CN105421786A - Large steel formwork firewall concrete pumping auxiliary equipment - Google Patents

Large steel formwork firewall concrete pumping auxiliary equipment Download PDF

Info

Publication number
CN105421786A
CN105421786A CN201510990025.5A CN201510990025A CN105421786A CN 105421786 A CN105421786 A CN 105421786A CN 201510990025 A CN201510990025 A CN 201510990025A CN 105421786 A CN105421786 A CN 105421786A
Authority
CN
China
Prior art keywords
funnel
gathering sill
auxiliary equipment
concrete pumping
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510990025.5A
Other languages
Chinese (zh)
Other versions
CN105421786B (en
Inventor
陈健
居乐
韩荣国
沈允泉
敬涛
徐涛
滕学东
马骏捷
刘壮
卢鹏
郝克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Electric Power Transmission and Substation Engineering Co
Original Assignee
Shandong Electric Power Transmission and Substation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Electric Power Transmission and Substation Engineering Co filed Critical Shandong Electric Power Transmission and Substation Engineering Co
Priority to CN201510990025.5A priority Critical patent/CN105421786B/en
Publication of CN105421786A publication Critical patent/CN105421786A/en
Application granted granted Critical
Publication of CN105421786B publication Critical patent/CN105421786B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/025Buckets specially adapted for use with concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0481Concrete chutes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides large steel formwork firewall concrete pumping auxiliary equipment which comprises a hopper, a hopper moving bracket, a hopper lifting device, a guide groove group and a sliding guide rail, wherein the hopper and the hopper lifting device are arranged on the hopper moving bracket; the hopper moving bracket is arranged on the sliding guide rail; and the guide groove group is arranged below the hopper. With the adoption of the hopper lifting device, the concrete pouring height can be easily changed, so that the pouring quality and efficiency are improved; the guide groove group consists of multiple flow guide grooves through sleeving, and concrete flows in an S-shaped manner in the guide groove group, so that a phenomenon of concrete disintegration is precluded basically; and with the adoption of the sliding guide rail, the pouring position of the hopper can be changed rapidly, so that the pouring efficiency is improved.

Description

Large-scale steel form fire wall concrete pumping auxiliary equipment
Technical field
The present invention relates to a kind of concrete placing installation, particularly relate to a kind of large-scale steel form fire wall concrete pumping auxiliary equipment.
Background technology
Conventional steel template concrete pumping mode is investigated, there is concrete pumping pressure large, the problems such as conveyance conduit not easily gos deep in reinforcing cage, and efficiency of construction is low, there is larger potential safety hazard in work progress, and Concrete Anti wall with flues exists the defects such as aberration, bubble, water wave, honeycomb, pitted skin.Under Frozen-thawed cycled or other environmental factor effects, the quality of existence to fire wall of these defects causes very large threat, once have an accident, consequence is hardly imaginable.
Application publication number is that the Chinese patent of CN104594354A discloses a kind of concrete-spouting plant, the conduit that this equipment comprises base, be arranged on the irrigator of two lifting gears on base and funnel-shaped structure and be communicated with in irrigator bottom, conduit and irrigator junction are connected with control and drive stream valve, and the bottom of conduit is deeply poured in cylindrical shell through base.This equipment is used to there is following some problem in large-scale building in engineering: the lifting gear the first, on this equipment is lift cylinder, in order to coordinate the execution of lift cylinder, need for a set of air power source system of Equipments Setting, thus cause equipment comparatively complicated, simultaneously, comparatively large owing to building area, need repeatedly to move placing installation, cause the locomotivity of equipment poor because this equipment is comparatively complicated; The second, mostly comparatively severe owing to building environment, the more security reliability of cylinder that makes of dust reduces greatly; Three, the conduit in this equipment is vertical siphunculus, its length can not regulate, some build highly higher project use this equipment time, likely make the concrete flowing out conduit, in the process arriving casting position, segregation phenomenon occur, thus reduce pouring quality.
Summary of the invention
For the complex structure existing for above-mentioned existing concreting auxiliary equipment, locomotivity difference and build the problems such as the degree of depth is narrow, the invention provides a kind of large-scale steel form fire wall concrete pumping auxiliary equipment, this auxiliary equipment overall structure is comparatively simple, locomotivity is strong, can build any adjustment of height simultaneously.
The present invention solves the technical scheme that its technical problem takes: a kind of large-scale steel form fire wall concrete pumping auxiliary equipment, described auxiliary equipment comprises funnel, it is characterized in that, described auxiliary equipment also comprises funnel traversing carriage, funnel lifting appliance, gathering sill group and rail plate;
The opposed riser of described funnel inlet end two all arranges semicircle suspension ring, and a mounting rope is set between two described semicircle suspension ring, four summits of funnel inlet end periphery all arrange a hollow circular-tube, described funnel moves pedestal upper end and is provided with and described hollow circular-tube vertical four corresponding montants that lead one by one, be nested with by described hollow circular-tube and described funnel be arranged on described funnel traversing carriage on described guiding montant, described funnel lateral wall is also provided with the hanging mechanisms be connected with described gathering sill group;
Described funnel lifting appliance comprises lifting bracket, hoisting drum, fixed pulley support and fixed pulley, described lifting bracket is fixedly installed on described funnel traversing carriage, described hoisting drum is arranged on described lifting bracket, described hoisting drum is provided with along the equally distributed multiple swing handle of described hoisting drum circumferential direction, described lifting bracket is provided with the two through hole along described hoisting drum axial direction, one cross bar is set in described two through hole, and described cross bar is adjacent with swing handle, described fixed pulley support is nested with by four shanks that its surrounding is arranged and moves pedestal upper end at described funnel, described fixed pulley is arranged on described fixed pulley support, described hoisting drum is provided with the hawser of one end with hook, described hawser is connected with described mounting rope by described hook through described fixed pulley,
Described gathering sill group is arranged on below described funnel, described gathering sill group comprises multiple gathering sill be socketed successively, the entrance point on described gathering sill top is trapezium structure, the port of export of bottom is rectangular configuration, described in each the top of gathering sill entrance point inside be provided with two pieces of relative upper lapping plates, described in each, the port of export arranged outside of the bottom of gathering sill has two pieces of relative lower lapping plates, and the both sides of the first segment gathering sill in described gathering sill group all arrange semicircle suspension ring;
Described rail plate is arranged on below described funnel traversing carriage.
Preferably, described hanging mechanisms comprise and are arranged on two suspension ring on the opposed swash plate of described funnel two and two ends all with the connecting rope of hook.
Preferably, described hanging mechanisms comprise and are arranged on the opposed gathering sill lapping plate of two pieces, described hopper outlet end, and described gathering sill lapping plate can be connected together with the upper lapping plate on described first segment gathering sill.
Further, gathering sill lapping plate described in each block arranges a through hole, lapping plate and described lower lapping plate are provided with a through hole on described in each block.
Preferably, described rail plate comprises two L-type guide rails, and arranges the crossbeam of multiple equidistant distribution between two described L-type guide rails.
Further, L-type guide rail described in any one is provided with the scale mark of equidistantly distribution.
Further, the bottom surface of described funnel traversing carriage is provided with roller, described roller is positioned on two described L-type guide rails.
Further, described L-type guide rail is provided with the semi-circular recesses of multiple equidistant distribution.
The invention has the beneficial effects as follows:
1, funnel lifting appliance is provided with in the present invention, the electrodeless adjustment of hopper level can be realized by the swing handle rotated on hoisting drum, and then realize the adjustment of building height, thus ensure that concrete pouring quality, meanwhile, when needs removable hopper, the gathering sill be inserted in reinforcing cage can be risen to reinforcing cage outside by lifting appliance, do not need the gathering sill group below to funnel to remove to move again, improve and build efficiency.
2, the rail plate in the present invention, change casting position for funnel to provide convenience, avoid and repeatedly adopt hanging device to carry out the flow process of equipment moving when mobile device, thus improve and build efficiency, meanwhile, when mobile device, can accurately control concretely to build radius by the scale mark be arranged on L-type guide rail, thus avoid the generation of concrete scalelike mark, improve pouring quality.
3, the gathering sill group in the present invention is set in together by more piece gathering sill and forms, the flow channel of gathering sill group inner concrete is S type, when such concrete flows in gathering sill group, all the time the wall flow of gathering sill can be against, gathering sill group is made to provide great cushioning effect to concrete, thus avoid concrete generation segregation phenomenon, improve pouring quality.
4, the groove in the present invention, rail plate arranged, plays restriction to the roller be arranged on funnel traversing carriage, thus ensure that funnel is in casting process, can not be subjected to displacement phenomenon because of concrete impact.
5, the fixed pulley support in the present invention is plugged on above funnel traversing carriage, thus is convenient to the installation and removal of funnel on funnel traversing carriage.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is part preferred embodiment of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is overall structure schematic diagram of the present invention;
Fig. 2 is overall structure lateral view of the present invention;
Fig. 3 is funnel overall structure schematic diagram;
Fig. 4 is gathering sill overall structure schematic diagram;
Fig. 5 is fixed pulley support overall structure schematic diagram;
Fig. 6 is funnel and gathering sill group connected mode first embodiment schematic diagram;
Fig. 7 is A place enlarged drawing in Fig. 2;
Fig. 8 is B place enlarged drawing in Fig. 2;
Fig. 9 is the flow schematic diagram of concrete in gathering sill group;
Figure 10 is that upper lapping plate and lower lapping plate overlap schematic diagram;
In figure: 1 funnel, 11 funnel traversing carriages, 111 guiding montants, 112 rollers, 12 mounting ropes, 13 semicircle suspension ring, 14 suspension ring, 15 gathering sill lapping plates, 16 hollow circular-tubes, 17 connecting ropes, 18 funnel inlet ends, 19 hopper outlet ends, 2 funnel lifting appliances, 21 hoisting drums, 211 swing handles, 212 hawsers, 213 fixed pulley supports, 2131 shanks, 2132 fixed pulleys, 22 lifting brackets, 23 cross bars, 231 through holes, 3 gathering sill groups, 31 first segment gathering sills, lapping plate on 311, 312 semicircle suspension ring, 313 times lapping plates, 32 second section gathering sills, section 33 the 3rd, gathering sills, 4 rail plates, 41L type guide rail, 411 semi-circular recesses.
Detailed description of the invention
Below in conjunction with specific embodiment and accompanying drawing, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only a part of preferred embodiment of the present invention, instead of whole embodiments.Those skilled in the art can when without prejudice to doing similar distortion when intension of the present invention, therefore the present invention is by the restriction of following public specific embodiment.
The invention provides a kind of large-scale steel form fire wall concrete pumping auxiliary equipment (as shown in Figure 1), described auxiliary equipment comprises funnel 1, funnel traversing carriage 11, funnel lifting appliance 2, gathering sill group 3 and rail plate 4.
Funnel 1 is conventional leakage material equipment in prior art, and the import of its upper end and the outlet of lower end are rectangular configuration, and the rectangular configuration size of import is greater than the rectangular configuration size of outlet.
The opposed riser of described funnel inlet end 18 (as shown in Figure 3) two all arranges semicircle suspension ring 13, and a mounting rope 12 is set between two described semicircle suspension ring 13, mounting rope 12 promotes funnel 1 for funnel lifting appliance 2 and uses, four summits of funnel 1 entrance point periphery all arrange a hollow circular-tube 16, described funnel traversing carriage 11 upper end is provided with and described hollow circular-tube 16 vertical four corresponding montants 111 that lead one by one, be nested with by described hollow circular-tube 16 is arranged on described funnel traversing carriage 11 by described funnel 1 on described guiding montant 111, funnel 1 can slide up and down along guiding montant 111, the initial position of funnel 1 is positioned at guiding montant 111 bottom, and funnel 1 is supported by the bar of lateral connection being bottom arranged on guiding montant 111, the lateral wall of described funnel 1 is also provided with the hanging mechanisms be connected with described gathering sill group 3, consider in work progress, funnel 1 and gathering sill group 3 can be quick and firm link together, at this, we devise two kinds of specific embodiments of the hanging mechanisms be positioned on funnel 1 lateral wall, the first specific embodiment is: described hanging mechanisms comprise and are arranged on two suspension ring 14 on described funnel 1 liang of opposed swash plate and two ends all with the connecting rope 17 of hook, the second embodiment of hanging mechanisms is: described hanging mechanisms comprise and are arranged on the opposed gathering sill lapping plate 15 of 19 two pieces, described hopper outlet end.
Described funnel lifting appliance 2 comprises lifting bracket 22, hoisting drum 21, fixed pulley support 213 and fixed pulley 2132, described lifting bracket 22 is fixedly installed on described funnel traversing carriage 11, described hoisting drum 21 is arranged on described lifting bracket 22, described hoisting drum 21 is provided with along the equally distributed multiple swing handle 211 of described hoisting drum 21 circumferential direction, by pulling swing handle 211, hoisting drum 21 can rotate freely on lifting bracket 22, the position that described lifting bracket 22 is adjacent with the outward flange of described hoisting drum 21 is provided with the two through hole 231 along described hoisting drum 21 axial direction, one cross bar 23 is set in described two through hole 231, and described cross bar 23 is adjacent with swing handle 211, described fixed pulley support 213 is nested with in described funnel traversing carriage 11 upper end by four shanks 2131 that its surrounding is arranged, described fixed pulley 2132 is fixedly installed on described fixed pulley support 213, fixed pulley 2132 is corresponding with the center of funnel 1, described hoisting drum 21 is provided with the hawser 212 of one end with hook, described hawser 212 is connected with described mounting rope 12 by described hook through described fixed pulley 2132, at this, by rotating hoisting drum 21, hawser 212 can make funnel 1 freely up and down slide along guiding montant 111, fixed pulley 2132 makes the lifting work of funnel 1 convenient.
Described gathering sill group 3 is arranged on below described funnel 1 (as shown in Figure 6), described gathering sill group 3 comprises multiple gathering sill be socketed successively, the entrance point on described gathering sill top is trapezium structure, the port of export of bottom is rectangular configuration, described in each gathering sill entrance point inside be provided with two pieces of relative upper lapping plates 311, described in each, the port of export arranged outside of gathering sill has two pieces of relative lower lapping plates 313, at this, by reference to the accompanying drawings 7, gathering sill group 3 is socketed successively by three joint gathering sills and forms, three joint gathering sills are respectively first segment gathering sill 31, second section gathering sill 32 and Section of three gathering sill 33, the wherein entrance point of second section gathering sill 32 and the port of export phase clamping of first segment gathering sill 31, section three, the entrance point of gathering sill 33 and the port of export phase clamping of second section gathering sill 32, the both sides of first segment gathering sill 31 all arrange semicircle suspension ring 312.
When gathering sill group 3 being arranged on funnel 1, the port of export of funnel 1 is socketed in the entrance point of first segment gathering sill 31, funnel 1 has two kinds of embodiments with the connected mode of first segment gathering sill 31, the first is: funnel 1 is connected with first segment gathering sill 31 by connecting rope 17, hook one end and the suspension ring 14 at connecting rope 17 two ends mount, and the other end and semicircle suspension ring 312 mount; The second is: funnel 1 is connected with first segment gathering sill 31 by two the gathering sill lapping plates 15 being arranged on its port of export, and wherein, gathering sill lapping plate 15 is positioned at the below of lapping plate 311.
Reliable in order to ensure the connection between funnel 1 and first segment gathering sill 31 and between each interconnective gathering sill, gathering sill lapping plate 15 described in each block arranges a through hole, lapping plate 311 and described lower lapping plate 313 are provided with a through hole on described in each block, through hole on upper lapping plate 311 when connecting between each gathering sill is corresponding with the through hole on overlapped lower lapping plate 313, through hole on gathering sill lapping plate 15 is corresponding with the through hole on the upper lapping plate 311 on first segment gathering sill 31, in corresponding through hole, insert bearing pin can guarantee to connect safety.
Described rail plate 4 is arranged on below described funnel traversing carriage 11, described rail plate 3 comprises two L-type guide rails 41, and the crossbeam of multiple equidistant distribution is set between two described L-type guide rails 41, larger owing to building area, removable hopper 1 is at any time needed to carry out building of different parts, radius is built for what guarantee funnel 1, improve pouring quality, described L-type guide rail 41 is provided with the scale mark 412 of equidistantly distribution, on rail plate 4 during removable hopper traversing carriage 11, its displacement is with scale mark 412 reference, mobile convenient on L-type guide rail 41 for the ease of funnel traversing carriage 11, therefore roller 112 is provided with on the bottom surface of described funnel traversing carriage 11, described roller 112 is positioned on two described L-type guide rails 41, when building, be not moved easily to make funnel traversing carriage 11, described L-type guide rail 41 is provided with the semi-circular recesses 411 of multiple equidistant distribution, when building, roller 112 is just in time in semi-circular recesses 411.
When using the present invention to build, first, by hoisting drum 21, funnel 1 should be risen to a high position, then according to building the joint number highly determining required gathering sill required for first floor, when after the joint number determining gathering sill, gathering sill is socketed in successively the below of funnel 1, then by hoisting drum 21, funnel 1 is put down, gathering sill is entered in reinforcing cage build, larger owing to building area, when reaching designed thickness at the concrete of certain, removable hopper 1 is needed to carry out building of another location, when removable hopper 1, first by hoisting drum 21, gathering sill group 3 is pulled out in reinforcing cage, if (do not pulled out, due to the inhibition of reinforcing cage, gathering sill group 3 cannot move) pull-out after, arriving next at removable hopper 1 specifies casting position to build.After first floor has been built, funnel 1 upwards extracted can realize by promoting rolling 21 adjustment that the second layer builds height, need not realize building adjustment highly by dismounting gathering sill, thus substantially increased and build efficiency.
In the present invention, " on ", D score is all position relationship and the relative position adopted for convenience of description, therefore can not be interpreted as restriction to protection domain as absolute position.
Except the technical characteristic described in manual, be the known technology of those skilled in the art.
The above has made detailed description to the preferred embodiment of the present invention and embodiment by reference to the accompanying drawings; but the present invention is not limited to the above-described embodiment and examples; for those skilled in the art; without departing from the inventive concept of the premise; can also make some improvement and modification, these improve and modification also should be considered as protection scope of the present invention.

Claims (8)

1. a large-scale steel form fire wall concrete pumping auxiliary equipment, described auxiliary equipment comprises funnel, it is characterized in that, described auxiliary equipment also comprises funnel traversing carriage, funnel lifting appliance, gathering sill group and rail plate;
The opposed riser of described funnel inlet end two all arranges semicircle suspension ring, and a mounting rope is set between two described semicircle suspension ring, four summits of funnel inlet end periphery all arrange a hollow circular-tube, described funnel moves pedestal upper end and is provided with and described hollow circular-tube vertical four corresponding montants that lead one by one, be nested with by described hollow circular-tube and described funnel be arranged on described funnel traversing carriage on described guiding montant, described funnel lateral wall is also provided with the hanging mechanisms be connected with described gathering sill group;
Described funnel lifting appliance comprises lifting bracket, hoisting drum, fixed pulley support and fixed pulley, described lifting bracket is fixedly installed on described funnel traversing carriage, described hoisting drum is arranged on described lifting bracket, described hoisting drum is provided with along the equally distributed multiple swing handle of described hoisting drum circumferential direction, described lifting bracket is provided with the two through hole along described hoisting drum axial direction, one cross bar is set in described two through hole, and described cross bar is adjacent with swing handle, described fixed pulley support is nested with by four shanks that its surrounding is arranged and moves pedestal upper end at described funnel, described fixed pulley is arranged on described fixed pulley support, described hoisting drum is provided with the hawser of one end with hook, described hawser is connected with described mounting rope by described hook through described fixed pulley,
Described gathering sill group is arranged on below described funnel, described gathering sill group comprises multiple gathering sill be socketed successively, the entrance point on described gathering sill top is trapezium structure, the port of export of bottom is rectangular configuration, described in each the top of gathering sill entrance point inside be provided with two pieces of relative upper lapping plates, described in each, the port of export arranged outside of the bottom of gathering sill has two pieces of relative lower lapping plates, and the both sides of the first segment gathering sill in described gathering sill group all arrange semicircle suspension ring;
Described rail plate is arranged on below described funnel traversing carriage.
2. large-scale steel form fire wall concrete pumping auxiliary equipment according to claim 1, is characterized in that, described hanging mechanisms comprise and are arranged on two suspension ring on the opposed swash plate of described funnel two and two ends all with the connecting rope of hook.
3. large-scale steel form fire wall concrete pumping auxiliary equipment according to claim 1, it is characterized in that, described hanging mechanisms comprise and are arranged on the opposed gathering sill lapping plate of two pieces, described hopper outlet end, and described gathering sill lapping plate can be connected together with the upper lapping plate on described first segment gathering sill.
4. large-scale steel form fire wall concrete pumping auxiliary equipment according to claim 3, is characterized in that, gathering sill lapping plate described in each block arranges a through hole, lapping plate and described lower lapping plate is provided with a through hole on described in each block.
5. large-scale steel form fire wall concrete pumping auxiliary equipment according to claim 1, it is characterized in that, described rail plate comprises two L-type guide rails, and arranges the crossbeam of multiple equidistant distribution between two described L-type guide rails.
6. large-scale steel form fire wall concrete pumping auxiliary equipment according to claim 5, is characterized in that, L-type guide rail described in any one is provided with the scale mark of equidistantly distribution.
7. large-scale steel form fire wall concrete pumping auxiliary equipment according to claim 6, is characterized in that, the bottom surface of described funnel traversing carriage is provided with roller, and described roller is positioned on two described L-type guide rails.
8. large-scale steel form fire wall concrete pumping auxiliary equipment according to claim 7, is characterized in that, described L-type guide rail is provided with the semi-circular recesses of multiple equidistant distribution.
CN201510990025.5A 2015-12-24 2015-12-24 Large steel formwork firewall concrete pumping auxiliary equipment Active CN105421786B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510990025.5A CN105421786B (en) 2015-12-24 2015-12-24 Large steel formwork firewall concrete pumping auxiliary equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510990025.5A CN105421786B (en) 2015-12-24 2015-12-24 Large steel formwork firewall concrete pumping auxiliary equipment

Publications (2)

Publication Number Publication Date
CN105421786A true CN105421786A (en) 2016-03-23
CN105421786B CN105421786B (en) 2017-05-17

Family

ID=55500291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510990025.5A Active CN105421786B (en) 2015-12-24 2015-12-24 Large steel formwork firewall concrete pumping auxiliary equipment

Country Status (1)

Country Link
CN (1) CN105421786B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908972A (en) * 2016-05-31 2016-08-31 中国建筑第八工程局有限公司 Slidable tumbling barrel used for top formwork platform and construction method thereof
CN108179751A (en) * 2018-01-26 2018-06-19 四川公路桥梁建设集团有限公司大桥工程分公司 Suitable for structure, device and the design method of the cast of deep narrow structure inner concrete
CN109537898A (en) * 2018-12-18 2019-03-29 筑梦高科建筑有限公司 Material distributing machine
CN110630018A (en) * 2019-09-11 2019-12-31 李素梅 Template construction device and construction method for visual construction of stand column
CN110883826A (en) * 2019-11-18 2020-03-17 芜湖蓝博塑胶有限公司 Material collecting device of air conditioner filter screen
CN111364769A (en) * 2020-04-20 2020-07-03 中国一冶集团有限公司 Assembled conveyer suitable for original narrow pavement pipeline is buried underground
CN112227718A (en) * 2020-10-23 2021-01-15 中国水利水电第七工程局有限公司 Concrete placement construction prevents discrete device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4315648A1 (en) * 1993-05-11 1994-11-17 Emil Sandau Pump for delivering free-flowing materials, such as concrete or a concrete/water mixture
WO2006101320A1 (en) * 2005-03-19 2006-09-28 Seog Jae Jang Tip connecting apparatus for concrete discharge hose in a concrete pump car
CN201687213U (en) * 2010-05-26 2010-12-29 长沙中联重工科技发展股份有限公司 Supporting device for engineering apparatus and engineering apparatus
CN202090611U (en) * 2011-05-04 2011-12-28 中国水利水电第十四工程局有限公司 Modified concrete suspension bucket
CN102359276A (en) * 2011-09-30 2012-02-22 石家庄铁道大学 Concrete pouring fast construction method
CN103526945A (en) * 2013-10-15 2014-01-22 中联重科股份有限公司 Concrete pumping machine with multi-section cantilever crane pipe
CN203905502U (en) * 2014-06-20 2014-10-29 山东电力建设第一工程公司 Electric control concrete mortar hopper with cleaning function and controllable discharge speed
CN205276887U (en) * 2015-12-24 2016-06-01 山东送变电工程公司 Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4315648A1 (en) * 1993-05-11 1994-11-17 Emil Sandau Pump for delivering free-flowing materials, such as concrete or a concrete/water mixture
WO2006101320A1 (en) * 2005-03-19 2006-09-28 Seog Jae Jang Tip connecting apparatus for concrete discharge hose in a concrete pump car
CN201687213U (en) * 2010-05-26 2010-12-29 长沙中联重工科技发展股份有限公司 Supporting device for engineering apparatus and engineering apparatus
CN202090611U (en) * 2011-05-04 2011-12-28 中国水利水电第十四工程局有限公司 Modified concrete suspension bucket
CN102359276A (en) * 2011-09-30 2012-02-22 石家庄铁道大学 Concrete pouring fast construction method
CN103526945A (en) * 2013-10-15 2014-01-22 中联重科股份有限公司 Concrete pumping machine with multi-section cantilever crane pipe
CN203905502U (en) * 2014-06-20 2014-10-29 山东电力建设第一工程公司 Electric control concrete mortar hopper with cleaning function and controllable discharge speed
CN205276887U (en) * 2015-12-24 2016-06-01 山东送变电工程公司 Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908972A (en) * 2016-05-31 2016-08-31 中国建筑第八工程局有限公司 Slidable tumbling barrel used for top formwork platform and construction method thereof
CN105908972B (en) * 2016-05-31 2018-06-26 中国建筑第八工程局有限公司 For the slidably tumbling barrel and its construction method of backform platform
CN108179751A (en) * 2018-01-26 2018-06-19 四川公路桥梁建设集团有限公司大桥工程分公司 Suitable for structure, device and the design method of the cast of deep narrow structure inner concrete
CN109537898A (en) * 2018-12-18 2019-03-29 筑梦高科建筑有限公司 Material distributing machine
CN109537898B (en) * 2018-12-18 2021-03-02 广东博智林机器人有限公司 Material distributing machine
CN110630018A (en) * 2019-09-11 2019-12-31 李素梅 Template construction device and construction method for visual construction of stand column
CN110630018B (en) * 2019-09-11 2021-04-02 李素梅 Template construction device and construction method for visual construction of stand column
CN110883826A (en) * 2019-11-18 2020-03-17 芜湖蓝博塑胶有限公司 Material collecting device of air conditioner filter screen
CN111364769A (en) * 2020-04-20 2020-07-03 中国一冶集团有限公司 Assembled conveyer suitable for original narrow pavement pipeline is buried underground
CN112227718A (en) * 2020-10-23 2021-01-15 中国水利水电第七工程局有限公司 Concrete placement construction prevents discrete device
CN112227718B (en) * 2020-10-23 2021-09-21 中国水利水电第七工程局有限公司 Concrete placement construction prevents discrete device

Also Published As

Publication number Publication date
CN105421786B (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN105421786A (en) Large steel formwork firewall concrete pumping auxiliary equipment
CN205276887U (en) Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form
CN106348188B (en) The manufacture method of planer-type building-construction lifting device
CN104975719A (en) Novel material distribution device and floor concrete casting construction method of novel material distribution device
CN103633583B (en) Bridge running line method under cable based on combined type running line cage
CN105479098B (en) A kind of online method for dismounting of large-sized gas pipeline
CN203977422U (en) Building pile foundation holing with slurry wall protection sediment treating apparatus
CN206859698U (en) A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inverted construction facility
CN205998851U (en) A kind of prefabricated panel multipoint hoisting device
CN205575242U (en) Cable drum machine of scalable removal
CN202689488U (en) Movable building scaffold
CN205916957U (en) Light piping erection hoisting frame
CN204954202U (en) Blast furnace stove outer covering inner wall welded platform
CN205077842U (en) Multi -use architecture support
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN207671613U (en) A kind of lift cart of Pipe installing
CN105800479A (en) Tower crane for construction site with movable scaffold
CN106121254A (en) Heavy component transportation system and construction method after a kind of contrary sequence method dismounting
CN104014981A (en) Disassembling method for guide and guard mechanism of closed rolling mill for sectional steel
CN103938900A (en) Construction method of cooling tower and tower crane
CN204954201U (en) Blast furnace stove outer covering outer wall welding platform
CN204609267U (en) A kind of suspension bracket for tank inside construction
CN104555833B (en) Method for hoisting steel inner cylinder of chimney
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN209383344U (en) A kind of steel column horizontal transport and lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant