CN105397241B - A kind of welding method for 610U2L material spherical tanks - Google Patents

A kind of welding method for 610U2L material spherical tanks Download PDF

Info

Publication number
CN105397241B
CN105397241B CN201510865990.XA CN201510865990A CN105397241B CN 105397241 B CN105397241 B CN 105397241B CN 201510865990 A CN201510865990 A CN 201510865990A CN 105397241 B CN105397241 B CN 105397241B
Authority
CN
China
Prior art keywords
welding
layer
weld
seam
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510865990.XA
Other languages
Chinese (zh)
Other versions
CN105397241A (en
Inventor
丁中清
耿进杰
王彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering No14 Construction Co Ltd
Original Assignee
China National Chemical Engineering No14 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering No14 Construction Co Ltd filed Critical China National Chemical Engineering No14 Construction Co Ltd
Priority to CN201510865990.XA priority Critical patent/CN105397241B/en
Publication of CN105397241A publication Critical patent/CN105397241A/en
Application granted granted Critical
Publication of CN105397241B publication Critical patent/CN105397241B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/013Arc cutting, gouging, scarfing or desurfacing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/02Seam welding; Backing means; Inserts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/32Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention discloses a kind of welding method for 610U2L material spherical tanks, including step:1) groove processing is carried out to outside in the welding edge of the Spherical Tank Shell Plates of spherical tank;2) according to the distribution route selection longitudinal seam welding method or transverse joint welding of weld seam;3) welding rod is chosen according to welding rod selection standard, and drying and processing is carried out to welding rod;4) welded according to the welding of welding procedure and selection;Wherein, welding process requirement includes welding surroundings requirement, weld preheating and the control of interlayer temperature and rear hot dehydrogenation.The welding method can realize the welding to 610U2L material spherical tanks, with preferable application prospect.

