CN105421173B - A kind of method improving operation double track railway rail control network - Google Patents
A kind of method improving operation double track railway rail control network Download PDFInfo
- Publication number
- CN105421173B CN105421173B CN201510716748.6A CN201510716748A CN105421173B CN 105421173 B CN105421173 B CN 105421173B CN 201510716748 A CN201510716748 A CN 201510716748A CN 105421173 B CN105421173 B CN 105421173B
- Authority
- CN
- China
- Prior art keywords
- point
- line
- iii
- net
- double track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 8
- 239000013256 coordination polymer Substances 0.000 claims abstract description 31
- 238000005259 measurement Methods 0.000 claims abstract description 8
- 230000002747 voluntary effect Effects 0.000 claims abstract description 6
- 238000012423 maintenance Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/02—Means for marking measuring points
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510716748.6A CN105421173B (en) | 2015-10-28 | 2015-10-28 | A kind of method improving operation double track railway rail control network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510716748.6A CN105421173B (en) | 2015-10-28 | 2015-10-28 | A kind of method improving operation double track railway rail control network |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421173A CN105421173A (en) | 2016-03-23 |
CN105421173B true CN105421173B (en) | 2017-03-08 |
Family
ID=55499690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510716748.6A Expired - Fee Related CN105421173B (en) | 2015-10-28 | 2015-10-28 | A kind of method improving operation double track railway rail control network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421173B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106192631B (en) * | 2016-08-10 | 2018-01-30 | 中铁第一勘察设计院集团有限公司 | The structure maintaining method in measurement scale space |
CN106840066A (en) * | 2017-01-13 | 2017-06-13 | 武汉大学 | A kind of long distance tunnel internal precision horizontal control network net type |
CN107805984A (en) * | 2017-09-21 | 2018-03-16 | 中铁工程设计咨询集团有限公司 | The method and system of unilateral measure track control net stake point |
CN109109910A (en) * | 2018-08-28 | 2019-01-01 | 罗文彬 | A kind of track benchmark control net and measurement method for existing general fast railroad maintenance |
CN109468899B (en) * | 2018-09-21 | 2020-08-14 | 湖北省水利水电规划勘测设计院 | Method for increasing observed quantity between free observation stations of railway track control network |
CN110132229B (en) * | 2019-05-10 | 2021-06-25 | 西南交通大学 | Method for measuring and processing triangular elevation of railway track control network |
CN111101412B (en) * | 2019-12-31 | 2022-05-13 | 中铁十九局集团第二工程有限公司 | Method for monitoring settlement and displacement of railway business line |
CN111155383B (en) * | 2020-01-03 | 2020-09-15 | 中铁十五局集团路桥建设有限公司 | Large-span self-anchored steel box girder suspension bridge track lofting and measuring method |
CN112212843B (en) * | 2020-10-20 | 2022-07-12 | 中铁二院工程集团有限责任公司 | Method for synchronous measurement and joint adjustment of railway CP II and CP III control networks |
CN113884077B (en) * | 2021-09-27 | 2024-04-19 | 四川瑞峰轨道交通设备有限公司 | Operation period common speed railway control network and test method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101736662A (en) * | 2009-12-30 | 2010-06-16 | 中铁八局集团有限公司 | Network layout method of control foundation pile |
EP2216441A2 (en) * | 2009-02-05 | 2010-08-11 | Windhoff Bahn- und Anlagentechnik GmbH | Levelling system for rail technology |
CN101962925A (en) * | 2010-08-12 | 2011-02-02 | 上海铁路局科学技术研究所 | Method for efficiently measuring three-dimensional coordinates of track based on track precise control net |
JP4966616B2 (en) * | 2006-09-19 | 2012-07-04 | 大成建設株式会社 | Shape variation monitoring method and shape variation monitoring system |
CN103132412A (en) * | 2013-02-07 | 2013-06-05 | 中铁上海设计院集团有限公司 | Track maintenance base point lateral deviation measuring method based on Helen formula |
-
2015
- 2015-10-28 CN CN201510716748.6A patent/CN105421173B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4966616B2 (en) * | 2006-09-19 | 2012-07-04 | 大成建設株式会社 | Shape variation monitoring method and shape variation monitoring system |
EP2216441A2 (en) * | 2009-02-05 | 2010-08-11 | Windhoff Bahn- und Anlagentechnik GmbH | Levelling system for rail technology |
CN101736662A (en) * | 2009-12-30 | 2010-06-16 | 中铁八局集团有限公司 | Network layout method of control foundation pile |
CN101962925A (en) * | 2010-08-12 | 2011-02-02 | 上海铁路局科学技术研究所 | Method for efficiently measuring three-dimensional coordinates of track based on track precise control net |
CN103132412A (en) * | 2013-02-07 | 2013-06-05 | 中铁上海设计院集团有限公司 | Track maintenance base point lateral deviation measuring method based on Helen formula |
Non-Patent Citations (2)
Title |
---|
普速铁路新型轨道控制网平面网建网方法及精度探讨;罗远刚等;《铁道科学与工程学报》;20140228;第11卷(第1期);第55-59页 * |
有砟轨道CPIII控制网布设方案研究;李政;《科技创新与应用》;20131231(第1期);第6页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105421173A (en) | 2016-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421173B (en) | A kind of method improving operation double track railway rail control network | |
CN105421172B (en) | Measuring method for one-sided operating double track railway track control net | |
CN103306172B (en) | Method for building track control CP III network in simple point form | |
CN101825662B (en) | Short-distance measurement method and structure of grounding resistance of grounding network | |
CN105004252B (en) | The detection method of verticality between the Mosaic face and datum level of square-section slender piece | |
CN106758602A (en) | A kind of staticaccelerator track ride comfort detecting system and method | |
CN206090317U (en) | High pier slip form construction perpendicularity control device | |
CN105043381A (en) | Magnetic nail-based positioning method | |
CN105586994A (en) | Monitoring device and monitoring method for horizontal displacement of pile tip of retaining pile for foundation pit | |
CN107805984A (en) | The method and system of unilateral measure track control net stake point | |
CN103276644A (en) | Rail traffic catenary system and conductor rail measuring method based on rail foundation pile control network | |
CN102518013A (en) | Method for construction of measurement and pavement of GRP (ground reference point) of ballastless track reference network | |
CN105821727B (en) | A kind of plane net measuring methods of CP III | |
CN106289125B (en) | A kind of ship closes up greatly the measurement method of step simulations carrying | |
CN204165484U (en) | Measurement mechanism | |
CN201909814U (en) | Short-range measuring measurement structure for grounded resistor of grounded network | |
CN204115719U (en) | Tunnel cross-section measurement point laying out apparatus | |
CN104597513B (en) | A kind of acquisition methods of geophysics magnetic field big data pretreatment values | |
CN104132644B (en) | Tunnel cross-section measurement point laying out apparatus and tunnel cross-section measurement point setting out method | |
CN203298907U (en) | Soil pressure box fixing device | |
CN109778617A (en) | A kind of lateral platform trackless pipeline construction method of Subway Tunnel | |
CN105258687A (en) | Detection device and method for cast-in-place concrete wall perpendicularity | |
CN105926387B (en) | A kind of plane net measuring methods of CP III | |
CN204461395U (en) | A kind of overhead contact built-in conduit gap measuring device | |
CN207515782U (en) | A kind of floor surveying setting-out fast accurate positioning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190305 Address after: 610000 No. 01, 6th Floor, New 2 Science and Technology Building, Jiulidi Middle Road, Wisdom City, Huanjiao University, Jinniu District, Chengdu City, Sichuan Province Co-patentee after: Liu Chenglong Patentee after: Chengdu Southwest Jiaotong University Cci Capital Ltd. Co-patentee after: Yang Xuefeng Address before: 610031 science and technology office, Southwest Jiao Tong University, 111 north section, two ring road, Chengdu, Sichuan Patentee before: Southwest Jiaotong University |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210113 Address after: No. 2202, 22F, innovation building, Southwest Jiaotong University, No. 111, North 1st section of 2nd Ring Road, huanjiaotong University, Jinniu District, Chengdu, Sichuan 610031 Patentee after: Chengdu Xijiao surveying and Mapping Research Institute Co.,Ltd. Address before: 610000 No. 01, 6th Floor, New 2 Science and Technology Building, Jiulidi Middle Road, Wisdom City, Huanjiao University, Jinniu District, Chengdu City, Sichuan Province Patentee before: Chengdu Southwest Jiaotong University Cci Capital Ltd. Patentee before: Liu Chenglong Patentee before: Yang Xuefeng |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170308 |