CN105423056B - Saddle electric smelting end cap - Google Patents

Saddle electric smelting end cap Download PDF

Info

Publication number
CN105423056B
CN105423056B CN201510969688.9A CN201510969688A CN105423056B CN 105423056 B CN105423056 B CN 105423056B CN 201510969688 A CN201510969688 A CN 201510969688A CN 105423056 B CN105423056 B CN 105423056B
Authority
CN
China
Prior art keywords
end cap
block
connecting rod
briquetting
cap body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510969688.9A
Other languages
Chinese (zh)
Other versions
CN105423056A (en
Inventor
童津金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO HENGYUAN PRECISION VALVES TECHNOLOGY Co Ltd
Original Assignee
NINGBO HENGYUAN PRECISION VALVES TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO HENGYUAN PRECISION VALVES TECHNOLOGY Co Ltd filed Critical NINGBO HENGYUAN PRECISION VALVES TECHNOLOGY Co Ltd
Priority to CN201510969688.9A priority Critical patent/CN105423056B/en
Publication of CN105423056A publication Critical patent/CN105423056A/en
Application granted granted Critical
Publication of CN105423056B publication Critical patent/CN105423056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow from or in pipes or hoses
    • F16L55/115Caps

Abstract

The invention discloses saddle electric smelting end cap, including end cap body, bolt positioning hole, end cap inner body wall shaves shape tooth provided with first, and end cap body is provided with fixing device;Fixing device includes sealing ring, connecting rod, briquetting, pushing block, retaining groove, block, sliding shoe, movable block, sealing ring is arranged in end cap body, and movable block is provided with the outside of sealing ring, movable block is fixedly connected with briquetting, movable block is also fixedly connected with block, and connecting rod is provided with briquetting, and connecting rod is connected with pushing block, connecting rod is also connected with sliding shoe, and end cap body is provided with the retaining groove coordinated with pushing block;Movable block is driven pushing block is reached retaining groove position by pressing briquetting, sliding shoe is removed to both sides again promotes connecting rod the pushing block being connected with connecting rod is entered in retaining groove, this ensures that the movable block energy squeezed tight being fixedly connected with briquetting firmly sealing ring, sealed effect is ensure that, and is difficult to slide.

Description

Saddle electric smelting end cap
Technical field
The present invention relates to pipeline connection area, and in particular to saddle electric smelting end cap.
Background technology
Electric smelting saddle type pipe fitting is the passage of fuel gas transmission, is broadly divided into three major types:Straight-through saddle, bypass saddle, closure saddle Type;Straight-through saddle is needed without gas, the not with pressure, pipeline newly laid suitable for main pipeline as branch, replacement threeway after connection Special cutting element is wanted, drills, then can use on main pipeline upon connection;Bypass saddle be applied to main pipeline band gas, As branch in the pipeline of subsidiary low pressure, threeway is substituted, there is the included band of pipe fitting a combination that can cut through supervisor's material wall to cut Instrument is cut, instrument restores after the completion of cutting through supervisor's material, cutting using combination cutting element after connection, remains in saddle pipe fitting It is interior, it is the pipe fitting for being constructed with gas;Closure saddle be then exclusively used in repair polyethylene pipe on scratch and tiny air leakage point it is special Use pipe fitting.
And electric smelting saddle type end cap is then that electric smelting saddle type pipe fitting can be blocked to the device for preventing that combustion gas from flowing out, but it is existing Electric smelting saddle type end cap simply tighten electric smelting saddle type end cap be fixed on electric smelting saddle type pipe fitting using bolt, easily produce pine It is dynamic, cause gas leakage.
The content of the invention
The invention aims to provide can place end cap loosen cause gas leakage so that between end cap and pipe fitting more Plus the saddle electric smelting end cap being brought into close contact.
The present invention is achieved through the following technical solutions:Saddle electric smelting end cap, including end cap body, bolt positioning hole, it is described First is additionally provided with end cap inner body wall shaves and be additionally provided with fixing device on shape tooth, the end cap body;The fixing device includes Sealing ring, connecting rod, briquetting, pushing block, retaining groove, block, sliding shoe, movable block, the sealing ring are arranged on end cap body In, movable block is additionally provided with the outside of the sealing ring, the movable block is fixedly connected with briquetting, the movable block is also solid with block Connecting rod is provided with fixed connection, the briquetting, the connecting rod is connected with pushing block, and the connecting rod is also connected with sliding shoe, the end cap The retaining groove coordinated with pushing block is additionally provided with body;The sliding shoe is provided with fixture block, and the block is provided with matches somebody with somebody with fixture block The neck of conjunction;The end cap body is provided with bolt positioning hole;The retaining groove engaging edge is set to arc.
The present invention drives movable block so that pushing block reaches the position of retaining groove, then again by slip by pressing briquetting Block is removed to both sides promotes connecting rod that the pushing block being connected with connecting rod is entered in retaining groove, this ensures that solid with briquetting Surely the movable block energy squeezed tight connected lives the groove for being provided with and coordinating with sealing ring on sealing ring, electric smelting saddle type pipe fitting, pressing Block crush seal circle is into groove, it is ensured that sealed effect, and is difficult to slide;It is additionally provided with electric smelting saddle type pipe fitting and end cap First in inner body wall shave the cooperation of shape tooth second shave shape tooth, it is ensured that it is more not easy to slide to cause gas leakage.
The present invention is advantageous in that:1) pressing briquetting drive movable block cause pushing block reach retaining groove position Put, sliding shoe removes promotion connecting rod so that the pushing block being connected with connecting rod enters retaining groove to both sides, it is ensured that fixed with briquetting Groove on the movable block energy squeezed tight of connection to electric smelting saddle type pipe fitting, anti-sliding stop;2) sliding shoe is provided with fixture block, block It is provided with the neck coordinated with fixture block, it is ensured that sliding shoe can engage with block so that sliding shoe, which is difficult abjection, causes pushing block to take off Go out retaining groove;3) second on shape tooth and electric smelting saddle type pipe fitting is shaved by first on electric smelting saddle type end cap inwall to shave shape tooth and match somebody with somebody Close so that electric smelting saddle type end cap with electric smelting saddle type pipe fitting is even closer fits, anti-sliding stop and cause gas leakage.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is the structural representation of fixing device of the present invention.
Embodiment
Below in conjunction with the accompanying drawings with embodiment, the invention will be further described.
See on Fig. 1 to Fig. 2, saddle electric smelting end cap, including end cap body 7, bolt positioning hole 4, the inwall of end cap body 7 It is additionally provided with first and shaves and is additionally provided with fixing device 5 on shape tooth 6, the end cap body 7;The fixing device 5 includes sealing ring 51, connected Bar 56, briquetting 52, pushing block 55, retaining groove 53, block 58, sliding shoe 57, movable block 54, the sealing ring 51 are arranged on end In lid body 7, the outside of sealing ring 51 is additionally provided with movable block 54, and the movable block 54 is fixedly connected with briquetting 52, described Movable block 54 is also fixedly connected with block 58, and connecting rod 56 is provided with the briquetting 52, and the connecting rod 56 is connected with pushing block 55, institute Connecting rod 56 is stated to be also connected with being additionally provided with the retaining groove 53 coordinated with pushing block 55 on sliding shoe 57, the end cap body 7;The cunning Motion block 57 is provided with fixture block 51, and the block 58 is provided with the neck coordinated with fixture block 51;The end cap body 7 is provided with bolt Positioning hole 4;The engaging of retaining groove 53 edge is set to arc.
In present embodiment, electric smelting saddle type end cap want the electric smelting saddle type pipe fitting 1 that upper shield gets on be provided with end cap body 7 First on wall, which shaves the second of the cooperation of shape tooth 6, shaves shape tooth 3 and the groove 2 with the cooperation of sealing ring 51, causes electricity by cooperating Molten saddle end cap with electric smelting saddle type pipe fitting 1 is even closer fits.
In present embodiment, the engaging of retaining groove 53 edge is set to arc, facilitates the engaging of pushing block 55 and pulls out Go out.
In present embodiment, user's pressing briquetting 52 drives movable block 54 to cause pushing block 55 to reach retaining groove 53 Position, then sliding shoe 57 is promoted to both sides again, sliding shoe 57 be provided with fixture block 51, block 58 be provided with and fixture block 51 The neck of cooperation, fixture block 51 engages with neck prevents sliding shoe 57 from moving, sliding shoe 57 movement cause connecting rod 56 to strut cause and In the feeding retaining groove 53 of pushing block 55 that connecting rod 56 is connected, this ensures that the energy of movable block 54 being fixedly connected with briquetting 52 Squeezed tight lives sealing ring 51 into the groove 2 of electric smelting saddle type pipe fitting 1, it is ensured that sealed effect, and on electric smelting saddle type pipe fitting 1 Second shave shape tooth 6 to shave shape tooth with first on the inwall of end cap body 7 mutually ratcheting, it is ensured that it is more not easy to slide, then adds Bolt positioning hole 4 on upper end cover body 7 is positioned by screw bolt reinforcing, is reinforced by triple so that electric smelting saddle type end cap is firmly Electric smelting saddle type pipe fitting 1 is fitted in, will not slide to cause gas leakage.
Protection scope of the present invention includes but is not limited to embodiment of above, and protection scope of the present invention is with claims It is defined, any replacement being readily apparent that to those skilled in the art that this technology is made, deformation, improvement each fall within the present invention's Protection domain.

Claims (3)

1. saddle electric smelting end cap, including end cap body (7), bolt positioning hole (4), it is characterised in that:In the end cap body (7) First is additionally provided with wall shaves and be additionally provided with fixing device (5) on shape tooth (6), the end cap body (7);Fixing device (5) bag Sealing ring (51), connecting rod (56), briquetting (52), pushing block (55), retaining groove (53) are included, block (58), sliding shoe (57) are moved Motion block (54), the sealing ring (51) is arranged in end cap body (7), and movable block is additionally provided with the outside of the sealing ring (51) (54), the movable block (54) is fixedly connected with briquetting (52), and the movable block (54) is also fixedly connected with block (58), institute State and connecting rod (56) is provided with briquetting (52), the connecting rod (56) is connected with pushing block (55), the connecting rod (56) is also connected with sliding The retaining groove (53) coordinated with pushing block (55) is additionally provided with block (57), the end cap body (7);Set on the sliding shoe (57) There is fixture block, the block (58) is provided with the neck coordinated with fixture block.
2. saddle electric smelting end cap according to claim 1, it is characterised in that:The end cap body (7) is fixed provided with bolt Position hole (4).
3. saddle electric smelting end cap according to claim 1, it is characterised in that:Retaining groove (53) the engaging edge is set For arc.
CN201510969688.9A 2015-12-21 2015-12-21 Saddle electric smelting end cap Active CN105423056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510969688.9A CN105423056B (en) 2015-12-21 2015-12-21 Saddle electric smelting end cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510969688.9A CN105423056B (en) 2015-12-21 2015-12-21 Saddle electric smelting end cap

Publications (2)

Publication Number Publication Date
CN105423056A CN105423056A (en) 2016-03-23
CN105423056B true CN105423056B (en) 2017-10-24

Family

ID=55501476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510969688.9A Active CN105423056B (en) 2015-12-21 2015-12-21 Saddle electric smelting end cap

Country Status (1)

Country Link
CN (1) CN105423056B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112295127B (en) * 2019-07-30 2022-06-14 南京耀泽电子科技有限公司 Anti-skid fixing mode and anti-skid method for air respirator back plate device
CN112295126B (en) * 2019-07-30 2022-06-14 南京耀泽电子科技有限公司 Telescopic positive pressure type air respirator back plate device and telescopic method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29822922U1 (en) * 1998-12-16 1999-05-27 Schlemenat Alfred Detachable connection of rotationally symmetrical cover closures
CN2382937Y (en) * 1999-06-20 2000-06-14 刘耀腾 Pipeline blocking and repairing sleeve
CN2867055Y (en) * 2006-01-27 2007-02-07 陈亨斌 Polyethylene pipe electric melting saddle pipe fitting
CN203628141U (en) * 2013-09-11 2014-06-04 杨爱弟 Drainage-type magnetic leakage-stopping fixture
CN203979743U (en) * 2014-07-04 2014-12-03 邢梓杉 Plastic conveying and plastic drilling under pressure of pipeline electric-melting saddle-shaped bypass
RU2557648C1 (en) * 2014-10-20 2015-07-27 Федеральное автономное учреждение "25 Государственный научно-исследовательский институт химмотологии Министерства обороны Российской Федерации" Device for temporary filling of holes and cracks in stiff structures of any shape and configuration, which are filled with liquid
CN205208028U (en) * 2015-12-21 2016-05-04 宁波恒元精工管阀科技有限公司 Saddle -type electric smelting end cover

Also Published As

Publication number Publication date
CN105423056A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105423056B (en) Saddle electric smelting end cap
CN105423055B (en) A kind of saddle electric smelting end cap
CN205208028U (en) Saddle -type electric smelting end cover
CN205261127U (en) Saddle -type electric smelting end cover
CN203656402U (en) Pipe coupling
CN200943799Y (en) Plugging device for pipe pressing
CN202065586U (en) Drain pipe joint convenient to assemble and disassemble
CN203023731U (en) Oil channel plugging structure
CN102865427A (en) Pipeline connecting device
CN202115835U (en) Bottle cap for leakage prevention of barreled water
CN203236100U (en) Argon conveying protection device of manual argon tungsten-arc welding
CN105202209A (en) Inorganic-machining vacuum evanescent mode cast telescopic gate valve
CN202674645U (en) Pipe clamping device for hose connection
CN203757282U (en) Station gas storage cylinder group outer pipeline pressure testing tool
CN202828398U (en) Connecting and sealing device
CN204459524U (en) A kind of Novel water pipe connecting device
CN204470765U (en) Gauge pipe welding argon-filling device
JP2016075312A (en) Fluid pipe removal method, protective case and cutting closing device used for the method
CN210219005U (en) High-tightness inner tooth tee joint convenient to install
CN209876207U (en) Be used for exhaust gas purifier intake pipe connecting device
CN204284749U (en) A kind of automobile engine oil pipe joint
CN203927141U (en) With leading directly to of Double seal ring
CN202901645U (en) Pipeline sealing connecting device
CN103851303B (en) Oil and gas pipeline Quick leak stoppage apparatus and method
CN205207758U (en) Ball valve

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant