CN105442700A - Partition plate run-through joint for connection of rectangular concrete-filled steel tube column and H-shaped steel beam - Google Patents

Partition plate run-through joint for connection of rectangular concrete-filled steel tube column and H-shaped steel beam Download PDF

Info

Publication number
CN105442700A
CN105442700A CN201511014352.3A CN201511014352A CN105442700A CN 105442700 A CN105442700 A CN 105442700A CN 201511014352 A CN201511014352 A CN 201511014352A CN 105442700 A CN105442700 A CN 105442700A
Authority
CN
China
Prior art keywords
partition plate
girder steel
lower clapboard
joint
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511014352.3A
Other languages
Chinese (zh)
Inventor
陈志华
张旺
周婷
黄�俊
熊清清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201511014352.3A priority Critical patent/CN105442700A/en
Publication of CN105442700A publication Critical patent/CN105442700A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material

Abstract

The invention discloses a partition plate run-through joint for connection of a rectangular concrete-filled steel tube column and an H-shaped steel beam. The partition plate run-through joint comprises an upper partition plate and a lower partition plate, wherein the upper partition plate and the lower partition plate are welded to the rectangular concrete-filled steel tube column. Outwards-extending plates are welded to the two sides of the rectangular concrete-filled steel tube column respectively and connected to a web plate of the H-shaped steel beam in an overlapping mode, and the outwards-extending plates and the web plate are welded together. The upper partition plate is opposite to an upper flange plate of the H-shaped steel beam and is welded to the upper flange. A lower flange plate of the H-shaped steel beam and the lower partition plate are connected in an overlapping mode through high-strength bolts. According to the partition plate run-through joint, mixed connection of adopting the bolts on the lower portion and conducting welding on the upper portion is adopted, field installation can be quickly in place, the project period can be remarkably shortened, and the assembling process can be promoted; the in-place difficulty of bolt connection of the lower flange plate can be lowered; a roof floor slab can be conveniently installed; the structure is simple, and force transmission is definite; the requirement for outwards-moving of a plastic hinge at the beam end can be met, the steel beam is damaged before the joint is damaged, the safety of the joint is ensured, and the requirement for strong joints and weak components in earthquake fortification is met.

Description

For the through node of dividing plate that rectangular steel-tube concrete column is connected with H girder steel
Technical field
The invention belongs to structural engineering technical field, particularly relate to a kind of through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column.
Background technology
Encased structures fill concrete in steel pipe is formed, the existence of steel pipe can prevent concrete premature rupture, concrete existence can prevent the too early flexing of steel pipe, the two synergy can give full play to the advantage that steel examining tensile behavior is high and concrete compression performance is good, therefore has that bearing capacity is high, plasticity and good toughness, anti-seismic performance are good, many advantages such as remarkable in economical benefits and construction environmental protection.
Rectangular steel tube with concrete infilled has the advantage that bending rigidity is large, node is easy to connect.And the frame structure system that rectangular steel-tube concrete column and girder steel are formed, because layout is flexible, structure simple, component is easy to the features such as standardization, speed of application is fast, cost is low, there is good application prospect in executive information systems, be now subject to the most attention in domestic and international project field.
At present, rectangular steel-tube concrete column-steel beam connecting joint that " rectangular steel tube with concrete infilled tecnical regulations " (CECS159:2004) of China recommends comprises four kinds: internal partition formula connects, external fin ring-plate connects, the board-like connection of outer shroud is connected with diaphragm-through type.Four kinds of nodes all have bolt to weld mixed node, i.e. edge of a wing welding, web is with bolts.
But existing bolted and welded connection node affects by weld seam, and anti-seismic performance is poor, therefore domestic some propose to adopt full bolt joint.But practical engineering experience shows: full bolt joint stress performance is better, the impact of weld seam especially bottom flange weld defect can be avoided.But due to needs processing and construct a large amount of bolt and bolt hole, therefore cost is very high; And install due to bolt and need longer overhanging dividing plate, therefore to bolt machining accuracy, that on-the-spot beam column installs positioning accuracy request is very high, once column inclination or beam can not centerings, construction will be very difficult.
Summary of the invention
The present invention provides a kind of through node of dividing plate is connected with H girder steel for rectangular steel-tube concrete column for solving in known technology the technical problem that exists, and this node structure is reasonable, easy construction, fast.
The technical scheme that the present invention takes for the technical problem existed in solution known technology is: a kind of through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column, comprise the upper spacer and lower clapboard that weld with described rectangular steel-tube concrete column, a cantilever plate is respectively welded with in the both sides of described rectangular steel-tube concrete column, described cantilever plate is overlapped on the web of described H girder steel, and the two welds together; Described upper spacer is relative with the top flange plate of described H girder steel, and the two welds together; Bottom wing listrium and the described lower clapboard of described H girder steel overlap, and the two is connected by high-strength bolt.
The bottom wing listrium of described H girder steel is overlapped on described lower clapboard.
Described lower clapboard is overlapped on the bottom wing listrium of described H girder steel.
Described upper spacer be provided with circumferential body and with wide overhanging section of the top flange plate of described H girder steel, overhanging section of described upper spacer adopts arc transition structure with the circumferential body of described upper spacer; Described lower clapboard be provided with circumferential body and with wide overhanging section of the bottom wing listrium of described H girder steel, overhanging section of described lower clapboard adopts arc transition structure with the circumferential body of described lower clapboard.
Described upper spacer be provided with circumferential body and with wide overhanging section of the top flange plate of described H girder steel, overhanging section of described upper spacer adopts obtuse angle transition structure with the circumferential body of described upper spacer; Described lower clapboard be provided with circumferential body and with wide overhanging section of the bottom wing listrium of described H girder steel, overhanging section of described lower clapboard adopts obtuse angle transition structure with the circumferential body of described lower clapboard.
The advantage that the present invention has and good effect are:
1) adopt through upper lower clapboard, increase the rigidity of node area, make plastic hinge, and then make the destruction of destruction early than node of girder steel, achieve the antidetonation criterion of " the weak component of strong node ".
2) upper lower clapboard welds with post jamb, avoids the repeatedly welding of post jamb, and the stress reducing post jamb is concentrated and fragility, improves the ductility of nodes domains.
3) bottom flange of H girder steel adopts high-strength bolt to be connected with lower clapboard, decreases the workload of Site Welding, saves manpower, improve site operation efficiency.Lower clapboard extension is large, is connected, girder steel hogging moment area supporting capacity is greatly strengthened by high-strength bolt with girder steel bottom flange; Avoid the adverse effect of bottom flange weld defect simultaneously, effectively can prevent welding the stress brought and concentrate, good anti-seismic performance is provided.
4) top flange of H girder steel is welded with upper spacer, and web and the cantilever plate of H girder steel weld and reduce full bolt and be connected and the risk that girder steel that construction error brings cannot be in place such as tilt or misalign due to post, reduce precision sensitiveness, can accelerate installation rate.
5) by bottom flange and the lower clapboard link position relationship change of H girder steel, the node of multiple different connected mode can be formed, with the requirement of satisfied different engineering to joint behavior and node construction mode.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the 1-1 sectional drawing of Fig. 1;
Fig. 3 is the 2-2 sectional drawing of Fig. 1;
Fig. 4 is the structural representation of the embodiment of the present invention 2;
Fig. 5 is the 3-3 sectional drawing of Fig. 4;
Fig. 6 is the 4-4 sectional drawing of Fig. 4.
In figure: 1, rectangular steel-tube concrete column, 2, H girder steel, 3, upper spacer, 4, lower clapboard, 5, cantilever plate, 6, high-strength bolt.
Detailed description of the invention
For summary of the invention of the present invention, Characteristic can be understood further, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1 ~ Fig. 6, a kind of through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column of the present invention, comprise the upper spacer 3 and lower clapboard 4 that weld with described rectangular steel-tube concrete column 1, a cantilever plate 5 is respectively welded with in the both sides of described rectangular steel-tube concrete column 1, described cantilever plate 5 is overlapped on the web of described H girder steel 2, and the two welds together; Described upper spacer 3 is relative with the top flange plate of described H girder steel 2, and the two welds together; Bottom wing listrium and the described lower clapboard 4 of described H girder steel 2 overlap, and the two is connected by high-strength bolt 6.
Now exemplify the structure of two kinds of through nodes of aforementioned barriers.
Embodiment 1:
Refer to Fig. 1 ~ Fig. 3, the bottom wing listrium of described H girder steel 2 is overlapped on described lower clapboard 4.Described upper spacer 3 be provided with circumferential body and with wide overhanging section of the top flange plate of described H girder steel 2, overhanging section of described upper spacer 3 adopts arc transition structure with the circumferential body of described upper spacer 3; Described lower clapboard 4 be provided with circumferential body and with wide overhanging section of the bottom wing listrium of described H girder steel 2, overhanging section of described lower clapboard 4 adopts arc transition structure with the circumferential body of described lower clapboard 4.
Embodiment 2:
Refer to Fig. 4 ~ Fig. 6, be with the difference of embodiment 1, described lower clapboard 4 is overlapped on the bottom wing listrium of described H girder steel 2.Described upper spacer 3 be provided with circumferential body and with wide overhanging section of the top flange plate of described H girder steel 2, overhanging section of described upper spacer 3 adopts obtuse angle transition structure with the circumferential body of described upper spacer 3; Described lower clapboard 4 be provided with circumferential body and with wide overhanging section of the bottom wing listrium of described H girder steel 2, overhanging section of described lower clapboard 4 adopts obtuse angle transition structure with the circumferential body of described lower clapboard 4.
The present invention the through node bottom flange of dividing plate and web bolt top flange welding basis on improve, adopt on lower bolt and weld Hybrid connections, bottom flange and lower clapboard are connected by high-strength bolt, and in-site installation is soon in place, can obvious reduction of erection time, promote assemblingization process; Web welds with cantilever plate, and upper spacer welds at the scene with top flange plate, can reduce bottom flange crab bolt further and connect because post tilts or misaligns the difficulty in place brought.The upper surface absolute altitude of upper spacer and top flange plate is unified, and be convenient to roofing floor and install, achieve the object of easy construction, simple structure, power transmission is clear and definite; Meanwhile, owing to have employed through dividing plate node, the requirement of beam-ends plastic hinge can be realized, make the destruction of destruction prior to node of girder steel, ensure that the safety of node, reach the requirements for fortification against earthquake of " strong node, weak component ".
Although be described the preferred embodiments of the present invention by reference to the accompanying drawings above; but the present invention is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; do not departing under the ambit that present inventive concept and claim protect, can also make a lot of form, these all belong within protection scope of the present invention.

Claims (5)

1. the through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column, comprise the upper spacer and lower clapboard that weld with described rectangular steel-tube concrete column, a cantilever plate is respectively welded with in the both sides of described rectangular steel-tube concrete column, it is characterized in that, described cantilever plate is overlapped on the web of described H girder steel, and the two welds together; Described upper spacer is relative with the top flange plate of described H girder steel, and the two welds together; Bottom wing listrium and the described lower clapboard of described H girder steel overlap, and the two is connected by high-strength bolt.
2. the through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column according to claim 1, it is characterized in that, the bottom wing listrium of described H girder steel is overlapped on described lower clapboard.
3. the through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column according to claim 1, it is characterized in that, described lower clapboard is overlapped on the bottom wing listrium of described H girder steel.
4. the through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column according to claim 1, it is characterized in that, described upper spacer be provided with circumferential body and with wide overhanging section of the top flange plate of described H girder steel, overhanging section of described upper spacer adopts arc transition structure with the circumferential body of described upper spacer; Described lower clapboard be provided with circumferential body and with wide overhanging section of the bottom wing listrium of described H girder steel, overhanging section of described lower clapboard adopts arc transition structure with the circumferential body of described lower clapboard.
5. the through node of dividing plate be connected with H girder steel for rectangular steel-tube concrete column according to claim 1, it is characterized in that, described upper spacer be provided with circumferential body and with wide overhanging section of the top flange plate of described H girder steel, overhanging section of described upper spacer adopts obtuse angle transition structure with the circumferential body of described upper spacer; Described lower clapboard be provided with circumferential body and with wide overhanging section of the bottom wing listrium of described H girder steel, overhanging section of described lower clapboard adopts obtuse angle transition structure with the circumferential body of described lower clapboard.
CN201511014352.3A 2015-12-28 2015-12-28 Partition plate run-through joint for connection of rectangular concrete-filled steel tube column and H-shaped steel beam Pending CN105442700A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511014352.3A CN105442700A (en) 2015-12-28 2015-12-28 Partition plate run-through joint for connection of rectangular concrete-filled steel tube column and H-shaped steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511014352.3A CN105442700A (en) 2015-12-28 2015-12-28 Partition plate run-through joint for connection of rectangular concrete-filled steel tube column and H-shaped steel beam

Publications (1)

Publication Number Publication Date
CN105442700A true CN105442700A (en) 2016-03-30

Family

ID=55553294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511014352.3A Pending CN105442700A (en) 2015-12-28 2015-12-28 Partition plate run-through joint for connection of rectangular concrete-filled steel tube column and H-shaped steel beam

Country Status (1)

Country Link
CN (1) CN105442700A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386463A (en) * 2017-08-30 2017-11-24 天津大学 A kind of lower logical upper link point

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001279818A (en) * 2000-03-31 2001-10-10 Shimizu Corp Connection structure of concrete filled steel pipe column and connection bolt
JP4382590B2 (en) * 2004-06-25 2009-12-16 岡部株式会社 Method of joining steel column and steel beam, joining structure thereof and beam bracket for joining
CN101967855A (en) * 2010-09-29 2011-02-09 中冶建筑研究总院有限公司 Wedge box rigid connection node of rectangular tubular column and H-shaped steel beam
CN102296705A (en) * 2011-06-17 2011-12-28 清华大学 Composite steel pipe concrete column and steel beam connecting node
CN102561530A (en) * 2012-03-19 2012-07-11 天津大学 Rectangular steel tube concrete column and steel beam all-bolt connecting joint
CN103967133A (en) * 2014-04-18 2014-08-06 天津大学 Stud welding mixed connection node of rectangular concrete filled steel tubular column and H-shaped steel girder
CN205296391U (en) * 2015-12-28 2016-06-08 天津大学 A baffle link up node that is used for rectangle steel core concrete column and H girder steel to connect

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001279818A (en) * 2000-03-31 2001-10-10 Shimizu Corp Connection structure of concrete filled steel pipe column and connection bolt
JP4382590B2 (en) * 2004-06-25 2009-12-16 岡部株式会社 Method of joining steel column and steel beam, joining structure thereof and beam bracket for joining
CN101967855A (en) * 2010-09-29 2011-02-09 中冶建筑研究总院有限公司 Wedge box rigid connection node of rectangular tubular column and H-shaped steel beam
CN102296705A (en) * 2011-06-17 2011-12-28 清华大学 Composite steel pipe concrete column and steel beam connecting node
CN102561530A (en) * 2012-03-19 2012-07-11 天津大学 Rectangular steel tube concrete column and steel beam all-bolt connecting joint
CN103967133A (en) * 2014-04-18 2014-08-06 天津大学 Stud welding mixed connection node of rectangular concrete filled steel tubular column and H-shaped steel girder
CN205296391U (en) * 2015-12-28 2016-06-08 天津大学 A baffle link up node that is used for rectangle steel core concrete column and H girder steel to connect

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386463A (en) * 2017-08-30 2017-11-24 天津大学 A kind of lower logical upper link point

Similar Documents

Publication Publication Date Title
CN102733492B (en) H-shaped steel beam and H-shaped steel column minor axis variable beam height fabricated node and construction method thereof
CN103015537B (en) Beam-column joint connecting device of assembled steel structure system
CN103161224A (en) Rectangular concrete filled steel tubular column - steel beam connection node and construction methods thereof
CN103114733B (en) Rectangular steel pipe concrete column steel beam lower bolt upper welding outer rib annular plate node construction method
CN105464221A (en) Partition plate penetrating node for connecting rectangular steel tube concrete column with box-shaped steel beam
CN103967133B (en) Rectangular steel-tube concrete column and H profile steel beam bolted and welded connection node
CN105332422A (en) Vertical outer rib beam-column joint connector applicable to prefabricated steel structural systems
CN103015536A (en) Beam-column joint connecting device for multi-story/high-rise assembly type steel structure system
CN105569184A (en) One-way bolt connection node between rectangular steel pipe concrete column and H-type girders
CN112160419A (en) Assembled beam column connected node based on anti special-shaped post of side of buckled plate
CN104060699A (en) Connection device of beam and column of assembly-type T-type piece with rib plates
CN210947142U (en) Assembled concrete structure post roof beam connecting steel node
CN201826395U (en) Overhang end plate beam column connected node structure
CN103469902B (en) Full rigid steel pipes concrete column connected node
CN216713336U (en) Double-limb spliced beam and steel pipe column and double-limb spliced beam assembly type beam column joint
CN205024832U (en) With cross post non -orthogonal connected node
CN205296391U (en) A baffle link up node that is used for rectangle steel core concrete column and H girder steel to connect
CN113931324A (en) Cross steel rib column full-bolt rigid connection node and construction method
CN213038987U (en) Through node for welding lower bolt partition plate on square steel tube concrete column-steel beam
CN105220767A (en) One and the non-orthogonal connected node of cross column and construction method
CN104652616A (en) Half-welding half-bolt beam-column joint connection device of assembly type steel structure system
CN105839789B (en) A kind of weak axis separate type double-T part connection structure of I-shaped column being easily assembled
CN112302167A (en) Assembled steel construction dysmorphism post frame construction system
CN105442700A (en) Partition plate run-through joint for connection of rectangular concrete-filled steel tube column and H-shaped steel beam
CN205296412U (en) A baffle link up node that is used for rectangle steel core concrete column and box girder steel to be connected

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160330

WD01 Invention patent application deemed withdrawn after publication