CN105390976A CN201510744132.XA CN201510744132A CN105390976A CN 105390976 A CN105390976 A CN 105390976A CN 201510744132 A CN201510744132 A CN 201510744132A CN 105390976 A CN105390976 A CN 105390976A
Authority
CN
China
Prior art keywords
roller
combined
electric power
pulley
bottom bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510744132.XA
Other languages
Chinese (zh)
Inventor
蒙国珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Ziyou Electrical Equipment Co Ltd
Original Assignee
Guangxi Ziyou Electrical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Ziyou Electrical Equipment Co Ltd filed Critical Guangxi Ziyou Electrical Equipment Co Ltd
Priority to CN201510744132.XA priority Critical patent/CN105390976A/en
Publication of CN105390976A publication Critical patent/CN105390976A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Handcart (AREA)

Abstract

The invention discloses a cable erecting pulley for electric power engineering construction. The cable erecting pulley comprises two bottom rods arranged symmetrically; two end portions are arranged at the top of each bottom rod symmetrically; and a U-shaped support rod is arranged between the two symmetric end portions in a cooperative mode. Two moving sleeves are arranged on the body of each support rod; and a support rod is arranged between the two moving sleeves in a cooperative mode. A rotating shaft is arranged between the two support rods in a cooperating mode; and a pulley wheel is arranged on the rotating shaft in a cooperative mode. A rolling wheel is arranged at one side of each bottom rod and a first rolling wheel is arranged at the other end of the bottom rod, wherein the diameter of the first rolling wheel is smaller than that of the rolling wheel. Besides, L-shaped fixed clamp claws are arranged at outer rings of the first rolling wheels. According to the pulley, when transporting or position adjusting is carried out, the rolling wheels are used as pivoting points to make rotation and support the pulley to move; when moving to a designated site, the pulley is buckled on the ground by the fixed clamp claws. Therefore, movement of the pulley during cable traction can be effectively avoided.

Description

The cable erection coaster of Phase of Electric Power Projects
Technical field
The present invention relates to a kind of cable erection coaster of Phase of Electric Power Projects.
Background technology
In Phase of Electric Power Projects; often can need to use coaster; the traction of cable is completed by coaster; coaster of the prior art is in order to ensure the stability in distraction procedure; therefore be that roller is not set mostly; therefore needed manually to carry coaster before traction, very heavy, comparatively inconvenience.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of cable erection coaster of Phase of Electric Power Projects, this device carry out carrying or position adjustments time, only needing with roller is that axle point rotates, carry out position by this device of roller supporting to move, when moving to appointed place, by stationary jaw buckle on the ground, the movement of making cost apparatus when cable draws can effectively be avoided, simple to operation, the labour intensity reduced a staff.
For solving the problem, the present invention adopts following technical scheme:
A kind of cable erection coaster of Phase of Electric Power Projects, comprise two symmetrically arranged bottom bars, described bottom bar is symmetrically arranged with two fixed covers, side link is combined with between described fixed cover on two described bottom bars, the top of described bottom bar is symmetrically arranged with two ends, the cradling piece of U-shaped is combined with between two symmetrically arranged described ends, the second screw is combined with between described cradling piece and described end, the shaft of described cradling piece is provided with two movable sleeves, the first screw is combined with between described movable sleeve and described cradling piece, support bar is combined with between two described movable sleeves, rotating shaft is combined with between two described support bars, described rotating shaft is combined with pulley, the side of described bottom bar is provided with roller, the first rotating shaft is combined with between described roller and described bottom bar, the other end of described bottom bar is provided with the first roller, the diameter of described first roller is less than described roller diameter, the outer ring of described first roller is provided with the stationary jaw of a L shape, the first rotating shaft is combined with between described first roller and described bottom bar, the bottom of described bottom bar, described first scroll wheel positions place is provided with handlebar stem.
As preferred technical scheme, described bottom bar is hollow steel rod member, is welded and fixed between described bottom bar and described end.
As preferred technical scheme, described pulley has spoke hole.
As preferred technical scheme, the outer ring of described roller is provided with wheel periderm, the outer ring of described first roller is provided with first round periderm.
As preferred technical scheme, the top of described stationary jaw is provided with locating piece, and the top of described locating piece is provided with the first magnetic patch, and the bottom of described handlebar stem is provided with the second magnetic patch coordinating described first magnetic patch.
As preferred technical scheme, described handlebar stem has handle slot.
As preferred technical scheme, described stationary jaw is taper away from that one end of described first roller.
The invention has the beneficial effects as follows: this device carry out carrying or position adjustments time, only needing with roller is that axle point rotates, carry out position by this device of roller supporting to move, when moving to appointed place, by stationary jaw buckle on the ground, effectively can avoid the movement of making cost apparatus when cable draws, simple to operation, the labour intensity reduced a staff, the structure of this device is comparatively simple, cost is comparatively cheap, is applicable to promoting the use of.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described in detail, can be easier to make advantages and features of the invention be readily appreciated by one skilled in the art, thus more explicit defining is made to protection scope of the present invention.
Consult the cable erection coaster of a kind of Phase of Electric Power Projects shown in Fig. 1, comprise two symmetrically arranged bottom bars 1, described bottom bar 1 is symmetrically arranged with two fixed covers 2, side link (not shown) is combined with between described fixed cover 2 on two described bottom bars 1, the top of described bottom bar 1 is symmetrically arranged with two ends 3, the cradling piece 4 of U-shaped is combined with between two symmetrically arranged described ends 3, the second screw 301 is combined with between described cradling piece 4 and described end 3, the shaft of described cradling piece 4 is provided with two movable sleeves 5, the first screw 501 is combined with between described movable sleeve 5 and described cradling piece 4, support bar 6 is combined with between two described movable sleeves 5, rotating shaft 7 is combined with between two described support bars 6, described rotating shaft 7 is combined with pulley 8, the side of described bottom bar 1 is provided with roller 9, the first rotating shaft 901 is combined with between described roller 9 and described bottom bar 1, the other end of described bottom bar 1 is provided with the first roller 10, the diameter of described first roller 10 is less than described roller 9 diameter, the outer ring of described first roller 10 is provided with the stationary jaw 11 of a L shape, the first rotating shaft 13 is combined with between described first roller 10 and described bottom bar 1, the bottom of described bottom bar 1, described first roller 10 position is provided with handlebar stem 12.
A preferred embodiment in the present invention, described bottom bar 1 is hollow steel rod member, is welded and fixed between described bottom bar 1 and described end 3.
A preferred embodiment in the present invention, described pulley 8 has spoke hole 811.
A preferred embodiment in the present invention, the outer ring of described roller 9 is provided with wheel periderm 911, the outer ring of described first roller 10 is provided with first round periderm 121.
A preferred embodiment in the present invention, the top of described stationary jaw 11 is provided with locating piece 131, and the top of described locating piece 131 is provided with the first magnetic patch 141, and the bottom of described handlebar stem 12 is provided with the second magnetic patch 151 coordinating described first magnetic patch 141.
A preferred embodiment in the present invention, described handlebar stem 12 has handle slot 161.
A preferred embodiment in the present invention, described stationary jaw 11 is taper away from that one end of described first roller 10.
The invention has the beneficial effects as follows: this device carry out carrying or position adjustments time, only needing with roller is that axle point rotates, carry out position by this device of roller supporting to move, when moving to appointed place, by stationary jaw buckle on the ground, effectively can avoid the movement of making cost apparatus when cable draws, simple to operation, the labour intensity reduced a staff, the structure of this device is comparatively simple, cost is comparatively cheap, is applicable to promoting the use of.
More than show and describe general principle of the present invention, principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and specification just illustrates principle of the present invention; the present invention also has various changes and modifications without departing from the spirit and scope of the present invention, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection range is defined by appending claims and equivalent thereof.

Claims (7)

