CN105401719B - Aluminium alloy stair tread formwork - Google Patents
Aluminium alloy stair tread formwork Download PDFInfo
- Publication number
- CN105401719B CN105401719B CN201510989214.0A CN201510989214A CN105401719B CN 105401719 B CN105401719 B CN 105401719B CN 201510989214 A CN201510989214 A CN 201510989214A CN 105401719 B CN105401719 B CN 105401719B
- Authority
- CN
- China
- Prior art keywords
- time
- unit
- marking time
- connecting plate
- height
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
- E04G13/062—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A kind of aluminium alloy stair tread formwork of the present invention, including section bar of marking time, are arranged at the height connecting plate marked time on section bar, and be respectively arranged at the end-plate at the section bar two ends of marking time;The cross section of the section bar of marking time is L-shaped, marked time unit including first, marked time unit by described first one end vertically extending second for marking time unit, described first marks time unit and the second unit of marking time is rectangular slab, and described second remote described the first of unit one end for marking time unit of marking time is provided with connecting hole;The height connecting plate is arranged at described first and marked time on unit, and the height connecting plate is provided with connecting hole;The end-plate is two pieces, is respectively fixedly connected with the two ends in the profile length direction of marking time.Compared with correlation technique, it the beneficial effects of the present invention are, the highly versatile of aluminium alloy stair tread formwork of the invention, can be achieved a multi-purpose, and be convenient to mount and dismount.
Description
【Technical field】
The present invention is applied to building aluminum alloy mould plate field, more particularly to a kind of aluminium alloy stair tread formwork.
【Background technology】
In building construction process, floor reinforced concrete structure main body is built after-pouring by template and formed, stair conduct
The component of interfloor traffic, is made up of stair step, platform and Fence structure etc., and stair step is poured using template of marking time and built up
Type.The size marked time includes height, width and length, and the height marked time is determined by floor floor height, the scope of stair step height
Between 150mm~175mm.In correlation technique, many money stair step aluminum alloy pattern plates of staircase design of different riser heights.Related skill
The deficiency of art is, due to many money stair step aluminum alloy pattern plates of the staircase design of different riser heights, therefore, stair step aluminum alloy pattern plate
Species is more, and assembly and disassembly are difficult.
Therefore, it is necessary that providing a kind of new stair step aluminum alloy pattern plate solves above-mentioned technical problem in fact.
【The content of the invention】
The technical problem to be solved in the invention is to provide the aluminium alloy stair step of a kind of highly versatile and convenient disassembly
Template.
A kind of aluminium alloy stair tread formwork of the present invention, including section bar of marking time, are arranged at the height marked time on section bar
Connecting plate, and it is respectively arranged at the end-plate at the section bar two ends of marking time;The cross section of the section bar of marking time is L-shaped, bag
Include first to mark time unit, marked time unit by described first one end vertically extending second for marking time unit, described first marks time list
Member and the second unit of marking time are rectangular slab, described second mark time remote described the first of unit mark time unit one end provided with company
Connect hole;The height connecting plate is arranged at described first and marked time on unit, and the height connecting plate is provided with connecting hole;The end
Shrouding is two pieces, is respectively fixedly connected with the two ends in the profile length direction of marking time.
It is preferred that, the section bar of marking time also include with described first mark time unit, second mark time that unit is fixedly linked plus
Strengthening tendons.
It is preferred that, the reinforcement surrounds hollow cavity structure with the described first mark time unit, the second unit of marking time.
It is preferred that, the height connecting plate is 3-5.
It is preferred that, the height connecting plate is equally spaced along first length direction for marking time unit.
It is preferred that, the height connecting plate has the height dimension of plurality of specifications.
It is preferred that, the end-plate fixes the two ends for being welded in the profile length direction of marking time.
It is preferred that, the height connecting plate fixation is welded in described first and marked time on unit.
Compared with correlation technique, the beneficial effects of the present invention are the general of, aluminium alloy stair tread formwork of the invention
Property it is strong, can be achieved a multi-purpose, and be convenient to mount and dismount.
【Brief description of the drawings】
Fig. 1 is the integrated model schematic diagram of aluminium alloy stair tread formwork of the present invention;
Fig. 2 is the section bar schematic cross-section of marking time of aluminium alloy stair tread formwork of the present invention;
Fig. 3 is the scheme of installation of aluminium alloy stair tread formwork of the present invention.
In figure:Mark time section bar 1, height connecting plate 2, end-plate 3, first marks time unit 11, and second marks time unit 12, reinforcement
Muscle 13, connecting hole 4.
【Embodiment】
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Referring to Fig. 1 to Fig. 3, a kind of aluminium alloy stair tread formwork of the invention, including section bar 1 of marking time, it is arranged at the type of marking time
Height connecting plate 2 on material 1, and it is respectively arranged at the end-plate 3 at the two ends of section bar 1 of marking time;The mark time cross section of section bar 1 is in
" L " shape, including first mark time unit 11, is marked time unit 12, first by first one end vertically extending second for marking time unit 11
Mark time unit 11 and the second unit 12 of marking time be rectangular slab, second mark time unit 12 unit 11 of being marked time away from first one end
Provided with connecting hole 4;Height connecting plate 2 is arranged at first and marked time on unit 11, and height connecting plate 2 is provided with connecting hole 4;End-plate
3 be two pieces, is respectively fixedly connected with the two ends for the length direction of section bar 1 of marking time.
Section bar 1 of marking time also include with first mark time unit 11, second mark time the reinforcement 13 that unit 12 is fixedly linked.
Reinforcement 13 and the first mark time unit 11, the second unit 12 of marking time surround hollow cavity structure.
Height connecting plate 2 is 3-5.
Height connecting plate 2 is equally spaced along the first length direction for marking time unit 11.
Height connecting plate 2 has the height dimension of plurality of specifications.Different height can be highly set according to different stair
The height dimension of connecting plate 2 is spent, it is also possible to the hole position height by adjusting height connecting plate 2, so as to meet riser height
Design.So so that the highly versatile and convenient disassembly of aluminium alloy stair tread formwork of the present invention.
During the installation of aluminium alloy stair tread formwork of the present invention, multiple templates of marking time are spliced layer by layer.That is, will by connector
Connecting hole on height connecting plate 2 connecting hole marked time on section bar 1 adjacent thereto is connected.
Compared with correlation technique, the beneficial effects of the present invention are the general of, aluminium alloy stair tread formwork of the invention
Property it is strong, can be achieved a multi-purpose, and be convenient to mount and dismount.
Above-described is only embodiments of the present invention, it should be noted here that for one of ordinary skill in the art
For, without departing from the concept of the premise of the invention, improvement can also be made, but these belong to the protection model of the present invention
Enclose.
Claims (1)
1. a kind of aluminium alloy stair tread formwork, it is characterised in that including section bar of marking time, is arranged at the height marked time on section bar
Connecting plate is spent, and is respectively arranged at the end-plate at the section bar two ends of marking time;
The cross section of the section bar of marking time is L-shaped, including first marks time unit, by described first mark time unit one end it is vertical
The second of extension is marked time unit, and described first marks time unit and the second unit of marking time is rectangular slab, and described second marks time unit
Remote described first mark time unit one end be provided with connecting hole;
The height connecting plate is arranged at described first and marked time on unit, and the height connecting plate is provided with connecting hole;
The end-plate is two pieces, is respectively fixedly connected with the two ends in the profile length direction of marking time;
The section bar of marking time also include with described first mark time unit, second mark time the reinforcement that unit is fixedly linked;
The reinforcement surrounds hollow cavity structure with the described first mark time unit, the second unit of marking time;
The height connecting plate is 3-5;
The height connecting plate is equally spaced along first length direction for marking time unit;
The height connecting plate has the height dimension of plurality of specifications;
The end-plate fixes the two ends for being welded in the profile length direction of marking time;
The height connecting plate fixation is welded in described first and marked time on unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510989214.0A CN105401719B (en) | 2015-12-24 | 2015-12-24 | Aluminium alloy stair tread formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510989214.0A CN105401719B (en) | 2015-12-24 | 2015-12-24 | Aluminium alloy stair tread formwork |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105401719A CN105401719A (en) | 2016-03-16 |
CN105401719B true CN105401719B (en) | 2017-08-22 |
Family
ID=55467439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510989214.0A Active CN105401719B (en) | 2015-12-24 | 2015-12-24 | Aluminium alloy stair tread formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105401719B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952149A (en) * | 2016-06-13 | 2016-09-21 | 福建省南铝铝材工程有限公司 | Aluminum alloy stair step formwork |
CN106121224A (en) * | 2016-08-15 | 2016-11-16 | 五矿二十三冶建设集团有限公司 | The totally-enclosed stair template of aluminium alloy |
CN106988529B (en) * | 2017-05-02 | 2018-12-25 | 闫相明 | A kind of stair template structure and the stair construction method using the formwork structure |
CN109653495B (en) * | 2018-11-20 | 2020-01-17 | 中国矿业大学 | Prefabricated assembled stair modular assembling die and mounting method thereof |
CN114016735B (en) * | 2021-11-24 | 2023-05-16 | 晟通科技集团有限公司 | Connection structure and template structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1072922A (en) * | 1996-08-30 | 1998-03-17 | Yasuyuki Tsuruta | Construction method of concrete stair and device therefor |
US7185875B1 (en) * | 2004-08-27 | 2007-03-06 | Samuel Jarrett | Steps made easy for concrete only |
CN202055526U (en) * | 2011-04-27 | 2011-11-30 | 中国葛洲坝集团股份有限公司 | Set-shaped steel formwork for cast-in-situ concrete steps |
CN103850437A (en) * | 2014-01-27 | 2014-06-11 | 广西矿建集团有限公司 | Detachable stair step template and installing method thereof |
CN104060825A (en) * | 2014-07-11 | 2014-09-24 | 贵州建工集团第四建筑工程有限责任公司 | Adjustable type universal stair formwork |
CN203846772U (en) * | 2014-05-23 | 2014-09-24 | 晟通科技集团有限公司 | Aluminum alloy stair formwork |
-
2015
- 2015-12-24 CN CN201510989214.0A patent/CN105401719B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1072922A (en) * | 1996-08-30 | 1998-03-17 | Yasuyuki Tsuruta | Construction method of concrete stair and device therefor |
US7185875B1 (en) * | 2004-08-27 | 2007-03-06 | Samuel Jarrett | Steps made easy for concrete only |
CN202055526U (en) * | 2011-04-27 | 2011-11-30 | 中国葛洲坝集团股份有限公司 | Set-shaped steel formwork for cast-in-situ concrete steps |
CN103850437A (en) * | 2014-01-27 | 2014-06-11 | 广西矿建集团有限公司 | Detachable stair step template and installing method thereof |
CN203846772U (en) * | 2014-05-23 | 2014-09-24 | 晟通科技集团有限公司 | Aluminum alloy stair formwork |
CN104060825A (en) * | 2014-07-11 | 2014-09-24 | 贵州建工集团第四建筑工程有限责任公司 | Adjustable type universal stair formwork |
Also Published As
Publication number | Publication date |
---|---|
CN105401719A (en) | 2016-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105401719B (en) | Aluminium alloy stair tread formwork | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN105971276B (en) | Integral aluminum formwork stair one-step continuous pouring forming structure and construction method | |
CN110359631A (en) | Secondary structure Constructional Col-umn Construction method | |
CN206859480U (en) | A kind of assembled large span combines steel truss concrete superimposed sheet | |
CN206109960U (en) | Steel that can be under construction fast concrete integrated configuration bridge | |
CN209723438U (en) | A kind of novel coagulation body precast stair plate | |
CN205894681U (en) | Closed staircase template | |
CN114517575A (en) | Formwork-attached assembling type double-layer integral hoisting elevator shaft construction method | |
CN107100366A (en) | A kind of construction method for skyscraper reinforced concrete stairs formwork | |
CN202064281U (en) | Slip form frame | |
CN207062771U (en) | A kind of H types Pier Formwork platform integrated apparatus | |
CN109025275A (en) | A kind of shear wall side regularization stair punching block and installation method | |
CN202401753U (en) | Sliding die device | |
CN206170288U (en) | Vertical combination stair plates mould | |
CN107338809A (en) | Subway station portal template and its Fast Installation construction method under super-high voltage | |
CN111236603B (en) | Comprehensive construction method for steel plate mesh overhanging scaffold | |
CN106968380A (en) | A kind of assembled large span combination steel truss concrete superimposed sheet and its construction method | |
CN207296399U (en) | Continuous placing is molded overall assembled stair template system | |
CN108661255A (en) | A kind of assembling-type precast stair and its production method | |
CN108068202A (en) | Vertical Combination stair board mold | |
CN204691249U (en) | A kind of with can the stair step steel form of tread | |
CN206942134U (en) | A kind of embedded stair template device | |
CN208023953U (en) | Fast-assembling stair template and fast-assembling stair template system | |
CN207749828U (en) | The steel formwork of spigot-and-socket precast stair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181106 Address after: 410200 Jinxing Road, Wangcheng economic and Technological Development Zone, Changsha, Hunan 109 Patentee after: Hunan Fast Construction Technology Co., Ltd. Address before: No. 109, Wangcheng District, Wangcheng District, Changsha, Hunan Patentee before: Suntown Technology Group Corporation |
|
TR01 | Transfer of patent right |