CN105427017A - 一种水电富集电网特大规模电站群短期计划编制方法 - Google Patents
一种水电富集电网特大规模电站群短期计划编制方法 Download PDFInfo
- Publication number
- CN105427017A CN105427017A CN201510717677.1A CN201510717677A CN105427017A CN 105427017 A CN105427017 A CN 105427017A CN 201510717677 A CN201510717677 A CN 201510717677A CN 105427017 A CN105427017 A CN 105427017A
- Authority
- CN
- China
- Prior art keywords
- power station
- power
- load
- station
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510717677.1A CN105427017B (zh) | 2015-10-29 | 2015-10-29 | 一种水电富集电网特大规模电站群短期计划编制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510717677.1A CN105427017B (zh) | 2015-10-29 | 2015-10-29 | 一种水电富集电网特大规模电站群短期计划编制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105427017A true CN105427017A (zh) | 2016-03-23 |
CN105427017B CN105427017B (zh) | 2019-08-09 |
Family
ID=55505210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510717677.1A Active CN105427017B (zh) | 2015-10-29 | 2015-10-29 | 一种水电富集电网特大规模电站群短期计划编制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105427017B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107274302A (zh) * | 2017-07-06 | 2017-10-20 | 大连理工大学 | 一种跨省互联水电站群长期联合调峰调度方法 |
CN108320111A (zh) * | 2018-03-16 | 2018-07-24 | 大连理工大学 | 一种超大规模水电站群短期实用化调度方法 |
CN109149562A (zh) * | 2018-08-22 | 2019-01-04 | 中国南方电网有限责任公司 | 一种适用于交直流混联电网的经济调度方法及装置 |
CN110852901A (zh) * | 2019-11-07 | 2020-02-28 | 广西电网有限责任公司 | 一种省级电网水电站群简-详计算交互的日前发电计划制定方法 |
CN110912200A (zh) * | 2019-10-21 | 2020-03-24 | 贵州电网有限责任公司 | 一种梯级水电站优化调度系统、方法及安全电网系统 |
CN111724253A (zh) * | 2020-05-21 | 2020-09-29 | 中国南方电网有限责任公司 | 一种水电交易执行偏差调度方法、系统、装置及存储介质 |
CN113673851A (zh) * | 2021-08-09 | 2021-11-19 | 云南电网有限责任公司 | 一种基于数据驱动的省级电网日前发电计划编制方法 |
CN116565947A (zh) * | 2023-04-26 | 2023-08-08 | 武汉大学 | 水电站日调峰能力确定方法及设备 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130099508A1 (en) * | 2011-10-19 | 2013-04-25 | Alstom Technology Ltd. | Methods for using a carbon dioxide capture system as an operating reserve |
CN104392284A (zh) * | 2014-11-28 | 2015-03-04 | 大连理工大学 | 一种基于情境分析的大中小水电短期可消纳电量最大协调优化调度方法 |
CN104408557A (zh) * | 2014-11-17 | 2015-03-11 | 大连理工大学 | 一种汛期水电富集电网省调平衡电厂电源电量分配方法 |
CN104463378A (zh) * | 2014-12-29 | 2015-03-25 | 国家电网公司 | 用于水电资源丰富地区省级电网风力发电消纳能力的算法 |
-
2015
- 2015-10-29 CN CN201510717677.1A patent/CN105427017B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130099508A1 (en) * | 2011-10-19 | 2013-04-25 | Alstom Technology Ltd. | Methods for using a carbon dioxide capture system as an operating reserve |
CN104408557A (zh) * | 2014-11-17 | 2015-03-11 | 大连理工大学 | 一种汛期水电富集电网省调平衡电厂电源电量分配方法 |
CN104392284A (zh) * | 2014-11-28 | 2015-03-04 | 大连理工大学 | 一种基于情境分析的大中小水电短期可消纳电量最大协调优化调度方法 |
CN104463378A (zh) * | 2014-12-29 | 2015-03-25 | 国家电网公司 | 用于水电资源丰富地区省级电网风力发电消纳能力的算法 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107274302A (zh) * | 2017-07-06 | 2017-10-20 | 大连理工大学 | 一种跨省互联水电站群长期联合调峰调度方法 |
CN108320111A (zh) * | 2018-03-16 | 2018-07-24 | 大连理工大学 | 一种超大规模水电站群短期实用化调度方法 |
CN109149562A (zh) * | 2018-08-22 | 2019-01-04 | 中国南方电网有限责任公司 | 一种适用于交直流混联电网的经济调度方法及装置 |
CN109149562B (zh) * | 2018-08-22 | 2021-10-08 | 中国南方电网有限责任公司 | 一种适用于交直流混联电网的经济调度方法及装置 |
CN110912200A (zh) * | 2019-10-21 | 2020-03-24 | 贵州电网有限责任公司 | 一种梯级水电站优化调度系统、方法及安全电网系统 |
CN110852901A (zh) * | 2019-11-07 | 2020-02-28 | 广西电网有限责任公司 | 一种省级电网水电站群简-详计算交互的日前发电计划制定方法 |
CN110852901B (zh) * | 2019-11-07 | 2022-04-12 | 广西电网有限责任公司 | 一种省级电网水电站群简-详计算交互的日前发电计划制定方法 |
CN111724253A (zh) * | 2020-05-21 | 2020-09-29 | 中国南方电网有限责任公司 | 一种水电交易执行偏差调度方法、系统、装置及存储介质 |
CN113673851A (zh) * | 2021-08-09 | 2021-11-19 | 云南电网有限责任公司 | 一种基于数据驱动的省级电网日前发电计划编制方法 |
CN113673851B (zh) * | 2021-08-09 | 2022-12-02 | 云南电网有限责任公司 | 一种基于数据驱动的省级电网日前发电计划编制方法 |
CN116565947A (zh) * | 2023-04-26 | 2023-08-08 | 武汉大学 | 水电站日调峰能力确定方法及设备 |
CN116565947B (zh) * | 2023-04-26 | 2024-04-19 | 武汉大学 | 水电站日调峰能力确定方法及设备 |
Also Published As
Publication number | Publication date |
---|---|
CN105427017B (zh) | 2019-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105427017A (zh) | 一种水电富集电网特大规模电站群短期计划编制方法 | |
Tang et al. | Solar energy curtailment in China: Status quo, reasons and solutions | |
Qi et al. | A distributed control framework for smart grid development: Energy/water system optimal operation and electric grid integration | |
WO2019006733A1 (zh) | 一种跨省互联水电站群长期联合调峰调度方法 | |
Yuan et al. | Stochastic optimization model for the short-term joint operation of photovoltaic power and hydropower plants based on chance-constrained programming | |
CN106682810B (zh) | 巨型水电站动态投产下跨流域梯级水电站群长期运行方法 | |
CN104063808B (zh) | 一种跨省送电梯级水电站群调峰调度两阶段搜索方法 | |
Ding et al. | A forecast-driven decision-making model for long-term operation of a hydro-wind-photovoltaic hybrid system | |
CN111769600B (zh) | 一种基于灵活性裕度的电力系统源荷储协调滚动调度方法 | |
CN109390981B (zh) | 新能源参与电量平衡的送端电网机组组合运行控制方法 | |
CN103580061A (zh) | 微电网运行方法 | |
CN105335561A (zh) | 一种基于指标排序的梯级水电站群超短期调度方法 | |
CN104268653A (zh) | 基于集束径流预报的梯级水库优化调度方法 | |
Zhang et al. | The flexibility pathways for integrating renewable energy into China’s coal dominated power system: The case of Beijing-Tianjin-Hebei Region | |
CN110942212B (zh) | 一种基于梯级水库运行系数的梯级水库优化运行方法 | |
CN104377726A (zh) | 一种大规模新能源并网发电的调峰方法 | |
CN104239980A (zh) | 一种梯级水电站群短期优化调度方法 | |
CN103226735A (zh) | 一种基于风电分段的电力系统优化调度方法 | |
CN104392284A (zh) | 一种基于情境分析的大中小水电短期可消纳电量最大协调优化调度方法 | |
CN104182804A (zh) | 一种预测出力不确定小水电与大中型水电站协调的日前发电方法 | |
CN105552971A (zh) | 小水电与大中型水电站群协调优化的分区消纳方法 | |
Casella et al. | Optimal operation of solar tower plants with thermal storage for system design | |
CN108075471B (zh) | 基于随机性电源出力预测的多目标约束优化电网调度策略 | |
CN107769268B (zh) | 一种含小水电的地调范围日前预测省供负荷方法 | |
CN114330827A (zh) | 多能流虚拟电厂分布式鲁棒自调度优化方法及其应用 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160421 Address after: 116024 Liaoning, Dalian, Ganjingzi Ling Road, No. 2 Applicant after: Dalian University of Technology Address before: 116024 Liaoning, Dalian, Ganjingzi Ling Road, No. 2 Applicant before: Dalian University of Technology Applicant before: Yunnan Electric Power Dispatch Control Center |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190627 Address after: 116024 No. 2 Ling Road, Ganjingzi District, Liaoning, Dalian Applicant after: Dalian University of Technology Applicant after: Yunnan Electric Power Dispatch Control Center Address before: 116024 No. 2 Ling Road, Ganjingzi District, Liaoning, Dalian Applicant before: Dalian University of Technology |
|
GR01 | Patent grant | ||
GR01 | Patent grant |