1. the cable erection coaster of a Phase of Electric Power Projects, it is characterized in that: comprise two symmetrically arranged bottom bars, described bottom bar is symmetrically arranged with two fixed covers, side link is combined with between described fixed cover on two described bottom bars, the top of described bottom bar is symmetrically arranged with two ends, the cradling piece of U-shaped is combined with between two symmetrically arranged described ends, the second screw is combined with between described cradling piece and described end, the shaft of described cradling piece is provided with two movable sleeves, the first screw is combined with between described movable sleeve and described cradling piece, support bar is combined with between two described movable sleeves, rotating shaft is combined with between two described support bars, described rotating shaft is combined with pulley, the side of described bottom bar is provided with roller, the first rotating shaft is combined with between described roller and described bottom bar, the other end of described bottom bar is provided with the first roller, the diameter of described first roller is less than described roller diameter, the outer ring of described first roller is provided with the stationary jaw of a L shape, the first rotating shaft is combined with between described first roller and described bottom bar, the bottom of described bottom bar, described first scroll wheel positions place is provided with handlebar stem.
2. the cable erection coaster of Phase of Electric Power Projects according to claim 1, is characterized in that: described bottom bar is hollow steel rod member, is welded and fixed between described bottom bar and described end.
3. the cable erection coaster of Phase of Electric Power Projects according to claim 1, is characterized in that: described pulley has spoke hole.
4. the cable erection coaster of Phase of Electric Power Projects according to claim 1, is characterized in that: the outer ring of described roller is provided with wheel periderm, the outer ring of described first roller is provided with first round periderm.
5. the cable erection coaster of Phase of Electric Power Projects according to claim 1, it is characterized in that: the top of described stationary jaw is provided with locating piece, the top of described locating piece is provided with the first magnetic patch, and the bottom of described handlebar stem is provided with the second magnetic patch coordinating described first magnetic patch.
6. the cable erection coaster of Phase of Electric Power Projects according to claim 1, is characterized in that: described handlebar stem has handle slot.
7. the cable erection coaster of Phase of Electric Power Projects according to claim 1, is characterized in that: described stationary jaw is taper away from that one end of described first roller.
CN201510744132.XA 2015-11-06 2015-11-06 Cable erecting pulley for electric power engineering construction Pending CN105390976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510744132.XA CN105390976A (en) 2015-11-06 2015-11-06 Cable erecting pulley for electric power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510744132.XA CN105390976A (en) 2015-11-06 2015-11-06 Cable erecting pulley for electric power engineering construction

Publications (1)

Publication Number Publication Date
CN105390976A true CN105390976A (en) 2016-03-09

Family

ID=55422951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510744132.XA Pending CN105390976A (en) 2015-11-06 2015-11-06 Cable erecting pulley for electric power engineering construction

Country Status (1)

Country Link
CN (1) CN105390976A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106241487A (en) * 2016-08-31 2016-12-21 国网河南襄城县供电公司 Electrical lead actinobacillus device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201868796U (en) * 2010-12-04 2011-06-15 中铁建电气化局集团北方工程有限公司 Movable paying-off frame with easy disassembly and assembly
KR200466893Y1 (en) * 2011-12-23 2013-05-13 대우조선해양 주식회사 Jig for cable drum
CN104071198A (en) * 2014-06-27 2014-10-01 国家电网公司 Server conveying and installing vehicle
CN104986198A (en) * 2015-07-16 2015-10-21 苏州胜信光电科技有限公司 Cable reel uncoiling cart

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201868796U (en) * 2010-12-04 2011-06-15 中铁建电气化局集团北方工程有限公司 Movable paying-off frame with easy disassembly and assembly
KR200466893Y1 (en) * 2011-12-23 2013-05-13 대우조선해양 주식회사 Jig for cable drum
CN104071198A (en) * 2014-06-27 2014-10-01 国家电网公司 Server conveying and installing vehicle
CN104986198A (en) * 2015-07-16 2015-10-21 苏州胜信光电科技有限公司 Cable reel uncoiling cart

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106241487A (en) * 2016-08-31 2016-12-21 国网河南襄城县供电公司 Electrical lead actinobacillus device

Similar Documents

Publication Publication Date Title
CN207204886U (en) A kind of decoiling equipment of uncoiler
CN105390976A (en) Cable erecting pulley for electric power engineering construction
CN106944791A (en) A kind of tie hoop processing of circular steel reinforcement cage and welding equipment
CN206244110U (en) A kind of steel band unwinding device
CN110980399A (en) Power cable pay-off device and use method thereof
CN107954252A (en) A kind of curl cable laying tool
CN204396522U (en) Wire drawing and paying frame
CN203922326U (en) Wire draw off gear
CN104209771A (en) Mobile lifting platform
CN203833394U (en) Labor-saving winding tool flexible in winding and unwinding
CN205341893U (en) Turnover machine
CN204528874U (en) Cable pipe box pay off rack in a kind of road construction
EP2992976A1 (en) Mobile bending device
CN205851603U (en) A kind of straightener of roller
CN205771665U (en) Die-cutting machine device for discharging
CN103646725A (en) Cable doubling apparatus
CN203582381U (en) Crane special for use in machining production
CN207375467U (en) A kind of pay off rack easy to remove
CN208686404U (en) Arch clamping device and tunnel arch Operation Van
CN203946675U (en) A kind of pay off rack
CN105322466A (en) Pay-off reel vehicle for laying electric wires and cables
CN105151899A (en) Electric power wire winding device
CN205869124U (en) Can align device of multiple length roller
CN205499011U (en) Carrying device of robot
CN202922142U (en) Fixing device for welding of drill bit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160309