CN105449670B - A kind of distribution network load characteristic analysis method - Google Patents

A kind of distribution network load characteristic analysis method Download PDF

Info

Publication number
CN105449670B
CN105449670B CN201510919407.9A CN201510919407A CN105449670B CN 105449670 B CN105449670 B CN 105449670B CN 201510919407 A CN201510919407 A CN 201510919407A CN 105449670 B CN105449670 B CN 105449670B
Authority
CN
China
Prior art keywords
load
day
characteristic analysis
distribution
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510919407.9A
Other languages
Chinese (zh)
Other versions
CN105449670A (en
Inventor
吴�琳
尚健
苏义荣
杜红卫
席旸旸
韩韬
王双虎
陈连杰
尹宏旭
戴玮
田小东
柳劲松
方陈
吴福保
许晓慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Nari Technology Co Ltd
State Grid Shanghai Electric Power Co Ltd
State Grid Electric Power Research Institute
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Nari Technology Co Ltd
State Grid Shanghai Electric Power Co Ltd
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Nari Technology Co Ltd, State Grid Shanghai Electric Power Co Ltd, State Grid Electric Power Research Institute filed Critical State Grid Corp of China SGCC
Priority to CN201510919407.9A priority Critical patent/CN105449670B/en
Publication of CN105449670A publication Critical patent/CN105449670A/en
Application granted granted Critical
Publication of CN105449670B publication Critical patent/CN105449670B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Power Engineering (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of distribution network load Characterization method.Load Characteristic Analysis and investigation are the bases of Power System Planning, are the necessary means in user and market in understanding and prediction compass of competency.Resident load and industry and commerce load are the important components of city load, and it is investigated, significant to load prediction, the formulation of power supply plan, urban power network planning, economy operation of power grid and Marketing of Power Market.This method carries out analytic statistics to the load in 10kV distributions, study daily load characteristic, influence factor and the changing rule of various loads, and form typical day curve, the method of operation, the work such as make rational planning for can be arranged to provide foundation for power distribution network, and the constantly improve for the advanced application of distribution provides support.

Description

A kind of distribution network load characteristic analysis method
Technical field
The present invention relates to the analysis application module in distribution automation system.
Background technology
Electric load is the important component of power network.Load monitoring and management are to transformer station, power plant and whole electric power The operation of system is significant.It is transformer station's spatial load forecasting, and power plant arranges daily trading planning, determines Operation of Electric Systems The Plant maintenance plan such as mode and main transformer, generating set and transformer station, power plant extend the foundation of newly-built planning.Together When, after grasping part throttle characteristics, by reasonably, in a planned way arranging the electricity consumption time of all types of user, network load song can be optimized Line, reduce peak load and the difference of minimum load, make load curve figure relatively flat, so as to be advantageous to make full use of hair Electricity, power supply unit (main transformer etc.) capacity, improve the economy of system operation.
With the progress of society and popularizing for electric energy, the scope of electric power application is more and more extensive.On the one hand, by electric power The characteristics of system and power consumer electricity consumption, is determined that electric load has the characteristics of continuity, regular;On the other hand, due to There is contacting for countless ties with many factors such as society, economy, politics, meteorology, electric load shows certain random again Property.
Dimension, analytic statistics can be carried out to the load in 10kV distributions, study the daily load characteristic of various loads, influence Factor and changing rule, and form typical day curve, the method for operation can be arranged for power distribution network, is made rational planning for etc. work provide according to According to, and the constantly improve for the advanced application of distribution provides support.
The content of the invention
Goal of the invention:In order to grasp the operation characteristic of regional load, the present invention provides a kind of distribution network load specificity analysis Method, this method carry out analytic statistics to the load in 10kV distributions, study daily load characteristic, the influence factor of various loads with And changing rule, and typical day curve is formed, the work such as can arrange the method for operation for power distribution network, make rational planning for provide foundation, and Constantly improve for the advanced application of distribution provides support.
Technical scheme:In order to solve the above technical problems, the technical solution adopted by the present invention is:
Step 1:According to outlet switch ID, topology search inquiry downstream institute band distribution transforming situation is enabled, obtains these distribution transformings ID;
Step 2:Judge the load type of distribution transforming, if public become then into resident load, specially become then into industrial and commercial load;
Step 3:Capacity of distribution transform, electric current and active power value are obtained according to distribution transforming ID;
Step 4:Count number of users, capacity and the proportion of two types load.
Step 5:After starting Load Characteristic Analysis, the part throttle characteristics point set by downstream load statistics of features interface is obtained Analyse parameter;
Step 6:Determined to carry out the period of Load Characteristic Analysis according to parameter, call dynamic bank interface, obtained outlet and open Close the active power sampled value in the period;
Step 7:Judge whether sampled data is complete, if imperfect pop-up dialogue box prompting data are imperfect, Wu Fajin Row Load Characteristic Analysis;
Step 8:Search out typical day of the peak day in the period as Load Characteristic Analysis;
Step 9:Obtain the sampled data of the typical case in a few days each distribution transforming in downstream;
Step 10:Judge whether the sampled data of each distribution transforming is complete, if imperfect pop-up dialogue box prompting data are not Completely, Load Characteristic Analysis can not be carried out;
Step 11:The switching data of acquisition is added up, by cumulative the data obtained forming curves and shown;
Step 12:According to cumulative obtained data parameter and show.
Beneficial effect:Distribution network load characteristic analysis method provided by the invention, the method achieve in 10kV distributions Load carry out analytic statistics, by studying daily load characteristic, influence factor and the changing rule of load, and form typical day Curve, for method of operation arrangement, making rational planning for provides technical support.
Brief description of the drawings
Fig. 1 is downstream load statistics of features method.
Fig. 2 is Load Characteristic Analysis method.
Embodiment
1st, downstream load statistics of features
Downstream load statistics of features is to clear outlet switch downstream residential electricity consumption load, service trade power load, industry and commerce Several big load species such as power load, illuminating and heating power load, and count the proportion of total load shared by each type load.This The purpose of work is to grasp the changing rule of different load, and then providing the higher typical load curve of accuracy rate and prepare.
Wherein, Distribution Network Load Data species is defined as two classes:Residential electricity consumption load and industry and commerce power load.Searched by topology Rope downstream institute band distribution transforming situation, and obtain the public quantity and rated capacity, electricity for becoming (resident load) and specially becoming (industry and commerce load) The information such as stream and active power, counts two types load number of users, total capacity and proportion on this basis.
Comprise the following steps that:
Step 1:According to outlet switch ID, topology search inquiry downstream institute band distribution transforming situation is enabled, obtains these distribution transformings ID;
Step 2:Judge the load type of distribution transforming, if public become then into resident load, specially become then into industrial and commercial load;
Step 3:Capacity of distribution transform, electric current and active power value are obtained according to distribution transforming ID;
Step 4:Count number of users, capacity and the proportion of two types load.
2nd, Load Characteristic Analysis
Part throttle characteristics is periodically and regular due to existing, thus can be found by Load Characteristic Analysis in it rule Property.This programme carries out daily load specificity analysis using index method and curve method in terms of qualitative and be quantitative two.
Index method is to represent part throttle characteristics by the index of various part throttle characteristics, can with index method analysis load characteristic Quantitatively to describe the development and change of part throttle characteristics.Curve method is a kind of most direct Load Characteristic Analysis method, passes through drafting Load curve can intuitively represent part throttle characteristics, be mainly used in qualitative analysis part throttle characteristics.
Index calculating method:
Daily treatment cost:In the load of typical day entry, maximum one.
Day minimum load:In the load of typical day entry, minimum one.
Daily load rate:The ratio of average load and maximum load, calculation formula are as follows:
Day ratio of minimum load to maximum load:Day minimum load and the ratio when Daily treatment cost, calculation formula are as follows:
Day peak-valley difference:The difference of Daily treatment cost and day minimum load.
Day peak-valley ratio:Day peak-valley difference and the ratio when Daily treatment cost, calculation formula are as follows:
Typical day load curve:By the curve drawn in one day by hour (half an hour, 15min) load variations.
Load Characteristic Analysis step is as follows:
Step 1:After starting Load Characteristic Analysis, the part throttle characteristics point set by downstream load statistics of features interface is obtained Analyse parameter;
Step 2:Determined to carry out the period of Load Characteristic Analysis according to parameter, call dynamic bank interface, obtained outlet and open Close the active power sampled value in the period;
Step 3:Judge whether sampled data is complete, if imperfect pop-up dialogue box prompting data are imperfect, Wu Fajin Row Load Characteristic Analysis;
Step 4:Search out typical day of the peak day in the period as Load Characteristic Analysis;
Step 5:Dynamic bank interface is called, obtains the sampled data of the typical case in a few days each distribution transforming in downstream;
Step 6:Judge whether the sampled data of each distribution transforming is complete, if imperfect pop-up dialogue box prompting data are endless It is whole, Load Characteristic Analysis can not be carried out;
Step 7:The switching data of acquisition is added up, by cumulative the data obtained forming curves and shown;
Step 8:According to cumulative obtained data parameter and show.
In addition, the concrete methods of realizing and approach of the present invention are a lot, described above is only the preferred embodiment of the present invention. It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, it can also do Go out some improvements and modifications, these improvements and modifications also should be regarded as protection scope of the present invention.What is be not known in the present embodiment is each The available prior art of part is realized.

Claims (1)

1. a kind of distribution network load characteristic analysis method, it is characterised in that comprise the following steps:
Step 1:According to outlet switch ID, topology search inquiry downstream institute band distribution transforming situation is enabled, obtains these distribution transformings ID;
Step 2:Judge the load type of distribution transforming, if public become then into resident load, specially become then into industrial and commercial load;
Step 3:Capacity of distribution transform, electric current and active power value are obtained according to distribution transforming ID;
Step 4:Count number of users, capacity and the proportion of two types load;
Step 5:After starting Load Characteristic Analysis, obtain the Load Characteristic Analysis set by downstream load statistics of features interface and join Number;
Step 6:Determined to carry out the period of Load Characteristic Analysis according to parameter, call dynamic bank interface, obtaining outlet switch should Active power sampled value in period;
Step 7:Judge whether sampled data is complete, if imperfect pop-up dialogue box prompting data are imperfect, can not be born Lotus specificity analysis;
Step 8:Search out typical day of the peak day in the period as Load Characteristic Analysis;
Step 9:Obtain the sampled data of the typical case in a few days each distribution transforming in downstream;
Step 10:Judge whether the sampled data of each distribution transforming is complete, if imperfect pop-up dialogue box prompting data are imperfect, Load Characteristic Analysis can not be carried out;
Step 11:The switching data of acquisition is added up, by cumulative the data obtained forming curves and shown;
Step 12:According to cumulative obtained data parameter and show;
Wherein,
Distribution network load specificity analysis is carried out using two methods of index method and curve method, index method is by various part throttle characteristics Index represent part throttle characteristics, the development and change of part throttle characteristics are described with index method analysis load property quantification;Curve Method is a kind of most direct Load Characteristic Analysis method, can intuitively represent part throttle characteristics by drawing load curve, be used for Qualitative analysis part throttle characteristics;
Index calculating method is:
Daily treatment cost:In the load of typical day entry, maximum one;
Day minimum load:In the load of typical day entry, minimum one;
Daily load rate:The ratio of average load and maximum load, calculation formula are as follows:
Day ratio of minimum load to maximum load:Day minimum load and the ratio when Daily treatment cost, calculation formula are as follows:
Day peak-valley difference:The difference of Daily treatment cost and day minimum load;
Day peak-valley ratio:Day peak-valley difference and the ratio when Daily treatment cost, calculation formula are as follows:
Typical day load curve:The curve drawn by the load variations of the unit interval in one day.
CN201510919407.9A 2015-12-11 2015-12-11 A kind of distribution network load characteristic analysis method Active CN105449670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510919407.9A CN105449670B (en) 2015-12-11 2015-12-11 A kind of distribution network load characteristic analysis method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510919407.9A CN105449670B (en) 2015-12-11 2015-12-11 A kind of distribution network load characteristic analysis method

Publications (2)

Publication Number Publication Date
CN105449670A CN105449670A (en) 2016-03-30
CN105449670B true CN105449670B (en) 2018-03-20

Family

ID=55559588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510919407.9A Active CN105449670B (en) 2015-12-11 2015-12-11 A kind of distribution network load characteristic analysis method

Country Status (1)

Country Link
CN (1) CN105449670B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105930930B (en) * 2016-04-21 2021-04-09 国电南瑞科技股份有限公司 Load data calibration method based on load characteristic analysis and load prediction technology
CN106446345B (en) * 2016-08-30 2019-08-20 国网江苏省电力公司 Distribution operating index processing method based on subdivision geographic area
CN106447123A (en) * 2016-10-14 2017-02-22 国网天津市电力公司 Typical daily load characteristics based substation locating method and substation locating device
CN106779237B (en) * 2016-12-29 2020-12-29 天津大学 Load curvilinearization prediction method for active power distribution network from bottom to top
CN113131469B (en) * 2021-04-19 2023-04-18 广东电网有限责任公司佛山供电局 Static load analysis method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505825A (en) * 2014-12-15 2015-04-08 国家电网公司 Power supply safety diagnosis analysis method for high voltage distribution network
EP2950414A1 (en) * 2013-01-24 2015-12-02 Kabushiki Kaisha Toshiba Power system control system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1304010C (en) * 2003-04-28 2007-03-14 南昌弘益科技有限公司 Ribavirin inhalation powder atomizing agent and its preparing process and anti-virus infection use

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2950414A1 (en) * 2013-01-24 2015-12-02 Kabushiki Kaisha Toshiba Power system control system
CN104505825A (en) * 2014-12-15 2015-04-08 国家电网公司 Power supply safety diagnosis analysis method for high voltage distribution network

Also Published As

Publication number Publication date
CN105449670A (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN105449670B (en) A kind of distribution network load characteristic analysis method
Mbungu et al. Overview of the optimal smart energy coordination for microgrid applications
Di Santo et al. A review on smart grids and experiences in Brazil
Li et al. Development of low voltage network templates—Part I: Substation clustering and classification
CN107169880A (en) Platform is monitored in power grid user electricity consumption on-line
CN110599047A (en) Power distribution network low voltage analysis and evaluation method based on big data
CN105182250B (en) A kind of non-intrusion type distributed power source output monitoring device
CN110907884A (en) Electric energy meter error diagnosis and analysis method based on non-invasive measurement
CN103455857A (en) Method for finely classifying user requirements to perform power grid load analysis and load prediction
CN203689667U (en) Electricity consumption information acquisition system in intelligent electricity-supplied residential area
CN103632031B (en) A kind of rural area based on load curve decomposition load type load modeling method
CN107145969A (en) A kind of development zone distribution network planning method and system
CN110991716A (en) Load prediction method for large power consumer business expansion
CN105279617B (en) The computational methods that power distribution network project yet to be built influences on electric network reliability
Yenginer et al. A review of energy management systems for smart grids
CN111105174B (en) Power distribution network power supply voltage qualification rate layered evaluation method and system
CN112598257A (en) Power failure analysis method and system based on big data feature mining
Li et al. Implementation of load profile test for electricity distribution networks
Hafez Time of use prices considering smart meters and their future implementation in Saudi Arabia smart grid
CN112202248B (en) Low-voltage distribution network topology branch refining identification method
CN111552911B (en) Quantitative analysis method for technical line loss influence factors based on multi-scene generation
CN106600129A (en) Power grid planning method and system
Hasan et al. Distribution network voltage analysis with data-driven electric vehicle load profiles
CN113675953A (en) Low-voltage distribution area topology identification method based on voltage similarity clustering
Zhuang et al. Research on Key Technologies of Carbon Emission Data Acquisition for New Power Systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant