CN105414858B CN201610016521.5A CN201610016521A CN105414858B CN 105414858 B CN105414858 B CN 105414858B CN 201610016521 A CN201610016521 A CN 201610016521A CN 105414858 B CN105414858 B CN 105414858B
Authority
CN
China
Prior art keywords
guide pillar
tray
hole
semicircle
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610016521.5A
Other languages
Chinese (zh)
Other versions
CN105414858A (en
Inventor
潘新阳
李洪洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI ZHONGHUI REFRIGERATION Co Ltd
Original Assignee
ANHUI ZHONGHUI REFRIGERATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI ZHONGHUI REFRIGERATION Co Ltd filed Critical ANHUI ZHONGHUI REFRIGERATION Co Ltd
Priority to CN201610016521.5A priority Critical patent/CN105414858B/en
Publication of CN105414858A publication Critical patent/CN105414858A/en
Application granted granted Critical
Publication of CN105414858B publication Critical patent/CN105414858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

The invention discloses a method for manufacturing a gas-liquid separator welding jig and belongs to the field of work fixtures. The welding jig comprises a first guide pillar, a semicircular support block, a guide pillar, an air inlet pipe support block, a rotary semicircular support block, a second guide pillar, a third guide pillar, a base and a limiting back plate, wherein the limiting back plate is fixed to the base, one end of the first guide pillar and one end of the third guide pillar are perpendicularly fixed to the base, and the other end of the first guide pillar and the other end of the third guide pillar are connected with the semicircular support block; one end of the second guide pillar is perpendicularly fixed to the base, and the other end of the second guide pillar is connected with the rotary semicircular support block; two semicircular grooves are formed in the semicircular support block, two semicircular grooves are formed in the rotary semicircular support block, and the semicircular grooves in the semicircular support block and the semicircular grooves in the rotary semicircular support block are combined pairwise to form two air outlet pipe fixing holes. By the adoption of the method, the problems that stability is low, the yield is low, precision is low, and internal oxidation is caused by poor gas shield during gas-liquid separator welding can be effectively solved, and a workpiece obtained after welding is stable, reliable and high in precision, internal cleanness and air tightness.

Description

A kind of method of manufacture gas-liquid separator weld jig
The application is entitled " a kind of gas-liquid separator weld jig and its using method and manufacture method ", application Number be 2015100448224, the applying date is the divisional application of the patent application on January 28th, 2015.
Technical field
The invention belongs to frock clamp field, specifically, is related to a kind of method of manufacture gas-liquid separator weld jig.
Background technology
Gas-liquid separator is a kind of device for separating the droplet condensed in saturated gas, realize lime set reclaim or The purpose of gas phase purifying.Gas-liquid separator between air-conditioning refrigeration system compressor air suction end and evaporimeter, Ke Yiyong Carry out the liquid that returns of temporary transient storage system, control liquid refrigerant and lubricating oil return compressor with safe speed, it is to avoid fluid power occurs Impact, moreover it is possible to play a part of filtration, oil return.Gas-liquid separator generally comprises air inlet pipe, muffler (i.e. escaping pipe), upper cover (i.e. upper end cover), cylinder, low head (i.e. bottom end cover) and spill port etc., air inlet pipe and muffler (i.e. escaping pipe) pass through upper cover (i.e. upper end cover) is arranged in cylinder, and air inlet pipe and muffler (i.e. escaping pipe) must be weldingly fixed on upper cover (i.e. upper end cover) On, and ensure good air-tightness.In actual welding installation process, air inlet pipe, muffler (i.e. escaping pipe) and upper cover is (i.e. Upper end cover) fix unstable before welding, often occur gas when deflection, insecure, poor air-tightness or welding after welding Body protects bad phenomenon, aoxidizes interiors of products, needs that by rear operation cleaning treatment product requirement could be met, and installs Speed is slow, does not reach the mounting finished product wanted in design.
China Patent No. 201420220984, publication date is in September, 2014 patent document of 10 days, discloses one kind and is related to Field of central air-conditioning vertical gas-liquid separator.The utility model is by air inlet pipe, upper cover, cylinder, low head and muffler group Into.Muffler is using U-shape structure and import sets 45 ° of oblique angles, effectively adjustment gas-liquid separator tank interior air inlet pipe, muffler position Put, improve the gas-liquid separation quality of coolant circulating system, gas-liquid separation effect is improved, so as to improve the reliability of system.The reality It is related to a kind of gas-liquid separator with new, but does not refer to the process of its welded and installed, especially common welding relies on behaviour Make the weld horizontal of personnel, percent defective is high.
China Patent No. 201210583812, publication date be on July 2nd, 2014, disclose a kind of gas-liquid separator and its Assembly method, the gas-liquid separator includes upper shell, lower shell, outlet and fixed plate, and upper shell and lower shell dock to be formed The cavity of closing;Fixed plate coordinates with cavity, and fixed plate also includes align member, and align member coordinates with outlet, and positions Outlet, when mounted, fixed plate has defined location relation, align member positioning to the gas-liquid separator of the invention with cavity Outlet, it is determined that the position relationship of fixed plate and outlet, i.e. fixed plate determines position of the outlet in cavity, it is fixed Plate can accurately determine the relative position of outlet and cavity, it is ensured that the position of the spill port of outlet meets design requirement, energy Enough meet recirculating oil quantity requirement during work.The assembly method of the disclosure of the invention includes assembling and welds that unused weld jig is adopted With integrally molded, it is impossible to ensure that all parts can be welded in place, it is impossible to ensure welding airtightness and precision.
The content of the invention
1st, the problem to be solved
During existing gas-liquid separator welded and installed, air inlet pipe, muffler (escaping pipe) and upper cover (upper end Lid) fix unstable before welding, often occur after deflection, insecure or welding that air-tightness is bad shows after welding As the mounting finished product wanted in cannot designing causes serious human and material resources to waste, and hinders gas-liquid separator extensively to produce The problem for using, the present invention provides a kind of method of manufacture gas-liquid separator weld jig, can effectively fix air inlet pipe, muffler The relative position of (escaping pipe) and upper cover (upper end cover), makes welding process more reliable and more stable, the workpiece accuracy after welding compared with Height, cleaning inside degree is high, and air-tightness is good, and effectively reduces human and material resources input, cost-effective, improves productivity ratio.
2nd, technical scheme
To solve the above problems, the present invention is adopted the following technical scheme that.
A kind of method of manufacture gas-liquid separator weld jig, its step is:
(A) manufacture of base:From one piece of steel plate, rectangle steel plate, burr removing, three guide pillars peaces of processing are processed into Dress hole and two spacing backup plate installing holes;
(B) manufacture of spacing backup plate:Spacing backup plate is processed into from steel plate;
(C) manufacture of the first guide pillar, the 3rd guide pillar, the second guide pillar and lead column:From three, round steel, it is processed into first and leads Post, the 3rd guide pillar and the second guide pillar, from a round steel, are processed into lead column, the first guide pillar, the 3rd guide pillar and the second guide pillar One end processes a blind hole, and machining internal thread, and lead column one end processes a blind hole, and machining internal thread;
(D) manufacture of locating piece:From bloom one, square is processed into, in the adjacent one side processing in locating piece side One through hole, in locating piece side, relative one side processes a hole, and axis and the through-bore axis in the hole intersect vertically, and process Internal thread;
(E) manufacture of semicircle tray and rotating semicircular tray:From two pieces of steel plate, half nahlock is processed into, removes Burr removal;Its In one piece process a boss, and process two guide pillar sliding eyes, axis and the semicircle tray upper table of two guide pillar sliding eyes The line of face intersection point is parallel with faying face;Midpoint with the line processes a lead column installing hole as the center of circle, on boss; A guide pillar sliding eye is processed on another block of semicircle steel plate, on the position relationship and base of three for being processed guide pillar sliding eye The position relationship of the guide pillar installing hole processed is corresponding;The nahlock of two pieces half processes two after faying face split in mosaic Escaping pipe fixing hole;