Description

A kind of welding method for 610U2L material spherical tanks
Technical field
The present invention relates to a kind of welding method, especially a kind of welding method for 610U2L material spherical tanks.
Background technology
With the development of petroleum chemical industry, chemical plant installations maximization, the spherical tank for containing cryogenic media is more and more.Selection Suitable material is to ensure the basis of spherical tank safety.Spherical Tank Shell Plates are that should meet high intensity with the selection principle of material, are ensured that Mouldability, excellent welding performance, enough notch toughness values and performance reliably and with long-term well.
It is more severe for manufacturing applying working condition that recent year has introduced a kind of JFE-HITEN610U2L steel of Japan's production The spherical storage tank at quarter.The steel grade not only has an excellent low-temperature flexibility, and good weldability, the mechanical property of welding point compared with It is high.The steel grade first Application in 2003 is in the 2500m of Yangtze petrochemical industry--48 DEG C of BASF Co., Ltd design temperature3Propylene Spherical tank.The good performance of the steel grade has obtained the favor of each side, is made more using this steel grade contain ethene, propylene etc. in recent years The high pressure low temperature spherical tank of medium.
However, there is presently no the welding method for 610U2L material spherical tanks, being welded with solving 610U2L materials The Welding Problems run into journey.
The content of the invention
It is an object of the invention to:A kind of welding method for 610U2L material spherical tanks is provided.
Technical scheme:Welding method of the present invention for 610U2L material spherical tanks, comprises the following steps:
Step 1, groove processing is carried out to outside in the welding edge of the Spherical Tank Shell Plates of spherical tank;
Step 2, according to the distribution route selection longitudinal seam welding method or transverse joint welding of weld seam;
Step 3, welding rod is chosen according to welding rod selection standard, and drying and processing is carried out to welding rod;
Step 4, welded according to the welding of welding procedure and selection;
Wherein, the welding process requirement includes:
A. welding surroundings requirement:Weather requires non-sleety weather;Wind speed requirement is less than 5m/s;Environment temperature requirement is at 0 DEG C More than;Relative humidity requirement is below 80%;
B. weld preheating and the control of interlayer temperature:Weld preheating uses electrical heating, and preheating width is Weld pipe mill both sides Respectively away from 150mm, preheating temperature is >=125 DEG C, and with tempilstick in Weld pipe mill both sides symmetrical measurement, every weld seam measuring point is no less than Three pairs, every weld seam must be preheated in welding process, and to ensure that preheating temperature is uniform, interlayer temperature during welding should be controlled 180~200 DEG C;
C. hot dehydrogenation after:Postwelding should carry out dehydrogenation, using electrical heating, and postheat temperature is 180~230 DEG C, is protected The warm 1 hour time;
The longitudinal seam welding method is required to include:
D. welded according to segmentation from top to bottom, during using several welders welding simultaneously, speed of welding is consistent, with for the moment Between the difference of weld length must not exceed 300mm;
E. triangle arc manipulation method is used, welding rod is stopped and short arc operation in weld seam both sides, according to the welding number of plies It is determined that corresponding welding parameter;
F. every layer of face of weld is filled and led up in crescent, and first layer uses φ 3.2mm welding rod, is welded in subinverse First layer, successively thickeies layer since the second layer, and every layer of weldering meat should fill uniform and neat within 3~4mm, Last capping layer need to be completed disposably, must not undercut;
G. after the shaping of outside groove welding, carbon arc air gouging back chipping is carried out at interior side slope mouth, the weldering meat of first layer is fallen clearly, Carburized layer, finishing channeling are abraded using emery wheel, bottom radius should be greater than 5mm, finishes rear groove face and carries out 100% magnetic inspection Look into, it is qualified after carry out again inner side groove welding;
The transverse joint welding is required to include:
H. on butt-welding fitting during seam welding, welded from two toward centre, under butt-welding fitting during seam welding, from middle toward two Weldering, two welding machines weld a seam simultaneously;
I. in girth welding big to equator, using several welders welding, Equal round girth, counter clockwise direction constant speed simultaneously Welding, same time first layer and the second layer weld length difference must not exceed 300mm, uses and divides in everyone segmentation limit Section back welding, multi-pass welding;
J. backing welding is using oval manipulation of electrode, welding rod direction of advance and the inclination angle that weld seam tangential direction is in 30~45 °;
K. more than the second layer welded using pressure road, and every layer must thoroughly scarfing cinder.
The welding procedure of spherical tank is defined using tri- welding process requirements of a, b and c, 610U2L can be effectively ensured The welding quality of material spherical tank, it is to avoid welding is done over again, improves efficiency of construction;Longitudinal joint is welded using tetra- welding requirements of d, e, f and g Connection is defined, and effectively increases the welding quality of longitudinal joint;Filled and led up in crescent, can be easy to using every layer of face of weld Scarfing cinder is more convenient next layer of welding;Using first layer is welded in subinverse, be conducive to interior back chipping, stomata is fallen clearly;Using h, Tetra- welding requirements of i, j and k are defined to transverse joint welding, can effectively improve transverse joint welding quality.
As the further limits scheme of the present invention, in the requirement of the longitudinal seam welding method and transverse joint welding, using many During name welder welding simultaneously, should stagger with tee seam at welding point, and two welders collect junction should stagger 50~ 100mm.This is designed to prevent welding point from concentrating on same section, so that the structure effectively improved at welding point is strong Degree.
It is used as the further limits scheme of the present invention, step 1) in, groove processing requirement is determined according to the thickness of global shell The angle of groove, and need objectionable impurities of the cleaning in the range of groove face and both sides 50mm.Removing objectionable impurities can be true Protect welding quality.
As the further limits scheme of the present invention, objectionable impurities includes iron rust and greasy dirt.
It is used as the further limits scheme of the present invention, step 3) in, welding rod selection standard requires diffusible hydrogen in welding rod Content is less than 5.0ml/100g.
It is used as the further limits scheme of the present invention, step 3) in, drying and processing requirement temperature in 2 hours rises to 350~400 DEG C, and maintain the temperature 1~2 hour, require that temperature drop is to 100~150 DEG C in 1 hour in cooling, and Maintain the temperature at least three hour.Drying and processing can effectively improve welding quality of the welding rod in welding.
As the further limits scheme of the present invention, the corresponding relation of the welding number of plies and welding parameter is referring to table 1:
Table 1
Using the different welding parameter of setting at different levels, it can effectively strengthen the structural strength after welding.
Compared with prior art, its advantage is the present invention:(1) using tri- welding process requirements of a, b and c to spherical tank Welding procedure be defined, can effectively ensure the welding quality of 610U2L material spherical tanks, it is to avoid welding do over again, improve construction Efficiency;(2) longitudinal seam welding method is defined using tetra- welding requirements of d, e, f and g, effectively increases the welding matter of longitudinal joint Amount;(3) filled and led up using every layer of face of weld in crescent, the welding that scarfing cinder can be easy to be more convenient next layer;(4) using by First layer is welded in subinverse, is conducive to interior back chipping, stomata is fallen clearly;(5) transverse joint is welded using tetra- welding requirements of h, i, j and k Connection is defined, and can effectively improve transverse joint welding quality.
Brief description of the drawings
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is drying and processing temperature control curve figure of the invention.
Embodiment
Technical solution of the present invention is described in detail below in conjunction with the accompanying drawings, but protection scope of the present invention is not limited to The embodiment.
Embodiment 1:
As shown in figure 1, a kind of welding method for 610U2L material spherical tanks that the present invention is provided, comprises the following steps:
Step 1, groove processing is carried out to outside in the welding edge of the Spherical Tank Shell Plates of spherical tank;
Step 2, according to the distribution route selection longitudinal seam welding method or transverse joint welding of weld seam;
Step 3, welding rod is chosen according to welding rod selection standard, and drying and processing is carried out to welding rod;
Step 4, welded according to the welding of welding procedure and selection;
Wherein, welding process requirement includes:
A. welding surroundings requirement:Weather requires non-sleety weather;Wind speed requirement is less than 5m/s;Environment temperature requirement is at 0 DEG C More than;Relative humidity requirement is below 80%;
B. weld preheating and the control of interlayer temperature:Weld preheating uses electrical heating, and preheating width is Weld pipe mill both sides Respectively away from 150mm, preheating temperature is >=125 DEG C, and with tempilstick in Weld pipe mill both sides symmetrical measurement, every weld seam measuring point is no less than Three pairs, every weld seam must be preheated in welding process, and to ensure that preheating temperature is uniform, interlayer temperature during welding should be controlled 180~200 DEG C;
C. hot dehydrogenation after:Postwelding should carry out dehydrogenation, using electrical heating, and postheat temperature is 180~230 DEG C, is protected The warm 1 hour time;
Longitudinal seam welding method is required to include:
D. welded according to segmentation from top to bottom, during using several welders welding simultaneously, speed of welding is consistent, with for the moment Between the difference of weld length must not exceed 300mm;
E. triangle arc manipulation method is used, welding rod is stopped and short arc operation in weld seam both sides, according to the welding number of plies It is determined that corresponding welding parameter;
F. every layer of face of weld is filled and led up in crescent, and the welding for being easy to scarfing cinder to be more convenient next layer, first layer is used φ 3.2mm welding rod, welds first layer in subinverse, is so conducive to interior back chipping, and stomata is fallen clearly, since the second layer by Layer thickeies layer, and every layer of weldering meat should fill uniform and neat, last capping layer needs disposable complete within 3~4mm Into must not undercut;
G. after the shaping of outside groove welding, carbon arc air gouging back chipping is carried out at interior side slope mouth, the weldering meat of first layer is fallen clearly, Carburized layer, finishing channeling are abraded using emery wheel, bottom radius should be greater than 5mm, finishes rear groove face and carries out 100% magnetic inspection Look into, it is qualified after carry out again inner side groove welding;
Transverse joint welding is required to include:
H. on to global shell during seam welding, welded from two toward centre, when to seam welding under global shell, from middle toward two Head weldering, two welding machines weld a seam simultaneously;
I. in girth welding big to equator, using several welders welding, Equal round girth, counter clockwise direction constant speed simultaneously Welding, same time first layer and the second layer weld length difference must not exceed 300mm, uses and divides in everyone segmentation limit Section back welding, multi-pass welding;
J. backing welding is using oval manipulation of electrode, welding rod direction of advance and the inclination angle that weld seam tangential direction is in 30~45 °;
H. more than the second layer welded using pressure road, and every layer must thoroughly scarfing cinder.
Wherein, in the requirement of the longitudinal seam welding method and transverse joint welding, during using several welders welding simultaneously, welding connects It should stagger at head with tee seam, and two welders collect junction and should staggered 50~100mm;In step 1) in, at groove Reason requires to determine the angle of groove according to the thickness of weldment, and needs to clear up harmful in the range of groove face and both sides 50mm Impurity, objectionable impurities is generally iron rust and greasy dirt;In step 3) in, welding rod selection standard requires diffusible hydrogen content in welding rod Less than 5.0ml/100g;In step 3) in, drying and processing requirement temperature in 2 hours rises to 350~400 DEG C, and maintains to be somebody's turn to do Temperature 1~2 hour, requires that temperature drop is to 100~150 DEG C in 1 hour, and maintain the temperature at least three small in cooling When, as shown in Figure 2;The corresponding relation of the number of plies and welding parameter is welded referring to table 1:
Table 1
When each Spherical Tank Shell Plates to seeking tank body are welded, outside welding sequence is followed successively by:Equatorial zone longitudinal joint is outer, upper pole Side plate longitudinal joint is outer, upper extremely middle plate piece is outer, upper pole side plate month teeth space is outer, lower pole side plate longitudinal joint is outer, lower extremely middle plate piece is outer, lower pole Outside side plate month teeth space and equatorial zone is up and down outside big circumferential weld.Outside weld after the completion of, it is necessary to carry out inner side gouge back chipping, by Inner side welding is carried out according to order above.
Points for attention during welding include:
(1) inconel weld forming a solder, if midway stops welding, a weld seam is at least welded more than two layers, Welded again after need to being preheated when welding next time;
(2) per pass weld seam continuously all should be soldered to terminal from top, and the action for changing welding rod is fast, it is necessary in 5 seconds Complete, no matter any cold junction will reconditioning welding again;
(3) the weldering meat of longitudinal welding bead is soldered to the center of circumferential welded seam, is ground off before girth welding;
(4) forbid the striking outside groove, striking uses reflow welding bead arc inciting process, i.e., draw at 10~15mm of side before welding Arc, then retracts joint welding, top fills up arc crater.
It is intraoral in clivia after big groove side has been welded, it is necessary to carry out back chipping and polishing to weld seam after the completion of welding Side back chipping.Carbon arc air gouging uses the bevel shape width uniformity after φ 8mm carbon-point, electric welding machine straight polarity direct current method, back chipping, Then with abrasive machine polishing oxide layer, untill metallic luster is presented, the groove after polishing should carry out 100% magnetic inspection Look into, such as find that defect is eliminated immediately and welded again.
When the weld seam after the completion of to welding is checked, it is necessary to note:
A. Seam and heat effected zone surface must not have crackle;
B. face of weld must not have the defects such as undercut, stomata, slag inclusion, arc crater, must not there is slag splash;
C. weld width answers broadening 2 ± 1mm than groove per side.
Foundation《3000m3LPG spherical tanks manufacture mounting technique condition》And weld seam postwelding physical dimension quality requirement meets following table 2:
Table 2
Sequence number Inspection project Tolerance (mm)
1 Postwelding angular deformation ≤5
2 Maximum gauge and minimum diameter after sphere welding < 65
3 Outer surface weld reinforcement 0~1
5 Inner surface weld reinforcement 0~1
6 Pillar verticality ≤12
When the surface defect of the weld seam after the completion of to welding is repaired:Use gradient in the range of abrasive machine reconditioning, reconditioning At least 3:1, work card has after gouge, repair welding is answered when surface defect depth is more than 1.3mm, repair welding is with formal welding procedure It is identical;Reconditioning is round and smooth excessively after repair welding, and MT inspections are done after repairing.
Required when the internal flaw of the weld seam after the completion of to welding is repaired:
A. before the repairing of weld seam internal flaw, ultrasound examination depth of defect is used, defect property is determined, eliminated and Defect of repair welding Depth, must not exceed the 2/3 of spherical shell thickness of slab, more than when overleaf carry out elimination defect, repair welding, soldering length is more than 50mm;
When b. eliminating defect using carbon arc air gouging, rebuild after defect expressivity with abrasive machine, grind off oxide layer repair welding again;
C. repair welding is identical with the formal welding procedure of spherical tank, and visual examination and Non-Destructive Testing are carried out after repair welding, repair welding Number of times and the technique of repair welding should carry out detailed record;
D. reprocessing for same position be must not exceed twice, and reliable and effective technological measure must be taken twice by such as exceeding, and It can be carried out after ratifying through unit person in charge of the technology aspect.
After the inside and outside welding forming of spherical tank, detected through visual examination is qualified, detection project includes:
(1) Non-Destructive Testing
Non-Destructive Testing is carried out in postwelding through visual examination after qualified 36 hours.Butt weld (including the manhole reinforcement of spherical shell The weld seam of part and manhole flange), should be using 100%TOFD detections, and 20% ray repetition measurement is carried out, perform standard JB/T4730- 2005 II grades are qualified;
(2) Magnetic testing
Magnetic testing before heat treatment, heat treatment after and the water pressure test after carry out.Surfaces externally and internally (the bag of spherical tank butt weld Include locating piece, fixture, covering repairing etc.), the outer surface of stiffening ring or pillar angle welding carries out the magnetic of 100% fusion length Powder detects that I grade is qualified by JB/T4730-2005;
(3) detection of the defect after repairing, mending
There is excessive defect inside weld seam, the repair welding after Defect removal after visual examination is qualified, is implemented by former characterization processes Detection.
As described above, although the present invention has been represented and described with reference to specific preferred embodiment, it must not be explained For to the limitation of itself of the invention., can be right under the premise of the spirit and scope of the present invention that appended claims are defined are not departed from Various changes can be made in the form and details for it.

Claims (6)

1. a kind of welding method for 610U2L material spherical tanks, it is characterised in that comprise the following steps:
Step 1, groove processing is carried out to outside in the welding edge of the Spherical Tank Shell Plates of spherical tank;
Step 2, according to the distribution route selection longitudinal seam welding method or transverse joint welding of weld seam;
Step 3, welding rod is chosen according to welding rod selection standard, and drying and processing is carried out to welding rod;
Step 4, welded according to the welding of welding procedure and selection;
Wherein, the welding process requirement includes:
A. welding surroundings requirement:Weather requires non-sleety weather;Wind speed requirement is less than 5m/s;Environment temperature requirement is more than 0 DEG C; Relative humidity requirement is below 80%;
B. weld preheating and the control of interlayer temperature:Weld preheating uses electrical heating, preheating width be Weld pipe mill both sides it is each away from 150mm, preheating temperature is >=125 DEG C, and with tempilstick in Weld pipe mill both sides symmetrical measurement, every weld seam measuring point is no less than three Right, every weld seam must be preheated in welding process, and to ensure that preheating temperature is uniform, interlayer temperature during welding should be controlled 180~200 DEG C;
C. hot dehydrogenation after:Postwelding should carry out dehydrogenation, and using electrical heating, postheat temperature is 180~230 DEG C, during insulation Between 1 hour;
The longitudinal seam welding method is required to include:
D. welded according to segmentation from top to bottom, during using several welders welding simultaneously, speed of welding is consistent, same time weldering The difference of spreading degree must not exceed 300mm;
E. triangle arc manipulation method is used, welding rod is stopped and short arc operation in weld seam both sides, is determined according to the welding number of plies Corresponding welding parameter;
F. every layer of face of weld is filled and led up in crescent, and first layer uses φ 3.2mm welding rod, and first is welded in subinverse Layer, successively thickeies layer since the second layer, and every layer of weldering meat should fill uniform and neat, finally within 3~4mm Capping layer need to be completed disposably, must not undercut;
G. after the shaping of outside groove welding, carbon arc air gouging back chipping is carried out at interior side slope mouth, the weldering meat of first layer is fallen clearly, is used Emery wheel abrades carburized layer, finishing channeling, and bottom radius should be greater than 5mm, finishes rear groove face and carries out 100% magnetic particle inspection, closes Inner side groove welding is carried out after lattice again;
The transverse joint welding is required to include:
H. on to Spherical Tank Shell Plates during seam welding, welded from two toward centre, when to seam welding under Spherical Tank Shell Plates, from middle toward two Weldering, two welding machines weld a seam simultaneously;
I. in girth welding big to equator, using several welders welding simultaneously, Equal round girth, counter clockwise direction constant speed is applied Weldering, same time first layer and the second layer weld length difference must not exceed 300mm, using segmentation in everyone segmentation limit Back welding, multi-pass welding;
J. backing welding is using oval manipulation of electrode, welding rod direction of advance and the inclination angle that weld seam tangential direction is in 30~45 °;
K. more than the second layer welded using pressure road, and every layer must thoroughly scarfing cinder;
The corresponding relation of the number of plies and welding parameter is welded referring to table 1:
Table 1
2. the welding method according to claim 1 for 610U2L material spherical tanks, it is characterised in that the longitudinal seam welding In the requirement of method and transverse joint welding, during using several welders welding simultaneously, it should stagger at welding point with tee seam, and Two welders collect junction and should staggered 50~100mm.
3. the welding method according to claim 1 or 2 for 610U2L material spherical tanks, it is characterised in that in step 1, Groove processing requirement determines the angle of groove according to the thickness of Spherical Tank Shell Plates, and needs to clear up in groove face and both sides 50mm scopes Interior objectionable impurities.
4. the welding method according to claim 3 for 610U2L material spherical tanks, it is characterised in that objectionable impurities includes Iron rust and greasy dirt.
5. the welding method according to claim 1 or 2 for 610U2L material spherical tanks, it is characterised in that in step 3, Welding rod selection standard requires that diffusible hydrogen content is less than 5.0ml/100g in welding rod.
6. the welding method according to claim 1 or 2 for 610U2L material spherical tanks, it is characterised in that in step 3, Drying and processing requirement temperature in 2 hours rises to 350~400 DEG C, and maintains the temperature 1~2 hour, is required in cooling Temperature drop is to 100~150 DEG C in 1 hour, and maintains the temperature at least three hour.
CN201510865990.XA 2015-12-02 2015-12-02 A kind of welding method for 610U2L material spherical tanks Active CN105397241B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510865990.XA CN105397241B (en) 2015-12-02 2015-12-02 A kind of welding method for 610U2L material spherical tanks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510865990.XA CN105397241B (en) 2015-12-02 2015-12-02 A kind of welding method for 610U2L material spherical tanks

Publications (2)

Publication Number Publication Date
CN105397241A CN105397241A (en) 2016-03-16
CN105397241B true CN105397241B (en) 2017-10-13

Family

ID=55463173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510865990.XA Active CN105397241B (en) 2015-12-02 2015-12-02 A kind of welding method for 610U2L material spherical tanks

Country Status (1)

Country Link
CN (1) CN105397241B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106312354B (en) * 2016-10-21 2018-06-05 中国化学工程第六建设有限公司 The welding method of TP347H austenitic stainless steel thick-walled pipes
CN106425052B (en) * 2016-10-31 2018-08-10 北京石油化工学院 A kind of realization arc welding all positon one side welding with back formation method
CN106695150A (en) * 2017-01-25 2017-05-24 江苏岭南发酵设备有限公司 Welding method used for large-size fermentation tank
CN109623106B (en) * 2018-12-26 2020-10-20 常州市乐萌压力容器有限公司 Welding process of semiconductor single crystal furnace cavity
CN111112877A (en) * 2019-12-25 2020-05-08 湖北理工学院 Welding process of 07MnNiMoDR steel spherical tank at-50 DEG C
CN112122884A (en) * 2020-08-25 2020-12-25 上海宝冶冶金工程有限公司 Construction method of duplex stainless steel non-standard tank body
CN113634854A (en) * 2021-08-25 2021-11-12 台州市五洲船业有限公司 Welding process for storage tank of full-pressure liquefied gas transport ship

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1641257A (en) * 2004-12-28 2005-07-20 上海市安装工程有限公司 Low-temperature spherical tank for storing ethylene and its preparing method
CN103464865A (en) * 2013-07-24 2013-12-25 武汉一冶钢结构有限责任公司 Equal-intensity matching welding rod manual welding method for P690QL1 high-intensity steel
CN103521886A (en) * 2013-10-25 2014-01-22 武汉一冶钢结构有限责任公司 Welding method for stainless steel one-side welding double-side forming

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100045071A (en) * 2008-10-23 2010-05-03 대우조선해양 주식회사 Both-sided welding method of butt welding joint with v groove configuration

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1641257A (en) * 2004-12-28 2005-07-20 上海市安装工程有限公司 Low-temperature spherical tank for storing ethylene and its preparing method
CN103464865A (en) * 2013-07-24 2013-12-25 武汉一冶钢结构有限责任公司 Equal-intensity matching welding rod manual welding method for P690QL1 high-intensity steel
CN103521886A (en) * 2013-10-25 2014-01-22 武汉一冶钢结构有限责任公司 Welding method for stainless steel one-side welding double-side forming

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JFE - HITEN610U2L球罐用低温钢焊接工艺研究与工程应用;杨定军等;《焊接技术》;20120930;第41卷(第9期);第49-52页 *
JFE-HITEN610U2L高强钢制球罐的焊接;徐立泉等;《金属加工(热加工)》;20091031(第20期);第57-59页 *

Also Published As

Publication number Publication date
CN105397241A (en) 2016-03-16

Similar Documents

Publication Publication Date Title
CN105397241B (en) A kind of welding method for 610U2L material spherical tanks
CN104741741B (en) A kind of pipe pipe docking all positon automatic TIG welding technique of continuous pipe
CN101774063B (en) Defect repair welding process of stainless steel composite board coating
CN102756235B (en) Field welding repair method especially for larger and penetrating defects in steel casting with heavy wall thickness
CN104816076B (en) A kind of pipe pipe butt weld technologies for steel method of continuous pipe
CN105750708B (en) A kind of heavy wall nickel-base alloy header welding method of girth weld
CN102330034B (en) X65MS steel-grade spiral welded tube for acidic corrosion environment and manufacturing method thereof
CN103231155B (en) Easy-welding high-strength large-thickness steel plate preheating-free gas shielded welding process
CN104858555A (en) Pressure pipeline welding process
CN103920967B (en) Absorption tower welding method
CN105689857A (en) Tower drum manufacturing welding process
CN103170712A (en) Tube socket fillet weld reheat crack prevention method
CN101412136A (en) Welding process of large-sized liquefied natural gas storage tank
CN104002023A (en) Welding process special for thick dissimilar material plate
CN104625322B (en) Large non-standard device thick-plate all-position welding method
CN109454313A (en) A kind of big specification low-alloy steel tube sheet welding plate preparation process
CN102139418A (en) Non-preheating strength gradient matched welding technology for low-alloy high-strength steel with yield strength of 800MPa
CN106002008A (en) Method for welding door frame of ultra-low-temperature high-power wind turbine tower
CN103658958A (en) Resistance spot welding of aluminum to aluminum and steel to steel
CN106180981A (en) The CO of super large caliber steel pipe2gas protection welding process
CN102330032B (en) Acid-proof X70MS steel-grade spiral welded pipe and manufacturing method thereof
CN110449698A (en) A kind of 6-16mm welding method for steel plates
CN106346115A (en) Method for repairing inside weld seam of U rib plate
CN105478964A (en) Surfacing welding technology for large-area anti-corrosion layers of tube plate
CN101554680A (en) Explosive welding method for SUS444 ferrite stainless steel composite steel plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant