CN105484287A - Design and construction method of joining new subway station and existing subway station by holing baseplates - Google Patents
Design and construction method of joining new subway station and existing subway station by holing baseplates Download PDFInfo
- Publication number
- CN105484287A CN105484287A CN201510063216.7A CN201510063216A CN105484287A CN 105484287 A CN105484287 A CN 105484287A CN 201510063216 A CN201510063216 A CN 201510063216A CN 105484287 A CN105484287 A CN 105484287A
- Authority
- CN
- China
- Prior art keywords
- subway station
- existing
- design
- base plate
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention belongs to the technical field of architectural design and construction, and particularly relates to a design and construction method of joining a new subway station and an existing subway station by holing baseplates. The design and construction method of joining the new subway station and the existing subway station by holing the baseplates sequentiallycomprises the following steps of: step one,performing holing construction on platform plates of the existing station; step two,performing holing construction on baseplates of the existing station; step three,constructing U-shaped stiffening beams, wherein the baseplates of the existing station are located in depressions of the stiffening beams; and step four,constructing transfer passageways, wherein the U-shaped stiffening beams are connected to the transfer passageways. According to the design and construction method, a shallow buried covered excavation method is mainly adopted for constructing new transfer passageways, top plates of the passageways pass through the middles of the structural baseplates of the existing subway station closely and downwards, then the existing baseplates are holed for realizing the transfer function, and the construction can be performed on the basis of minimumrenovationof the structure and equipment of the existing subway station. The construction method does not affect the normal operation of existing lines.
Description
Technical field
The invention belongs to architectural design and technical field of construction, particularly relate to a kind of new subway station and old subway station base plate and to punch the design and construction method be connected.
Background technology
Subway station is a kind of important building in Urban Rail Transit, auxiliary equipment comprises escalator, goes straight up to elevator, rolling door, the anti-Hongmen Gate, traveler guiding, throw light on, sell check system, station equipment robot control system(RCS) etc., for passenger's boarding, the place of changing to and waiting.At present due to a lot of existing line subway station, to build up the age comparatively remote, not reserved transfer interface condition at a specified future date, and scale is generally smaller, such as Beijing Metro 1, No. 2 lines, built up last century 60, the seventies, being all the form of one deck half, is individual layer section station layer namely, both sides are little interlayers, as station hall layer and device rooms district.Along with the fast development in city, after subway line net is formed, the key that needs solve is the transfer problem of new and old subway line.
Existing operating line passenger flow is saturated on the other hand, pressure is very large, if it is very unrealistic that transferring passage new-old structure connection is carried out in the stoppage in transit of consideration existing line, adding subway station generally builds at bustling block or major urban arterial highway, both sides high buildings and large mansions stand in great numbers, traffic above-ground is busy, and underground gathers pipeline, does not possess open cut condition.So transferring passage adopts shallow burial hidden digging to realize often, therefore newly-built transferring passage can not affect the normal operation of existing line, minimum to existing equipment transformation amount, realizes transfer function again, difficulty and risk are quite large, and this is all a very stern challenge to design and construction.
Summary of the invention
The invention provides a kind of new subway station and old subway station base plate to punch the design and construction method be connected, with solve in the transferring passage work progress that proposes in above-mentioned background technology on existing Metro Station Structure and scrap build little and do not affect the problem of existing line normal operation.
Technical problem solved by the invention realizes by the following technical solutions: a kind of new subway station and old subway station base plate punch the design and construction method be connected, and it is characterized in that: comprise the following steps successively:
The first step, to punch construction to building up station platform slab;
Second step, to punch construction to building up station base plate;
3rd step, builds U-shaped stiffening girder, and the base plate of building up station is positioned at the recess of U-shaped stiffening girder;
4th step, build transferring passage, U-shaped stiffening girder is connected with transferring passage.
Abolishing of building up station platform slab, base plate adopts diamond rope saw static force ablation technique, and cutting speed is fast, and the light and handy spirit of cutting machine becomes, the environment pollutions such as shockproof, noise, dust.Large area cutting is avoided to impact existing structure and operation security.
By U-shaped beam strengthening measure, avoid bar planting to damage both wired bottom girders, ensure both wired waterproof slab effects.
Wearing both wired and existing base plates under transferring passage punches in work progress, hydrostatic level is adopted to carry out 24 hours remote automation Real-Time Monitorings to existing structure and track, and monitored data is analyzed in time, design and construction, ensure safety and the normal operation of existing structure.
U-shaped stiffening girder is collar tie beam.
Beneficial effect of the present invention is:
This construction method mainly adopts the newly-built transferring passage of shallow burial hidden digging, through in the middle of existing Metro Station Structure base plate under passage top board is closely connected, then punch at existing base plate, realize transfer function, construct in the basis that this form of construction work can show existing Metro Station Structure and equipment in as far as possible little transformation, and this construction method can not have influence on the normal operation of existing line, wherein both wired station base plate, abolishing of platform slab adopts diamond rope saw static force ablation technique, the advantage of this technology is that cutting speed is fast, the light and handy spirit of cutting machine becomes, shockproof, noise, the environment pollutions such as dust.Large area cutting is avoided to impact existing structure and operation security, by U-shaped beam strengthening measure, bar planting is avoided to damage both wired bottom girders, ensure both wired waterproof slab effects, wearing both wired and existing base plates under transferring passage punches in work progress, hydrostatic level is adopted to carry out 24 hours remote automation Real-Time Monitorings to existing structure and track, and monitored data is analyzed in time, design and construction, ensure safety and the normal operation of existing structure, be connected to existing base plate by transferring passage and punch and be connected to both wired station layers, achieve " Room ~ platform " or " platform ~ platform " transfer easily, substantially reduce transfer distance and the transfer discrepancy in elevation, fully demonstrate the design concept that people-oriented, for Metro transfer stop provides good case history from now on, achieve good Social and economic benef@.
Accompanying drawing explanation
Fig. 1 is floor map of the present invention;
Fig. 2 is schematic cross section of the present invention;
Fig. 3 is vertical section of the present invention schematic diagram;
Fig. 4 is constructing structure schematic diagram of the present invention;
Fig. 5 is remote automation of the present invention monitoring schematic diagram.
Detailed description of the invention
Be below the optional embodiment of the present invention, the technician in this professional domain can modify to it and polish under the prerequisite not changing the present invention's spirit and content.Below in conjunction with accompanying drawing, the present invention is described further:
New subway station and old subway station base plate punch the design and construction method be connected, and it is characterized in that: comprise the following steps successively:
The first step, to punch construction to building up station platform slab;
Second step, to punch construction to building up station base plate;
3rd step, builds U-shaped stiffening girder, and the base plate of building up station is positioned at the recess of U-shaped stiffening girder;
4th step, build transferring passage, U-shaped stiffening girder is connected with transferring passage.
Abolishing of building up station platform slab, base plate adopts diamond rope saw static force ablation technique, and cutting speed is fast, and the light and handy spirit of cutting machine becomes, the environment pollutions such as shockproof, noise, dust.Large area cutting is avoided to impact existing structure and operation security.
By U-shaped beam strengthening measure, avoid bar planting to damage both wired bottom girders, ensure both wired waterproof slab effects.
Wearing both wired and existing base plates under transferring passage punches in work progress, hydrostatic level is adopted to carry out 24 hours remote automation Real-Time Monitorings to existing structure and track, and monitored data is analyzed in time, design and construction, ensure safety and the normal operation of existing structure.
This construction method mainly adopts the newly-built transferring passage of shallow burial hidden digging, through in the middle of existing Metro Station Structure base plate under passage top board is closely connected, then punch at existing base plate, realize transfer function, this form of construction work can be constructed on the basis of the little existing Metro Station Structure of transformation and equipment of trying one's best, and this construction method can not have influence on the normal operation of existing line, wherein both wired station base plate, abolishing of platform slab adopts diamond rope saw static force ablation technique, the advantage of this technology is that cutting speed is fast, the light and handy spirit of cutting machine becomes, shockproof, noise, the environment pollutions such as dust.Large area cutting is avoided to impact existing structure and operation security, by U-shaped beam strengthening measure, bar planting is avoided to damage both wired bottom girders, ensure both wired waterproof slab effects, wearing both wired and existing base plates under transferring passage punches in work progress, hydrostatic level is adopted to carry out 24 hours remote automation Real-Time Monitorings to existing structure and track, and monitored data is analyzed in time, design and construction, ensure safety and the normal operation of existing structure, be connected to existing base plate by transferring passage and punch and be connected to both wired station layers, achieve " Room ~ platform " or " platform ~ platform " transfer easily, substantially reduce transfer distance and the transfer discrepancy in elevation, fully demonstrate the design concept that people-oriented, for Metro transfer stop provides good case history from now on, achieve good Social and economic benef@.
Utilize technical solutions according to the invention, or those skilled in the art being under the inspiration of technical solution of the present invention, designing similar technical scheme, and reach above-mentioned technique effect, is all fall into protection scope of the present invention.
Claims (5)
1. new subway station and old subway station base plate punch the design and construction method be connected, and it is characterized in that: comprise the following steps successively:
The first step, to punch construction to building up station platform slab;
Second step, to punch construction to building up station base plate;
3rd step, builds U-shaped stiffening girder, and the base plate of building up station is positioned at the recess of U-shaped stiffening girder;
4th step, build transferring passage, U-shaped stiffening girder is connected with transferring passage.
2. a kind of new subway station according to claim 1 and old subway station base plate punch the design and construction method be connected, it is characterized in that: abolishing of building up station platform slab, base plate adopts diamond rope saw static force ablation technique, cutting speed is fast, the light and handy spirit of cutting machine becomes, the environment pollutions such as shockproof, noise, dust, avoid large area cutting to impact existing structure and operation security.
3. a kind of new subway station according to claim 1 and old subway station base plate punch the design and construction method be connected, and it is characterized in that: by U-shaped beam strengthening measure, avoid bar planting to damage both wired bottom girders, ensure both wired waterproof slab effects.
4. a kind of new subway station according to claim 1 and old subway station base plate punch the design and construction method be connected, it is characterized in that: wear both wired and existing base plates under transferring passage and punch in work progress, hydrostatic level is adopted to carry out 24 hours remote automation Real-Time Monitorings to existing structure and track, and monitored data is analyzed in time, design and construction, ensure safety and the normal operation of existing structure.
5. a kind of new subway station according to claim 1 and old subway station base plate punch the design and construction method be connected, and it is characterized in that: U-shaped stiffening girder is collar tie beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510063216.7A CN105484287A (en) | 2015-02-06 | 2015-02-06 | Design and construction method of joining new subway station and existing subway station by holing baseplates |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510063216.7A CN105484287A (en) | 2015-02-06 | 2015-02-06 | Design and construction method of joining new subway station and existing subway station by holing baseplates |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105484287A true CN105484287A (en) | 2016-04-13 |
Family
ID=55671533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510063216.7A Pending CN105484287A (en) | 2015-02-06 | 2015-02-06 | Design and construction method of joining new subway station and existing subway station by holing baseplates |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105484287A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013253A (en) * | 2016-05-19 | 2016-10-12 | 中铁第四勘察设计院集团有限公司 | Connection node structure of metro transfer station and connection node construction method |
CN112324176A (en) * | 2020-09-22 | 2021-02-05 | 中铁武汉勘察设计研究院有限公司 | Transformation method for additionally installing escalator on existing passenger tunnel and station house upright post co-building structure |
CN116443052A (en) * | 2023-03-10 | 2023-07-18 | 广州地铁设计研究院股份有限公司 | Existing subway line and newly-built subway line transfer structure and transfer method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000179288A (en) * | 1998-12-18 | 2000-06-27 | Taisei Corp | Shield machine and construction method for shield tunnel |
CN102943678A (en) * | 2012-11-28 | 2013-02-27 | 北京市市政工程设计研究总院 | Arched subway station old and new building connection structure and construction method |
CN104818994A (en) * | 2015-04-30 | 2015-08-05 | 中铁二十二局集团第一工程有限公司 | Urban subway n-shaped double-shaft and double transverse passage plane arrangement system |
-
2015
- 2015-02-06 CN CN201510063216.7A patent/CN105484287A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000179288A (en) * | 1998-12-18 | 2000-06-27 | Taisei Corp | Shield machine and construction method for shield tunnel |
CN102943678A (en) * | 2012-11-28 | 2013-02-27 | 北京市市政工程设计研究总院 | Arched subway station old and new building connection structure and construction method |
CN104818994A (en) * | 2015-04-30 | 2015-08-05 | 中铁二十二局集团第一工程有限公司 | Urban subway n-shaped double-shaft and double transverse passage plane arrangement system |
Non-Patent Citations (1)
Title |
---|
周书明: "拆除运营地铁车站底板施工换乘结构的关键技术", 《都市快轨交通》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013253A (en) * | 2016-05-19 | 2016-10-12 | 中铁第四勘察设计院集团有限公司 | Connection node structure of metro transfer station and connection node construction method |
CN112324176A (en) * | 2020-09-22 | 2021-02-05 | 中铁武汉勘察设计研究院有限公司 | Transformation method for additionally installing escalator on existing passenger tunnel and station house upright post co-building structure |
CN116443052A (en) * | 2023-03-10 | 2023-07-18 | 广州地铁设计研究院股份有限公司 | Existing subway line and newly-built subway line transfer structure and transfer method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204055768U (en) | A kind of subway station | |
CN105370287B (en) | Large Underground parking lot machinery excavating construction method | |
CN103452561B (en) | Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side | |
CN102943678B (en) | Arched subway station old and new building connection structure and construction method | |
CN103938538B (en) | Railroad bridge evacuation platform | |
CN104594173B (en) | One kind embraces rail magnetic levitation track traffic box beam | |
CN105484287A (en) | Design and construction method of joining new subway station and existing subway station by holing baseplates | |
CN104563158B (en) | Existing subway station realizes the construction method of transfer with new subway station platform layer | |
CN203639826U (en) | Steel truss girder bridge inspection vehicle | |
CN106638325A (en) | Construction method applicable to steel member gliding assembling in narrow spaces | |
CN103352580A (en) | Construction method for internally added elevator structure in multilayer masonry house | |
CN108412500A (en) | Mountainous City Underground Subway Station vented construction and its construction method | |
CN104372743A (en) | Rapid construction method for trestle | |
CN104818994A (en) | Urban subway n-shaped double-shaft and double transverse passage plane arrangement system | |
CN102003207A (en) | Escape platform and security channel structure for single-hole dual-line magnetic suspension tunnel | |
CN110532664A (en) | A kind of subway work risk source identification system based on BIM | |
RU141153U1 (en) | STATION COMPLEX OF LITTLE LOCATION METRO | |
CN204085524U (en) | A kind of high-rise building Core Walls Structure axis Vertical device adopting mould crawling process | |
CN103578346B (en) | A kind of simply supported girder bridge teaching simulation structure | |
CN204450292U (en) | A kind of die set device that effectively can improve elevator door installation accuracy and speed | |
CN205400741U (en) | Structure under railway shield tunnel rail based on rescue is sparse | |
CN112610023B (en) | Construction method for dismantling building in existing track operation interval | |
RU2734753C1 (en) | Small underground metro station complex with single central entrance hall | |
RU146088U1 (en) | STATION COMPLEX OF THE METRO WITH ONE VESTIBULE SEPARATED BY THE FIRE PARTITION | |
CN203588579U (en) | Teaching simulation structural body of simply supported beam bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160413 |
|
WD01 | Invention patent application deemed withdrawn after publication |