CN105425698A - 一种三维数字变电站一体化管控方法及系统 - Google Patents
一种三维数字变电站一体化管控方法及系统 Download PDFInfo
- Publication number
- CN105425698A CN105425698A CN201510756031.4A CN201510756031A CN105425698A CN 105425698 A CN105425698 A CN 105425698A CN 201510756031 A CN201510756031 A CN 201510756031A CN 105425698 A CN105425698 A CN 105425698A
- Authority
- CN
- China
- Prior art keywords
- equipment
- transformer station
- dimensional
- module
- true
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/048—Monitoring; Safety
Abstract
本发明公开了一种三维数字变电站一体化管控方法,首先利用三维激光扫描仪采集测量控制点的场景空间物体表面所有点的三维坐标;建立变电站场景的真三维模型;然后建立变电站信息数据库;最后获取变电站内设备的各种参数数据并对变电站内的设备状态信息进行判断;根据数据查询条件在对应设备真三维模型上实时显示设备运行各项状态参量。本发明运用三维激光扫描技术,扫描获取场景空间物体表面所有点的三维坐标,并组成点云模型,是对场景的真实复制,建模成真三维模型,基于真三维模型建立的信息集成系统,可接入大量的数据接口,如视频监控接口、红外成像接口、视觉辨识系统接口等,最终形成智能的三维可视化管理系统。
Description
技术领域
本发明涉及变电站监控领域,特别涉及一种三维数字变电站一体化管控方法及系统。
背景技术
三维可视化以其智能、直观、便捷的展示方式,为工厂、电厂、变电站等管理质量和工作效率带来质的飞越。因此,实现工厂、电厂、变电站的三维数字化管理,成为了数字信息时代的潮流和趋势。
实现变电站三维可视化,三维数字模型的建立是一个必不可少的基础。传统的建模可通过测点绘制平面图纸,或用摄影测量方法进行立体测量,在此基础上进行建模。非但效率不高,而且模型不能准确的反映真实场景的尺寸,是假三维模型,数据的价值并不高。因此需要一种能准确反映变电站现场场景设备运行状态及其分析的方法和系统。
发明内容
本发明的目的就是提供一种三维数字变电站一体化管控方法及系统。
本发明的目的是通过这样的技术方案实现的:
本发明提供的三维数字变电站一体化管控方法,包括以下步骤:
S1:布设变电站测量控制点并获取测量控制点的三维坐标地址;
S2:利用三维激光扫描仪采集测量控制点的场景空间物体表面所有点的三维坐标;
S3:利用三维坐标建立变电站场景的真三维模型;
S4:根据变电站内各类设备的真三维模型建立变电站信息数据库;
S5:输入数据查询条件在变电站信息数据库中获取对应设备真三维模型关联的设备标准参数数据;
S6:获取测量控制点的环境参数数据和设备现场运行状态参数数据;
S7:判断变电站设备现场运行状态参数数据是否属于相应的环境参数数据状态信息和设备标准参数数据的正常范围,如果是,则在对应设备真三维模型上实时显示设备运行各项状态参量;如果否,则发出报警信号并在对应设备真三维模型上实时显示设备运行各项状态参量。
进一步,所述对变电站内的设备状态信息进行判断包括对变电站现场异常监控判断过程,具体步骤如下:
S511:获取变电站监控区域的图像;
S512:处理图像信息获取监控区域图像信息;
S513:根据图像分析信息判断监控区域是否属于预设异常信息,如果有,则发出报警信号;
S514:如果不属于预设异常信息,则返回步骤S51重复循环进行。
进一步,所述对变电站内的设备状态信息进行判断包括对变电站现场设备健康状态监控判断过程,具体步骤如下:
S521:获取变电站监控区域的处于运行状态的设备运行参数数据;
S522:将设备运行参数数据与设备标准参数数据进行比较获得设备状态参数差值;
S523:判断设备状态参数差值是否大于预设阈值,如果是,则发出报警信号;
S524:如果否,则返回步骤S521重复循环进行。
进一步,所述对变电站现场设备健康状态监控判断过程中的预设阈值是按照以下方式来确定的:
获取变电站现场设备处于离线状态时进行检测的标准参数;获取变电站现场设备正常运行时处于在线状态时的在线参数;获取变电站现场设备处于离线状态的标准参数和在线状态时的在线参数的偏离值;将偏离值作为预设阈值。
本发明还提供了一种三维数字变电站一体化管控系统,包括真三维模型模块、变电站信息数据库模块、设备状态信息采集模块、设备状态判断模块和设备状态显示模块;
所述真三维模型模块,用于根据布设变电站测量控制点并获取测量控制点的三维坐标地址;利用三维激光扫描仪采集测量控制点的场景空间物体表面所有点的三维坐标;利用三维坐标建立变电站场景的真三维模型;
所述变电站信息数据库模块,用于根据变电站内各类设备的真三维模型建立变电站信息数据库;
所述设备状态信息采集模块,用于获取测量控制点的环境参数数据、设备标准参数数据、设备现场运行状态参数数据;
所述设备状态判断模块,用于判断变电站内的设备状态信息;
所述设备状态显示模块,用于根据数据查询条件在对应设备真三维模型上实时显示设备运行各项状态参量;
所述设备状态信息采集模块分别与真三维模型模块、变电站信息数据库模块和设备状态判断模块连接;所述设备状态判断模块与设备状态显示模块连接;
所述设备状态判断模块分别与真三维模型模块和变电站信息数据库连接。
进一步,所述设备状态判断模块包括变电站异常监控模块,所述变电站异常监控模块,用于对变电站内的设备状态信息进行判断包括对变电站现场异常监控判断过程,具体步骤如下:
S511:获取变电站监控区域的图像;
S512:处理图像信息获取监控区域图像信息;
S513:根据图像分析信息判断监控区域是否属于预设异常信息,如果有,则发出报警信号;
S514:如果不属于预设异常信息,则返回步骤S51重复循环进行。
进一步,所述设备状态判断模块包括变电站现场设备健康状态监控模块,所述变电站现场设备健康状态监控模块,用于对变电站内的设备状态信息进行判断包括对变电站现场设备健康状态监控判断过程,具体步骤如下:
S521:获取变电站监控区域的处于运行状态的设备运行参数数据;
S522:将设备运行参数数据与设备标准参数数据进行比较获得设备状态参数差值;
S523:判断设备状态参数差值是否大于预设阈值,如果是,则发出报警信号;
S524:如果否,则返回步骤S521重复循环进行。
进一步,所述设备状态信息采集模块包括视频监控采集接口和红外成像采集接口;所述视频监控采集接口,用于通过连接摄像头采集变电站内现场设备的图像信息数据;所述红外成像采集接口,用于通过连接红外成像设备来采集变电站内现场设备的红外图像信息数据;所述视频监控采集接口和红外成像采集接口分别与设备状态判断模块连接。
进一步,所述设备状态判断模块包括预设阈值模块,所述预设阈值模块,用于对变电站现场设备健康状态监控判断过程中的预设阈值是按照以下方式来确定的:
获取变电站现场设备处于离线状态时进行检测的标准参数;获取变电站现场设备正常运行时处于在线状态时的在线参数;获取变电站现场设备处于离线状态的标准参数和在线状态时的在线参数的偏离值;将偏离值作为预设阈值。
由于采用了上述技术方案,本发明具有如下的优点:
本发明运用三维激光扫描技术,将扫描获取场景空间物体表面所有点的三维坐标,并组成点云模型,是对场景的真实复制,建模成真三维模型。真三维模型有着非常高的数据价值。而基于真三维模型建立的信息集成系统,可接入大量的数据接口,如视频监控接口、红外成像接口、视觉辨识系统接口等,变形成了智能的三维可视化管理系统。
本发明的其他优点、目标和特征在某种程度上将在随后的说明书中进行阐述,并且在某种程度上,基于对下文的考察研究对本领域技术人员而言将是显而易见的,或者可以从本发明的实践中得到教导。本发明的目标和其他优点可以通过下面的说明书和权利要求书来实现和获得。
附图说明
本发明的附图说明如下。
图1为本发明的三维数字变电站一体化管控方法流程图。
图2为本发明的三维数字变电站一体化管控系统方框图。
具体实施方式
下面结合附图和实施例对本发明作进一步说明。
实施例1
如图所示,本实施例提供的三维数字变电站一体化管控方法,包括以下步骤:
S1:布设变电站测量控制点并获取测量控制点的三维坐标地址;
S2:利用三维激光扫描仪采集测量控制点的场景空间物体表面所有点的三维坐标;
S3:利用三维坐标建立变电站场景的真三维模型;
S4:根据变电站内各类设备的真三维模型建立变电站信息数据库;
S5:输入数据查询条件在变电站信息数据库中获取对应设备真三维模型关联的设备标准参数数据;
S6:获取测量控制点的环境参数数据和设备现场运行状态参数数据;
S7:判断变电站设备现场运行状态参数数据是否属于相应的环境参数数据状态信息和设备标准参数数据的正常范围,如果是,则在对应设备真三维模型上实时显示设备运行各项状态参量;如果否,则发出报警信号并在对应设备真三维模型上实时显示设备运行各项状态参量。
所述对变电站内的设备状态信息进行判断包括对变电站现场异常监控判断过程,具体步骤如下:
S511:获取变电站监控区域的图像;
S512:处理图像信息获取监控区域图像信息;
S513:根据图像分析信息判断监控区域是否属于预设异常信息,如果有,则发出报警信号;
S514:如果不属于预设异常信息,则返回步骤S51重复循环进行。
所述对变电站内的设备状态信息进行判断包括对变电站现场设备健康状态监控判断过程,具体步骤如下:
S521:获取变电站监控区域的处于运行状态的设备运行参数数据;
S522:将设备运行参数数据与设备标准参数数据进行比较获得设备状态参数差值;
S523:判断设备状态参数差值是否大于预设阈值,如果是,则发出报警信号;
S524:如果否,则返回步骤S521重复循环进行。
所述对变电站现场设备健康状态监控判断过程中的预设阈值是按照以下方式来确定的:
获取变电站现场设备处于离线状态时进行检测的标准参数;获取变电站现场设备正常运行时处于在线状态时的在线参数;获取变电站现场设备处于离线状态的标准参数和在线状态时的在线参数的偏离值;将偏离值作为预设阈值。
本实施例还提供了一种三维数字变电站一体化管控系统,包括真三维模型模块、变电站信息数据库模块、设备状态信息采集模块、设备状态判断模块和设备状态显示模块;
所述真三维模型模块,用于根据布设变电站测量控制点并获取测量控制点的三维坐标地址;利用三维激光扫描仪采集测量控制点的场景空间物体表面所有点的三维坐标;利用三维坐标建立变电站场景的真三维模型;
所述变电站信息数据库模块,用于根据变电站内各类设备的真三维模型建立变电站信息数据库;
所述设备状态信息采集模块,用于获取测量控制点的环境参数数据、设备标准参数数据、设备现场运行状态参数数据;
所述设备状态判断模块,用于判断变电站内的设备状态信息;
所述设备状态显示模块,用于根据数据查询条件在对应设备真三维模型上实时显示设备运行各项状态参量;
所述设备状态信息采集模块分别与真三维模型模块、变电站信息数据库模块和设备状态判断模块连接;所述设备状态判断模块与设备状态显示模块连接;
所述设备状态判断模块分别与真三维模型模块和变电站信息数据库连接。
所述设备状态判断模块包括变电站异常监控模块,所述变电站异常监控模块,用于对变电站内的设备状态信息进行判断包括对变电站现场异常监控判断过程,具体步骤如下:
S511:获取变电站监控区域的图像;
S512:处理图像信息获取监控区域图像信息;
S513:根据图像分析信息判断监控区域是否属于预设异常信息,如果有,则发出报警信号;
S514:如果不属于预设异常信息,则返回步骤S51重复循环进行。
所述设备状态判断模块包括变电站现场设备健康状态监控模块,所述变电站现场设备健康状态监控模块,用于对变电站内的设备状态信息进行判断包括对变电站现场设备健康状态监控判断过程,具体步骤如下:
S521:获取变电站监控区域的处于运行状态的设备运行参数数据;
S522:将设备运行参数数据与设备标准参数数据进行比较获得设备状态参数差值;
S523:判断设备状态参数差值是否大于预设阈值,如果是,则发出报警信号;
S524:如果否,则返回步骤S521重复循环进行。
所述设备状态信息采集模块包括视频监控采集接口和红外成像采集接口;所述视频监控采集接口,用于通过连接摄像头采集变电站内现场设备的图像信息数据;所述红外成像采集接口,用于通过连接红外成像设备来采集变电站内现场设备的红外图像信息数据;所述视频监控采集接口和红外成像采集接口分别与设备状态判断模块连接。
所述设备状态判断模块包括预设阈值模块,所述预设阈值模块,用于对变电站现场设备健康状态监控判断过程中的预设阈值是按照以下方式来确定的:
获取变电站现场设备处于离线状态时进行检测的标准参数;获取变电站现场设备正常运行时处于在线状态时的在线参数;获取变电站现场设备处于离线状态的标准参数和在线状态时的在线参数的偏离值;将偏离值作为预设阈值。
本实施例提供的预设阈值模块,可以通过一系列在线实际测量来获取在线参数。
实施例2
本实施例提供的设备状态参数信息包括设备运行温度;绕组温度、触头温度、带电状况、变压器油色谱参数、变压器局部放电状态参数、容性设备绝缘性能状态参数;
还包括获取图像类参数,包括红外图像、可见光图像采用2D图片的形式展现;数据类参数的实时数据采用2D文本框的形式展现;数据类参数的历史数据集变化趋势采用2D曲线图的形式展现。
本实施例提供的三维模型可展示变电站中设备分布、设备位置、外形结构等;设备三维模型包括试点500kv变电站所有主要设备外形结构,包括:线路、变压器(电抗器)、断路器/GIS、隔离开关、CT、PT、避雷器、电抗器、电容器等。变电站场景3D模型包括变电站大门、围墙以及主控室、保护小室等主要建筑物。
提供建立三维全景可视化数据仓库,对设备外形结构进行三维仿真,各部件作为不可拆分的整体建立模型,不展示内部结构;变电站建筑物仅作外形仿真;大大减少了建模数据,加快了系统运行速度;通过与PMS接口获取文字显示设备运行编号等基本台帐信息。三维模型可全角度旋转观看、缩放、漫游等基本三维操作。
设备的运行参数也采用可视化显示,与在线监测平台交互,在设备三维模型上实时显示设备运行参数。设备在线监测状态数据:通过与在线监测装置或子系统接口获取,具体包括设备运行温度(saw、红外);设备带电状况;变压器油色谱参数;变压器油质参数;变压器局放在线监测装置;变压器油温及绕组温度在线监测;容性设备绝缘性能(介损等)在线监测装置。
在对应设备模型上(不对应到具体的设备部件)根据用户选择的项目,采用显示其运行的各项状态参量,如绕组温度、触头温度、油色谱等。范围不超过上述运行参数范围。图像类参数(包括红外图像、可见光图像)采用二维图片的形式展现。数据类参数的实时数据采用二维文本框的形式展现。数据类参数的历史数据集变化趋势采用二维曲线图的形式展现。
本实施例还实现变电站现场异常监控功能,首先建立变电站内各类参数的预警及报警数据库,然后自动对采集及识别的设备状态信息进行判断,按照系统预定的规则,分不同的级别和类型,最后以各种方式进行预警和报警,如推屏、声光、短信等。三维数字变电站全景模型建立可采用基于图纸信息来进行,通过扫描的方式获取二维、三维模型,建立变电站主要设备及建筑的三维全景模型。通过与运行维护系统的接口,实现三维模型与运行数据的交汇,实现基于三维模型的运行监视可视化。
其中,变电站健康显示系统包括以下部分:
(1)三维场景漫游及设备演示单元;
(2)运行参数管理单元;
(3)自动巡检管理单元;
(4)风险数据库信息管理单元;
(5)信息分析及风险预警单元;
(6)信息检索及查询单元;
(7)二三维模型结构关联导航单元。
本实施例提供一体化管控系统在运行期间,用户可通过Internet访问代理服务器间接连接项目集群与三维模型服务器,使黑客即使攻破到代理服务器也无法对项目集群与三维模型服务器进程破坏。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。
Claims (9)
1.一种三维数字变电站一体化管控方法,其特征在于:包括以下步骤:
S1:布设变电站测量控制点并获取测量控制点的三维坐标地址;
S2:利用三维激光扫描仪采集测量控制点的场景空间物体表面所有点的三维坐标;
S3:利用三维坐标建立变电站场景的真三维模型;
S4:根据变电站内各类设备的真三维模型建立变电站信息数据库;
S5:输入数据查询条件在变电站信息数据库中获取对应设备真三维模型关联的设备标准参数数据;
S6:获取测量控制点的环境参数数据和设备现场运行状态参数数据;
S7:判断变电站设备现场运行状态参数数据是否属于相应的环境参数数据状态信息和设备标准参数数据的正常范围,如果是,则在对应设备真三维模型上实时显示设备运行各项状态参量;如果否,则发出报警信号并在对应设备真三维模型上实时显示设备运行各项状态参量。
2.如权利要求1所述的三维数字变电站一体化管控方法,其特征在于:所述对变电站内的设备状态信息进行判断包括对变电站现场异常监控判断过程,具体步骤如下:
S511:获取变电站监控区域的图像;
S512:处理图像信息获取监控区域图像信息;
S513:根据图像分析信息判断监控区域是否属于预设异常信息,如果有,则发出报警信号;
S514:如果不属于预设异常信息,则返回步骤S51重复循环进行。
3.如权利要求1所述的三维数字变电站一体化管控方法,其特征在于:所述对变电站内的设备状态信息进行判断包括对变电站现场设备健康状态监控判断过程,具体步骤如下:
S521:获取变电站监控区域的处于运行状态的设备运行参数数据;
S522:将设备运行参数数据与设备标准参数数据进行比较获得设备状态参数差值;
S523:判断设备状态参数差值是否大于预设阈值,如果是,则发出报警信号;
S524:如果否,则返回步骤S521重复循环进行。
4.如权利要求1所述的三维数字变电站一体化管控方法,其特征在于:所述对变电站现场设备健康状态监控判断过程中的预设阈值是按照以下方式来确定的:
获取变电站现场设备处于离线状态时进行检测的标准参数;获取变电站现场设备正常运行时处于在线状态时的在线参数;获取变电站现场设备处于离线状态的标准参数和在线状态时的在线参数的偏离值;将偏离值作为预设阈值。
5.一种三维数字变电站一体化管控系统,其特征在于:包括真三维模型模块、变电站信息数据库模块、设备状态信息采集模块、设备状态判断模块和设备状态显示模块;
所述真三维模型模块,用于根据布设变电站测量控制点并获取测量控制点的三维坐标地址;利用三维激光扫描仪采集测量控制点的场景空间物体表面所有点的三维坐标;利用三维坐标建立变电站场景的真三维模型;
所述变电站信息数据库模块,用于根据变电站内各类设备的真三维模型建立变电站信息数据库;
所述设备状态信息采集模块,用于获取测量控制点的环境参数数据、设备标准参数数据、设备现场运行状态参数数据;
所述设备状态判断模块,用于判断变电站内的设备状态信息;
所述设备状态显示模块,用于根据数据查询条件在对应设备真三维模型上实时显示设备运行各项状态参量;
所述设备状态信息采集模块分别与真三维模型模块、变电站信息数据库模块和设备状态判断模块连接;所述设备状态判断模块与设备状态显示模块连接;
所述设备状态判断模块分别与真三维模型模块和变电站信息数据库连接。
6.如权利要求5所述的三维数字变电站一体化管控系统,其特征在于:所述设备状态判断模块包括变电站异常监控模块,所述变电站异常监控模块,用于对变电站内的设备状态信息进行判断包括对变电站现场异常监控判断过程,具体步骤如下:
S511:获取变电站监控区域的图像;
S512:处理图像信息获取监控区域图像信息;
S513:根据图像分析信息判断监控区域是否属于预设异常信息,如果有,则发出报警信号;
S514:如果不属于预设异常信息,则返回步骤S51重复循环进行。
7.如权利要求5所述的三维数字变电站一体化管控系统,其特征在于:所述设备状态判断模块包括变电站现场设备健康状态监控模块,所述变电站现场设备健康状态监控模块,用于对变电站内的设备状态信息进行判断包括对变电站现场设备健康状态监控判断过程,具体步骤如下:
S521:获取变电站监控区域的处于运行状态的设备运行参数数据;
S522:将设备运行参数数据与设备标准参数数据进行比较获得设备状态参数差值;
S523:判断设备状态参数差值是否大于预设阈值,如果是,则发出报警信号;
S524:如果否,则返回步骤S521重复循环进行。
8.如权利要求5所述的三维数字变电站一体化管控系统,其特征在于:所述设备状态信息采集模块包括视频监控采集接口和红外成像采集接口;所述视频监控采集接口,用于通过连接摄像头采集变电站内现场设备的图像信息数据;所述红外成像采集接口,用于通过连接红外成像设备来采集变电站内现场设备的红外图像信息数据;所述视频监控采集接口和红外成像采集接口分别与设备状态判断模块连接。
9.如权利要求7所述的三维数字变电站一体化管控系统,其特征在于:所述设备状态判断模块包括预设阈值模块,所述预设阈值模块,用于对变电站现场设备健康状态监控判断过程中的预设阈值是按照以下方式来确定的:
获取变电站现场设备处于离线状态时进行检测的标准参数;获取变电站现场设备正常运行时处于在线状态时的在线参数;获取变电站现场设备处于离线状态的标准参数和在线状态时的在线参数的偏离值;将偏离值作为预设阈值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510756031.4A CN105425698A (zh) | 2015-11-09 | 2015-11-09 | 一种三维数字变电站一体化管控方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510756031.4A CN105425698A (zh) | 2015-11-09 | 2015-11-09 | 一种三维数字变电站一体化管控方法及系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105425698A true CN105425698A (zh) | 2016-03-23 |
Family
ID=55503972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510756031.4A Pending CN105425698A (zh) | 2015-11-09 | 2015-11-09 | 一种三维数字变电站一体化管控方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105425698A (zh) |
Cited By (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105894576A (zh) * | 2016-04-05 | 2016-08-24 | 国家电网公司 | 一种基于虚拟仿真技术的3d变电站全景实时调控系统 |
CN105929770A (zh) * | 2016-04-19 | 2016-09-07 | 广西电网有限责任公司电力科学研究院 | 一种基于cim模型的变电站运行工况可视化方法 |
CN106787211A (zh) * | 2017-01-25 | 2017-05-31 | 国网新疆电力公司经济技术研究院 | 三维可视化变电站在线监测告警系统及使用方法 |
CN107085863A (zh) * | 2017-04-19 | 2017-08-22 | 国网山东省电力公司临邑县供电公司 | 变电站监控方法及装置 |
CN108111339A (zh) * | 2017-12-12 | 2018-06-01 | 上海建工五建集团有限公司 | 基于bim的三维设备监控方法及系统 |
CN109035392A (zh) * | 2018-07-25 | 2018-12-18 | 上海华测导航技术股份有限公司 | 一种用于变电站三维模型的建模方法 |
CN109491303A (zh) * | 2018-10-30 | 2019-03-19 | 国家电网有限公司 | 基于人工智能的项目现场管理系统及方法 |
CN109544675A (zh) * | 2018-10-11 | 2019-03-29 | 广东电网有限责任公司 | 基于全息数据处理变电设备的三维模型状态可视化方法 |
CN109709936A (zh) * | 2018-12-24 | 2019-05-03 | 广州供电局有限公司 | 设备运行状态监测方法、装置、计算机设备和存储介质 |
CN110417120A (zh) * | 2019-06-26 | 2019-11-05 | 广东康云科技有限公司 | 一种变电站实景三维智能巡检系统及方法 |
CN110673158A (zh) * | 2019-08-28 | 2020-01-10 | 国网福建省电力有限公司 | 基于激光扫描点云的电力生产场景三维空间异常检测方法 |
CN110689610A (zh) * | 2019-09-27 | 2020-01-14 | 国网上海市电力公司 | 一种基于泛在电力物联网的数字化变电站 |
CN110716103A (zh) * | 2019-09-27 | 2020-01-21 | 国网山西省电力公司太原供电公司 | 一种配网故障的预警方法 |
CN110795583A (zh) * | 2019-11-07 | 2020-02-14 | 中水三立数据技术股份有限公司 | 一种泵站清污机智能管理方法 |
CN110827404A (zh) * | 2019-11-07 | 2020-02-21 | 中水三立数据技术股份有限公司 | 一种泵站全景监控预警系统及其方法 |
CN110826201A (zh) * | 2019-10-24 | 2020-02-21 | 深圳供电局有限公司 | 一种用于数据中心运维管理系统的三维可视化平台 |
CN110874866A (zh) * | 2019-11-19 | 2020-03-10 | 国网智能科技股份有限公司 | 一种基于视频的变电站三维监控方法及系统 |
CN111311726A (zh) * | 2019-11-22 | 2020-06-19 | 济南信通达电气科技有限公司 | 一种变电站的三维模型建模方法及装置 |
CN111367221A (zh) * | 2020-03-23 | 2020-07-03 | 国网江苏省电力有限公司镇江供电分公司 | 基于混合现实技术变电站智能运检辅助系统人机交互方法 |
CN111444164A (zh) * | 2020-03-27 | 2020-07-24 | 广西电网有限责任公司河池供电局 | 基于设备监控信息规范建立变电站设备监控信息库的方法 |
CN111521256A (zh) * | 2020-04-13 | 2020-08-11 | 国家电网有限公司 | 一种基于数据映射的主变压器表面振动可视化检测方法 |
CN111524224A (zh) * | 2020-04-13 | 2020-08-11 | 国家电网有限公司 | 一种电力变压器表面温度分布的全景成像方法 |
CN111722575A (zh) * | 2019-03-22 | 2020-09-29 | 江苏海内软件科技有限公司 | 智能园企管理系统、方法和设备 |
CN111754001A (zh) * | 2020-05-25 | 2020-10-09 | 北京三清互联科技有限公司 | 展示三维巡检数据的方法和智能巡检系统 |
CN111798572A (zh) * | 2020-06-12 | 2020-10-20 | 广东电网有限责任公司揭阳供电局 | 一种机房虚拟巡检方法及系统 |
CN111884336A (zh) * | 2020-07-14 | 2020-11-03 | 广西电网有限责任公司钦州供电局 | 一种基于大数据的实时监控系统 |
CN111882816A (zh) * | 2020-06-24 | 2020-11-03 | 国网宁夏电力有限公司检修公司 | 一种用于变电站的危险报警方法、介质及系统 |
CN111881553A (zh) * | 2020-06-28 | 2020-11-03 | 国家电网有限公司 | 一种基于物联网和3d建模智能测距的装置及方法 |
CN111882077A (zh) * | 2020-06-24 | 2020-11-03 | 国网宁夏电力有限公司检修公司 | 一种用于变电站的布防空间的建立方法及系统 |
CN112073679A (zh) * | 2020-05-26 | 2020-12-11 | 许继集团有限公司 | 一种基于三维技术的变电站设备监控系统及其控制方法 |
CN112135091A (zh) * | 2020-08-27 | 2020-12-25 | 杭州张量科技有限公司 | 监控场景标记方法、装置、计算机设备和存储介质 |
CN112235537A (zh) * | 2020-09-29 | 2021-01-15 | 国网浙江省电力有限公司嘉兴供电公司 | 一种变电站现场作业安全预警方法 |
CN112749813A (zh) * | 2020-10-29 | 2021-05-04 | 广东电网有限责任公司 | 一种数据处理系统、方法、电子设备及存储介质 |
CN113432734A (zh) * | 2021-06-16 | 2021-09-24 | 南京江行联加智能科技有限公司 | 智能开关柜温度监测方法、装置、设备及存储介质 |
CN116000475A (zh) * | 2023-03-23 | 2023-04-25 | 深圳欧斯普瑞智能科技有限公司 | 激光切割头的控制方法、装置、计算机设备和存储介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103021024A (zh) * | 2012-12-14 | 2013-04-03 | 国家电网公司 | 用于对变电站中的电磁场进行三维可视化展示的方法 |
CN103258256A (zh) * | 2013-04-12 | 2013-08-21 | 国家电网公司 | 电缆线路状态监测多维可视化管理平台 |
CN103335608A (zh) * | 2013-07-03 | 2013-10-02 | 国家电网公司 | 用于构建输变电三维数字电网的机载LiDAR三维数据采集方法 |
-
2015
- 2015-11-09 CN CN201510756031.4A patent/CN105425698A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103021024A (zh) * | 2012-12-14 | 2013-04-03 | 国家电网公司 | 用于对变电站中的电磁场进行三维可视化展示的方法 |
CN103258256A (zh) * | 2013-04-12 | 2013-08-21 | 国家电网公司 | 电缆线路状态监测多维可视化管理平台 |
CN103335608A (zh) * | 2013-07-03 | 2013-10-02 | 国家电网公司 | 用于构建输变电三维数字电网的机载LiDAR三维数据采集方法 |
Non-Patent Citations (3)
Title |
---|
刘求龙等: "三维激光扫描仪在惠泉变电站三维模型构建中的研究与实现", 《测绘通报》 * |
赵春林: "基于三维全景快速建模的变电站可视化的研究和应用", 《中国优秀硕士学位论文全文数据库(电子期刊)工程科技II辑》 * |
陈斯雅: "智能输变电设备状态评估诊断专家系统和可视化监测软件开发", 《中国优秀硕士学位论文全文数据库(电子期刊)工程科技II辑》 * |
Cited By (45)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105894576A (zh) * | 2016-04-05 | 2016-08-24 | 国家电网公司 | 一种基于虚拟仿真技术的3d变电站全景实时调控系统 |
CN105929770B (zh) * | 2016-04-19 | 2019-01-08 | 广西电网有限责任公司电力科学研究院 | 一种基于cim模型的变电站运行工况可视化方法 |
CN105929770A (zh) * | 2016-04-19 | 2016-09-07 | 广西电网有限责任公司电力科学研究院 | 一种基于cim模型的变电站运行工况可视化方法 |
CN106787211A (zh) * | 2017-01-25 | 2017-05-31 | 国网新疆电力公司经济技术研究院 | 三维可视化变电站在线监测告警系统及使用方法 |
CN107085863A (zh) * | 2017-04-19 | 2017-08-22 | 国网山东省电力公司临邑县供电公司 | 变电站监控方法及装置 |
CN108111339A (zh) * | 2017-12-12 | 2018-06-01 | 上海建工五建集团有限公司 | 基于bim的三维设备监控方法及系统 |
CN109035392A (zh) * | 2018-07-25 | 2018-12-18 | 上海华测导航技术股份有限公司 | 一种用于变电站三维模型的建模方法 |
CN109544675A (zh) * | 2018-10-11 | 2019-03-29 | 广东电网有限责任公司 | 基于全息数据处理变电设备的三维模型状态可视化方法 |
CN109544675B (zh) * | 2018-10-11 | 2023-04-28 | 广东电网有限责任公司 | 基于全息数据处理变电设备的三维模型状态可视化方法 |
CN109491303A (zh) * | 2018-10-30 | 2019-03-19 | 国家电网有限公司 | 基于人工智能的项目现场管理系统及方法 |
CN109709936A (zh) * | 2018-12-24 | 2019-05-03 | 广州供电局有限公司 | 设备运行状态监测方法、装置、计算机设备和存储介质 |
CN111722575A (zh) * | 2019-03-22 | 2020-09-29 | 江苏海内软件科技有限公司 | 智能园企管理系统、方法和设备 |
CN110417120A (zh) * | 2019-06-26 | 2019-11-05 | 广东康云科技有限公司 | 一种变电站实景三维智能巡检系统及方法 |
CN110673158A (zh) * | 2019-08-28 | 2020-01-10 | 国网福建省电力有限公司 | 基于激光扫描点云的电力生产场景三维空间异常检测方法 |
CN110689610A (zh) * | 2019-09-27 | 2020-01-14 | 国网上海市电力公司 | 一种基于泛在电力物联网的数字化变电站 |
CN110716103A (zh) * | 2019-09-27 | 2020-01-21 | 国网山西省电力公司太原供电公司 | 一种配网故障的预警方法 |
CN110826201A (zh) * | 2019-10-24 | 2020-02-21 | 深圳供电局有限公司 | 一种用于数据中心运维管理系统的三维可视化平台 |
CN110826201B (zh) * | 2019-10-24 | 2023-11-03 | 深圳供电局有限公司 | 一种用于数据中心运维管理系统的三维可视化平台 |
CN110827404A (zh) * | 2019-11-07 | 2020-02-21 | 中水三立数据技术股份有限公司 | 一种泵站全景监控预警系统及其方法 |
CN110795583A (zh) * | 2019-11-07 | 2020-02-14 | 中水三立数据技术股份有限公司 | 一种泵站清污机智能管理方法 |
CN110827404B (zh) * | 2019-11-07 | 2023-09-29 | 中水三立数据技术股份有限公司 | 一种泵站全景监控预警系统及其方法 |
CN110874866A (zh) * | 2019-11-19 | 2020-03-10 | 国网智能科技股份有限公司 | 一种基于视频的变电站三维监控方法及系统 |
CN110874866B (zh) * | 2019-11-19 | 2023-09-01 | 山东鲁软数字科技有限公司智慧能源分公司 | 一种基于视频的变电站三维监控方法及系统 |
CN111311726A (zh) * | 2019-11-22 | 2020-06-19 | 济南信通达电气科技有限公司 | 一种变电站的三维模型建模方法及装置 |
CN111367221A (zh) * | 2020-03-23 | 2020-07-03 | 国网江苏省电力有限公司镇江供电分公司 | 基于混合现实技术变电站智能运检辅助系统人机交互方法 |
CN111444164A (zh) * | 2020-03-27 | 2020-07-24 | 广西电网有限责任公司河池供电局 | 基于设备监控信息规范建立变电站设备监控信息库的方法 |
CN111444164B (zh) * | 2020-03-27 | 2023-03-21 | 广西电网有限责任公司河池供电局 | 基于设备监控信息规范建立变电站设备监控信息库的方法 |
CN111524224A (zh) * | 2020-04-13 | 2020-08-11 | 国家电网有限公司 | 一种电力变压器表面温度分布的全景成像方法 |
CN111521256A (zh) * | 2020-04-13 | 2020-08-11 | 国家电网有限公司 | 一种基于数据映射的主变压器表面振动可视化检测方法 |
CN111524224B (zh) * | 2020-04-13 | 2023-09-29 | 国家电网有限公司 | 一种电力变压器表面温度分布的全景成像方法 |
CN111754001A (zh) * | 2020-05-25 | 2020-10-09 | 北京三清互联科技有限公司 | 展示三维巡检数据的方法和智能巡检系统 |
CN112073679A (zh) * | 2020-05-26 | 2020-12-11 | 许继集团有限公司 | 一种基于三维技术的变电站设备监控系统及其控制方法 |
CN111798572A (zh) * | 2020-06-12 | 2020-10-20 | 广东电网有限责任公司揭阳供电局 | 一种机房虚拟巡检方法及系统 |
CN111798572B (zh) * | 2020-06-12 | 2022-05-27 | 广东电网有限责任公司揭阳供电局 | 一种机房虚拟巡检方法及系统 |
CN111882816A (zh) * | 2020-06-24 | 2020-11-03 | 国网宁夏电力有限公司检修公司 | 一种用于变电站的危险报警方法、介质及系统 |
CN111882077A (zh) * | 2020-06-24 | 2020-11-03 | 国网宁夏电力有限公司检修公司 | 一种用于变电站的布防空间的建立方法及系统 |
CN111881553A (zh) * | 2020-06-28 | 2020-11-03 | 国家电网有限公司 | 一种基于物联网和3d建模智能测距的装置及方法 |
CN111884336B (zh) * | 2020-07-14 | 2021-12-28 | 广西电网有限责任公司钦州供电局 | 一种基于大数据的实时监控系统 |
CN111884336A (zh) * | 2020-07-14 | 2020-11-03 | 广西电网有限责任公司钦州供电局 | 一种基于大数据的实时监控系统 |
CN112135091A (zh) * | 2020-08-27 | 2020-12-25 | 杭州张量科技有限公司 | 监控场景标记方法、装置、计算机设备和存储介质 |
CN112235537A (zh) * | 2020-09-29 | 2021-01-15 | 国网浙江省电力有限公司嘉兴供电公司 | 一种变电站现场作业安全预警方法 |
CN112749813A (zh) * | 2020-10-29 | 2021-05-04 | 广东电网有限责任公司 | 一种数据处理系统、方法、电子设备及存储介质 |
CN112749813B (zh) * | 2020-10-29 | 2023-11-10 | 广东电网有限责任公司 | 一种数据处理系统、方法、电子设备及存储介质 |
CN113432734A (zh) * | 2021-06-16 | 2021-09-24 | 南京江行联加智能科技有限公司 | 智能开关柜温度监测方法、装置、设备及存储介质 |
CN116000475A (zh) * | 2023-03-23 | 2023-04-25 | 深圳欧斯普瑞智能科技有限公司 | 激光切割头的控制方法、装置、计算机设备和存储介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105425698A (zh) | 一种三维数字变电站一体化管控方法及系统 | |
KR101937096B1 (ko) | 3차원 bim 객체 모델을 이용한 3차원 모니터링 서버 및 이를 포함하는 3차원 모니터링 시스템 | |
CN106710001A (zh) | 一种基于变电站巡检机器人集中监控仿真系统及其方法 | |
CN103778566A (zh) | 基于三维可视化展示的火电厂监测方法 | |
CN104618694A (zh) | 一种机房三维动态监测的方法及系统 | |
CN111798572B (zh) | 一种机房虚拟巡检方法及系统 | |
CN106787211A (zh) | 三维可视化变电站在线监测告警系统及使用方法 | |
CN109269555A (zh) | 基于无人机和三维建模技术的尾矿库安全监测系统及方法 | |
CN104361586A (zh) | 基于全景图的电力杆塔维护与预警系统 | |
CN112150596B (zh) | 一种变电站设备故障全息再现方法及系统 | |
CN107071297A (zh) | 一种用于电力信通机房展示的虚拟现实系统 | |
CN110610542A (zh) | 变电站设备状态监测全景分析系统 | |
CN114418145A (zh) | 基于gim的变电站数字孪生方法及系统 | |
CN106875081A (zh) | 一种用于电力变电站的增强虚拟现实方法 | |
CN116298701B (zh) | 一种基于数字孪生系统的配电网故障检测方法及相关装置 | |
CN112186901B (zh) | 一种变电站全景感知监控方法及系统 | |
CN104881870A (zh) | 面向待观察点的监控实况启动方法及装置 | |
KR20200063684A (ko) | 에너지 사용량을 3차원 공간에 렌더링 하여 표시하는 에너지 모니터링 방법 및 이를 이용한 에너지 모니터링 시스템 | |
CN115496398A (zh) | 一种电力作业安全管控方法及系统 | |
CN110609864B (zh) | 一种面向化工供应链的数据可视化管理方法及装置 | |
CN116720242A (zh) | 一种高压电缆隧道数字孪生全景监测系统 | |
CN111384776B (zh) | 一种基于vr的变电站三维全景状态监测方法及系统 | |
CN113992891A (zh) | 一种基于视频监控多信息融合的可视化应用系统 | |
CN111465045B (zh) | 一种ap的监控方法、监控服务器和监控系统 | |
Liu et al. | Flying robot based viewpoint selection for the electricity transmission equipment inspection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160323 |