CN106180981A - The CO of super large caliber steel pipe2gas protection welding process - Google Patents

The CO of super large caliber steel pipe2gas protection welding process Download PDF

Info

Publication number
CN106180981A
CN106180981A CN201610643456.9A CN201610643456A CN106180981A CN 106180981 A CN106180981 A CN 106180981A CN 201610643456 A CN201610643456 A CN 201610643456A CN 106180981 A CN106180981 A CN 106180981A
Authority
CN
China
Prior art keywords
welding
weld
steel pipe
preheating
super large
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610643456.9A
Other languages
Chinese (zh)
Inventor
张鹏忠
陈涛涛
李东东
周雪娇
刘子田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201610643456.9A priority Critical patent/CN106180981A/en
Publication of CN106180981A publication Critical patent/CN106180981A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K33/00Specially-profiled edge portions of workpieces for making soldering or welding connections; Filling the seams formed thereby
    • B23K33/004Filling of continuous seams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2101/00Articles made by soldering, welding or cutting
    • B23K2101/04Tubular or hollow articles
    • B23K2101/06Tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K2103/00Materials to be soldered, welded or cut
    • B23K2103/02Iron or ferrous alloys
    • B23K2103/04Steel or steel alloys

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Arc Welding In General (AREA)

Abstract

A kind of CO of super large caliber steel pipe2Gas protection welding process, comprises the steps: 1. to weld front preparation: by clean for the eliminating impurities in the range of all plan faces of weld and groove both sides each 50~100mm;2. tack welding: first preheat the steel pipe of welding, during tack welding centered by weld, is preheating in the range of steel tube head at least 150mm;And welding position should be away from end of welding bead 30 40mm, its length is at more than 50mm, and spacing is 130 160mm;3. weld preheating: first steel pipe seam is preheated, preheating temperature 100~150 DEG C, then carry out the temperature measuring of weld seam;4. the selection of welding parameter includes: gage of wire, arc voltage, speed of welding, the elongation of welding wire, current polarity, gas flow, post weld heat treatment parameter;5. steel-pipe welding: weld preheating, employing symmetrical welding;Welding direction by centre to both sides welding;Post weld heat treatment.The present invention is simple to operate, be completely embedded, and can reduce the generation of welding deformation and weld crack.

Description

The CO of super large caliber steel pipe2Gas protection welding process
Technical field
The present invention relates to the welding method of a kind of steel pipe, particularly to the CO of a kind of super large caliber steel pipe2Gas shielded arc welding Connect technique.
Background technology
Long 12m, the above steel pipe of external diameter 3.22m weld at the scene, and the quality of its weld seam can be by environment, steel pipe docking port The discrepancy in elevation and the restriction of displacement.At present, generally use manual metal-arc welding and submerged-arc welding, but both welding methods have following defects that 1, higher due to temperature, steel pipe is easy thermal expansion in welding process, causes occurring that after last docking uneven thermal expansion deforms, Often such that steel pipe does not docks.2, longer due to steel pipe, deadweight is relatively big, there will be the most reciprocity discrepancy in elevation in welding process, Thus cause weld cracking, even more so that pipe deformation., there is top overhead welding in 3, steel pipe seam circular arc docking, technical staff is very The most complete difficult pipe end butt welding that completes works, as improper in controlled in welding process, easily causes docking port stress occur Concentration causes nozzle distortion, the defective situation of crank detection test.
Summary of the invention
In order to solve problems of the prior art, the present invention provides the CO2 gas shield of a kind of super large caliber steel pipe Welding procedure, this technological operation is simple, be completely embedded, and can reduce the generation of welding deformation and weld crack.
As above conceiving, the technical solution used in the present invention is as follows: the CO of a kind of super large caliber steel pipe2Gas shielded welding work Skill, it is characterised in that: comprise the steps:
1. prepare before weldering: by clean for the eliminating impurities in the range of all plan faces of weld and groove both sides each 50~100mm;
2. tack welding: first preheat the steel pipe of welding, during tack welding centered by weld, away from steel tube head Preheat in the range of at least 150mm;And welding position should be away from end of welding bead 30-40mm, its length in more than 50mm, spacing is 130-160mm;
3. weld preheating: before formal welding, first steel pipe seam is preheated, preheating temperature 100~150 DEG C, then Carry out the temperature measuring of weld seam;
4. the selection of welding parameter includes: gage of wire, arc voltage, speed of welding, the elongation of welding wire, electric current pole Property, gas flow, post weld heat treatment parameter;
5. steel-pipe welding: weld preheating, employing symmetrical welding;Welding direction by centre to both sides welding;Post weld heat treatment.
Above-mentioned tack welding uses carbon-dioxide arc welding.
The welding position thickness of above-mentioned tack welding is less than 1/2nd of formal weld bead height, less than 8mm.
Above-mentioned weld preheating uses the mode of electric heater to heat.
The temperature measuring width of above-mentioned weld seam is each 3 times of steel plate thickness scopes in weld seam both sides, and >=100mm, away from weld seam Symmetrical measurement at each 50mm of centrage, every weld measurement point >=3 are right.
The present invention can improve the welding quality of super large caliber steel pipe, it is ensured that fastener for connection is firm, steel-pipe welding is indeformable.And And method rationally, processing ease, construction operation difficulty can be reduced, improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the groove type figure at pipe fitting two ends;
Fig. 2 is steel pipe circular seam welding sequence schematic diagram.
Detailed description of the invention
A kind of CO of super large caliber steel pipe2Gas protection welding process, thickness of steel pipe 22mm, outer diameter of steel pipes 3220mm, long Degree 12m: comprise the following steps.
(1) prepare before weldering
Oxide skin, rust, greasy dirt and other foreign material in the range of all plan faces of weld and groove both sides each 50~100mm should be clear Except clean, each layer of welding bead also should be cleared up after being soldered in time, can weld after passed examination again.
(2) tack welding
Tack welding uses carbon dioxide gas arc welding.First the steel pipe of welding is preheated, should be with weldering during tack welding Centered by meeting place, should preheat in the range of steel tube head at least 150mm, welding position should be away from end of welding bead 35mm, its Length should be at more than 50mm, and spacing is 150mm, thickness no more than 1/2nd of formal weld bead height, the thickest no more than 8mm。
(3) weld preheating
Before formal welding, first preheating steel pipe seam, preheating temperature 100~150 DEG C, weld preheating uses electricity to add The mode of hot device heats, and the surface thermometer using supervisor to agree to measures temperature, and measuring width is each 3 times of weld seam both sides Steel plate thickness scope, and not less than 100mm, at symmetrical measurement at each 50mm of axis of a weld, every weld measurement point should not Right less than 3.
(4) selection of welding parameter includes: gage of wire, arc voltage, speed of welding, the elongation of welding wire, electric current pole Property, gas flow, post weld heat treatment parameter
(5) selection of welding parameter
The first, the selection of gage of wire: for avoiding seam organization thick, impacts toughness and declines, it is necessary to use little rule Model welds.The steel-pipe welding of this engineering selects the welding wire of 2.0mm, selects the mode of fine droplets transition to weld.
The second, arc voltage: optimal arc voltage is relevant with factors such as the size of electric current, positions.During the welding of steel pipe The arc voltage selected is 40V.
3rd, speed of welding: speed of welding is too high, can destroy gas shield effect, and appearance of weld is bad, and weld seam is cooled Hurry up, cause reducing plastic property of weld bead, toughness.Speed of welding is too low easily makes arc burn, forms thick seam organization.Speed of welding is selected Use 20m/h.
4th, the elongation of welding wire: splash for reducing, make electrode extension less as far as possible, but with the increasing of welding current Greatly, its extension elongation should suitably increase.20mm is selected during welding.
5th, current polarity: carbon dioxide gas arc welding mainly uses DC reverse connection method.
6th, gas flow: gas flow directly affects gas shield effect.18L/min is selected during steel-pipe welding.
7th, post weld heat treatment parameter: for reducing welding residual stress, reduce the hydrogen content in weld seam, improve weld seam Metal structure and performance, answer butt welded seam to carry out heat treatment at postwelding.Heat treatment temperature is: 600 DEG C~640 DEG C, and constant temperature time is 2 Hour.
(6) steel-pipe welding
The first, weld preheating: before welding, first preheats, and constant temperature welded after 30 minutes.
The second, welding: for preventing welding deformation, use six people's symmetrical weldings, welding direction by centre to both sides welding.? In welding during mouth, ground floor to the second layer must use little specification to weld, because its welding is affect welding deformation main Reason.After the welding second layer terminates, the back side uses carbon arc air gouging back chipping, and back chipping must carry out mechanical beating by butt welded seam after terminating Mill, the carburizing on trimming surface, expose metallic luster, prevent surface carbonation from effectively causing crackle.Collar extension point two-layer is soldered, After the remainder of mouth in weldering again.When welding the second layer, welding direction should be in opposite direction with ground floor, by that analogy.Every layer Welding point should stagger 15mm~20mm.
3rd, post weld heat treatment: welding point should carry out post weld heat treatment at postwelding within 12 hours.
4th, weld seam shortcoming processes and repair welding: the internal shortcoming of weld seam should use emery wheel or carbon arc air gouging method to remove, and repaiies Wear into the groove beneficially welded.Should check before soldering, as lacked for crackle, then magnetic powder or permeating method should be used to detect, Confirm that crackle has eliminated, can soldering.Tube wall surface pit depth is more than the 10% of thickness of slab or more than 2mm, should carry out soldering, Before soldering, reconditioning pit is answered to be beneficial to welding, as preheated and after-baking.After soldering, should polish at soldering, check for splitting Stricture of vagina.High-strength steel also should be carried out magnetic powder or Liquid penetrant testing, do not allow to there is crackle.

Claims (5)

1. the CO of a super large caliber steel pipe2Gas protection welding process, it is characterised in that: comprise the steps:
1. prepare before weldering: by clean for the eliminating impurities in the range of all plan faces of weld and groove both sides each 50~100mm;
2. tack welding: first preheat the steel pipe of welding, during tack welding centered by weld, away from steel tube head at least Preheat in the range of 150mm;And welding position should be away from end of welding bead 30-40mm, its length is at more than 50mm, and spacing is 130- 160mm;
3. weld preheating: before formal welding, first steel pipe seam is preheated, preheating temperature 100~150 DEG C, then carry out The temperature measuring of weld seam;
4. the selection of welding parameter includes: gage of wire, arc voltage, speed of welding, the elongation of welding wire, current polarity, gas Body flow, post weld heat treatment parameter;
5. steel-pipe welding: weld preheating, employing symmetrical welding;Welding direction by centre to both sides welding;Post weld heat treatment.
The CO of super large caliber steel pipe the most according to claim 12Gas protection welding process, it is characterised in that: above-mentioned location Weldering uses carbon-dioxide arc welding.
The CO of super large caliber steel pipe the most according to claim 12Gas protection welding process, it is characterised in that: above-mentioned location The welding position thickness of weldering is less than 1/2nd of formal weld bead height, less than 8mm.
The CO of super large caliber steel pipe the most according to claim 12Gas protection welding process, it is characterised in that: before above-mentioned weldering Preheating uses the mode of electric heater to heat.
The CO of super large caliber steel pipe the most according to claim 12Gas protection welding process, it is characterised in that: above-mentioned weld seam Temperature measuring width be each 3 times of steel plate thickness scopes in weld seam both sides, and >=100mm, right at each 50mm of axis of a weld Claiming to measure, every weld measurement point >=3 are right.
CN201610643456.9A 2016-08-05 2016-08-05 The CO of super large caliber steel pipe2gas protection welding process Pending CN106180981A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610643456.9A CN106180981A (en) 2016-08-05 2016-08-05 The CO of super large caliber steel pipe2gas protection welding process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610643456.9A CN106180981A (en) 2016-08-05 2016-08-05 The CO of super large caliber steel pipe2gas protection welding process

Publications (1)

Publication Number Publication Date
CN106180981A true CN106180981A (en) 2016-12-07

Family

ID=57513799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610643456.9A Pending CN106180981A (en) 2016-08-05 2016-08-05 The CO of super large caliber steel pipe2gas protection welding process

Country Status (1)

Country Link
CN (1) CN106180981A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106735758A (en) * 2017-01-03 2017-05-31 苏州长风航空电子有限公司 A kind of two-way argon arc welding method for preventing from welding deformation
CN106895252A (en) * 2017-03-10 2017-06-27 广州增立钢管结构股份有限公司 A kind of steel pipe and its manufacture method with blocking magnetic conduction construction
CN107511566A (en) * 2017-10-24 2017-12-26 徐州市华圆机械厂 A kind of welding method for being heat-treated destressing
CN108907417A (en) * 2018-07-20 2018-11-30 四川汇源钢建装配建筑有限公司 A kind of steel plate interconnection method and welding steel
CN109332854A (en) * 2018-11-30 2019-02-15 国家电网有限公司 Technique suitable for penstock automatic welding high-intensitive in water-conveyance tunnel
CN110508954A (en) * 2019-08-16 2019-11-29 江苏海力风电设备科技股份有限公司 A kind of wind power foundation thin plate submerged-arc welding process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0205828A1 (en) * 1985-06-10 1986-12-30 Hoesch Aktiengesellschaft Method and use of a steel for manufacturing steel pipes with a high resistance to acid gases
CN101301699A (en) * 2007-11-23 2008-11-12 鞍钢建设集团有限公司 Large caliber aluminium alloy pipeline non-pad tungsten electrode argon arc single face welding and double face shaping method
CN101811214A (en) * 2009-12-21 2010-08-25 南通中远船务工程有限公司 Slab welding process
CN101850460A (en) * 2010-05-21 2010-10-06 中国石化集团第五建设公司 Welding process of 12Cr1MoV high-pressure pipeline CO2 semiautomatic or automatic gas shielded welding
CN102554402A (en) * 2012-01-18 2012-07-11 江苏中核利柏特股份有限公司 Welding and heat treatment processes of large-diameter and thick-wall nuclear process pipes
CN102825367A (en) * 2012-09-19 2012-12-19 常熟天地煤机装备有限公司 Welding method for prolonging service life of high-strength metal shell
CN105312742A (en) * 2014-07-17 2016-02-10 刘振宇 Welding technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0205828A1 (en) * 1985-06-10 1986-12-30 Hoesch Aktiengesellschaft Method and use of a steel for manufacturing steel pipes with a high resistance to acid gases
CN101301699A (en) * 2007-11-23 2008-11-12 鞍钢建设集团有限公司 Large caliber aluminium alloy pipeline non-pad tungsten electrode argon arc single face welding and double face shaping method
CN101811214A (en) * 2009-12-21 2010-08-25 南通中远船务工程有限公司 Slab welding process
CN101850460A (en) * 2010-05-21 2010-10-06 中国石化集团第五建设公司 Welding process of 12Cr1MoV high-pressure pipeline CO2 semiautomatic or automatic gas shielded welding
CN102554402A (en) * 2012-01-18 2012-07-11 江苏中核利柏特股份有限公司 Welding and heat treatment processes of large-diameter and thick-wall nuclear process pipes
CN102825367A (en) * 2012-09-19 2012-12-19 常熟天地煤机装备有限公司 Welding method for prolonging service life of high-strength metal shell
CN105312742A (en) * 2014-07-17 2016-02-10 刘振宇 Welding technology

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106735758A (en) * 2017-01-03 2017-05-31 苏州长风航空电子有限公司 A kind of two-way argon arc welding method for preventing from welding deformation
CN106895252A (en) * 2017-03-10 2017-06-27 广州增立钢管结构股份有限公司 A kind of steel pipe and its manufacture method with blocking magnetic conduction construction
CN107511566A (en) * 2017-10-24 2017-12-26 徐州市华圆机械厂 A kind of welding method for being heat-treated destressing
CN108907417A (en) * 2018-07-20 2018-11-30 四川汇源钢建装配建筑有限公司 A kind of steel plate interconnection method and welding steel
CN109332854A (en) * 2018-11-30 2019-02-15 国家电网有限公司 Technique suitable for penstock automatic welding high-intensitive in water-conveyance tunnel
CN110508954A (en) * 2019-08-16 2019-11-29 江苏海力风电设备科技股份有限公司 A kind of wind power foundation thin plate submerged-arc welding process

Similar Documents

Publication Publication Date Title
CN106180981A (en) The CO of super large caliber steel pipe2gas protection welding process
CN104384677B (en) A kind of super-thick steel plate welding method
CN102756235B (en) Field welding repair method especially for larger and penetrating defects in steel casting with heavy wall thickness
CN109175617A (en) A kind of high steam pipeline welding method
CN103212913B (en) A kind of group of large diameter thin wall corrugated stainless steel tubing to and welding method
CN104801839B (en) The welding procedure of austenitic stainless steel and chrome molybdenum heat resisting steel
CN101850460A (en) Welding process of 12Cr1MoV high-pressure pipeline CO2 semiautomatic or automatic gas shielded welding
CN103962791A (en) Welding repair method for large-sized heat-resistant steel castings
CN104741741A (en) Automatic tube butt joint all-position TIG welding technology for coiled tubing
CN105728908A (en) Field welding method of domestic A335 P91 high-pressure thick-wall pipe
CN105195872A (en) Double-sided submerged arc back-chipping-free welding technology for pipeline steel
CN103920967B (en) Absorption tower welding method
CN102363239B (en) Automatic narrow-gap submerged arc welding process for all-welded fixed ball valve with medium and large calibers
CN104002023A (en) Welding process special for thick dissimilar material plate
CN105665898A (en) Automatic submerged arc welding method for pearlitic heat-resistant steel composite board
CN103464873B (en) Electric-arc welding process for Ti alloy and nickel-base high-temperature alloy
CN110355449A (en) A kind of welding procedure method of Low background stainless steel 06Cr19Ni10 structure
CN107984105A (en) The welding procedure of wind power tower S355NL steel
CN104625322B (en) Large non-standard device thick-plate all-position welding method
CN102744553A (en) Repair method for transversal cracks of welding seams of thick-wall submerged arc welded pipe
CN102267000B (en) Metal active gas (MAG) welding method for butting quenched low-alloy super-high-strength steel and high-quality carbon structural steel
CN104526133A (en) Method for preventing tearing of metal welding layers
CN104607827B (en) A kind of cast steel that prevents welds the method cracked with steel
CN107552987A (en) Pipeline welding process
CN107584194A (en) The welding method of high intensity crack arrest steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination