CN105464361A - Binding device for scaffold plate - Google Patents

Binding device for scaffold plate Download PDF

Info

Publication number
CN105464361A
CN105464361A CN201511024427.6A CN201511024427A CN105464361A CN 105464361 A CN105464361 A CN 105464361A CN 201511024427 A CN201511024427 A CN 201511024427A CN 105464361 A CN105464361 A CN 105464361A
Authority
CN
China
Prior art keywords
fixing base
fixture block
ratchet
binding device
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511024427.6A
Other languages
Chinese (zh)
Other versions
CN105464361B (en
Inventor
马刚
王进
郭建新
王建兴
李莉
刘沅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO Electric Power Construction Co Ltd
Original Assignee
NINGXIA ELECTRIC POWER BUILDING AND INSTALLING PROJECT Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA ELECTRIC POWER BUILDING AND INSTALLING PROJECT Co filed Critical NINGXIA ELECTRIC POWER BUILDING AND INSTALLING PROJECT Co
Priority to CN201511024427.6A priority Critical patent/CN105464361B/en
Publication of CN105464361A publication Critical patent/CN105464361A/en
Application granted granted Critical
Publication of CN105464361B publication Critical patent/CN105464361B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards
    • E04G2007/285Clips or connections for securing boards specially adapted for toe boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The invention relates to a binding device for a scaffold plate. The binding device is characterized in that the binding device comprises a fixing base plate (5), and a hooked steel tube clamping ring (9) and a locking handle (12) are installed on the fixing base plate (5); the binding device further comprises a locker (13), one end of the locker (13) is installed on the locking handle (12), and the other end of the locker (13) is detachably installed on the steel tube clamping ring (9). A rotary ratchet (4) is installed on the fixing base plate (5) through a rotary shaft rotatably, one end of a steel wire rope (1) is wound around the rotary ratchet (4), the other end of the steel wire rope (1) is connected with a cylindrical clamping block (10), and a cylindrical clamping groove (11) matched with the cylindrical clamping block (10) is formed in the fixing base plate (5). According to the binding device serving a special tool for binding the scaffold plate, the steel wire rope is used as a binding material, and as for the binding mode, special locking components are used.

Description

Scaffolding board binding device
Technical field
The present invention relates to a kind of scaffolding board binding device.
Background technology
Often use steel pipe scaffold during the operation of engineering construction high and medium, steel pipe scaffold is a kind of provisional accessory building instrument, and the scaffold floor platform laid can provide safe protection for the constructor of work high above the ground.Needs just colligation after the laying of scaffold floor completes, adopt traditional iron wire process of binding loaded down with trivial details, colligation efficiency is low, and can not reuse after colligation operation iron wire used reclaims, construction cost is high.
Summary of the invention
The object of this invention is to provide a kind of scaffolding board binding device, the scaffold colligation of various width can be completed, and the intensity of colligation is high, speed fast, save material, compliance is good.
A kind of scaffolding board binding device, its special feature is: comprise fixing base, this fixing base is separately installed with hook-shaped steel pipe snap ring and set lever, also comprises locker, one end of this locker is arranged on its other end on set lever and is detachably arranged on steel pipe snap ring; This fixing base is also provided with rotating ratchet by rotating shaft is rotatable, this rotating ratchet is wound with one end of wire rope, the other end of this wire rope is connected with a cylinder fixture block, this fixing base has the cylinder draw-in groove coordinated with this cylinder fixture block, on the fixing base that this rotating ratchet is other, ratchet fixture block is also installed in addition.
Wherein be set with the hollow tubule of one section of circular arc on a steel cord.
Wherein also comprise fixture block spring, the two ends of this fixture block spring are connected with fixing base and ratchet fixture block respectively, and ratchet fixture block is arranged on fixing base by fixture block fixed axis.
Wherein on rotating ratchet, be installed with set lever.
Wherein on rotating ratchet, be provided with wirerope-winding groove.
The invention provides is a kind of special tool scaffolding board being carried out to colligation, and Binding material adopts wire rope to substitute traditional iron wire, and improving bud grafting can adopt special locking member.Apparatus of the present invention compact structure, be easy to carry, simple to operate, colligation intensity is higher than traditional binding method.Apparatus of the present invention can repeatedly use, and effectively reduce construction cost.Apparatus of the present invention are light and handy, easy and simple to handle, are conducive to ascend operation, decrease the potential safety hazard in work progress.The present invention is easy and simple to handle, can improve construction efficiency, can meet the demand of engineering construction progress.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present invention, and figure comprises wire rope 1, rotary handle 2, set bolt 3, rotating ratchet 4, fixing base 5, fixture block spring 6, ratchet fixture block 7, fixture block fixed axis 8, snap ring 9, cylinder fixture block 10, draw-in groove 11, set lever 12, locker 13, hollow tubule 14.
Detailed description of the invention
As shown in Figure 1, the invention provides a kind of scaffolding board binding device, comprise fixing base 5, this fixing base 5 is separately installed with hook-shaped steel pipe snap ring 9 and set lever 12, also comprise locker 13, one end of this locker 13 is arranged on set lever 12 that its other end is detachably arranged on steel pipe snap ring 9; This fixing base 5 is also provided with rotating ratchet 4 by rotating shaft is rotatable, this rotating ratchet 4 is wound with one end of wire rope 1, the other end of this wire rope 1 is connected with a cylinder fixture block 10, this fixing base 5 has the cylinder draw-in groove 11 coordinated with this cylinder fixture block 10, on the fixing base 5 that this rotating ratchet 4 is other, ratchet fixture block 7 is also installed in addition.
On wire rope 1, be wherein set with the hollow tubule 14 of one section of circular arc.
Wherein also comprise fixture block spring 6, the two ends of this fixture block spring 6 are connected with fixing base 5 and ratchet fixture block 7 respectively, and ratchet fixture block 7 is arranged on fixing base 5 by fixture block fixed axis 8.
Wherein on rotating ratchet 4, be installed with set lever 12.
Wherein on rotating ratchet 4, be provided with wire rope 1 winding groove.
Binding material in the present invention uses the wire rope 1 of φ 2mm, and locking member adopts common carbon steel.The present invention includes the compositions such as wire rope 1, fixing base 5 and set lever 12 mounted thereto, rotating ratchet 4, ratchet fixture block 7, snap ring 9.Wire rope 1 of the present invention is fixed on ratchet, and ratchet is provided with wire rope 1 winding groove, by rotating ratchet, carries out the adjustment of wire rope 1 length.Ratchet of the present invention is provided with locking device, by the cooperation of rotating ratchet and locking device, reaches the colligation of scaffold and fastening.Set bolt 3 is for installing the parts such as wire rope block.
Rotating ratchet 4 in the present invention, steel pipe snap ring 9, locker 13 are arranged on fixing base 5 by bolt respectively, and ratchet fixture block 7 is arranged on fixing base 5 by fixed axis, and rotating ratchet 4 can rotate on fixing base 5.One end of wire rope 1 is fixed on rotating ratchet 4, and the other end and cylinder fixture block 10 are fixed.Hollow tubule 14 is through on wire rope 1.Set lever 12 is fixed on rotating ratchet 4.
Using method of the present invention and operating principle are:
In the present invention, adopt the special binding tool of scaffolding board, embodiment takes out cylinder fixture block 10 from cylinder draw-in groove 11, hollow tubule 14 is stuck in the side of square steel pipe under scaffolding board, by bottom ratchet wheel fixture block 7, rotary handle 2 adjusts wire rope 1 to optimum length, by wire rope 1 through scaffolding board, steel pipe snap ring 9 is stuck on the steel pipe of scaffolding board opposite side, locker 13 is stuck on steel pipe snap ring 9, press set lever 12, by bottom ratchet wheel fixture block 7, screw rotary handle 2 and adjust wire rope 1 until unclamp ratchet fixture block 7 by after scaffolding board colligation firmly.

Claims (5)

1. a scaffolding board binding device, it is characterized in that: comprise fixing base (5), this fixing base (5) is separately installed with hook-shaped steel pipe snap ring (9) and set lever (12), also comprise locker (13), one end of this locker (13) is arranged on that set lever (12) is upper and its other end is detachably arranged on steel pipe snap ring (9); This fixing base (5) is also provided with rotating ratchet (4) by rotating shaft is rotatable, this rotating ratchet (4) is wound with one end of wire rope (1), the other end of this wire rope (1) is connected with a cylinder fixture block (10), this fixing base (5) has the cylinder draw-in groove (11) coordinated with this cylinder fixture block (10), on the fixing base (5) that this rotating ratchet (4) is other, ratchet fixture block (7) is also installed in addition.
2. scaffolding board binding device as claimed in claim 1, is characterized in that: the hollow tubule (14) being wherein set with one section of circular arc on wire rope (1).
3. scaffolding board binding device as claimed in claim 1, it is characterized in that: wherein also comprise fixture block spring (6), the two ends of this fixture block spring (6) are connected with fixing base (5) and ratchet fixture block (7) respectively, and ratchet fixture block (7) is arranged on fixing base (5) by fixture block fixed axis (8).
4. scaffolding board binding device as claimed in claim 1, is characterized in that: wherein on rotating ratchet (4), be installed with set lever (12).
5. as the scaffolding board binding device in Claims 1-4 as described in any one, it is characterized in that: wherein on rotating ratchet (4), be provided with wire rope (1) winding groove.
CN201511024427.6A 2015-12-31 2015-12-31 Scaffolding board binding device Active CN105464361B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511024427.6A CN105464361B (en) 2015-12-31 2015-12-31 Scaffolding board binding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511024427.6A CN105464361B (en) 2015-12-31 2015-12-31 Scaffolding board binding device

Publications (2)

Publication Number Publication Date
CN105464361A true CN105464361A (en) 2016-04-06
CN105464361B CN105464361B (en) 2017-10-03

Family

ID=55602476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511024427.6A Active CN105464361B (en) 2015-12-31 2015-12-31 Scaffolding board binding device

Country Status (1)

Country Link
CN (1) CN105464361B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778100A (en) * 2019-10-17 2020-02-11 国网河北省电力有限公司衡水供电分公司 Wooden pole binding device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2864980A1 (en) * 2004-01-12 2005-07-15 Macc Cam for adjusting, blocking and unblocking post supports, has off-centered revolution part that stops on hollow shaft when in clamping position, and drive shaft that is lifted to disengage part for moving supports on beam
CN1844609A (en) * 2005-04-10 2006-10-11 李超 Building scaffold rope fastener
CN200961352Y (en) * 2006-07-18 2007-10-17 李占杰 Fixing device for scaffold
JP2009012799A (en) * 2007-07-03 2009-01-22 Yasunari Masumoto Fastening band
CN201992195U (en) * 2010-12-09 2011-09-28 四川省晟茂建设有限公司 Cable fastener for scaffolding
JP2011220082A (en) * 2010-04-05 2011-11-04 Tabata Biken:Kk Scaffold board clamp
CN203008350U (en) * 2012-12-29 2013-06-19 广西建工集团第三建筑工程有限责任公司 Safety belt fixing device for clip-holding steel-tube scaffold
CN203654715U (en) * 2014-01-20 2014-06-18 古锦光 Scaffold fastener
CN203701569U (en) * 2013-11-29 2014-07-09 大连船舶重工集团有限公司 Special locking piece for fixing scaffold floor of scaffold
CN205330147U (en) * 2015-12-31 2016-06-22 宁夏电力建设工程公司 Scaffold is ligature device for board

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2864980A1 (en) * 2004-01-12 2005-07-15 Macc Cam for adjusting, blocking and unblocking post supports, has off-centered revolution part that stops on hollow shaft when in clamping position, and drive shaft that is lifted to disengage part for moving supports on beam
CN1844609A (en) * 2005-04-10 2006-10-11 李超 Building scaffold rope fastener
CN200961352Y (en) * 2006-07-18 2007-10-17 李占杰 Fixing device for scaffold
JP2009012799A (en) * 2007-07-03 2009-01-22 Yasunari Masumoto Fastening band
JP2011220082A (en) * 2010-04-05 2011-11-04 Tabata Biken:Kk Scaffold board clamp
CN201992195U (en) * 2010-12-09 2011-09-28 四川省晟茂建设有限公司 Cable fastener for scaffolding
CN203008350U (en) * 2012-12-29 2013-06-19 广西建工集团第三建筑工程有限责任公司 Safety belt fixing device for clip-holding steel-tube scaffold
CN203701569U (en) * 2013-11-29 2014-07-09 大连船舶重工集团有限公司 Special locking piece for fixing scaffold floor of scaffold
CN203654715U (en) * 2014-01-20 2014-06-18 古锦光 Scaffold fastener
CN205330147U (en) * 2015-12-31 2016-06-22 宁夏电力建设工程公司 Scaffold is ligature device for board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778100A (en) * 2019-10-17 2020-02-11 国网河北省电力有限公司衡水供电分公司 Wooden pole binding device
CN110778100B (en) * 2019-10-17 2021-12-28 国网河北省电力有限公司衡水供电分公司 Binding device for intersection point of wooden rod

Also Published As

Publication number Publication date
CN105464361B (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN205330147U (en) Scaffold is ligature device for board
CN104533096A (en) Steel bar connecting machine
CN203438167U (en) Movable cement paste cup detacher
CN204492203U (en) A kind of steel bar connecting machine
CN201838934U (en) Novel portable adjustable rod upper platform
CN203903830U (en) Small framework quickly-assembled jack for equipment
CN105464361A (en) Binding device for scaffold plate
CN203445577U (en) Cable drum rapid wire releaser
CN202825086U (en) Adjustable type manual position changing machine capable of conveniently welding
CN206279771U (en) A kind of smart master fixture
CN210171757U (en) Novel spraying equipment is used in steel sheet construction
CN205509206U (en) Copper nose hydraulic tong device
CN204248480U (en) Quick drill centre bore frock
CN205276653U (en) Furred ceiling jib installation device
CN204183194U (en) A kind of erecting device of axle sleeve
CN207810748U (en) Bar automatic aligning device
RU138511U1 (en) ELECTRIC SUPPORT JACK
CN204277392U (en) The quick dismounting hydraulic means of driving member
CN210208855U (en) Polytypic steel pipe cutting device
CN202268668U (en) Operating device of line lifter lead screw for transmission line
CN203312720U (en) Cable head processing auxiliary device
CN206464793U (en) Four-column type oil cylinder dismounts all-in-one
CN220705162U (en) Pouring plate support frame for building construction
CN204927902U (en) Electrical apparatus installation hoisting device of transformer substation
CN214288943U (en) Coating device for steel structure production and manufacturing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 750001, No. 459, Fenghuang South Street, Xingqing District, the Ningxia Hui Autonomous Region, Yinchuan

Patentee after: China Power Construction Ningxia Engineering Co., Ltd.

Address before: 750001, No. 459, Fenghuang South Street, Xingqing District, the Ningxia Hui Autonomous Region, Yinchuan

Patentee before: Ningxia Electric Power Building and Installing Project Company

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190508

Address after: 250000 Building No. 5, No. 3 District, Hanyu Financial and Business Center, Jinan City, Shandong Province

Patentee after: China Electric Construction Group Shandong Electric Power Construction Co., Ltd.

Address before: 750001 No. 459 South Fenghuang Street, Xingqing District, Yinchuan City, Ningxia Hui Autonomous Region

Patentee before: China Power Construction Ningxia Engineering Co., Ltd.