CN105389436A - 一种输电塔带电加固补强方法 - Google Patents
一种输电塔带电加固补强方法 Download PDFInfo
- Publication number
- CN105389436A CN105389436A CN201510783951.5A CN201510783951A CN105389436A CN 105389436 A CN105389436 A CN 105389436A CN 201510783951 A CN201510783951 A CN 201510783951A CN 105389436 A CN105389436 A CN 105389436A
- Authority
- CN
- China
- Prior art keywords
- reinforcement
- electric transmission
- pole tower
- transmission pole
- angle steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 143
- 238000000034 method Methods 0.000 title claims abstract description 38
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 12
- 238000005728 strengthening Methods 0.000 title claims description 16
- 230000002787 reinforcement Effects 0.000 claims abstract description 82
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 72
- 239000010959 steel Substances 0.000 claims abstract description 72
- 230000008878 coupling Effects 0.000 claims abstract description 17
- 238000010168 coupling process Methods 0.000 claims abstract description 17
- 238000005859 coupling reaction Methods 0.000 claims abstract description 17
- 238000004364 calculation method Methods 0.000 claims description 28
- 238000013461 design Methods 0.000 claims description 20
- 230000003287 optical effect Effects 0.000 claims description 8
- 230000000694 effects Effects 0.000 claims description 7
- 238000005452 bending Methods 0.000 claims description 5
- 238000004458 analytical method Methods 0.000 claims description 4
- 238000006073 displacement reaction Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 claims description 2
- 239000012212 insulator Substances 0.000 claims 2
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 claims 2
- 238000007596 consolidation process Methods 0.000 claims 1
- 238000005259 measurement Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 14
- 230000006835 compression Effects 0.000 description 6
- 238000007906 compression Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000006378 damage Effects 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 206010033799 Paralysis Diseases 0.000 description 2
- 239000003245 coal Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 231100000817 safety factor Toxicity 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000002301 combined effect Effects 0.000 description 1
- 230000009916 joint effect Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
- Wind Motors (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510783951.5A CN105389436B (zh) | 2015-11-16 | 2015-11-16 | 一种输电塔带电加固补强方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510783951.5A CN105389436B (zh) | 2015-11-16 | 2015-11-16 | 一种输电塔带电加固补强方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105389436A true CN105389436A (zh) | 2016-03-09 |
CN105389436B CN105389436B (zh) | 2018-08-17 |
Family
ID=55421720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510783951.5A Active CN105389436B (zh) | 2015-11-16 | 2015-11-16 | 一种输电塔带电加固补强方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105389436B (zh) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106250627A (zh) * | 2016-07-30 | 2016-12-21 | 青岛理工大学 | 一种角钢加固开裂箱型钢柱角钢长度的确定方法 |
CN108532980A (zh) * | 2018-04-10 | 2018-09-14 | 南方电网科学研究院有限责任公司 | 一种输电塔的修复方法及装置 |
CN108824837A (zh) * | 2018-08-10 | 2018-11-16 | 山东奥能电力科技有限公司 | 一种应用于77型输电铁塔的整体加固补强防腐结构 |
CN108952302A (zh) * | 2018-08-28 | 2018-12-07 | 国网山东省电力公司电力科学研究院 | 一种输电角钢塔塔腿主材弯曲的加固装置及加固方法 |
CN109033704A (zh) * | 2018-08-24 | 2018-12-18 | 国网山东省电力公司电力科学研究院 | 一种塌陷区铁塔塔腿不均匀沉降处治方法 |
CN109711033A (zh) * | 2018-12-22 | 2019-05-03 | 唐山高压电瓷有限公司 | 一种特高压支柱瓷绝缘子用金属附件结构设计方法 |
CN109815529A (zh) * | 2018-12-13 | 2019-05-28 | 重庆顺泰铁塔制造有限公司 | 角钢-节点板连接节点的设计方法 |
CN109885847A (zh) * | 2018-04-28 | 2019-06-14 | 广东电网有限责任公司 | 一种保底电网输电线路的防风强度计算及杆塔加固方法 |
CN112434456A (zh) * | 2020-11-26 | 2021-03-02 | 国网江西省电力有限公司建设分公司 | 一种输电线路塔型力学薄弱环节计算及加固方法 |
CN113054606A (zh) * | 2021-05-13 | 2021-06-29 | 广东电网有限责任公司湛江供电局 | 一种基于粘滞阻尼器的输电塔风致振动控制方法及设备 |
CN114969898A (zh) * | 2022-05-05 | 2022-08-30 | 贵州电网有限责任公司 | 一种500kV输电线路铁塔覆冰条件下加固措施方案选择方法 |
CN115387967A (zh) * | 2022-06-29 | 2022-11-25 | 华电电力科学研究院有限公司 | 塔筒应力检测测点的布置方法及应力分析方法 |
CN118886140A (zh) * | 2024-09-27 | 2024-11-01 | 国网山东省电力公司电力科学研究院 | 输电角钢塔插入式塔腿加固方法、系统、介质及设备 |
CN119221753A (zh) * | 2024-12-04 | 2024-12-31 | 国网山东省电力公司电力科学研究院 | 一种输电角钢塔复杂节点加固件结构及其制备方法 |
CN119244070A (zh) * | 2024-12-04 | 2025-01-03 | 国网山东省电力公司电力科学研究院 | 一种适用于输电塔复杂节点的补强加固方法及装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101781937A (zh) * | 2010-03-11 | 2010-07-21 | 同济大学 | 既有输电塔抗冰加固改造方法 |
CN102535874A (zh) * | 2012-01-11 | 2012-07-04 | 同济大学 | 高压及超高压输电线路铁塔抗风加固改造方法 |
CN102930103A (zh) * | 2012-11-01 | 2013-02-13 | 武汉大学 | 一种基于有限元力学分析的杆塔薄弱构件定位方法 |
-
2015
- 2015-11-16 CN CN201510783951.5A patent/CN105389436B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101781937A (zh) * | 2010-03-11 | 2010-07-21 | 同济大学 | 既有输电塔抗冰加固改造方法 |
CN102535874A (zh) * | 2012-01-11 | 2012-07-04 | 同济大学 | 高压及超高压输电线路铁塔抗风加固改造方法 |
CN102930103A (zh) * | 2012-11-01 | 2013-02-13 | 武汉大学 | 一种基于有限元力学分析的杆塔薄弱构件定位方法 |
Non-Patent Citations (2)
Title |
---|
张峰 等: "基于塔_线体系的输电塔覆冰加固有限元分析", 《广东电力》 * |
楼文娟 等: "长横担输电塔风致薄弱部位及加强措施", 《浙江大学学报(工学版)》 * |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106250627A (zh) * | 2016-07-30 | 2016-12-21 | 青岛理工大学 | 一种角钢加固开裂箱型钢柱角钢长度的确定方法 |
CN106250627B (zh) * | 2016-07-30 | 2019-04-16 | 青岛理工大学 | 一种角钢加固开裂箱型钢柱角钢长度的确定方法 |
CN108532980A (zh) * | 2018-04-10 | 2018-09-14 | 南方电网科学研究院有限责任公司 | 一种输电塔的修复方法及装置 |
CN109885847A (zh) * | 2018-04-28 | 2019-06-14 | 广东电网有限责任公司 | 一种保底电网输电线路的防风强度计算及杆塔加固方法 |
CN109885847B (zh) * | 2018-04-28 | 2023-05-26 | 广东电网有限责任公司 | 一种保底电网输电线路的防风强度计算及杆塔加固方法 |
CN108824837A (zh) * | 2018-08-10 | 2018-11-16 | 山东奥能电力科技有限公司 | 一种应用于77型输电铁塔的整体加固补强防腐结构 |
CN109033704A (zh) * | 2018-08-24 | 2018-12-18 | 国网山东省电力公司电力科学研究院 | 一种塌陷区铁塔塔腿不均匀沉降处治方法 |
CN109033704B (zh) * | 2018-08-24 | 2023-04-28 | 国网山东省电力公司电力科学研究院 | 一种塌陷区铁塔塔腿不均匀沉降处治方法 |
CN108952302B (zh) * | 2018-08-28 | 2023-05-30 | 国网山东省电力公司电力科学研究院 | 一种输电角钢塔塔腿主材弯曲的加固装置及加固方法 |
CN108952302A (zh) * | 2018-08-28 | 2018-12-07 | 国网山东省电力公司电力科学研究院 | 一种输电角钢塔塔腿主材弯曲的加固装置及加固方法 |
CN109815529A (zh) * | 2018-12-13 | 2019-05-28 | 重庆顺泰铁塔制造有限公司 | 角钢-节点板连接节点的设计方法 |
CN109711033A (zh) * | 2018-12-22 | 2019-05-03 | 唐山高压电瓷有限公司 | 一种特高压支柱瓷绝缘子用金属附件结构设计方法 |
CN112434456A (zh) * | 2020-11-26 | 2021-03-02 | 国网江西省电力有限公司建设分公司 | 一种输电线路塔型力学薄弱环节计算及加固方法 |
CN113054606A (zh) * | 2021-05-13 | 2021-06-29 | 广东电网有限责任公司湛江供电局 | 一种基于粘滞阻尼器的输电塔风致振动控制方法及设备 |
CN114969898A (zh) * | 2022-05-05 | 2022-08-30 | 贵州电网有限责任公司 | 一种500kV输电线路铁塔覆冰条件下加固措施方案选择方法 |
CN115387967A (zh) * | 2022-06-29 | 2022-11-25 | 华电电力科学研究院有限公司 | 塔筒应力检测测点的布置方法及应力分析方法 |
CN115387967B (zh) * | 2022-06-29 | 2024-08-23 | 华电电力科学研究院有限公司 | 塔筒应力检测测点的布置方法及应力分析方法 |
CN118886140A (zh) * | 2024-09-27 | 2024-11-01 | 国网山东省电力公司电力科学研究院 | 输电角钢塔插入式塔腿加固方法、系统、介质及设备 |
CN118886140B (zh) * | 2024-09-27 | 2024-12-20 | 国网山东省电力公司电力科学研究院 | 输电角钢塔插入式塔腿加固方法、系统、介质及设备 |
CN119221753A (zh) * | 2024-12-04 | 2024-12-31 | 国网山东省电力公司电力科学研究院 | 一种输电角钢塔复杂节点加固件结构及其制备方法 |
CN119244070A (zh) * | 2024-12-04 | 2025-01-03 | 国网山东省电力公司电力科学研究院 | 一种适用于输电塔复杂节点的补强加固方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN105389436B (zh) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105389436B (zh) | 一种输电塔带电加固补强方法 | |
CN102254061B (zh) | 输电塔线塔耦合体系的有限元建模及受力方法 | |
CN107657090B (zh) | 一种判断输电线路耐张塔覆冰失稳的方法 | |
CN102663215A (zh) | 架空输电线路塔-线耦合体系抗冰能力的评估方法 | |
CN113266192B (zh) | 一种自立式输电塔塔身拉线加固方法 | |
Yang et al. | Dynamic responses of transmission tower-line system under ice shedding | |
CN104295147B (zh) | 一种适用于变电站出线的构架 | |
CN202124867U (zh) | 一种用于独立式基础输电塔沉降加固装置 | |
CN116109210A (zh) | 输电线路杆塔的抗风能力评估方法、装置、介质及设备 | |
CN102296864A (zh) | 一种用于特高压同塔双回紧凑型输电的新型塔型 | |
CN201635465U (zh) | 一种特高压输电线路终端高塔 | |
CN210918441U (zh) | 高海拔特高压试验终端引流塔 | |
Rechtman et al. | Structural Analysis of Steel Transmission Towers for Large River Crossing of Overhead Transmission Lines: A Case Study in Brazil | |
Li et al. | Finite element analysis of foundation settlement of 220kv transmission tower with independent foundation | |
CN203626359U (zh) | 一种特高压交流单回路直线塔 | |
Chen et al. | Design of ultra-high-voltage alternating current (UHVAC) power transmission lines | |
CN204609420U (zh) | 一种高电压等级快速抢修塔 | |
Gao et al. | Experimental study on the bearing capacity of super high strength concrete pole | |
Wang et al. | Computation and analysis of the electric field distribution and voltage-sharing characteristics for 1000 kV composite tower | |
Chen et al. | In-situ live jacking technology of corner transmission tower | |
He-yan et al. | Optimizing the distribution of transmission line tower and foundation | |
Luo et al. | Collapse Analysis on 500kV Transmission Tower under Combined Action of Typhoon and Microtopography | |
CN205259681U (zh) | 一种高压输电铁塔加固补强结构 | |
Li et al. | Energy saving transmission line evaluation based on mechanical and electrical characteristics analysis | |
Li et al. | Gas Insulated Metal Enclosed Transmission Line (GIL) Seismic Response Analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 250002 Wang Yue Road, Ji'nan City, Shandong Province, No. 2000 Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company Applicant after: SHANDONG ELECTRIC POWER INDUSTRIAL BOILER PRESSURE VESSEL INSPECTION CENTER CO., LTD. Applicant after: State Grid Corporation of China Address before: 250002 Wang Yue Road, Ji'nan City, Shandong Province, No. 2000 Applicant before: Electric Power Research Institute of State Grid Shandong Electric Power Company Applicant before: SHANDONG ELECTRIC POWER INDUSTRIAL BOILER PRESSURE VESSEL INSPECTION CENTER CO., LTD. Applicant before: State Grid Corporation of China |
|
CB02 | Change of applicant information | ||
CB03 | Change of inventor or designer information |
Inventor after: Guan Mingjian Inventor after: Yuan Tangqing Inventor after: Ding Jianwei Inventor after: Zhang Huakai Inventor after: Zhang Guangcheng Inventor after: Li Qiying Inventor after: Zhang Duqing Inventor after: Yang Bo Inventor after: Sun Xiaobin Inventor after: Deng Hualing Inventor after: Zhang Zhongwen Inventor after: Huang Zhenning Inventor before: Guan Mingjian Inventor before: Zhang Guangcheng Inventor before: Zhang Duqing Inventor before: Yang Bo Inventor before: Zhang Zhongwen Inventor before: Yuan Tangqing Inventor before: Ding Jianwei |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |