CN105460732B - A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system - Google Patents

A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system Download PDF

Info

Publication number
CN105460732B
CN105460732B CN201610036355.5A CN201610036355A CN105460732B CN 105460732 B CN105460732 B CN 105460732B CN 201610036355 A CN201610036355 A CN 201610036355A CN 105460732 B CN105460732 B CN 105460732B
Authority
CN
China
Prior art keywords
longeron
pulley
steel wire
wire rope
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610036355.5A
Other languages
Chinese (zh)
Other versions
CN105460732A (en
Inventor
兰会学
陈艺诺
陈嘉豪
兰宇航
陈小军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Yuanrun Technology Engineering Co Ltd
Original Assignee
Lanzhou Yuanrun Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Yuanrun Technology Engineering Co Ltd filed Critical Lanzhou Yuanrun Technology Engineering Co Ltd
Priority to CN201610036355.5A priority Critical patent/CN105460732B/en
Publication of CN105460732A publication Critical patent/CN105460732A/en
Application granted granted Critical
Publication of CN105460732B publication Critical patent/CN105460732B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • B66B5/16Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system, including velocity sensor, PLC and two crossbeams be arrangeding in parallel up and down, it is connected with two longerons on every crossbeam side by side, every longeron and is above respectively installed with a pulley;Four longerons are located at four summits of same rectangle;Two moveable longerons are provided between two longerons of lower section side by side, four longerons of lower section are located in the same horizontal plane;Moveable two longerons drive moveable two longerons to move simultaneously in opposite directions by line slideway auxiliary and motor connection, two motors;Six pulley triplets are connected by steel cable;Velocity sensor and motor are connected with PLC signal.The rescue system can slow down the speed of falling of lift car in the lift car safeguard structure formed below that can make lift car " even deceleration ", and be finally stopped tenesmus, realize effective fanout free region rescue.

Description

A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system
Technical field
The invention belongs to elevator and elevator safety running technology field, it is related to a kind of elevator and elevator falls and personnel Falling accident emergency rescuing system.
Background technology
Start the house for twenty or thirty floor height occur the nineties in last century, elevator turns into the standard configuration in skyscraper, is personnel Go on a journey indispensable " vehicles ".However, because operation and maintenance is maintained improper, one to being considered as " most safety traffic work The elevator of tool " occurs frequently accident in recent years, it has also become can not avoid the problem of in Urban Construction in China.
Miserable elevator accident is played together so that people constantly seek the safety prevention measure of elevator.But cut-off 2015 Year December, from the point of view of patent search result and elevator accident news report, no matter in China or external, all fallen without elevator The very first time is quickly to taking elevator personnel or falling the professional equipment of the effective fanout free region rescue of well personnel progress after falling accident generation And technology.
The content of the invention
It is an object of the invention to provide a kind of elevator and elevator falls and personnel's falling accident emergency rescuing system, in electricity When falling accident occurs for ladder and lift, elevator and elevator falls can be effectively prevented to reduce damage to greatest extent to elevator shaft bottom Become estranged casualties.
To achieve the above object, the technical solution adopted in the present invention is:A kind of elevator and elevator falls and personnel's pendant Well accident emergency rescuing system, including velocity sensor, PLC and the first crossbeam be arrangeding in parallel up and down and the second horizontal stroke Beam, is connected with first longeron and second longeron perpendicular with first crossbeam on first crossbeam side by side, the first longeron and second vertical First pulley and second pulley are respectively installed with beam;Threeth perpendicular with second cross beam is connected with second cross beam side by side to indulge Beam and the 6th longeron, the 3rd pulley and the 6th pulley are respectively installed with the 3rd longeron and the 6th longeron;First longeron, second are indulged Beam, the 3rd longeron and the 6th longeron are located at four summits of same rectangle;The is provided between 3rd longeron and the 6th longeron side by side Four longerons and the 5th longeron, the 3rd longeron, the 4th longeron, the 5th longeron and the 6th longeron are located in the same horizontal plane, and the 4th is vertical The 4th pulley is set with beam, the 5th pulley is set with the 5th longeron;Two are additionally provided between 3rd longeron and the 6th longeron Line slideway auxiliary, a line slideway auxiliary are driven by a motor, and the sliding block in a line slideway auxiliary is connected with the 4th longeron, Sliding block in another line slideway auxiliary is connected with the 5th longeron, and two motors drive the 4th longeron and the 5th longeron simultaneously along phase Opposite direction moves;First pulley, the 5th pulley and the 6th pulley are connected by the first steel wire rope;Second pulley, the 3rd pulley and 4th pulley is connected by the second steel wire rope;Velocity sensor and motor are connected with PLC signal.
Emergency rescuing system of the present invention is arranged in elevator hoistway, and steel wire rope is preset by pulley, when lift car is sent out During raw falling accident, after velocity sensor detects abnormal lift car downstream rate, PLC starts motor, passes through Pulley or longeron drawing steel wire rope, two steel wire ropes are in the lift car protection knot formed below that can make lift car " even deceleration " Structure, slows down the speed of falling of lift car, and lift car is finally stopped tenesmus.The emergency rescuing system can be in elevator and liter The very first time carries out emergency relief during falling accident or personnel's falling accident occur for drop machine, realizes effective fanout free region rescue.
Brief description of the drawings
Fig. 1 is the structural representation of the first embodiment of emergency rescuing system of the present invention.
Fig. 2 is Fig. 1 left view.
Fig. 3 is the state diagram that emergency rescuing system shown in Fig. 1 completes rescue.
Fig. 4 is the structural representation of second of embodiment of emergency rescuing system of the present invention.
Fig. 5 is Fig. 4 left view.
Fig. 6 is the state diagram that emergency rescuing system shown in Fig. 4 completes rescue.
The structural representation of Fig. 7 the third embodiment of emergency rescuing system of the present invention.
Fig. 8 is Fig. 7 left view.
Fig. 9 is the state diagram that emergency rescuing system shown in Fig. 7 completes rescue.
In figure:1. the first longeron, 2. first pulleys, 3. first crossbeams, 4. second longerons, 5. second pulleys, 6. elevator cars Railway carriage or compartment, 7. rotating shafts, 8. the 3rd longerons, 9. the 4th longerons, 10. the 3rd pulleys, 11. the 4th pulleys, 12. second cross beams, 13. the 5th is vertical Beam, 14. the 6th longerons, 15. the 5th pulleys, 16. the 6th pulleys, 17. velocity sensors, 18. first steel wire ropes, 19. second steel Cord, 20. the 7th pulleys, 21. the 3rd steel wire ropes, 22. the 4th steel wire ropes, 23. the 5th steel wire ropes, 24. the 6th steel wire ropes, 25. First hook, 26. second hooks, 27. the 3rd hooks, 28. the 4th hooks.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
As depicted in figs. 1 and 2, the first embodiment of emergency rescuing system of the present invention, including velocity sensor 17 and on Under the first crossbeam 3 and second cross beam 12 that be arranged in parallel, be connected with the first longeron 1 and the second longeron 4 side by side on first crossbeam 3, First longeron 1 and the second longeron 4 are perpendicular with first crossbeam 3, and first pulley 2, the second longeron 4 are set with the first longeron 1 On be set with second pulley 5;The 3rd longeron 8 and the 6th longeron 14, the 3rd longeron 8 and the 6th are connected with second cross beam 12 side by side Longeron 14 is perpendicular with second cross beam 12, and the 3rd longeron 8 and the 6th longeron 14 are oppositely arranged, and is set with the 3rd longeron 8 Three pulleys 10, the 6th pulley 16 is set with the 6th longeron 14;First longeron 1, the longeron 8 of the second longeron 4 the 3rd and the 6th longeron 14 are located at four summits of same rectangle;The 4th longeron 9 and the 5th longeron are provided between 3rd longeron 8 and the 6th longeron 14 side by side 13, the 4th longeron 9 and the 5th longeron 13 are parallel with the 3rd longeron 8, the 3rd longeron 8, the 4th longeron 9, the 5th longeron 13 and Six longerons 14 are located in the same horizontal plane;The 4th pulley 11 is set with 4th longeron 9, the 5th cunning is set with the 5th longeron 13 Wheel 15;Two line slideway auxiliaries are additionally provided between 3rd longeron 8 and the 6th longeron 14, a line slideway auxiliary is driven by a motor Dynamic, the sliding block in a line slideway auxiliary is connected with the 4th longeron 9, sliding block and the 5th longeron 13 in another line slideway auxiliary Connection, two motors drive the 4th longeron 9 and the 5th longeron 13 to move simultaneously in opposite directions.First pulley 2, the 5th pulley 15 Connected with the 6th pulley 16 by the first steel wire rope 18;Second pulley 5, the 3rd pulley 10 and the 4th pulley 11 pass through the second steel wire The connection of rope 19.
Velocity sensor 17 and motor are connected with PLC signal.
During using the first embodiment of emergency rescuing system of the present invention:By first crossbeam 3, the first longeron 1 and the second longeron 4 Elevator well headroom is both secured to, PLC is installed in elevator(lift) machine room, by second cross beam 12, the 3rd longeron the 8, the 6th Longeron 14 and velocity sensor 17 are installed on the bottom surface of elevator hoistway, parallel with the 3rd longeron 8 in the bottom of lift car 6 Two seamed edges on each installation one can be around the rotating shaft 7 of own axis.In the running of lift car 6, if breaking down, When lift car 6 quickly falls, velocity sensor 17 detects the downstream rate of lift car 6 exception, and caused signal is passed PLC is defeated by, PLC starts two motors and started simultaneously, and two motors are vertical by line slideway auxiliary driving the 4th The longeron 13 of beam 9 and the 5th while move toward one another, until the 4th longeron 9 and the 5th longeron 13 meet, are wound on first pulley the 2, the 5th The first steel wire rope 18 on the pulley 16 of pulley 15 and the 6th forms a right angled triangle, is wound on second pulley 5, the 3rd pulley 10 Another right angled triangle is formed with the second steel wire rope 19 on the 4th pulley 11, two right angled triangles are full symmetric, shape Start the slip cableway after falling into lift car 6, and the hypotenuse of two right angled triangles is adjacent, as shown in Figure 3.Lift car 6 fall slides on the cableway of two right angled triangles compositions, and two rotating shafts 7 of the bottom of lift car 6 rotate, for protecting electricity Terraced car 6 does not cut the personnel in rupture injury lift car 6 by steel wire rope, while Triangle cableway is also in the neck of pulley Rotating, these tumblers are completed to buffer and discharge lift car 6 and cableway impact caused by contact for the first time jointly, due to Right angled triangle has very strong stability, and two hypotenuses of right angled triangle bear gravity when lift car 6 falls, to pendant Fall lift car 6 and form upward lifting force, and make the even retardation of lift car 6 to fall, i.e. " even deceleration ", the elevator to fall Car 6 decelerates to halted state on cableway.
As shown in Figure 4 and Figure 5, second of embodiment of emergency rescuing system of the present invention, including velocity sensor 17 and first Crossbeam 3, parallel on first crossbeam 3 to be connected with the first longeron 1 and the second longeron 4, the first longeron 1 and the second longeron 4 are with first Crossbeam 3 is perpendicular;The pulley 20 of first pulley 2 and the 7th is set with first longeron 1, second pulley 5 is set with the second longeron 4 With the 8th pulley;The lower section of first crossbeam 3 is provided with the 4th longeron 9, the 5th longeron 13 and two line slideway auxiliaries, the 4th longeron 9 In the lower section of the second longeron 4, parallel with the second longeron 4, the 4th longeron 9 is connected with the sliding block on a line slideway auxiliary, the Five longerons 13 are located at the lower section of the first longeron 1, parallel with the first longeron 1, on the 5th longeron 13 and another line slideway auxiliary Sliding block connection, two line slideway auxiliaries drive by motor respectively, and two motors drive the 4th longerons 9 and the 5th longeron 13 simultaneously Move in opposite direction.4th longeron 9 and the 5th longeron 13 are shifted to install, i.e., the movement locus of the 4th longeron 9 and the 5th is indulged The movement locus of beam 13 is parallel;The 4th pulley 11 is set with 4th longeron 9, the 5th pulley is set with the 5th longeron 13 15;First pulley 2, second pulley 5 and the 5th pulley 15 are connected by the 3rd steel wire rope 21, the 7th pulley 20, the 8th pulley and 4th pulley 11 is connected by the 4th steel wire rope 22.Motor and velocity sensor 17 are connected with PLC.
During using second of embodiment of emergency rescuing system of the present invention:By first crossbeam 3, the first longeron 1 and the second longeron 4 Elevator well headroom is both secured to, PLC is installed in elevator(lift) machine room, by the 4th longeron 9, the 5th longeron 13 and speed Degree sensor 17 is installed on the bottom surface of elevator hoistway, on two seamed edges parallel with the 4th longeron 9 of the bottom of lift car 6 Each installation one can be around the rotating shaft 7 of own axis.In the running of lift car 6, if breaking down, lift car 6 is fast When speed is fallen, velocity sensor 17 detects the downstream rate of lift car 6 exception, and caused signal is transferred into PLC controls Device, PLC start two motors simultaneously, and two motors drive the 4th longeron 9 and the 5th longeron 13 by line slideway auxiliary Move toward one another simultaneously, the 4th longeron 9 are moved to the lower section of the first longeron 1, meanwhile, the 5th longeron 13 is moved to the lower section of the second longeron 4; 3rd steel wire rope 21 and the 4th steel wire rope 22 intersect to form " again " font and slide cableway, as shown in Figure 6.When lift car 6 falls In glide downwards on " again " font cableway, two rotating shafts 7 of the bottom of lift car 6 rotate, and prevent steel wire rope because of frictional force too It is broken greatly, while prevents steel wire rope cutting lift car 6 from injuring boarding personnel, and buffers and discharge lift car 6 and fall Impact when on steel wire rope.Because triangle has very strong stability, when used during elevator falling is born on two sides of triangle Gravity, upward lifting force is formed to the elevator cab that falls, and make the even deceleration of the equal sedan-chair of cage, i.e., lift car 6 is " again " Realized on font cableway " even deceleration ".Last is decelerated to halted state until the lift car 6 to fall.
As shown in Figure 7 and Figure 8, the third embodiment of emergency rescuing system of the present invention, its structure and the first embodiment Structure is essentially identical, and difference between the two is:Do not have in the structure of the third embodiment the 4th longeron 9, the 5th longeron 13, 4th pulley 11 and the 5th pulley 15, also without two line slideway auxiliaries;Along from the first longeron 1 to the direction of the 6th longeron 14, The first hook 25 and the second hook 26 are sequentially provided between first longeron 1 and the 6th longeron 14, one end of the 5th steel wire rope 23 is consolidated It is connected in second pulley 5, the other end of the 5th steel wire rope 23 is successively around the hook 26 of the hook of second pulley 5, first 25 and second Afterwards, it is fixed on the 3rd pulley 10;Along from the second longeron 4 to the direction of the 3rd longeron 8, the second longeron 4 and the 3rd longeron 8 The 3rd hook 27 and the 4th hook 28 are sequentially provided with, one end of the 6th steel wire rope 24 is fixed in first pulley 2, the 6th steel wire rope After 24 other end links up with 28 around the hook of first pulley the 2, the 3rd 27 and the 4th successively, it is fixed on the 6th pulley 16;One Motor drives the 3rd pulley 10 to rotate by the 3rd longeron 8, and another motor drives 16 turns of the 6th pulley by the 6th longeron 14 It is dynamic.Velocity sensor 17 and motor are connected with PLC signal.
During using the third embodiment of emergency rescuing system of the present invention, by first crossbeam 3, the first longeron 1 and the second longeron 4 Elevator well headroom is both secured to, PLC is installed in elevator(lift) machine room, by second cross beam 12, the 3rd longeron the 8, the 6th Longeron 14 and velocity sensor 17 are installed on the bottom surface of elevator hoistway, and four hooks are respectively arranged in into elevator hoistway In side wall, being respectively mounted one on four seamed edges parallel with the first longeron 1 of the outside of lift car 6 can be around own axis Rotating shaft 7, in the running of lift car 6, if breaking down, when lift car 6 quickly falls, velocity sensor 17 detects The downstream rate of lift car 6 is abnormal, and caused signal is transferred into PLC, and PLC starts two electricity simultaneously Machine, two motors involve the 5th steel wire rope 23 and the 6th steel wire rope 24 respectively, the 5th steel wire rope 23 and the 6th steel wire rope 24 from Depart from hook, and tense respectively, intersection is respectively formed above and below lift car 6, as shown in figure 9, now, the 5th steel The steel wire rope 24 of cord 23 and the 6th forms relative web tension, forms the slip cableway after lift car falls.Work as used during elevator falling Afterwards when being slided on netted cableway, four rotating shafts 7 on lift car 6 rotate, and prevent steel wire rope because of impact and frictional force too It is broken greatly, while prevents steel wire rope cutting lift car 6 and injure boarding personnel.Because network structure has very strong elasticity resistance Power, to falling, lift car forms cluster lifting force, and makes lift car even retardation, until lift car deceleration of falling To halted state.
All motors in emergency rescuing system of the present invention are the three phase electric machine or two-phase induction motor that one direction rotates.
When setting emergency rescuing system of the present invention in elevator hoistway, can install one in stair shaft shaft bottom has bullet The barrier of property, and several rubber safety air bags are placed below the barrier, cause personnel to slip when there are elevator faults When falling into elevator, elastic barrier forms the first buffering, and rubber safety air bag forms secondary buffer, to protect pendant to greatest extent Enter the personnel in elevator hoistway.
Emergency rescuing system of the present invention can be first during falling accident or personnel's falling accident occur for elevator and lift Time carries out emergency relief, free fall type is fallen(Slide)Elevator and lift carry out " even deceleration ", until elevator and Lift stops falling, and realizes effective fanout free region rescue.

Claims (4)

1. a kind of elevator and elevator falls and personnel's falling accident emergency rescuing system, it is characterised in that including velocity pick-up Device(17), PLC and the first crossbeam be arrangeding in parallel up and down(3)And second cross beam(12), first crossbeam(3)On side by side It is connected with and first crossbeam(3)The first perpendicular longeron(1)With the second longeron(4), the first longeron(1)With the second longeron(4) On be respectively installed with first pulley(2)And second pulley(5);Second cross beam(12)On be connected with side by side and second cross beam(12)Phase The 3rd vertical longeron(8)With the 6th longeron(14), the 3rd longeron(8)With the 6th longeron(14)On be respectively installed with the 3rd pulley (10)With the 6th pulley(16);First longeron(1), the second longeron(4)3rd longeron(8)With the 6th longeron(14)Positioned at same square Four summits of shape;3rd longeron(8)With the 6th longeron(14)Between be provided with the 4th longeron side by side(9)With the 5th longeron(13), 3rd longeron(8), the 4th longeron(9), the 5th longeron(13)With the 6th longeron(14)It is located in the same horizontal plane, the 4th longeron (9)On be set with the 4th pulley(11), the 5th longeron(13)On be set with the 5th pulley(15);3rd longeron(8)It is vertical with the 6th Beam(14)Between be additionally provided with two line slideway auxiliaries, a line slideway auxiliary is driven by a motor, in a line slideway auxiliary Sliding block and the 4th longeron(9)Connect, sliding block and the 5th longeron in another line slideway auxiliary(13)Connection, two motors drive Dynamic 4th longeron(9)With the 5th longeron(13)Move simultaneously in opposite directions;First pulley(2), the 5th pulley(15)With the 6th Pulley(16)Pass through the first steel wire rope(18)Connection;Second pulley(5), the 3rd pulley(10)With the 4th pulley(11)Pass through second Steel wire rope(19)Connection;Velocity sensor(17)It is connected with motor with PLC signal, lift car(6)Positioned at first Steel wire rope(18)With the second steel wire rope(19)Between, lift car(6)When quickly falling, velocity sensor(17)Detect elevator Car(6)Downstream rate is abnormal, and caused signal is transferred into PLC, and PLC starts two motors and opened simultaneously Dynamic, two motors drive the 4th longeron by line slideway auxiliary(9)With the 5th longeron(13)Move toward one another simultaneously, until the 4th is vertical Beam(9)With the 5th longeron(13)Meet, be wound on first pulley(2), the 5th pulley(15)With the 6th pulley(16)On the first steel Cord(18)A right angled triangle is formed, is wound on second pulley(5), the 3rd pulley(10)With the 4th pulley(11)On second Steel wire rope(19)Another right angled triangle is formed, two right angled triangles are full symmetric, form lift car(6)Start to fall Backward slip cableway, and the hypotenuse of two right angled triangles is adjacent.
2. a kind of elevator and elevator falls and personnel's falling accident emergency rescuing system, it is characterised in that including velocity pick-up Device(17), PLC and first crossbeam(3), first crossbeam(3)It is upper parallel to be connected with and first crossbeam(3)Perpendicular One longeron(1)With the second longeron(4);First longeron(1)On be set with first pulley(2)With the 7th pulley(20), the second longeron (4)On be set with second pulley(5)With the 8th pulley;First crossbeam(3)Lower section is provided with the 4th longeron(9), the 5th longeron(13) With two line slideway auxiliaries, the 4th longeron(9)Positioned at the second longeron(4)Lower section, the 4th longeron(9)With on a line slideway auxiliary Sliding block connection, the 5th longeron(13)Positioned at the first longeron(1)Lower section, the 5th longeron(13)With on another line slideway auxiliary Sliding block is connected, and two line slideway auxiliaries are driven by motor respectively, and two motors drive the 4th longeron(9)With the 5th longeron(13)Together When move in opposite direction;4th longeron(9)With the 5th longeron(13)Shift to install;4th longeron(9)On be set with the 4th Pulley(11), the 5th longeron(13)On be set with the 5th pulley(15);First pulley(2), second pulley(5)With the 5th pulley (15)Pass through the 3rd steel wire rope(21)It is connected, the 7th pulley(20), the 8th pulley and the 4th pulley(11)Pass through the 4th steel wire rope (22)It is connected;Velocity sensor(17)It is connected with motor with PLC, lift car(6)Positioned at the 3rd steel wire rope(21) With the 4th steel wire rope(22)Between, lift car(6)When quickly falling, velocity sensor(17)Detect lift car(6)Under Row velocity anomaly, and caused signal is transferred to PLC, PLC starts two motors simultaneously, and two motors lead to Cross line slideway auxiliary and drive the 4th longeron(9)With the 5th longeron(13)Move toward one another simultaneously, the 4th longeron(9)It is vertical to be moved to first Beam(1)Lower section, meanwhile, the 5th longeron(13)It is moved to the second longeron(4)Lower section;3rd steel wire rope(21)With the 4th steel wire rope (22)Intersect to form " again " font and slide cableway.
3. a kind of elevator and elevator falls and personnel's falling accident emergency rescuing system, it is characterised in that including velocity pick-up Device(17), PLC and the first crossbeam be arrangeding in parallel up and down(3)And second cross beam(12), first crossbeam(3)On side by side It is connected with and first crossbeam(3)The first perpendicular longeron(1)With the second longeron(4), the first longeron(1)With the second longeron(4) On be respectively installed with first pulley(2)And second pulley(5);Second cross beam(12)On be connected with side by side and second cross beam(12)Phase The 3rd vertical longeron(8)With the 6th longeron(14), the 3rd longeron(8)With the 6th longeron(14)On be respectively installed with the 3rd pulley (10)With the 6th pulley(16);First longeron(1), the second longeron(4), the 3rd longeron(8)With the 6th longeron(14)Positioned at same Four summits of rectangle;Along from the first longeron(1)To the 6th longeron(14)Direction, the first longeron(1)With the 6th longeron(14) Between be sequentially provided with the first hook(25)With the second hook(26), the 5th steel wire rope(23)One end be fixed in second pulley(5) On, the 5th steel wire rope(23)The other end bypass second pulley successively(5), first hook(25)With the second hook(26)Afterwards, Gu It is connected to the 3rd pulley(10)On;Along from the second longeron(4)To the 3rd longeron(8)Direction, the second longeron(4)With the 3rd longeron (8)Between be sequentially provided with the 3rd hook(27)With the 4th hook(28), the 6th steel wire rope(24)One end be fixed in first pulley (2)On, the 6th steel wire rope(24)The other end bypass first pulley successively(2), the 3rd hook(27)With the 4th hook(28)Afterwards, It is fixed in the 6th pulley(16)On;One motor passes through the 3rd longeron(8)Drive the 3rd pulley(10)Rotate, another motor leads to Cross the 6th longeron(14)Drive the 6th pulley(16)Rotate;Velocity sensor(17)It is connected with motor with PLC signal, Lift car(6)Positioned at the 5th steel wire rope(23)With the 6th steel wire rope(24)Between, lift car(6)When quickly falling, speed Sensor(17)Detect lift car(6)Downstream rate is abnormal, and caused signal is transferred into PLC, PLC controls Device starts two motors simultaneously, and two motors involve the 5th steel wire rope respectively(23)With the 6th steel wire rope(24), the 5th steel wire Rope(23)With the 6th steel wire rope(24)Depart from from hook, and tense respectively, in lift car(6)Above and below be respectively formed Intersect, form the slip cableway after lift car falls.
4. elevator and elevator falls and personnel's falling accident emergency rescuing system according to claim 1,2 or 3, it is special Sign is that the emergency rescuing system also includes flexible barrier and several air bags, in use, several safety Air bag is placed in below barrier.
CN201610036355.5A 2016-01-20 2016-01-20 A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system Expired - Fee Related CN105460732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610036355.5A CN105460732B (en) 2016-01-20 2016-01-20 A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610036355.5A CN105460732B (en) 2016-01-20 2016-01-20 A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system

Publications (2)

Publication Number Publication Date
CN105460732A CN105460732A (en) 2016-04-06
CN105460732B true CN105460732B (en) 2018-01-26

Family

ID=55598972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610036355.5A Expired - Fee Related CN105460732B (en) 2016-01-20 2016-01-20 A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system

Country Status (1)

Country Link
CN (1) CN105460732B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2613829B2 (en) * 1991-11-14 1997-05-28 三菱電機株式会社 Elevator safety equipment
CN2897954Y (en) * 2006-04-06 2007-05-09 陈洋 Safety super-speed brake by accident for inclined-well bogie
CN102774717A (en) * 2012-06-07 2012-11-14 苏州汾湖电梯有限公司 Safety device for elevator
CN202966348U (en) * 2012-12-27 2013-06-05 宁要武 Vehicle blocking fence suitable for monkey vehicle roadway
CN203269265U (en) * 2013-05-03 2013-11-06 扬州宏泰液压机电设备制造有限公司 Inclined shaft tramcar anti-sliding device for mine
CN205328400U (en) * 2016-01-20 2016-06-22 兰州源润科技工程有限公司 Elevator and lift fall and personnel weigh down well accident emergency rescue system

Also Published As

Publication number Publication date
CN105460732A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN107269476A (en) A kind of tower frame for wind generating set lift maintenance platform system
KR101344995B1 (en) Safety equipment of train platform
CN102756964B (en) Non-winding type high-rise rescuing elevator
US9868616B2 (en) Double-deck elevator
KR101547650B1 (en) Safety equipment of train platform
WO2020006872A1 (en) Anti-falling protection device of elevator
CN110921450B (en) Elevator safety supervision equipment protection architecture
CN205328400U (en) Elevator and lift fall and personnel weigh down well accident emergency rescue system
CN107892227B (en) Safety elevator capable of preventing high-speed falling
CN110171759A (en) One kind having machine room elevator method for dismounting
CN105460732B (en) A kind of elevator and elevator falls and personnel's falling accident emergency rescuing system
CN203033588U (en) Rope-break-proof damping slow-descending elevator
CN205240990U (en) A emergent retarder of permanent magnetism for over -and -under type elevator
CN205419395U (en) Elevator anti -falling device
CN207131536U (en) A kind of tower frame for wind generating set lift maintenance platform system
CN113697633A (en) Elevator sling with falling protection function
CN107585656A (en) A kind of impact absorbing supplementary security system
CN203033586U (en) Multistage speed governing device
JP6567143B2 (en) Elevator equipment
WO2020006875A1 (en) Protection device for bottom of elevator shaft
CN206328027U (en) The multi-functional mounting platform of elevator hoistways part
CN216841492U (en) Anti-collision device for well drilling
CN218624045U (en) Wall body backboard for aerial ladder
CN211056466U (en) Elevator lifting device
CN103072866A (en) Rope-breaking preventing damp slow-down elevator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180126

Termination date: 20210120