CN105398913B - Building hoist guide rail bracket power transmission changeover panel and its manufacture method - Google Patents

Building hoist guide rail bracket power transmission changeover panel and its manufacture method Download PDF

Info

Publication number
CN105398913B
CN105398913B CN201510898232.8A CN201510898232A CN105398913B CN 105398913 B CN105398913 B CN 105398913B CN 201510898232 A CN201510898232 A CN 201510898232A CN 105398913 B CN105398913 B CN 105398913B
Authority
CN
China
Prior art keywords
guide rail
main body
ladder cage
disc main
cage guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510898232.8A
Other languages
Chinese (zh)
Other versions
CN105398913A (en
Inventor
王辉
李迪
周勇
叶贞
孙金桥
夏劲松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201510898232.8A priority Critical patent/CN105398913B/en
Publication of CN105398913A publication Critical patent/CN105398913A/en
Application granted granted Critical
Publication of CN105398913B publication Critical patent/CN105398913B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ladders (AREA)

Abstract

The present invention provides a kind of building hoist guide rail bracket power transmission changeover panel, including ladder cage guide rail and conversion disc main body, described conversion disc main body is made up of the middle connecting rib of upper cover plate, lower cover and connection upper and lower cover plates, ladder cage guide rail is arranged between upper and lower cover plates, and ladder cage guide rail is connected with upper and lower cover plates respectively.The present invention can ensure that ladder cage is capable of being switched tracks by swivel for smooth steady.

Description

Building hoist guide rail bracket power transmission changeover panel and its manufacture method
Technical field
The present invention relates to building hoist field, and in particular to a kind of building hoist guide rail bracket power transmission changeover panel and its system Make method.
Background technology
As Super High project is fast-developing, one of key equipment as construction of super highrise building vertical transport, construction The loading of lift needs more and more higher, rotates track exchanging device by increasing, sees Chinese patent application CN104709795A, realizes Single-tower multiple-cage circular flow construction elevator, effectively improves delivery efficiency, and in single-tower multiple-cage circular flow construction elevator, Because swivel part is rotatable, after each 180 ° of rotation, the ladder cage guide rail of swivel part and fixed part The ladder cage guide rail of standard knot must is fulfilled for smooth transition, and not so, ladder cage will produce unexpected bounce in operation, cause to pacify Full hidden danger and produce destruction for whole device.
Meanwhile the vertical force of conventional building hoist reaches guide rail bracket base foundation, adhere to only transmit horizontal force above, Cause the increase of bottom standard knot column wall thickness, some is even up to 12mm, while also have impact on height that guide rail bracket can set up, Economic and safety.The position for needing to unload power in guide rail bracket sets discharge mechanism so that more than the guide rail bracket position and thereon The load of ladder cage is transferred to building or other fulcrums by the device.
Therefore a kind of building hoist guide rail bracket power transmission changeover panel of design is necessary.Because building hoist will pass Walked on power changeover panel, thus four root posts of power transmission changeover panel should power transmission it is reliable, possess very high positional precision again.
General building hoist guide rail bracket power transmission changeover panel is as a structural member, typically using integral solder and then machinery The method of processing is manufactured, but welding structure is difficult to ensure that the interchangeability after four column installations, even if passing through machining center Overall processing is carried out, cost is high, long in time limit, while the narrow and small position on column periphery can not also process.
The content of the invention
The technical problem to be solved in the present invention is:A kind of building hoist guide rail bracket power transmission changeover panel and its manufacturer are provided Method, ensure that ladder cage is capable of being switched tracks by swivel for smooth steady.
The technical solution taken by the invention to solve the above technical problem is:A kind of building hoist guide rail bracket power transmission turns Removable disk, including ladder cage guide rail and conversion disc main body, it is characterised in that:Described conversion disc main body is by upper cover plate, lower cover and company The middle connecting rib for connecting lower cover is formed, and ladder cage guide rail is arranged between upper and lower cover plates, and ladder cage guide rail respectively with it is upper Lower cover connects.
By said apparatus, described upper cover plate, lower cover are welded with middle connecting rib respectively, conversion disc main body with By key connection between ladder cage guide rail, and fixed by screw, the junction of conversion disc main body and ladder cage guide rail is entered by pin One step connects.
A kind of manufacture method of above-mentioned building hoist guide rail bracket power transmission changeover panel, it is characterised in that:It includes following step Suddenly:
S1, conversion disc main body and ladder cage guide rail are processed respectively:
Change disc main body:To upper cover plate, lower cover and middle connecting rib, blanking, assembling, welding, complete after correction successively Residual stress is eliminated into heat treatment, then carries out sandblasting;It is machined into that positioning boss, key-shaped knot are installed on conversion disc main body Structure, screwed hole and pin-and-hole;
Ladder cage guide rail:It is machined into keyway, screwed hole and the pin-and-hole coordinated with conversion disc main body;
S2, four ladder cage guide rails are installed to by key connection mode and changed on disc main body, be adjusted check and correction;
After S3, check and correction, whole detection is carried out, ladder cage guide rail is penetrated by screw after qualified and changes the spiral shell of disc main body Pit, it is fixed;
S4, pin is penetrated into ladder cage guide rail and changes the pin-and-hole of disc main body, carry out pin connection.
Beneficial effects of the present invention are:
1st, by using apparatus of the present invention, ensure that ladder cage is capable of being switched tracks by swivel for smooth steady.
2nd, by the way that conversion disc main body and ladder cage guide rail are taken apart, it is processed, is protected by the accurate processing of lathe respectively The precision of fit dimension is demonstrate,proved, then, conversion disc main body and ladder cage guide rail are assembled up by the connected mode of key and screw, most Ensure that integrally-built accurate size with the whole power transmission changeover panel of pin reinforcing is beaten in every ladder cage guide rail afterwards, avoid due to The problem of being deformed by welding to cause the ladder cage guide rail size low precision of changeover panel.
3rd, many welding procedures are substituted for by machining operation by the inventive method, while also without in changeover panel The center of main body is largely processed, when being reduced for the skill set requirements of worker, and effectively reducing overall processing and fabricating Between, save expense.
4th, ladder cage guide rail can be changed in use or maintenance process, so greatly reduce the difficulty and drop of maintenance Low expense.
Brief description of the drawings
Fig. 1 is the structural representation of one embodiment of the invention.
Fig. 2 is application drawing of the one embodiment of the invention on guide rail bracket.
In figure:1- ladder cage guide rails, 2- screws, 3- pins, 4- upper cover plates, 5- lower covers, 6- centres connecting rib.
Embodiment
With reference to instantiation and accompanying drawing, the present invention will be further described.
Fig. 1 be one embodiment of the invention structural representation, a kind of building hoist guide rail bracket power transmission changeover panel(Correspond to Upper rotation transition segment in Chinese patent application CN104709795A or under rotate through and cross section, be arranged on guide rail bracket, such as Fig. 2 institutes Show), including ladder cage guide rail 1 and conversion disc main body, conversion disc main body except ladder cage guide rail 1 including by upper cover plate 4, lower cover 5 and connecting The middle connecting rib 6 for connecting lower cover is formed, and ladder cage guide rail 1 is arranged between upper and lower cover plates 4,5, and ladder cage guide rail 1 divides It is not connected with upper and lower cover plates 4,5.
Described upper cover plate 4, lower cover 5 are welded with middle connecting rib 6 respectively, conversion disc main body and ladder cage guide rail By key connection between 1, and fixed by screw 2, the junction of conversion disc main body and ladder cage guide rail 1 passes through pin 3(It is such as round Pin)Further connection.
A kind of manufacture method of above-mentioned building hoist guide rail bracket power transmission changeover panel, comprises the following steps:
S1, conversion disc main body and ladder cage guide rail 1 are processed respectively:
Change disc main body:To upper cover plate 4, lower cover 5 and middle connecting rib 6, blanking, assembling, welding successively, after correction Complete heat treatment and eliminate residual stress, then carry out sandblasting;Be machined into install positioning boss, key-shaped structure, screwed hole and Pin-and-hole(Such as:In the present embodiment, car, which goes out, installs positioning boss, and mills out key-shaped structure, screwed hole and pin-and-hole);
Ladder cage guide rail 1:Machining(Such as:Milling)Go out keyway, screwed hole and the pin-and-hole coordinated with conversion disc main body;
S2, four ladder cage guide rails 1 are installed to by key connection mode and changed on disc main body, be adjusted check and correction;
After S3, check and correction, whole detection is carried out, ladder cage guide rail 1 is penetrated by screw 2 after qualified and changes disc main body Screwed hole, it is fixed;
S4, pin 3 is penetrated into ladder cage guide rail 1 and changes the pin-and-hole of disc main body, carry out pin 3(Such as straight pin)Connection.
A kind of in practical application, building hoist guide rail bracket power transmission changeover panel(Corresponding to Chinese patent application Upper rotation transition segment in CN104709795A or under rotate through and cross section)Conversion disc main body on be additionally provided with and be connected with other positions Bearing, and other components, due to not being the inventive point of the present invention, therefore do not elaborate.
Above example is merely to illustrate the design philosophy and feature of the present invention, and its object is to make technology in the art Personnel can understand present disclosure and implement according to this, and protection scope of the present invention is not limited to above-described embodiment.So it is all according to The equivalent variations made according to disclosed principle, mentality of designing or modification, within protection scope of the present invention.

Claims (1)

  1. A kind of 1. manufacture method of building hoist guide rail bracket power transmission changeover panel, it is characterised in that:Building hoist guide rail bracket passes Power changeover panel includes ladder cage guide rail and conversion disc main body, and described conversion disc main body is by upper cover plate, lower cover and connection upper and lower covers The middle connecting rib of plate is formed, and ladder cage guide rail is arranged between upper and lower cover plates, and ladder cage guide rail connects with upper and lower cover plates respectively Connect;Described upper cover plate, lower cover are welded with middle connecting rib respectively, change and pass through between disc main body and ladder cage guide rail Key connection, and fixed by screw, conversion disc main body is further connected with the junction of ladder cage guide rail by pin;
    This method comprises the following steps:
    S1, conversion disc main body and ladder cage guide rail are processed respectively:
    Change disc main body:To upper cover plate, lower cover and middle connecting rib, blanking, assembling, welding successively, heat is completed after correction Processing eliminates residual stress, then carries out sandblasting;Conversion disc main body on be machined into install positioning boss, key-shaped structure, Screwed hole and pin-and-hole;
    Ladder cage guide rail:It is machined into keyway, screwed hole and the pin-and-hole coordinated with conversion disc main body;
    S2, four ladder cage guide rails are installed to by key connection mode and changed on disc main body, be adjusted check and correction;
    After S3, check and correction, whole detection is carried out, ladder cage guide rail is penetrated by screw after qualified and changes the screw thread of disc main body Hole, it is fixed;
    S4, pin is penetrated into ladder cage guide rail and changes the pin-and-hole of disc main body, carry out pin connection.
CN201510898232.8A 2015-12-07 2015-12-07 Building hoist guide rail bracket power transmission changeover panel and its manufacture method Active CN105398913B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510898232.8A CN105398913B (en) 2015-12-07 2015-12-07 Building hoist guide rail bracket power transmission changeover panel and its manufacture method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510898232.8A CN105398913B (en) 2015-12-07 2015-12-07 Building hoist guide rail bracket power transmission changeover panel and its manufacture method

Publications (2)

Publication Number Publication Date
CN105398913A CN105398913A (en) 2016-03-16
CN105398913B true CN105398913B (en) 2018-01-16

Family

ID=55464735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510898232.8A Active CN105398913B (en) 2015-12-07 2015-12-07 Building hoist guide rail bracket power transmission changeover panel and its manufacture method

Country Status (1)

Country Link
CN (1) CN105398913B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5197570A (en) * 1991-04-16 1993-03-30 Kajima Corporation Linear motor driven elevator with passing function
US5235144A (en) * 1990-08-07 1993-08-10 Kajima Corporation Linear motor driven elevator
CN102229396A (en) * 2011-03-30 2011-11-02 任国辉 Single-well double-passageway up-and-down independent operating vertical lift elevator
CN103145019A (en) * 2013-03-20 2013-06-12 中建三局建设工程股份有限公司 Single-tower multiple-cage circularly operated construction elevator
CN104671037A (en) * 2015-03-20 2015-06-03 中建三局集团有限公司 Intelligent rotary rail exchanging control system and method
CN104709795A (en) * 2015-03-20 2015-06-17 中建三局集团有限公司 Rotating rail replacing device and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5235144A (en) * 1990-08-07 1993-08-10 Kajima Corporation Linear motor driven elevator
US5197570A (en) * 1991-04-16 1993-03-30 Kajima Corporation Linear motor driven elevator with passing function
CN102229396A (en) * 2011-03-30 2011-11-02 任国辉 Single-well double-passageway up-and-down independent operating vertical lift elevator
CN103145019A (en) * 2013-03-20 2013-06-12 中建三局建设工程股份有限公司 Single-tower multiple-cage circularly operated construction elevator
CN104671037A (en) * 2015-03-20 2015-06-03 中建三局集团有限公司 Intelligent rotary rail exchanging control system and method
CN104709795A (en) * 2015-03-20 2015-06-17 中建三局集团有限公司 Rotating rail replacing device and construction method thereof

Also Published As

Publication number Publication date
CN105398913A (en) 2016-03-16

Similar Documents

Publication Publication Date Title
US20160354879A1 (en) Method for assembling a blade of a wind turbine
US20110012360A1 (en) Wind turbine generator and method for constructing the same
CN209350896U (en) A kind of 3D printer high-precision lifting device
CN105398913B (en) Building hoist guide rail bracket power transmission changeover panel and its manufacture method
CN104763189B (en) Oblique parking equipment
CN208531964U (en) Install the guide-localization and attachment device of elevator hoistway with steel structure module additional
CN104276519A (en) Crane pedestal
CN203474327U (en) Crane base
CN103114714B (en) Anti-falling device of lifting-type scaffold
CN215756153U (en) Lifting pedal operation platform for direct-drive permanent magnet wind driven generator
CN203080895U (en) Anti-dropping device of lift type scaffold
CN205908014U (en) Support arrangement for a but, turbine screw continuously adjustable for hydraulic climbing formwork system
CN211496513U (en) Socket joint formula elevator frame post node device
CN209455893U (en) Driving plate
CN110145096A (en) A kind of modularization hoistway installing elevator additional
CN206829734U (en) The mounting structure of multi-storied garage intermediate station
CN206001119U (en) Large Hydroelectric Set center blowdown pipe pipe collar type guiding trestle
CN206737523U (en) The cantilever design of turntable is installed in multi-storied garage
EP3861180A1 (en) Building structure with independently cantilevered stories
CN201665458U (en) Bottom wheel device of inclined elevator cage
WO2017149730A1 (en) Coupling device for elevator driving machines
WO2023128909A1 (en) Tower climbing mechanism
WO2022018797A1 (en) Method for disassembling tower-type wind power generation facility
CN210828411U (en) Safety protection device for building exhibition hall
CN104929374B (en) The construction method of quality case system and its construction method and tuned mass damper

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant