor
    • C03B33/023Cutting or splitting sheet glass or ribbons; Apparatus or machines therefor the sheet or ribbon being in a horizontal position
    • C03B33/033Apparatus for opening score lines in glass sheets

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)

Abstract

A method of separating a glass sheet from a moving glass ribbon comprising engaging the moving glass ribbon with a traveling anvil machine comprising a separation device. The separation device applies a tension in a lateral (width-wise) direction and in a longitudinal direction (length-wise) relative to the glass ribbon, and a scoring device scores the glass ribbon across at least a portion of the width of the glass ribbon after the lateral and longitudinal tensioning. The separator device then applies a bending moment to the scored glass ribbon that causes the glass ribbon to separate along the score, thereby producing a glass sheet. The separator device reorients the glass sheet and transfers the glass sheet to a robot that conveys the glass sheet to a downstream process.

Description

From the method and apparatus of moving glass ribbon separation of glasses plate
Right of priority
The benefit of priority of U.S. Provisional Application Ser that the application requires on June 25th, 2013 to submit to according to 35U.S.C. § 119 number the 61/839106th, and by reference its content whole is incorporated into this based on its content.
Background
Field
The present invention relates in general to the equipment and method that manufacture sheet glass, and specifically from the method for the glass ribbon separation of glasses plate of continuous moving.
Technical background
The recent trend of liquid-crystal display (LCD) glass business is gradually towards wider and thinner sheet glass (such as mean thickness is less than the sheet glass of about 0.5mm).Several years ago, sheet glass, the typical thickness such as the glass of Flat Panel Display Industry is on average about 0.7mm.The commercial successful method of one for the production of high quality glass sheet is by fusion downdraw technique, wherein forms glass ribbon by making molten glass flow overmolded body, then cuts each sheet glass from the continuous moving glass ribbon formed from it.This processing requirement glass ribbon presents rigidity to a certain degree.Along with width and the thickness reduction of glass ribbon, glass ribbon rigidity can significantly decline.Along with glass ribbon Stiffness, the processing parameter bottom forming technology and draw area narrows.This causes the process disturbance frequency of drawing stability and the increase reduced.Such as, during drawing process, glass ribbon presents the curvature of crossing over bandwidth (transverse to draw direction) usually.This curvature increases band rigidity.But consistent processing requirement curvature is consistent (such as, curvature keeps directed along consistent direction) also.The rigidity that the glass ribbon that the other factors reduced due to such as thickness causes reduces can cause the reverse of curvature direction, sometimes suddenly oppositely, disturbs moulding process thus.Due to the uncontrollable cracking that another fault that tape thickness reduces and/or bandwidth increase can occur is glass ribbon, such as, during cutting technique.
Ribbon thickness reduces, and adds that flow increases, produces more sheet glass or square feet.Fusion draw machine (FDM) is with faster speed conveying glass ribbon, this means the device related to when delineating glass ribbon, anvil machine (TAM) of advancing must more to delineate sheet glass, and must be followed the tracks of glass ribbon and transmit sheet glass with more rapid rate for carrying out the robot tool that is separated by Rapid Circulation.
The demand of thin glass plate is continued to increase, and in order to utilize drawing device completely, has increased to keep synchronous by the flow of the melten glass of producing apparatus.So, also significantly reduce for the allowed cycling time of plate partitioning cycle.But, be subject to the restriction how soon sheet glass can be separated the vertical space (highly) occurred with separating technology cycling time.Current device is about to reach design limit, makes the further minimizing of partitioning cycle time can produce unstable drawing process.The speed increasing continuously equipment can adversely affect glass cutting technology stability and equipment life.
Summary of the invention
The disclosure relates to advance bottom drawing machine by increasing mechanism and control to the carriage assemblies part of advancing of anvil machine of advancing anvil machine and automation effect and to reduce cycling time, and does not sacrifice process stability.These increases transfer to from automation anvil machine of advancing with the function of separation of glasses plate by bending from continuous molding glass ribbon at score line place.Therefore, the multiaxis automation usually performing these tasks can be exempted these tasks and only be used as material handling device so that the sheet glass of separation is delivered to downstream process station.This task transfers can reduce the overall partitioning cycle time, because the bending of glass ribbon can be performed by anvil machine of advancing before first front glass panel is sent to downstream process at automation with being separated of glass ribbon with sheet glass.Therefore total score that automation must spend in anvil machine position of the advancing part (such as reducing from about 20% to about 50% in some cases) from cycling time can be reduced.In addition, along with new glass panel products thins down, glass ribbon linear speed by increase and the partitioning cycle time can reduce.The separation of current glass plate is carried out in automation circulation and the time needed for materials handling function limit production speed also can may cause not good enough sepn process.Separating device as herein described and method is adopted to can be used for reducing the overall partitioning cycle time and the process speed adapting to increase.In other side, adopt separating device as herein described and method can improve sepn process stability, especially for thin glass plate (being such as equal to or less than the glass ribbon of about 0.3mm for thickness), improvement is: change a) eliminating the tracking speed between the airborne frame component of anvil and flex apart device of advancing, b) rotation bending axis is aimed at score line high degree of mechanical thus off-axis can not be occurred bend, c) two axis providing controlled level plate to move, d) larger process optimization is provided by using the controlled rotation plate of two axis to move, wherein the independent separating arm rotated can be used for giving the torsion in glass ribbon and/or spacer plate, e) automation can not be interrupted automatically to be separated and break process, f) the automation design limit based on automation weight limits or the restriction of automation gap is eliminated, the accurate downward force independent of bending angle and automation weight is provided to control thus, g) can before delineation by symmetrical glass ribbon side tensioning to flatten glass ribbon and can not reversing, h) the partitioning cycle time is significantly reduced by eliminating automation to follow the tracks of the needs of glass ribbon motion, and i) allow suction cup and head are aimed at by common plant instead of coordinate more than one piece apparatus.In a word, the function be separated as anvil machine of advancing of sheet glass and moving glass ribbon eliminate that automation is followed the tracks of as glass ribbon, sidepiece tensioning, downward force and plate benging tripping device.Automation becomes sheet glass means of conveyance so that separation of glasses plate is sent to downstream conveyor to shorten cycling time from drawing bottom section.Sheet glass is separated the function as anvil machine plate tripping device of advancing with moving glass ribbon, sheet glass separating technology can be integrated with servo driving nose piece.Automation the separation to be captured such as predetermined position sheet glass and complete send for the tripping device that anvil machine of advancing is integrated.
Thus, in an embodiment disclosed herein, describe a kind of method be separated with movable glass plate by sheet glass, comprising: with speed S along draw direction from formed body draws molten glass to form glass ribbon; Move carriage assemblies with speed S along draw direction, described carriage assemblies comprises tripping device, the suction unit that described tripping device comprises separating arm and connects with described separating arm; Described glass ribbon is coordinated with described tripping device; Along the width of described glass ribbon, tension force is applied to glass ribbon with described tripping device; Along the length direction of described glass ribbon, tension force is applied to glass ribbon with described tripping device; In described glass ribbon, indentation is produced with scratching device; With described tripping device, bending moment is applied to be separated with described glass ribbon by sheet glass at described indentation place to described glass ribbon; Described sheet glass is coordinated with automation; And described tripping device and described sheet glass are thrown off.
Coordinate described glass ribbon can comprise described tripping device with described tripping device to move along the direction perpendicular to described draw direction.Described glass ribbon is clamped with the described suction unit that described tripping device coordinates described glass ribbon can comprise with being connected to described separating arm.
Along described width, transverse force is applied to the linear slide that glass ribbon applying tension force can comprise with being connected to described suction unit.
Apply tension force along described length direction to glass ribbon to comprise and apply power along the length direction of described glass ribbon to described glass ribbon by the linear slide being connected to described suction unit.
Apply bending moment to described glass ribbon can comprise around separating arm described in pivot axis.
Each embodiment described herein also can comprise: after described sheet glass is separated with described glass ribbon, along the direction towards described automation, described separating arm is moved to launching position.
Each embodiment described herein also can comprise: after being separated with described glass ribbon by described sheet glass but before described automation coordinates described sheet glass, make described separating arm around pivot axis.
After the bending moment applying described sheet glass to be separated with described glass ribbon to described glass ribbon with described tripping device, described sheet glass can be moved along described draw direction away from described glass ribbon.Due to the tension force that tripping device before delineation applies along the longitudinal direction, this motion can be carried out quite rapidly.
The suction unit being connected to automation can be contrary in the side coordinated by automation with sheet glass sheet glass side on coordinate sheet glass, or in other embodiments, automation and tripping device can coordinate sheet glass and/or glass ribbon on the same side.
On the other hand, disclose a kind of equipment be separated with the glass ribbon along draw direction movement by sheet glass, comprising: anvil machine of advancing, comprising: carriage assemblies, described carriage assemblies is configured to move along described draw direction; First nose piece, described first nose piece is connected to described carriage assemblies and is configured to move along the direction perpendicular to described draw direction; And tripping device, described tripping device for coordinating described glass ribbon and being connected to described carriage assemblies, and is configured to along to move perpendicular to the direction of described draw direction and also around pivot axis.This equipment also can comprise: the scoring device being connected to described carriage assemblies.This tripping device can comprise separating arm, and separating arm also comprises the suction unit that connects with it and is configured to move along at least two vertical direction relative to separating arm.Such as, suction unit useable linear sliding part is connected to separating arm.
Supplementary features of the present invention and advantage will be stated in the following detailed description, and these supplementary features and advantage will be apparent according to this description to a certain extent to those skilled in the art, or be easily realized by implementing each embodiment described here to comprise the invention described herein of following detailed description, claim and accompanying drawing.
Should be understood that, above general description and following detailed description provide embodiments of the invention, and they aim to provide general survey or the framework of essence and characteristic for understanding the present invention for required protection.What comprise accompanying drawings provides a further understanding of the present invention, and is incorporated in the present specification and forms the part of specification sheets.Accompanying drawing illustrates each embodiment of the present invention, and for illustration of principle of the present invention and operation together with this description.
Accompanying drawing explanation
Fig. 1 is the front view of example fusion downdraw glass manufacturing equipment;
Fig. 2 is the cross-sectional end view of the formed body of the glass manufacturing equipment of Fig. 1;
Fig. 3 be illustrate the anvil machine of advancing below formed body of being arranged on, the front view of the formed body of Fig. 2;
Fig. 4 is the formed body of Fig. 3 and the cross sectional end view of anvil machine of advancing;
Fig. 5 is the front view of anvil machine of advancing according to the example of embodiment disclosed herein;
Fig. 6 is the side-view of the anvil machine of advancing of Fig. 5, and this anvil machine of advancing comprises carriage assemblies, and this carriage assemblies comprises nose piece, tripping device and scoring device;
Fig. 7 is the side-view of the anvil machine of advancing of Fig. 6 that the nose piece coordinated with glass ribbon is shown;
Fig. 8 is the side-view of the anvil machine of advancing of Fig. 6 that the tripping device coordinated with glass ribbon is shown;
Fig. 9 is the side-view of the anvil machine of advancing of Fig. 6 that the scoring device coordinated with glass ribbon is shown;
Figure 10 illustrates to apply bending moment and the side-view of the anvil machine of advancing of the Fig. 6 of the tripping device be separated with glass ribbon by sheet glass to glass ribbon;
Figure 11 illustrates glass ribbon to move to launching position and the side-view of the anvil machine of advancing of the Fig. 6 of the tripping device altered course by sheet glass;
Figure 12 is the side-view of the anvil machine of advancing of the Fig. 6 of nose piece carriage assemblies, tripping device being shown and turning back to its corresponding zero position.
Embodiment
Now with reference to the accompanying drawings shown in example describe in detail embodiments of the invention.Whenever possible, use identical Reference numeral to represent same or similar part in all of the figs.
In the exemplary glass producing apparatus 10 shown in Fig. 1, the admixtion represented by arrow 12 is fed into smelting furnace 14, and fusing is to form the first temperature T 1under melten glass 16.First temperature T 1depend on concrete glass ingredient, but for the glass of liquid-crystal display can be used for, as non-restrictive example, T 1can more than 1500 DEG C.Melten glass flows through connecting tube 18 from smelting furnace 14 and enters refinery pipework (or " purifier ") 20.From purifier 20, melten glass flows to stirred vessel 22 with mixing and homogenizing by connecting tube 24, and arrives transport box 28 from stirred vessel 22 by pipe connecting 26, and after this arrives downtake 30.Then melten glass can be directed to formed body 32 from downtake 30 by entrance 34.As the clearlyest in Fig. 2 illustrate, formed body 32 comprises groove 36 and outsidely assembles molded surface 38, and this groove 36 receives molten glass flow from entrance 34, outsidely assembles line that molded surface 38 locates bottom formed body, root 40 place joins.When the technique of fusion downdraw shown in Fig. 1, the melten glass being transported to groove 36 overflows groove and flows through the convergence molded surface 38 of formed body 32 as separately stream, separately flows and to combine at root 40 place or fuse to form glass ribbon 42.Glass ribbon from root 40 by gravity and withdrawing roll 44 drop-down.Then glass ribbon can cool and be separated to form each sheet glass 46, as described in more detail below.
Fig. 3 illustrates the formed body 32 of Fig. 1 and 2, and also comprises the diagram of withdrawing roll 44 and anvil machine 48 of advancing.The opposed paired layout of withdrawing roll 44 also rotates backward.That is, adjacent with the first side of glass ribbon single withdrawing roll along with from the first withdrawing roll across and the contrary direction of the withdrawing roll adjacent with the second side of glass ribbon rotate.Glass ribbon is positioned between the withdrawing roll of opposing pair, makes withdrawing roll in the contact of the edge part office of glass ribbon and clamping glass band.The withdrawing roll of contrary rotation is driven by motor and apply downward force on glass ribbon, thus along draw direction 50 from formed body drawing glassribbons.They also contribute to the weight of supporting glass band, because in the period at least partially of partitioning cycle, the part below withdrawing roll of glass ribbon may not be supported.Do not have suitable clamping force, withdrawing roll may not apply enough downward pulling force maybe can not resist the part of gravity supporting glass band below withdrawing roll.
Along with glass ribbon declines from formed body, anvil machine 48 of advancing periodically coordinates with glass ribbon, and forms the score line 52 at least partially of crossing over glass ribbon.In order to ensure the maximum utilization of the sheet glass be separated with glass ribbon, it is desirable to be formed the indentation 55 of the edge section 54 of the lateral register being approximately perpendicular to glass ribbon.Edge section 54 can comprise the webbing part thicker than the internal portion of glass ribbon.Such as, webbing part may be formed due to surface tension effect.Along with glass ribbon is along draw direction 50 continuous moving, the width that scoring device crosses over glass ribbon with finite speed is advanced, should be clearly, in order to form the indentation of the edge section perpendicular to glass ribbon, scoring device must move and make during scribing process, do not have the relative movement along the direction being parallel to draw direction between scoring device and glass ribbon.Thus, in delineation cycle period, first anvil machine 48 of advancing moves along draw direction from initial zero position, and reaches the speed with the speeds match of moving glass ribbon.That is, glass ribbon is with velocity vector Vr continuous moving, and this velocity vector Vr comprises direction 50 along draw direction and predetermined speed S.Anvil machine of advancing obtains the velocity vector Vt mated with the velocity vector of glass ribbon.
With reference to Fig. 4, the scheduled time between the drop-down Formation period of anvil machine 48 of advancing, the first nose piece 56 being connected to anvil machine of advancing coordinates with the first side of glass ribbon, and the second side of the glass ribbon that this first side contacts with scoring device 58 is contrary.For the sake of clarity, the side contacted with scoring device 58 (such as scribe wheel) of glass ribbon is denoted as " A " side of glass ribbon, and the opposition side contacted with the first nose piece 56 of glass ribbon is denoted as " B " side (in order to simplify, carry out identical sign for the sheet glass that glass ribbon separates, what make sheet glass is denoted as " A " side of sheet glass and " B " side respectively with the side that scoring device or nose piece effectively contact).First nose piece 56 can be used for being flattened by sheet glass and providing the power contrary with scoring device exerted forces.That is, the first nose piece 56 is used as anvil machine, and during scribing process, glass ribbon 46 is compressed this anvil machine by scoring device.Although not shown, but in certain embodiments, additional nose piece can be used on " A " side of glass ribbon, on " B " side of glass ribbon or on " A " side and " B " both sides, side, glass ribbon flattened with auxiliary or reduce otherwise upwards can advance to the vibration of the visco-elastic portion of glass ribbon along the length of glass ribbon.The vibration being transitioned into the visco-elastic portion of the glass ribbon 42 of elastic stage at glass ribbon from viscous state can cause undesired stress in glass ribbon, and this stress can cause the warpage of the sheet glass 46 removed from glass ribbon.
In some scribing process, automation 60 coordinated with the end of glass ribbon before scribing process.Automation 60 comprises robotic arm 62 and suction unit 66 (such as suction cup), and robotic arm 62 comprises the platform 64 being positioned at its far-end, and suction unit 66 to be arranged on platform and to coordinate with the edge section of " B " side of glass ribbon.Robotic arm 62, with the velocity vector Vra mobile platform 64 mated with velocity vector Vr, makes glass ribbon, movement is all connected by anvil machine of advancing (comprising scoring device 58 and the first nose piece 56) and platform 64, and do not have relative movement betwixt.In other words, automation 60 makes platform 64 follow the tracks of glass ribbon by robotic arm 62.When platform 64 follow the tracks of glass ribbon 42 make along draw direction, relative movement not to occur between platform and glass ribbon time, robotic arm mobile platform 64, makes suction unit 66 coordinate (or by once position below the score line that formed) with the glass ribbon below score line 55.Once complete the delineation of glass ribbon, the robotic arm 62 being now connected to glass ribbon 46 gives glass ribbon with the bending moment against the first nose piece 56, produce the tension force crossing over score line 55, thus in glass ribbon, form gap crackle because indentation propagates across the thickness of glass ribbon and sheet glass 46 is separated with glass ribbon 42.Robotic arm is still connected to sheet glass 46 and glass ribbon is moved to receiving station.Sheet glass can such as be placed on transmission assembly by automation 60, and transmission assembly moving glass ribbon is to carry out downstream processing (such as removing the edge section of sheet glass, edge polishing, washing etc.).Once sheet glass is placed on downstream process, then robotic arm turns back to zero position, prepares be separated and transmit another sheet glass.
In the past bright should be understood that motion and operation that this technique depends on advance anvil machine 48 and the good layout of automation 60 is stated.These motions and operation can increase the quality time of overall operation circulation.The term partitioning cycle time used herein refers to that anvil machine of advancing starts and for some time stopped when advance anvil machine and automation have turned back to its corresponding starting position when draw direction is from starting position.Specifically, rely on automation 60 and perform multiple function, (such as realize along the moving of draw direction with draw rate, coordinate with glass ribbon, apply bending motion and sheet glass is sent to downstream process) unnecessarily increase partitioning cycle time.Such as, after separator well first sheet glass, the separation of the second sheet glass must be waited for, until automation is disposed the first sheet glass and returned to coordinate with glass ribbon).Thus, by eliminating some function and the motion of automation 60 and/or being moved to the shortening that anvil machine 48 of advancing can realize the partitioning cycle time.
Not only for coordinate with delineation glass ribbon but also for generation of causing the bending example of the glass ribbon be separated of sheet glass and glass ribbon to advance anvil machine shown in Fig. 5.According to the present embodiment, the predetermined position of automation 60 below the root 40 of formed body 32 coordinates with glass ribbon, make after sheet glass 46 to be separated with glass ribbon 42 by anvil machine 48 of advancing, sheet glass is delivered to automation 60 (i.e. robotic arm 62).Then sheet glass 46 is delivered to next technique station (such as transmission equipment, receiving jig etc.) by automation 60.Thus, such as glass ribbon tracking, sidepiece tensioning, downward force apply and for separating of the function of plate benging performed by anvil machine 48 of advancing.Automation 60 is only used as sheet glass means of conveyance, and arrange and be configured to from coordinating the sheet glass that is separated bottom drawing and being sent to downstream process.
Referring now to Fig. 5, according to the carriage assemblies 72 that the anvil machine 48 of advancing of the present embodiment comprises framework 70 and connects with framework 70.Framework 70 can be connected to the structure unit of the facility holding glass manufacturing equipment rigidly.Such as, framework 70 can be connected to structure iron or the concrete of shop building rigidly.Travel screw 74 to be installed in rotation on framework 70 and to extend between upper frame member 76 and lower frame member 78.Travel screw 74 can be connected at least one motor being configured to rotational travel screw rod.Such as, Fig. 5 illustrates the single-motor 80 being driven two travel screw 74 by wheel casing 82, power train 84 and drive shaft 86.Other also may be had to arrange.
Carriage assemblies 72 comprises at least one the driven nut (not shown) connected with it, and travel screw 74 passes wherein.Along with travel screw 74 rotates, driven nut is along advancing along screw rod according to the direction in bolt rotary direction, and the direction therefore along driven nut drives carriage assemblies.As previously mentioned, the first nose piece 56 is connected to carriage assemblies 72.Such as, the first nose piece 56 is connected to carriage assemblies 72 by one or more linear slide 88, and the direction that one or more linear slide 88 is configured to along being orthogonal to draw direction 50 extends towards or away from glass ribbon or the first nose piece of retracting respectively.At extended position, the first nose piece 56 coordinates with glass ribbon 42 (such as contacting).In retracted position, the first nose piece 56 is thrown off with glass ribbon 42.
Carriage assemblies 72 also can comprise the scoring device 58 being connected to carriage assemblies 72 by track 90.Scoring device 58 is driven along track 90 by any driving mechanism that scoring device 58 can be made to advance along suitable exact path.Such as, scoring device 58 is driven along track 90 by travel screw and driven nut, and mode is similar to the layout of carriage assemblies 72.Also can use the pneumatic operation for scoring device.Scoring device 58 also can comprise the linear slide that one or more pneumatic or step-by-step motor starts, and linear slide to be configured to scoring device or its part along the direction perpendicular to draw direction 50 respectively towards glass ribbon or extend away from glass ribbon or retract.At extended position, scoring device 58 coordinates with glass ribbon 42 (such as contacting).In retracted position, scoring device 58 and glass ribbon 42 are thrown off.In certain embodiments, available cordless completes delineation, wherein delineates and is completed by laser beam.In these cases, scoring device extension and retract may be unnecessary.
Carriage assemblies 72 also can comprise the one or more tripping devices 92 connected with it.Each one or more suction units 96 comprising separating arm 94 and connect with separating arm in one or more tripping device.Each in one or more separating arm 94 be configured to respectively along perpendicular to draw direction 50 and the direction being roughly parallel to glass ribbon width dimensions extend towards or away from glass ribbon 42 or retract.That is to say, be parallel to the X-direction shown in Fig. 5.In addition, each separating arm is configured to relative to pivot axis.Such as, in the embodiment shown in fig. 5, illustrate that two separating arms 94 comprise two tripping devices.Each separating arm is connected to carriage assemblies 72 by linear slide 98 and turning gear roller box 100, linear slide 98 be arranged to along perpendicular to draw direction 50 and the direction (Fig. 6) being parallel to Y-direction extend and retraction separator, and the pivot center 102 (see Fig. 6) that turning gear roller box 100 is configured to lean around the first end location of nearly separating arm rotates separating arm.Turning gear roller box 100 is driven by such as step motor (not shown).Each separating arm can be independently controlled.Such as, in certain embodiments, slewing rate can be different between separating arm, or rotating sequential can be different, the suction unit of separating arm is made not form plane (namely, separating arm be used in glass ribbon and/or sheet glass apply reverse, make a lateral edges of glass ribbon and opposite side edge not parallel).In addition, suction unit 96 is connected to separating arm by the first linear slide 104, and the first linear slide 104, along the direction being parallel to draw direction 50, is namely parallel to Z-direction and moves (extend or retract) suction unit.Such as, Fig. 6 illustrates the multiple paired suction unit being connected to each separating arm by the first linear slide 104, and often pair of suction unit is connected to each link arm by the first linear slide 104.In addition, suction unit 96 is also connected to separating arm by the second linear slide 106, and the second linear slide 106 is configured to along the direction perpendicular to draw direction 50, is namely parallel to X-direction and moves (extend or retract) suction unit.Obviously should can arrange that other constructs.Linear slide 104 and 106 can be such as pneumatically-operated carriage, but the driving mechanism substituted comprises the carriage that step motor drives.In addition, although Fig. 6 illustrates paired suction unit 96, suction unit 96 can individually be connected to separating arm 94.
The general introduction of the processing step taked by anvil machine 48 of advancing during being below partitioning cycle, see Fig. 7-12.
At first step 200, carriage assemblies 72 starts from the zero position of anvil machine top of stroke of advancing downwards and reach the speed (that is, Vr ≌ Vt) equaling or be substantially equal to glass ribbon speed along draw direction 50.Term used herein, " stroke " of carriage assemblies comprises carriage assemblies along the total journey of moving in direction being parallel to draw direction 50.During zero position represents glass partitioning cycle, carriage assemblies is advanced at utmost, and is the point of carriage assemblies along draw direction 50 setting in motion.
In next step 202 and carriage assemblies 72 reach equal or be substantially equal to glass ribbon along draw direction 50 speed after, separating arm 94 is advanced along linear slide 98 along the first direction (Y-direction) perpendicular to draw direction 50, wherein each suction unit 96 coordinates along edge section 54 with glass ribbon 42, and vacuum is applied to suction unit makes glass ribbon keep (such as clamp) by suction unit.
In step 204, carriage assemblies 72 continues to advance along draw direction along draw direction with the speed of the speed S equaling or be substantially equal to glass ribbon, activates the second linear slide 106 thus provide to be parallel to the horizontal tension that X-direction crosses over glass ribbon width.In order to apply the horizontal tension of the X-direction (i.e. width) being parallel to glass ribbon, activate the second linear slide 106 outside for the second linear slide (being X and-X-direction respectively) to be moved along the direction away from glass ribbon.But when suction unit 96 coordinates completely with sheet glass, suction unit is attempted to move produce the power being applied to glass ribbon along the direction being parallel to width and the remarkable actual motion not having suction unit along outside X and/or-X-direction.That is, first group of second linear slide 106 of locating along an edge section 54 of glass ribbon 42 activated to move in X direction, and activated along second group of second linear slide 106 that the opposing edge parts 54 of glass ribbon 42 locates and move with edge-X-direction.Thus, the width segments of the contrary power leap glass ribbon of drawn glass band is applied to glass ribbon 42 in the width direction.
In step 206, scoring device 58 is mobile in place on track 90, and scribing tool extends to contact glass ribbon 42, now scoring device 58 is along X (or-X-direction, according to arranging) cross over moving at least partially of glass ribbon 42, to form the indentation 55 of a part of crossing over glass ribbon width.Should point out, the webbing being positioned at edge section 54 makes the delineation difficulty in this region.Thus, indentation 55 can be formed between webbing.
In step 208, enable the first linear slide 104, make each suction unit 96 apply power along draw direction (-Z-direction) to glass ribbon, make longitudinally to apply tension force to glass ribbon 42.
In step 210, separating arm 94 rotation axis 102 that rotates is rotated, and makes glass ribbon 42 compress the first nose piece 56, crosses over indentation thus and applies tension force, until cross over indentation to apply rupture stress and crack is propagated at indentation place to be separated with glass ribbon 42 by sheet glass 46.In the separation moment, the longitudinal force applied by the actuating of the first linear slide 104 causes sheet glass 46 downward and away from the δ of displacement immediately of glass ribbon 42.This displacement prevents the accident between the sheet glass of separation and the free end of the new formation of glass ribbon from contacting, and eliminates the Latent destruction source to sheet glass or glass ribbon thus.
In step 212, separating arm 94 moves farther to launching position by each linear slide 98 along Y-direction.In step 214, separating arm 94 is rotated by turning gear roller box 100, make sheet glass 46 for vertically or roughly vertical, and carriage assemblies 72 is along the stopping of moving of draw direction 50.Meanwhile, automation 60 moves robotic arm 62, each suction unit 66 is coordinated with " A " side of sheet glass 46, and applies vacuum to each suction unit 66, thus is kept (or being sucked device clamping) against suction unit by sheet glass 46.In step 216, each suction unit 96 is thrown off with " B " side of sheet glass, and move think that the glass ribbon 42 of decline provides space along the direction (being respectively X and-X-direction) perpendicular to draw direction, and separating arm is along to be parallel to and second direction (-Y-direction) perpendicular to draw direction is mobile, until separating arm is positioned at zero position wait for next partitioning cycle.In step 218, sheet glass 46 is sent to next downstream process by automation 60.In step 220, carriage assemblies 72 starts along to be parallel to but move in direction (Z-direction) in contrast to draw direction 50.In step 222, each suction unit 96 moves inward along the direction (respectively X and-X-direction) perpendicular to draw direction, to prepare again to coordinate with glass ribbon during next partitioning cycle.In step 224, carriage assemblies 72 turns back to zero position, to prepare to start another partitioning cycle.
Should be obvious, keep the re-set target reducing the partitioning cycle time, the multiple abovementioned steps presented with particular order for the ease of understanding can perform in fact simultaneously.Such as, the linear of separating arm and rotational motion can be there is simultaneously.Also should not be construed as the concrete order requiring to enumerate.Equally, such as and the reason that occurs in turn in order to rotation and the motion of translation of separating arm of hypothesis, rotation may occur before linearly advancing, or on the contrary.
According to each embodiment described herein, before automation 60 returns from the first front glass panel of transmission, bending glass sheet can be carried out by tripping device 92 and is separated.Therefore automation is put part cycling time that must spend and is greatly reduced in anvil seat in the plane of advancing, and anvil machine of advancing is without the need to waiting for that automation performs except coordinating with sheet glass and transmitting the action of sheet glass.
Describe from previous embodiment and operation and obviously also may have other embodiment.Such as, in the context of Fig. 5 and 6, tripping device 92 is located so that suction unit 96 contacts the edge section 54 of glass ribbon 42 on " B " side of glass ribbon, and by rotating counterclockwise along direction " tractive " glass ribbon (see Fig. 6) towards the first nose piece 56.Tripping device can re-construct easily, thus on " B " side being positioned at glass ribbon at tripping device 92 while, suction unit coordinates with glass ribbon on " A " side of sheet glass that (wherein suction unit fabricated section holds the edge of glass ribbon.Even if therefore automation can above coordinate with glass ribbon in the same side (" A " side), each suction unit can, via linear second sliding part 106 transverse shifting, make each suction unit not have the obstacle passed required for automation guiding glass sheets.
Alternatively, the position of tripping device 92 can rearrange on carriage assemblies 72, tripping device is positioned on " A " side of glass ribbon, and automation 60 is positioned on " B " side of glass ribbon thus.In this embodiment, be not by standing to rotate counterclockwise along direction " tractive " glass ribbon (with reference to Fig. 6) towards the first nose piece 56, separating arm 94 can stand to rotate clockwise and against the first nose piece 56 " promotion " glass ribbon.But although various equipment may be had to construct, they have total step of above general introduction jointly: be connected to the motion of the separating arm of anvil machine of advancing to coordinate with the suction unit of its connection with glass ribbon; Glass ribbon is by the lateral tension of tripping device; Glass ribbon is by longitudinal tensioning of tripping device; The rotation of tripping device is to apply bending moment to glass ribbon, and sheet glass is separated with glass ribbon by this bending moment; Sheet glass sending to automation, and anvil machine of advancing (such as carriage assemblies, separating arm, scoring device) turns back to its starting position, is ready to start another partitioning cycle.
It will be apparent to those skilled in the art that and can carry out various change and change to the present invention and not deviate from the spirit and scope of the present invention.The present invention covers and falls into by the change of the present disclosure provided in appended claims and its equivalency range and modification.

Claims (15)

1., from a method for moving glass ribbon separation of glasses plate, comprising:
With speed S along draw direction from formed body draws molten glass to form glass ribbon;
Move carriage assemblies with speed S along draw direction, described carriage assemblies comprises tripping device, the suction unit that described tripping device comprises separating arm and connects with described separating arm;
Described glass ribbon is coordinated with described tripping device;
With described tripping device along described glass ribbon width tensioning described in glass ribbon;
With described tripping device along described glass ribbon length direction tensioning described in glass ribbon;
In described glass ribbon, indentation is produced with scratching device;
With described tripping device, bending moment is applied to be separated with described glass ribbon by sheet glass at described indentation place to described glass ribbon;
Described sheet glass is coordinated with automation; And
Described tripping device and described sheet glass are thrown off.
2. method according to claim 1, is characterized in that, coordinates described glass ribbon to comprise described tripping device move along the direction perpendicular to described draw direction with described tripping device.
3. method according to claim 1, is characterized in that, clamps described glass ribbon with the described suction unit that described tripping device coordinates described glass ribbon to comprise with being connected to described separating arm.
4. method according to claim 1, is characterized in that, the linear slide comprised with being connected to described suction unit along glass ribbon described in described width tensioning applies transverse force.
5. method according to claim 1, is characterized in that, comprises apply power along the length direction of described glass ribbon to described glass ribbon by the linear slide being connected to described suction unit along glass ribbon described in described length direction tensioning.
6. method according to claim 1, is characterized in that, applies bending moment comprise around separating arm described in pivot axis described glass ribbon.
7. the method for claim 1, is characterized in that, also comprises: after described sheet glass is separated with described glass ribbon, along the direction towards described automation, described separating arm is moved to launching position.
8. the method for claim 1, is characterized in that, also comprises: after being separated with described glass ribbon by described sheet glass but before described automation coordinates described sheet glass, make described separating arm around pivot axis.
9. method according to claim 1, is characterized in that, after the bending moment applying described sheet glass to be separated with described glass ribbon to described glass ribbon with described tripping device, moves described sheet glass along described draw direction away from described glass ribbon.
10. method according to claim 1, is characterized in that, the described suction unit being connected to described automation coordinates described sheet glass on side that is contrary with the side coordinated by described automation of described sheet glass, described sheet glass.
11. 1 kinds of equipment be separated with the glass ribbon along draw direction movement by sheet glass, comprising:
To advance anvil machine, comprising:
Carriage assemblies, described carriage assemblies is configured to move along described draw direction;
First nose piece, described first nose piece is connected to described carriage assemblies and is configured to move along the direction perpendicular to described draw direction; And
Tripping device, described tripping device for coordinating described glass ribbon and being connected to described carriage assemblies, and is configured to along to move perpendicular to the direction of described draw direction and also around pivot axis.
12. methods as claimed in claim 11, is characterized in that, also comprise: the scoring device being connected to described carriage assemblies.
13. equipment as claimed in claim 11, it is characterized in that, described tripping device comprises separating arm, and described separating arm also comprises the suction unit being connected to described separating arm.
14. equipment as claimed in claim 13, is characterized in that, described suction unit is configured to move along at least two vertical direction relative to described separating arm.
15. equipment as claimed in claim 13, it is characterized in that, described suction unit linear slide is connected to described separating arm.
CN201480046865.XA 2013-06-25 2014-06-23 From the method and apparatus of moving glass ribbon separation of glasses plate Expired - Fee Related CN105492396B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201361839106P 2013-06-25 2013-06-25
US61/839,106 2013-06-25
PCT/US2014/043567 WO2014209833A1 (en) 2013-06-25 2014-06-23 Method and apparatus for separating a glass sheet from a moving ribbon of glass

Publications (2)

Publication Number Publication Date
CN105492396A true CN105492396A (en) 2016-04-13
CN105492396B CN105492396B (en) 2018-07-10

Family

ID=52142583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201480046865.XA Expired - Fee Related CN105492396B (en) 2013-06-25 2014-06-23 From the method and apparatus of moving glass ribbon separation of glasses plate

Country Status (5)

Country Link
JP (1) JP6351715B2 (en)
KR (1) KR20160023794A (en)
CN (1) CN105492396B (en)
TW (1) TWI627139B (en)
WO (1) WO2014209833A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179028A (en) * 2018-10-26 2019-01-11 常州市新创智能科技有限公司 A kind of variable door width needle piercing and sucking disk takes cloth frame and control method
CN110405357A (en) * 2019-06-24 2019-11-05 东莞艾塔极新材料科技有限公司 A kind of OCA optical film cutter device and cutting method
CN111183121A (en) * 2017-09-15 2020-05-19 康宁公司 Systems and methods for processing glass ribbons
CN111836789A (en) * 2018-02-13 2020-10-27 康宁公司 Glass separation system and glass manufacturing apparatus including same
CN113044575A (en) * 2021-03-12 2021-06-29 郑州旭飞光电科技有限公司 Ultra-thin substrate glass ribbon conveying device and conveying method
CN114269667A (en) * 2019-06-26 2022-04-01 康宁公司 Method for separating and transporting glass sheets from a glass ribbon
CN115057233A (en) * 2022-06-09 2022-09-16 河北光兴半导体技术有限公司 Breaking device and breaking method

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9962828B2 (en) 2014-08-05 2018-05-08 Corning Incorporated End-of-arm tool
WO2016172065A1 (en) * 2015-04-22 2016-10-27 Corning Incorporated Glass manufacturing apparatus facilitating separation of a glass ribbon
US10793462B2 (en) 2015-07-07 2020-10-06 Corning Incorporated Apparatuses and methods for heating moving glass ribbons at separation lines and/or for separating glass sheets from glass ribbons
US10479718B2 (en) 2015-10-30 2019-11-19 Corning Incorporated Apparatus and methods for separating a glass ribbon
WO2017091529A1 (en) * 2015-11-25 2017-06-01 Corning Incorporated Methods of separating a glass web
JP2019501099A (en) * 2015-12-01 2019-01-17 コーニング インコーポレイテッド Glass web separating apparatus and method
JP6589620B2 (en) * 2015-12-21 2019-10-16 日本電気硝子株式会社 Glass plate manufacturing equipment
JP6647680B2 (en) * 2016-05-31 2020-02-14 日本電気硝子株式会社 Method and apparatus for manufacturing glass plate
TWI720211B (en) * 2016-06-23 2021-03-01 美商康寧公司 Methods and apparatuses for packaging glass articles
KR102479589B1 (en) * 2017-03-22 2022-12-20 코닝 인코포레이티드 Separation Methods of Glass Webs
CN110799464A (en) * 2017-06-26 2020-02-14 康宁股份有限公司 Sheet separation apparatus and method with tension measurement
WO2019199933A1 (en) 2018-04-12 2019-10-17 Corning Incorporated Apparatus and method for engaging a moving glass ribbon
KR20210090719A (en) * 2018-12-06 2021-07-20 코닝 인코포레이티드 Glass processing apparatus and methods
KR20200133090A (en) * 2019-05-16 2020-11-26 코닝 인코포레이티드 Apparatus For manufacturing a Glass ribbon
JP2022075174A (en) * 2020-11-06 2022-05-18 日本電気硝子株式会社 Method and apparatus for manufacturing plate glass
JP2022093901A (en) * 2020-12-14 2022-06-24 日本電気硝子株式会社 Method and apparatus for manufacturing glass plate
WO2023086249A1 (en) 2021-11-15 2023-05-19 Corning Incorporated Automated glass article bundling and palletizing apparatuses and methods

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4140258A (en) * 1975-03-06 1979-02-20 Pilkington Brothers Limited Methods and apparatus for separating glass sheets into separate sheet portions
CN101595069A (en) * 2006-09-20 2009-12-02 康宁股份有限公司 The temperature compensation of the glass baseplate plane stress that shape is caused
CN101679100A (en) * 2007-05-09 2010-03-24 康宁股份有限公司 Constant force scoring device and using method thereof
CN102099306A (en) * 2008-07-14 2011-06-15 旭硝子株式会社 Device and method for working splitting line for glass ribbon
CN102951783A (en) * 2011-08-23 2013-03-06 康宁股份有限公司 Apparatus and method for separating glass sheet from moving ribbon of glass

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9027815B2 (en) * 2010-08-31 2015-05-12 Corning Incorporated Apparatus and method for making glass sheet with improved sheet stability

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4140258A (en) * 1975-03-06 1979-02-20 Pilkington Brothers Limited Methods and apparatus for separating glass sheets into separate sheet portions
CN101595069A (en) * 2006-09-20 2009-12-02 康宁股份有限公司 The temperature compensation of the glass baseplate plane stress that shape is caused
CN101679100A (en) * 2007-05-09 2010-03-24 康宁股份有限公司 Constant force scoring device and using method thereof
CN102099306A (en) * 2008-07-14 2011-06-15 旭硝子株式会社 Device and method for working splitting line for glass ribbon
CN102951783A (en) * 2011-08-23 2013-03-06 康宁股份有限公司 Apparatus and method for separating glass sheet from moving ribbon of glass

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111183121A (en) * 2017-09-15 2020-05-19 康宁公司 Systems and methods for processing glass ribbons
US11780760B2 (en) 2017-09-15 2023-10-10 Corning Incorporated Systems and methods for processing a glass ribbon
CN111836789A (en) * 2018-02-13 2020-10-27 康宁公司 Glass separation system and glass manufacturing apparatus including same
CN111836789B (en) * 2018-02-13 2022-11-11 康宁公司 Glass separation system and glass manufacturing apparatus including the same
CN109179028A (en) * 2018-10-26 2019-01-11 常州市新创智能科技有限公司 A kind of variable door width needle piercing and sucking disk takes cloth frame and control method
CN110405357A (en) * 2019-06-24 2019-11-05 东莞艾塔极新材料科技有限公司 A kind of OCA optical film cutter device and cutting method
CN114269667A (en) * 2019-06-26 2022-04-01 康宁公司 Method for separating and transporting glass sheets from a glass ribbon
CN114269667B (en) * 2019-06-26 2023-12-29 康宁公司 Method for separating and transporting glass sheets from a glass ribbon
CN113044575A (en) * 2021-03-12 2021-06-29 郑州旭飞光电科技有限公司 Ultra-thin substrate glass ribbon conveying device and conveying method
CN115057233A (en) * 2022-06-09 2022-09-16 河北光兴半导体技术有限公司 Breaking device and breaking method
CN115057233B (en) * 2022-06-09 2024-01-09 河北光兴半导体技术有限公司 Breaking device and breaking method

Also Published As

Publication number Publication date
WO2014209833A1 (en) 2014-12-31
JP2016525056A (en) 2016-08-22
TW201505977A (en) 2015-02-16
CN105492396B (en) 2018-07-10
JP6351715B2 (en) 2018-07-04
TWI627139B (en) 2018-06-21
KR20160023794A (en) 2016-03-03

Similar Documents

Publication Publication Date Title
CN105492396A (en) Method and apparatus for separating a glass sheet from a moving ribbon of glass
KR102550388B1 (en) Glass plate manufacturing equipment
KR102591882B1 (en) Glass plate manufacturing equipment
US8794036B2 (en) Apparatus and method for separating a glass sheet from a moving ribbon of glass
KR102339936B1 (en) Glass sheet manufacturing device
US11820694B2 (en) Apparatuses and methods for heating moving continuous glass ribbons at desired lines of separation and/or for separating glass sheets from continuous glass ribbons
JP6589886B2 (en) Glass plate manufacturing equipment
US9556056B2 (en) Separation apparatuses for separating sheets of brittle material and methods for separating sheets of brittle material
CN104245604A (en) Methods and apparatus for managing stress in glass ribbons
TW201331137A (en) Device for machining cutting plane line of glass plate, and method for machining on cutting plane line
KR101361604B1 (en) Method for scribing mother board and dividing method therefor
JP2015164895A (en) Parting device
JP7193542B2 (en) Glass manufacturing apparatus and method for separating glass ribbon
US20220048806A1 (en) System and method for handling and removing a peripheral region of a glass sheet
CN114269667B (en) Method for separating and transporting glass sheets from a glass ribbon
KR20200143743A (en) Apparatus and method for processing glass sheets
JP5643737B2 (en) Mother board scribing method
TWM516600U (en) Glass separator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180710