CN105438860A - Loading-unloading device for vulnerable building materials and using method - Google Patents
Loading-unloading device for vulnerable building materials and using method Download PDFInfo
- Publication number
- CN105438860A CN105438860A CN201510797238.6A CN201510797238A CN105438860A CN 105438860 A CN105438860 A CN 105438860A CN 201510797238 A CN201510797238 A CN 201510797238A CN 105438860 A CN105438860 A CN 105438860A
- Authority
- CN
- China
- Prior art keywords
- building materials
- handling
- loading
- material platform
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G69/00—Auxiliary measures taken, or devices used, in connection with loading or unloading
- B65G69/22—Horizontal loading or unloading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a loading-unloading device for vulnerable building materials and a using method. Generally, professional protective measures or professional transport equipment is provided for building material transportation, but loading and unloading of building materials are not taken into account; the majority of the building materials are high in hardness and resistant to collisions, and meanwhile the tiny minority of the building materials are likely to be damaged; in the loading-unloading process, no professional loading-unloading device is provided, and a larger number of the vulnerable building materials are damaged. The loading-unloading device for the vulnerable building materials comprises a first grounding bracket (5); a motor (4) is installed on one side of the first grounding bracket and penetrates through the first grounding bracket through a grounding motor shaft and is connected with loading-unloading rotating discs (1); a set of positioning pin shafts (3) are uniformly installed on the loading-unloading rotating discs, and the positioning pin shafts are connected with material carrying platforms (2) which are connected with the loading-unloading rotating discs through the positioning pin shafts; the loading-unloading rotating discs are connected with a second grounding bracket (7) through a rotating shaft. The loading-unloading device is applied to loading and unloading of the vulnerable building materials.
Description
technical field:
the present invention relates to a kind of rapid wear building materials handler and using method.
background technology:
at present at building material industry; the transport of building materials is generally equipped with the safety method of specialty or the transport apparatus of specialty; but the handling of building materials are never paid attention to; most of building materials hardness is large, is not afraid of and collides with, but also have only a few building materials easily damaged; and in handling process, there is no the handler of specialty; a large amount of rapid wear building materials are damaged in handling process, add cost of construction, waste a large amount of manpower and materials.
summary of the invention:
the object of this invention is to provide a kind of using method of rapid wear building materials handler, solve the handling problem of rapid wear building materials
above-mentioned object is realized by following technical scheme:
a kind of rapid wear building materials handler, its composition comprises: floor stand one, the side of described floor stand one is provided with motor, described motor is connected with handling rotating disk one through floor stand one by ground motor shaft, described handling rotating disk is evenly provided with one group of alignment pin, described alignment pin expects that platform is connected with putting, described put material platform by alignment pin with load and unload rotating disk two and be connected, described handling rotating disk is connected with floor stand two by turning cylinder.
described rapid wear building materials handler, described motor is connected with floor stand one by bolt.
described rapid wear building materials handler, described putting on material platform is provided with blocking device, and described blocking device comprises one group of limiting stopper.
described rapid wear building materials handler, described locating support is welded by high strength steel, and described locating support is inner is filled by reinforcement gusset, and described locating support is of a size of long 1m, wide 0.75m, high 4m, described handling disk diameter 3m, the handling rotating disk spacing 2m described in two.
a using method for the rapid wear building materials handler utilizing one of claim 1-4 described, the method comprises the steps:
this device is placed in the tail end of building materials transport trolley, rotated by driven by motor runner, runner rotarily drives puts material platform movement, make to put the correct position that handling adjusted to by material platform, the building materials that will load and unload are transported to be put on material platform locking device, blocking device is locked by building materials, driven by motor handling turntable rotation, handling turntable rotation drives puts material platform movement, make to put the destination locations of material platform movement to handling, the mid-material platform of whole process can remain horizontality due to Action of Gravity Field, thus achieves the handling process of building materials.
beneficial effect of the present invention:
the building materials of underground can be transported to height required for construction by rotary motion by the present invention, and the building materials that also can need continue to use next time by finishing using be transported to transport trolley or ground from the construction ground of certain altitude, are carrying out unifying to preserve.
structure of the present invention is simple, easy to process, is loaded and unloaded by the building materials of rapid wear by mechanical electric structure, avoids colliding with of artificial handling, ensures the safety in rapid wear building materials handling process.
accompanying drawing illustrates:
accompanying drawing 1 is structural representation of the present invention.
accompanying drawing 2 is the structural representations loading and unloading rotating disk in accompanying drawing 1.
accompanying drawing 3 is structural representations of the mid-material platform of accompanying drawing 1.
detailed description of the invention:
embodiment 1:
a kind of rapid wear building materials handler, its composition comprises: floor stand 1, the side of described floor stand one is provided with motor 4, described motor is connected with handling rotating disk 1 through floor stand one by ground motor shaft, described handling rotating disk is evenly provided with one group of alignment pin 3, described alignment pin 3 expects that platform 2 is connected with putting, described put material platform by alignment pin with load and unload rotating disk and be connected, described handling rotating disk is connected with floor stand 27 by turning cylinder.
embodiment 2:
rapid wear building materials handler described according to embodiment 1, described motor is connected with floor stand one by bolt.
embodiment 3:
rapid wear building materials handler according to embodiment 1 or 2, described putting on material platform is provided with blocking device, and described blocking device comprises one group of limiting stopper.
embodiment 4:
rapid wear building materials handler according to embodiment 1 or 2, described locating support is welded by high strength steel, described locating support is inner is filled by reinforcement gusset, described locating support is of a size of long 1m, wide 0.75m, high 4m, described handling disk diameter 3m, the handling rotating disk spacing 2m described in two.
embodiment 5:
a using method for the rapid wear building materials handler utilizing one of claim 1-4 described, the method comprises the steps:
this device is placed in the tail end of building materials transport trolley, rotated by driven by motor runner, runner rotarily drives puts material platform movement, make to put the correct position that handling adjusted to by material platform, the building materials that will load and unload are transported to be put on material platform locking device, blocking device is locked by building materials, driven by motor handling turntable rotation, handling turntable rotation drives puts material platform movement, make to put the destination locations of material platform movement to handling, the mid-material platform of whole process can remain horizontality due to Action of Gravity Field, thus achieves the handling process of building materials.
Claims (5)
1.
a kind of rapid wear building materials handler, its composition comprises: floor stand one, it is characterized in that: the side of described floor stand one is provided with motor, described motor is connected with handling rotating disk one through floor stand one by ground motor shaft, described handling rotating disk is evenly provided with one group of alignment pin, described alignment pin expects that platform is connected with putting, described put material platform by alignment pin with load and unload rotating disk two and be connected, described handling rotating disk is connected with floor stand two by turning cylinder.
2.
rapid wear building materials handler according to claim 1, is characterized in that: described motor is connected with floor stand one by bolt.
3. according to claim
rapid wear building materials handler described in 1 or 2, is characterized in that: described putting on material platform is provided with blocking device, and described blocking device comprises one group of limiting stopper.
4.
rapid wear building materials handler according to claim 1 and 2, it is characterized in that: described locating support is welded by high strength steel, described locating support is inner is filled by reinforcement gusset, described locating support is of a size of long 1m, wide 0.75m, high 4m, described handling disk diameter 3m, the handling rotating disk spacing 2m described in two.
5.
a using method for the rapid wear building materials handler utilizing one of claim 1-4 described, is characterized in that: the method comprises the steps:
this device is placed in the tail end of building materials transport trolley, rotated by driven by motor runner, runner rotarily drives puts material platform movement, make to put the correct position that handling adjusted to by material platform, the building materials that will load and unload are transported to be put on material platform locking device, blocking device is locked by building materials, driven by motor handling turntable rotation, handling turntable rotation drives puts material platform movement, make to put the destination locations of material platform movement to handling, the mid-material platform of whole process can remain horizontality due to Action of Gravity Field, thus achieves the handling process of building materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510797238.6A CN105438860A (en) | 2015-11-18 | 2015-11-18 | Loading-unloading device for vulnerable building materials and using method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510797238.6A CN105438860A (en) | 2015-11-18 | 2015-11-18 | Loading-unloading device for vulnerable building materials and using method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105438860A true CN105438860A (en) | 2016-03-30 |
Family
ID=55549593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510797238.6A Pending CN105438860A (en) | 2015-11-18 | 2015-11-18 | Loading-unloading device for vulnerable building materials and using method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105438860A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107719512A (en) * | 2017-10-05 | 2018-02-23 | 段建英 | A kind of construction puts brick car with building a wall |
CN111940042A (en) * | 2020-07-22 | 2020-11-17 | 厉风英 | Soil sample preparation facilities |
CN111977041A (en) * | 2020-07-22 | 2020-11-24 | 厉风英 | Soil sample's bottling mechanism |
CN113415515A (en) * | 2021-07-20 | 2021-09-21 | 上汽通用汽车有限公司 | Fender work or material rest |
CN113772293A (en) * | 2021-09-16 | 2021-12-10 | 苏州乐创环保科技有限公司 | Double-layer type buried garbage can with high space utilization rate |
-
2015
- 2015-11-18 CN CN201510797238.6A patent/CN105438860A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107719512A (en) * | 2017-10-05 | 2018-02-23 | 段建英 | A kind of construction puts brick car with building a wall |
CN111940042A (en) * | 2020-07-22 | 2020-11-17 | 厉风英 | Soil sample preparation facilities |
CN111977041A (en) * | 2020-07-22 | 2020-11-24 | 厉风英 | Soil sample's bottling mechanism |
CN113415515A (en) * | 2021-07-20 | 2021-09-21 | 上汽通用汽车有限公司 | Fender work or material rest |
CN113772293A (en) * | 2021-09-16 | 2021-12-10 | 苏州乐创环保科技有限公司 | Double-layer type buried garbage can with high space utilization rate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105438860A (en) | Loading-unloading device for vulnerable building materials and using method | |
CN104265334B (en) | Shield machine segment fast unloading device | |
GB2518114A (en) | Sequential latch for palletized cargo | |
JP6431601B2 (en) | Lifting and transporting large objects in an underground nuclear power plant | |
CN208916012U (en) | A kind of production line transfer device | |
JP2017524845A5 (en) | ||
CN104291064A (en) | Weighing method and device of rapid quantitative plate conveyer | |
CN106629501A (en) | Unloading assisting device of liquefied natural gas | |
CN205220668U (en) | A trailer for driving kiln car motion | |
CN203318420U (en) | Mining flat car for conveying ultra-long anchor cables | |
CN204184382U (en) | Transfer car(buggy) | |
CN206028158U (en) | Suspension bridge type sorts modular construction | |
CN203667170U (en) | Oil barrel | |
CN103010256A (en) | Simple car arrester | |
CN205098689U (en) | Wire dish transport means | |
CN204587078U (en) | Anchor cable Transport Appropriation Rolling Stock | |
CN205221884U (en) | Conveyor system of kiln car | |
CN206345546U (en) | A kind of cable reel transported using underground orbit | |
Singh et al. | Finite Element Analysis of Stacker Mechanism used in Bearing Manufacturing | |
CN204751459U (en) | Quick handling device of building material | |
CN204297991U (en) | A kind of engineering machinery counter weight Self-loading-unloading mechanism | |
CN109322218A (en) | Tramroad structure with protection structure | |
CN204737434U (en) | High pedestal jib crane funnel feed system | |
CN204491333U (en) | The boat track frame that railway carriage uses can be fixed on | |
CN204137927U (en) | A kind of pipe loading-unloading vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160330 |