(F) manufacture of air inlet pipe tray:A bloom, burr removing is selected to add on the face relative with air inlet pipe tray bottom surface Work goes out bucking ladder, and bucking ladder is processed into into semicircle groove;Through hole is processed in one end of air inlet pipe tray bottom surface, in air inlet pipe tray A blind hole is processed near one end of through hole on side, internal thread is processed into;
(G) assemble:By the spacing backup plate installing hole on the screwed hole alignment base on spacing backup plate, the flute profile of spacing backup plate Be open dorsad two guide pillar installing holes, and blending bolt is fastened;First guide pillar, the 3rd guide pillar and the second guide pillar there is into screwed hole One end be respectively aligned to guide pillar installing hole, blending bolt fastening;By three locating pieces be through respectively the first guide pillar, the 3rd guide pillar and On second guide pillar, screwed in from locating piece upper screwed hole with locating piece bolt, pretension;Semicircle tray and rotating semicircular tray are led to Cross guide pillar sliding eye and penetrate guide pillar, and fall on three locating pieces of pretension, adjust three locating pieces, make semicircle tray and rotation Semicircle tray is fastened in same level;4th locating piece is penetrated into the second guide pillar, is fallen on rotating semicircular tray; Being directed to post has lead column installing hole in one end alignment boss of screwed hole, blending bolt fastening;Air inlet pipe tray is installed In lead column, and bolt is screwed in from air inlet pipe tray screwed hole, the position of fixed air inlet pipe tray.
Preferably, described steel plate, bloom material are No. 45 steel or bearing steel;The equipment of described processing includes milling Bed, drilling machine, planer, lathe, abrasive machine, hand screw tap, gas cutting equipment, wire cutting, grinding machine and welding machine;Described rectangle steel plate The connected mode of A and rectangle steel plate B is welding.
Preferably, described gas-liquid separator weld jig includes the first guide pillar, semicircle tray, lead column, air inlet conduit saddle Block, rotating semicircular tray, locating piece, the second guide pillar, the 3rd guide pillar, base and spacing backup plate;Described spacing backup plate is fixed on On base;Described the first guide pillar and one end of the 3rd guide pillar is vertically fixed on base, and the other end is connected with semicircle tray;Institute The second guide pillar one end stated is vertically fixed on base, and the other end is connected with rotating semicircular tray;Described locating piece has four, Two of which is separately positioned on the first guide pillar and the 3rd guide pillar below semicircle tray, and two other locating piece is arranged on second On guide pillar, a top for being located at rotating semicircular tray, a lower section for being located at rotating semicircular tray;On described semicircle tray It is provided with boss;Described air inlet pipe tray is arranged on boss;Described lead column is fixed on boss through air inlet pipe tray; Two half slots are respectively provided with described semicircle tray and rotating semicircular tray;The half slot of described semicircle tray and rotation half The half slot of circle tray combines in pairs two escaping pipe fixing holes of composition.
Preferably, described base is provided with two spacing backup plate installing holes and three guide pillar installing holes;Described three The axis of guide pillar installing hole constitutes a right angled triangle with the line of the three of base upper surface intersection points;Described two are spacing The axis of backup plate installing hole is constituted with the line of the two of base upper surface intersection points parallel to the line of three guide pillar installing holes The long right-angle side of right angled triangle;Described the first guide pillar, the second guide pillar and the 3rd guide pillar bottom are provided with screwed hole, by screw It is fixed on base;Described spacing backup plate is shaped as channel-shaped, which is provided with screwed hole, screwed hole and spacing backup plate installing hole Corresponding, spacing backup plate is bolted on base.
Preferably, described semicircle tray and rotating semicircular tray is provided with guide pillar sliding eye;Described the first guide pillar and 3rd guide pillar is connected through guide pillar sliding eye with semicircle tray;The second described guide pillar is through guide pillar sliding eye and rotating semicircular support Block connects.
Preferably, described locating piece is provided with locating piece bolt.
Preferably, the upper surface of described air inlet pipe tray is provided with groove, and groove side is provided with spiral shell near lead column one end Bolt.
Preferably, described rotating semicircular tray is provided with magnet away from it with one end of the second guide pillar junction;Described Semicircle tray is provided with breach near one end of the 3rd guide pillar.
3rd, beneficial effect
Compared to prior art, beneficial effects of the present invention are:
(1) a kind of gas-liquid separator weld jig in the present invention, on the whole, simply and effectively solves gas-liquid separation Device welds unstable technical problem;The escaping pipe of gas-liquid separator is fixed in use and positioned to wherein spacing backup plate;First The connection of guide pillar, the 3rd guide pillar and the second guide pillar and semicircle tray and rotating semicircular tray makes semicircle tray and rotating semicircular tray Can up and down adjust along each guide pillar, be adapted to the welding of the gas-liquid separator of differing heights;The setting of four locating pieces and fixed Position block is provided with locating piece bolt, can effectively fix the position of semicircle tray and rotating semicircular tray;Semicircle tray is provided with convex Platform, when using, boss can limit the position of upper end cover in gas-liquid separator;Air inlet pipe tray is arranged on boss, lead column It is fixed on boss through air inlet pipe tray, the upper surface of air inlet pipe tray is provided with groove, and groove side is near lead column one end It is provided with bolt, the air inlet pipe of the picking-up gas-liquid separator that the groove of air inlet pipe tray can be stable, air inlet pipe tray can be along leading To post slidable adjustment height, so as to the position for adjusting air inlet pipe when gas-liquid separator is welded, groove side can be passed through after adjusting Bolt of the face near lead column one end is fixed;
(2) base of the present invention is provided with two spacing backup plate installing holes and three guide pillar installing holes;Three guide pillar installing holes The line of three intersection points of axis and base upper surface constitute a right angled triangle;Two described spacing backup plate installing holes Axis and base upper surface two intersection points the right angled triangle that constitutes parallel to the line of three guide pillar installing holes of line Long right-angle side, the position of each connecting hole of standardizing makes device compacter, more coordinates when using, reliable;Described first Guide pillar, the second guide pillar and the 3rd guide pillar bottom are provided with screwed hole, are fixed by screws on base;The shape of described spacing backup plate Shape is channel-shaped, which is provided with screwed hole, and screwed hole is corresponding with spacing backup plate installing hole, and spacing backup plate is bolted on bottom On seat, facilitate the dismounting and maintenance of device, make the parts of device replaceable;
(3) rotating semicircular tray of the present invention is provided with magnet away from it with one end of the second guide pillar junction, can effectively keep And state when stable rotating semicircular tray and semicircle tray closure;
(4) a kind of method of use gas-liquid separator weld jig in the present invention, its advantage is:
(A) rotating semicircular tray is rotated, rotating semicircular tray and semicircle tray is opened, by gas-liquid separator to be processed Escaping pipe is placed in spacing backup plate, makes escaping pipe vertical with base, and quick positioning escaping pipe placement location, is that next step does It is good to prepare;
(B) upper-lower position of rotating semicircular tray and semicircle tray is adjusted, two pipelines for making escaping pipe are located at respectively rotation On the position for turning formed between semicircle tray and semicircle tray two escaping pipe fixing holes, rotating semicircular tray and semicircle support are closed Block, clamps escaping pipe, and the position of rotating semicircular tray and semicircle tray is locked by locking positioning block bolt stationary positioned block, The position of escaping pipe can stable, be accurately fixed, facilitates the carrying out of next step;
(C) air inlet pipe is placed on air inlet pipe tray, adjustment air inlet pipe tray position is fixed, energy by its side bolt Air inlet pipe position is accurately fixed according to technical requirements, is that welding is prepared;
(D) upper end cover is covered on boss, makes to be stretched out in the reserved hole from upper end cover of escaping pipe and air inlet pipe, form weldering Protective gas cavity is connect, it is ready to be that welding is passed through protective gas;
(E) position of escaping pipe, air inlet pipe and upper end cover is fixed in spot welding, and welding protection gas is continually fed into from escaping pipe Body, makes the cavity constituted between upper end cover, boss and rotating semicircular tray full of welding protection gas, makes weld more stable With it is firm;
(5) a kind of method of manufacture gas-liquid separator weld jig in the present invention, its manufacture process is simple, highly versatile, Manufacturing time is substantially reduced, production efficiency is improve;The instrument and equipment for using is processing common tool and equipment, reduces Production facility standard, reduces manufacture difficulty;The material for using can be common materials, save manufacturing cost.
Description of the drawings
Fig. 1 is overall structure diagram of the present invention;
Fig. 2 is base plate schematic diagram in the present invention;
Fig. 3 is that rotating semicircular tray in the present invention and semicircle tray combine schematic diagram;
Fig. 4 is the schematic diagram of present invention gas-liquid separator to be processed;
Fig. 5 is the front view of air inlet pipe tray in the present invention;
Fig. 6 is the left view of air inlet pipe tray in the present invention;
Fig. 7 is the upward view of air inlet pipe tray in the present invention;
Fig. 8 is the front view of locating piece in the present invention;
Fig. 9 is the upward view of locating piece in the present invention;
Figure 10 is the right view of locating piece in the present invention;
Figure 11 is the front view of spacing backup plate in the present invention;
Figure 12 is the left view of spacing backup plate in the present invention;
Figure 13 is the upward view of spacing backup plate in the present invention.
In figure:1st, the first guide pillar;2nd, semicircle tray;3rd, boss;4th, lead column;5th, air inlet pipe tray;6th, rotating semicircular support Block;7th, locating piece bolt;8th, locating piece;9th, the second guide pillar;10th, the 3rd guide pillar;11st, base;12nd, spacing backup plate;13rd, guide pillar peace Dress hole;14th, spacing backup plate installing hole;15th, guide pillar sliding eye;16th, escaping pipe fixing hole;17th, escaping pipe;18th, air inlet pipe;19、 Upper end cover;20th, cylinder;21st, bottom end cover;22nd, spacing backup plate bottom surface;23rd, locating piece side;24th, faying face;25th, air inlet conduit saddle Block bottom surface;26th, air inlet pipe tray side.
Specific embodiment
The present invention is further described below with reference to specific embodiment.
Embodiment 1
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12 and Figure 13, Yi Zhongqi Liquid/gas separator weld jig, it include the first guide pillar 1, semicircle tray 2, lead column 4, air inlet pipe tray 5, rotating semicircular tray 6, Locating piece 8, the second guide pillar 9, the 3rd guide pillar 10, base 11 and spacing backup plate 12;Base 11 is provided with two spacing backup plates and installs Hole 14 and three guide pillar installing holes 13;The line structure of the axis of three guide pillar installing holes 13 and three intersection points of the upper surface of base 11 Into a right angled triangle;The axis of two spacing backup plate installing holes 14 is parallel with the line of two intersection points of the upper surface of base 11 The long right-angle side of the right angled triangle constituted in the line of three guide pillar installing holes 13;Spacing backup plate 12 is fixed on the pedestal 11; Spacing backup plate 12 is shaped as channel-shaped, which is provided with screwed hole, and screwed hole is corresponding with spacing backup plate installing hole 14, spacing backup plate 12 are bolted on base 11;One end of first guide pillar 1 and the 3rd guide pillar 10 is vertically fixed on base 11, the other end It is connected with semicircle tray 2;The one end of second guide pillar 9 is vertically fixed on base 11, and the other end is connected with rotating semicircular tray 6;The One guide pillar 1, the second guide pillar 9 and the bottom of the 3rd guide pillar 10 are provided with screwed hole, are fixed by screws on base 11;Semicircle tray 2 Guide pillar sliding eye 15 is provided with rotating semicircular tray 6;First guide pillar 1 and the 3rd guide pillar 10 are through guide pillar sliding eye 15 and semicircle Tray 2 connects;Second guide pillar 9 connects through guide pillar sliding eye 15 and rotating semicircular tray 6;Locating piece 8 has four, two of which It is separately positioned on first guide pillar 1 and the 3rd guide pillar 10 of the lower section of semicircle tray 2, two other locating piece 8 is arranged on second and leads On post 9, a top for being located at rotating semicircular tray 6, a lower section for being located at rotating semicircular tray 6;Locating piece 8 is provided with fixed Position block bolt 7;Semicircle tray 2 is provided with boss 3;Air inlet pipe tray 5 is arranged on boss 3;Lead column 4 passes through air inlet pipe tray 5 are fixed on boss 3;The upper surface of air inlet pipe tray 5 is provided with groove, and groove side is provided with bolt near the one end of lead column 4;Half Two half slots are respectively provided with circle tray 2 and rotating semicircular tray 6;The half slot of semicircle tray 2 and the half of rotating semicircular tray 6 Circular groove combines in pairs two escaping pipe fixing holes 16 of composition;Rotating semicircular tray 6 is away from its one end with the junction of the second guide pillar 9 It is provided with magnet;Described semicircle tray 2 is provided with breach near one end of the 3rd guide pillar 10.
Being fixedly connected for each part is bolted in the present embodiment, facilitates the dismounting and maintenance of device;This enforcement Partly it is connected as being slidably connected in example, enables device to adjust its height according to the size of institute's converted products, enhances the suitable of device Ying Xing;It is the present embodiment described device compact conformation, simple, can stably, be securely fixed institute's converted products, be accurately performed processing Task.
A kind of method of use gas-liquid separator weld jig in the present embodiment, its step is:
(A) rotating semicircular tray 6 is rotated, rotating semicircular tray 6 and semicircle tray 2 is opened, by gas-liquid separation to be processed The escaping pipe 17 of device is placed in spacing backup plate 12, makes escaping pipe 17 vertical with base 11;
(B) upper-lower position of rotating semicircular tray 6 and semicircle tray 2 is adjusted, two pipelines for making escaping pipe 17 distinguish position Formed between rotating semicircular tray 6 and semicircle tray 2 on the position of two escaping pipe fixing holes 16, close rotating semicircular tray 6 and semicircle tray 2, escaping pipe 17 is clamped, the He of rotating semicircular tray 6 is locked by the stationary positioned block 8 of locking positioning block bolt 7 The position of semicircle tray 2;
(C) air inlet pipe 18 is placed on air inlet pipe tray 5, the position of adjustment air inlet pipe tray 5 is consolidated by its side bolt It is fixed;
(D) upper end cover 19 is covered on boss 3, the Kong Zhongshen for making escaping pipe 17 and air inlet pipe 18 reserve from upper end cover 19 Go out;
(E) position of escaping pipe 17, air inlet pipe 18 and upper end cover 19 is fixed in spot welding, and welding is continually fed into from escaping pipe 17 Protective gas nitrogen, makes the cavity constituted between upper end cover 19, boss 3 and rotating semicircular tray 6 be full of welding protection gas;
(F) escaping pipe 17, air inlet pipe 18 are welded, the welding completed between escaping pipe 17, air inlet pipe 18 and upper end cover 19 is consolidated It is fixed;
(G) rotating semicircular tray 6 is rotated, opens rotating semicircular tray 6 and semicircle tray 2, remove going out after being welded and fixed Tracheae 17, air inlet pipe 18 and upper end cover 19, air inlet pipe 18 is inserted in cylinder 20, and upper end cover 19 is covered on cylinder 20, complete with Welding between cylinder 20 and bottom end cover 21.
The method of gas-liquid separator weld jig is simple used in the present embodiment, and step is few, enormously simplify gas-liquid separation The welding procedure of device, reduces labour intensity, has saved material, reduces production cost, substantially reduces process time, to gas The processing of liquid/gas separator has very big facilitation, and a gas-liquid separator high yield rate welded, sound construction, can Lean on, high precision, air-tightness is good, long service life.
A kind of method of manufacture gas-liquid separator weld jig in the present embodiment, its step is:
(A) manufacture of base 11:From the steel plate that thickness is 8mm, material is No. 45 steel, with plate shearing machine length is processed into 190mm, the rectangle steel plate of wide 160mm, abrasive machine burr removing;It is processing dimension benchmark to choose the adjacent both sides of steel plate, and long side is X, broadside is Y, and the intersection point of long side and broadside sets up coordinate system for the origin of coordinates, with drilling machine coordinate be (14.1mm, 14.1mm), (175.8mm, 14.1mm), (14.1mm, 145.9mm) and (175.8mm, 145.9mm) processes everywhere four a diameter of 6.7mm's Hole, and be M8 coarse thread screw tap machining internal threads with specification;With drilling machine coordinate be (39.8mm, 48.1mm), (150.2mm, The hole of three a diameter of 8.2mm 48.1mm) and at (159mm, 92.3mm) three is processed, the hole is used as guide pillar installing hole 13;With brill , in the hole that coordinate is that (49mm, 80mm) and (141mm, 80mm) place processes two a diameter of 6.2mm, the hole is used as spacing backup plate for bed The diameter tolerance of installing hole 14, guide pillar installing hole 13 and spacing backup plate installing hole 14 is ± 0.02mm;
(B) manufacture of spacing backup plate 12:It is 5mm, one piece of the steel plate that material is No. 45 steel from thickness, is machined with shear Rectangle steel plate A of growth 102mm, width 40mm, abrasive machine burr removing;It is 10mm, the steel plate that material is No. 45 steel from thickness One piece, rectangle steel plate B of long 40mm, width 19.1mm is machined to shear, rectangle steel plate B is two pieces, abrasive machine unhairing Side;Rectangle steel plate A and rectangle steel plate B are welded to connect into grooved, and two diameters are processed in spacing backup plate bottom surface 22 with drilling machine For 5mm, the blind hole that depth is 25mm, the centre-to-centre spacing of two blind holes is 92mm, the axis of two blind holes and spacing backup plate bottom surface 22 Vertical range be 14.5mm, be M6 coarse thread screw tap machining internal threads with specification;
(C) manufacture of the first guide pillar 1, the 3rd guide pillar 10, the second guide pillar 9 and lead column 4:From a diameter of 15mm, material For three, the round steel of bearing steel, with cutting machine the first guide pillar 1, the 3rd guide pillar 10 and second that length is 285mm is processed into Guide pillar 9, from a diameter of 10mm, one, the round steel that material is bearing steel, it is leading for 50mm to be processed into length with cutting machine To post 4, one end drilling machine of the first guide pillar 1, the 3rd guide pillar 10 and the second guide pillar 9 along its axis process an a diameter of 6.7mm, Depth is the blind hole of 25mm, and is M8 coarse thread screw tap machining internal threads with specification, and the one end of lead column 4 drilling machine processes a diameter of 5mm, depth are the blind hole of 15mm, and are M6 coarse thread screw tap machining internal threads with specification;
(D) manufacture of locating piece 8:From the bloom that material is No. 45 steel, with planer the pros that the length of side is 20mm are processed into Body, with drilling machine the through hole of an a diameter of 15.1mm is processed, and axial line and the vertical range of locating piece side 23 of the through hole are 10mm, with drilling machine the hole of a diameter of 5mm is processed in the relative one side in locating piece side 23, and the axis in the hole is vertical with through-bore axis It is intersecting, and be M6 coarse thread screw tap machining internal threads with specification;
(E) manufacture of semicircle tray 2 and rotating semicircular tray 6:From thickness 18mm and 12mm, material are respectively for No. 45 The steel plate of steel is each one piece, and with gas cutting equipment half nahlock that radius is 76mm is cut to, and abrasive machine removes Burr removal, further adds Work is into two pieces of half nahlock that radius is 75.2mm;Wherein thickness for 18mm half nahlock milling machine process a diameter of 105.3mm, The boss 3 of high 6mm, with the guide pillar sliding eye 15 that drilling machine two centre-to-centre spacing of processing are 110.4mm, a diameter of 15.1mm, guide pillar is slided The vertical range of the axis of dynamic hole 15 and faying face 24 is 31.9mm, and through half nahlock axis and the face vertical with faying face 24 Vertical range is 55.2mm, processes the lead column installing hole of an a diameter of 6.1mm on boss 3 with drilling machine, and lead column is installed The vertical and intersectant centerline of axially bored line and two guide pillar sliding eyes 15 is in the midpoint of two center lines of guide pillar sliding eye 15;Use drilling machine The guide pillar sliding eye 15 of an a diameter of 15.1mm, the circle of the guide pillar sliding eye 15 are processed on the semicircle steel plate that thickness is 12mm The distance of the heart and faying face 24 is 12.3mm, is with the vertical range perpendicular to faying face 24 and through the face of half nahlock axis 64mm;The nahlock of two pieces half processes two escaping pipe fixing holes 16, two outlets with drilling machine after the split of faying face 24 in mosaic The centre-to-centre spacing of pipe fixing hole 16 is 60mm, and the axis of two escaping pipe fixing holes 16 is with the vertical range of half nahlock axis 30mm;
(F) manufacture of air inlet pipe tray 5:The bloom one that material is No. 45 steel is chosen, with planer processing growth 50mm, width The bloom of 30mm, high 26.5mm, then process bucking ladder, bucking ladder on the face relative with air inlet pipe tray bottom surface 25 with planer Long 35mm, depth 5.7mm, with vertical knee-type milling machine with away from the vertical range of air inlet pipe tray bottom surface 25 as 15.8mm, away from air inlet pipe tray side The vertical range of face 26 for 15mm straight line be axial line along bucking ladder process semicircle groove, a diameter of 19.5mm of semicircle groove, Tolerance is ± 0.02mm and a length of 35mm;With drilling machine on air inlet pipe tray bottom surface 25 with away from semicircle groove end face vertical range 42.1mm, straight line is the through hole that axis processes a diameter of 10.1mm at vertical range 15mm of air inlet pipe tray side 26, is being entered With away from semicircle groove end face vertical range 42.1mm, away from the vertical range of air inlet pipe tray bottom surface 25 on tracheae tray side 26 Straight line is the hole that axis processes a diameter of 5mm at 13.3mm, and the hole communicates with the through hole of 10.1mm, is M6 coarse thread screw taps with specification To the hole machined of 5mm into internal thread;
(G) assemble:6mm screwed holes on spacing backup plate 12 are directed at into the spacing backup plate installing hole 14 on base 11, it is spacing to lean on The slit opening of plate 12 dorsad two guide pillar installing holes 13, and fastened with M6 plain bolts;First guide pillar the 1, the 3rd is led One end that the guide pillar 9 of post 10 and second has screwed hole be respectively aligned to coordinate for (39.8mm, 48.1mm), (150.2mm, 48.1mm) and The guide pillar installing hole 13 of (159mm, 92.3mm), and fastened with M8 plain bolts;Three locating pieces 8 are through into respectively the first guide pillar 1st, on the 3rd guide pillar 10 and the second guide pillar 9, screwed in a diameter of 6mm screwed holes from locating piece 8 with locating piece bolt 7, pretension; Semicircle tray 2 and rotating semicircular tray 6 are penetrated into guide pillar by guide pillar sliding eye 15, and are fallen on three locating pieces 8 of pretension, Three locating pieces 8 of adjustment, make semicircle tray 2 and rotating semicircular tray 6 in same level, and fasten;By the 4th positioning Block 8 penetrates the second guide pillar 9, falls on rotating semicircular tray 6;Being directed to post 4 has a diameter of in one end alignment boss 3 of screwed hole The lead column installing hole of 6.1mm, and fastened with M6 plain bolts;Air inlet pipe tray 5 is pacified by the through hole of a diameter of 10.1mm It is mounted in lead column 4, and M6 plain bolts is screwed in from the screwed hole of air inlet pipe tray 5, the position of fixed air inlet pipe tray 5.
The method that gas-liquid separator weld jig is manufactured in this enforcement, using common used material in machinery plant and process equipment, Difficulty of processing is low, and processing cost is low;Using coordinate setting processing method, machining accuracy is higher;Processing criterion connection features, zero The interchangeability of part is strong.

Claims (8)

1. a kind of method of manufacture gas-liquid separator weld jig, its step is:
(A) manufacture of base (11):From one piece of steel plate, rectangle steel plate, burr removing, three guide pillars peaces of processing are processed into Dress hole (13) and two spacing backup plate installing holes (14);
(B) manufacture of spacing backup plate (12):Spacing backup plate (12) is processed into from steel plate;
(C) manufacture of the first guide pillar (1), the 3rd guide pillar (10), the second guide pillar (9) and lead column (4):From three, round steel, plus Work, from a round steel, is processed into lead column (4) into the first guide pillar (1), the 3rd guide pillar (10) and the second guide pillar (9), and first leads One end of post (1), the 3rd guide pillar (10) and the second guide pillar (9) processes a blind hole, and machining internal thread, lead column (4) one end One blind hole of processing, and machining internal thread;
(D) manufacture of locating piece (8):From bloom one, square is processed into, adjacent one side adds in locating piece side (23) One through hole of work, in locating piece side (23), relative one side processes a hole, and axis and the through-bore axis in the hole intersect vertically, And machining internal thread;
(E) manufacture of semicircle tray (2) and rotating semicircular tray (6):From two pieces of steel plate, half nahlock is processed into, removes Burr removal; It is one of to process a boss (3), and process two guide pillar sliding eyes (15), the axis of two guide pillar sliding eyes (15) with The line of semicircle tray (2) upper surface intersection point is parallel with faying face (24);Midpoint with the line as the center of circle, in boss (3) One lead column installing hole of upper processing;A guide pillar sliding eye (15), three for being processed are processed on another block of semicircle steel plate The position relationship of guide pillar sliding eye (15) is corresponding with the position relationship of the guide pillar installing hole (13) processed on base (11);Two The nahlock of part half processes two escaping pipe fixing holes (16) after faying face (24) split in mosaic;
(F) manufacture of air inlet pipe tray (5):Select a bloom, burr removing, on the face relative with air inlet pipe tray bottom surface (25) Bucking ladder is processed, bucking ladder is processed into into semicircle groove;Through hole is processed in one end of air inlet pipe tray bottom surface (25), in air inlet A blind hole is processed near one end of through hole on conduit saddle block side (26), internal thread is processed into;
(G) assemble:Screwed hole on spacing backup plate (12) is directed at into the spacing backup plate installing hole (14) on base (11), it is spacing to lean on The slit opening of plate (12) dorsad two guide pillar installing holes (13), blending bolt is fastened;First guide pillar (1), the 3rd are led One end that post (10) and the second guide pillar (9) have screwed hole is respectively aligned to guide pillar installing hole (13), blending bolt fastening;It is fixed by three Position block (8) is through respectively on the first guide pillar (1), the 3rd guide pillar (10) and the second guide pillar (9), with locating piece bolt (7) from positioning Screw in block (8) upper screwed hole, pretension;Semicircle tray (2) and rotating semicircular tray (6) are penetrated by guide pillar sliding eye (15) Guide pillar, and fall on three locating pieces (8) of pretension, three locating pieces (8) are adjusted, make semicircle tray (2) and rotating semicircular support Block (6) is fastened in same level;4th locating piece (8) is penetrated into the second guide pillar (9), is fallen in rotating semicircular tray (6) on;Being directed to post (4) has lead column installing hole in one end alignment boss (3) of screwed hole, blending bolt fastening;To enter Tracheae tray (5) screws in bolt from air inlet pipe tray (5) screwed hole in lead column (4), fixed air inlet pipe tray (5) position.
2. it is according to claim 1 it is a kind of manufacture gas-liquid separator weld jig method, it is characterised in that:Described steel Plate, bloom material are No. 45 steel or bearing steel;The equipment of described processing includes milling machine, drilling machine, planer, lathe, emery wheel Machine, hand screw tap, gas cutting equipment, wire cutting, grinding machine and welding machine.
3. it is according to claim 1 it is a kind of manufacture gas-liquid separator weld jig method, it is characterised in that:Described gas Liquid/gas separator weld jig includes the first guide pillar (1), semicircle tray (2), lead column (4), air inlet pipe tray (5), rotating semicircular Tray (6), locating piece (8), the second guide pillar (9), the 3rd guide pillar (10), base (11) and spacing backup plate (12);Described is spacing Backup plate (12) is fixed on base (11);Described the first guide pillar (1) and one end of the 3rd guide pillar (10) is vertically fixed on base (11) on, the other end is connected with semicircle tray (2);Described the second guide pillar (9) one end is vertically fixed on base (11), another End is connected with rotating semicircular tray (6);Described locating piece (8) has four, and two of which is separately positioned under semicircle tray (2) On first guide pillar (1) and the 3rd guide pillar (10) of side, two other locating piece (8) is arranged on the second guide pillar (9), and one is located at The top of rotating semicircular tray (6), a lower section for being located at rotating semicircular tray (6);Described semicircle tray (2) is provided with convex Platform (3);Described air inlet pipe tray (5) is arranged on boss (3);Described lead column (4) is fixed through air inlet pipe tray (5) On boss (3);Two half slots are respectively provided with described semicircle tray (2) and rotating semicircular tray (6);Described semicircle support The half slot of block (2) and the half slot of rotating semicircular tray (6) combine in pairs two escaping pipe fixing holes (16) of composition.
4. it is according to claim 3 it is a kind of manufacture gas-liquid separator weld jig method, it is characterised in that:Described bottom Seat (11) is provided with two spacing backup plate installing holes (14) and three guide pillar installing holes (13);Three described guide pillar installing holes (13) axis constitutes a right angled triangle with the line of three intersection points of base (11) upper surface;Described two spacing to lean on The line of the axis of plate installing hole (14) and two intersection points of base (11) upper surface is parallel to three guide pillar installing holes (13) The long right-angle side of the right angled triangle that line is constituted;Described the first guide pillar (1), the second guide pillar (9) and the 3rd guide pillar (10) bottom Portion is provided with screwed hole, is fixed by screws on base (11);Described spacing backup plate (12) is shaped as channel-shaped, which is provided with Screwed hole, screwed hole is corresponding with spacing backup plate installing hole (14), and spacing backup plate (12) is bolted on base (11).
5. it is according to claim 3 it is a kind of manufacture gas-liquid separator weld jig method, it is characterised in that:Described half Circle tray (2) and rotating semicircular tray (6) are provided with guide pillar sliding eye (15);Described the first guide pillar (1) and the 3rd guide pillar (10) it is connected with semicircle tray (2) through guide pillar sliding eye (15);Described the second guide pillar (9) through guide pillar sliding eye (15) and Rotating semicircular tray (6) connects.
6. it is according to claim 3 it is a kind of manufacture gas-liquid separator weld jig method, it is characterised in that:Described determines Position block (8) is provided with locating piece bolt (7).
7. it is according to claim 3 it is a kind of manufacture gas-liquid separator weld jig method, it is characterised in that:Described enters The upper surface of tracheae tray (5) is provided with groove, and groove side is provided with bolt near lead column (4) one end.
8. it is according to claim 5 it is a kind of manufacture gas-liquid separator weld jig method, it is characterised in that:Described rotation Turn semicircle tray (6) and be provided with magnet with one end of the second guide pillar (9) junction away from it;Described semicircle tray (2) is near the One end of three guide pillars (10) is provided with breach.
CN201610016521.5A 2015-01-28 2015-01-28 Method for manufacturing gas-liquid separator welding jig Active CN105414858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610016521.5A CN105414858B (en) 2015-01-28 2015-01-28 Method for manufacturing gas-liquid separator welding jig

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510044822.4A CN104607847B (en) 2015-01-28 2015-01-28 A kind of gas-liquid separator weld jig
CN201610016521.5A CN105414858B (en) 2015-01-28 2015-01-28 Method for manufacturing gas-liquid separator welding jig

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510044822.4A Division CN104607847B (en) 2015-01-28 2015-01-28 A kind of gas-liquid separator weld jig

Publications (2)

Publication Number Publication Date
CN105414858A CN105414858A (en) 2016-03-23
CN105414858B true CN105414858B (en) 2017-05-10

Family

ID=53142632

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610016522.XA Active CN105414859B (en) 2015-01-28 2015-01-28 Use method for welding clamp for gas-liquid separator
CN201610016521.5A Active CN105414858B (en) 2015-01-28 2015-01-28 Method for manufacturing gas-liquid separator welding jig
CN201510044822.4A Active CN104607847B (en) 2015-01-28 2015-01-28 A kind of gas-liquid separator weld jig

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610016522.XA Active CN105414859B (en) 2015-01-28 2015-01-28 Use method for welding clamp for gas-liquid separator

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201510044822.4A Active CN104607847B (en) 2015-01-28 2015-01-28 A kind of gas-liquid separator weld jig

Country Status (1)

Country Link
CN (3) CN105414859B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105499777A (en) * 2016-01-06 2016-04-20 蚌埠市瑞泰汽配制造有限公司 Convex spot welding device for filter
CN107378374B (en) * 2017-08-31 2023-02-28 安徽众汇制冷有限公司 Gas-liquid separator welding tool for multi-split commercial air conditioner and using method thereof
CN107363465B (en) * 2017-08-31 2023-01-31 安徽众汇制冷有限公司 Gas-liquid separator welding tool and using method thereof
JP7132706B2 (en) * 2017-10-06 2022-09-07 株式会社ディスコ Steam separation tank
CN109759797B (en) * 2019-03-08 2020-10-16 青岛开拓隆海制冷配件有限公司 Gas-liquid separator welding tool manufacturing process
CN109759798B (en) * 2019-03-08 2020-08-18 青岛开拓隆海制冷配件有限公司 Manufacturing process of welding tool for liquid accumulator
CN111843398B (en) * 2020-08-08 2021-05-25 浙江富源制冷设备股份有限公司 Low-cost U-shaped pipe welding method for gas-liquid separator

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3760478A (en) * 1971-10-04 1973-09-25 Borg Warner Method for assembling a rotary sliding vane compressor
DE2708040A1 (en) * 1977-02-24 1979-04-19 Boc Ltd Clamp for aligning and holding two pipe sections - positions pipes for internal welding by rotating laser beam
FR2382970A1 (en) * 1977-03-07 1978-10-06 Boc Ltd Clamp for aligning and holding two pipe sections - positions pipes for internal welding by rotating laser beam
CN201455591U (en) * 2009-05-31 2010-05-12 重庆宗申技术开发研究有限公司 Welding tool of oil-gas separator
CN102601553A (en) * 2011-12-31 2012-07-25 宁波市拓新焊接技术有限公司 Special girth welding machine for oil-gas separator shells
KR101460518B1 (en) * 2012-12-31 2014-11-21 성동조선해양(주) Weaving welding carriage
CN203830985U (en) * 2014-04-11 2014-09-17 浙江森拉特暖通设备有限公司 Clamp for heating and ventilation pipe welding
CN204413474U (en) * 2015-01-28 2015-06-24 安徽众汇制冷有限公司 A kind of gas-liquid separator weld jig

Also Published As

Publication number Publication date
CN104607847B (en) 2016-08-31
CN105414858A (en) 2016-03-23
CN104607847A (en) 2015-05-13
CN105414859A (en) 2016-03-23
CN105414859B (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN105414858B (en) Method for manufacturing gas-liquid separator welding jig
CN108480923B (en) Method for precisely machining large thin-wall revolving body part
CN105171158A (en) Technology for machining conical gas film holes of turbine guide blade
CN102069228A (en) Milling processing fixture for cylinder clamp ring of large steam turbine and processing method of clamp ring
CN106271303A (en) A kind of processing tool for the outer thermal insulation layer spacer flanger of H series gas turbine exhaust and method
CN105033580A (en) Machining method for banjo union
CN205111323U (en) A anchor clamps that is used for turbine guide blade toper air film spot facing work
CN208195748U (en) A kind of dedicated clamp for machining of valve rocker shaft stool drilling
CN110681932B (en) Electrochemical machining tool and method for complex curved surface based on industrial robot
CN204413474U (en) A kind of gas-liquid separator weld jig
CN109202197B (en) Multi-process linear cutting positioning fixture and method for thin-wall sealing sheet
CN217096749U (en) Double-spindle numerical control lathe capable of realizing multi-process machining
CN207735958U (en) Machining clamp for numerical control machine
CN203696170U (en) Built-up jig for machining main body and sleeve of lathe wrench
CN2875705Y (en) Composite operating outfit
CN206795303U (en) A kind of positioning clamping device for hole machined in tubular workpiece
CN214868619U (en) Waterwheel type multi-station combined processing machine tool
CN104154684B (en) The processing method of a kind of divider and processing divider
CN209288350U (en) The conical surface axis boring cutter of oil pipe spigotjoint in a kind of working fluid press pump
CN209364123U (en) A kind of intersection processing tool
CN217291373U (en) Tool is used in production of metal cutting tool
CN107398679A (en) A kind of high speed rotating plate processing method
CN114683044A (en) Processing method of waterwheel type multi-station combined processing machine tool
CN207447908U (en) A kind of turning attachment for processing circuit breaker base eccentric orfice
CN219443753U (en) Clamp for machining hard alloy multi-inclined-hole nozzle by wire cutting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant