CN105387843A - Measuring method for cross section of roadbed in high mountain region - Google Patents
Measuring method for cross section of roadbed in high mountain region Download PDFInfo
- Publication number
- CN105387843A CN105387843A CN201510672730.0A CN201510672730A CN105387843A CN 105387843 A CN105387843 A CN 105387843A CN 201510672730 A CN201510672730 A CN 201510672730A CN 105387843 A CN105387843 A CN 105387843A
- Authority
- CN
- China
- Prior art keywords
- point
- measuring
- measurement
- reference mark
- total station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C7/00—Tracing profiles
- G01C7/02—Tracing profiles of land surfaces
Landscapes
- Engineering & Computer Science (AREA)
- Multimedia (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The invention discloses a measuring method for the cross section of a roadbed in a high mountain region. The measuring method includes the following steps that one point with known plane coordinates and an known elevation is selected on the ground to serve as a control point A, then one point with known coordinates is selected on the ground to serve as an orientation point B, finally, two points are selected on a mountain slope to serve as a measuring point 1 and a measuring point 2; a total station is erected on the control point A, the orientation point B is used for orientation, the coordinate azimuth between the control point A provided with the total station and the orientation point B is calculated, and finally the measuring point 1 is measured in a three-dimensional coordinate mode, numbered and recorded; finally the measuring point 2 is measured. By means of the measuring method, the prism-free total station is used for replacing a common total station and serving as data acquisition equipment, measurement data numbers are directly recorded in a memory of the total station, only one person is needed for operating the total station to complete measurement and recording, measurement staff do not need to climb mountains for measurement, safety of the measurement staff is ensured, and measurement speed is increased.
Description
Technical field
The invention belongs to subgrade cross section field of measuring technique, particularly relate to a kind of alpine region subgrade cross section measuring method.
Background technology
At present, subgrade engineering carried out the measurement of subgrade cross section and the calculating of roadbed earthwork amount to check drawing quantities before construction.Subgrade cross section measuring method generally adopts total powerstation setting-out roadbed king-pile, spirit-leveling instrument and steel ruler is adopted to measure the offset distance of each detail point and king-pile within the scope of roadbed and the discrepancy in elevation or elevation again, this method field operation surveying work amount is large, speed is slow, and precision also affects greatly by taped measurement, taped measurement is from being difficult to guaranteed discharge apart from the normal direction being roadbed king-pile.Also a kind of fast and easy method adopts the transversal section of total station survey roadbed, this method needs an operating instrument, one people founds prism, first with the three-dimensional coordinate of this point of total station survey after vertical prism, use roadbed king-pile and Pian distance that counter program inverse coordinate is corresponding again, measure three-dimensional coordinate again and stored in instrument record with the vertical mirror people of intercom commander to the normal direction of appointment pile No., then go back to indoor and utilize pile No. and offset distance and the corresponding original ground king-pile discrepancy in elevation in the three-dimensional coordinate inverse of instrument record.This method is the most frequently used at present, but the problem that there is not intervisibility needs to remove instrument, cannot to climb the mountain vertical mirror for alpine region and precipitous steep cliff area survey crew.Another is exactly that RTK adds height fitting method fast.There is not intervisibility problem in this method, but the precision of height fitting is by territorial restrictions, in Plain, area, micro-mound adopts surface fitting and the leveling point protecting matching is evenly distributed and makes RTK vertical accuracy can reach mapping base point precision, but larger height anomaly is existed for alpine region, vertical accuracy is difficult to ensure, and vertical accuracy directly affects the accuracy of earthwork, the distance that survey crew is walked is many, and workload is heavy.Alpine region RTK measure there is survey crew equally cannot by precipitous on movement station band and steep cliff is regional measures.Survey crew go up a hill for a moment go down the hill to carry out for a moment roadbed section measure slower than plains region, efficiency is low.
Summary of the invention
The object of the present invention is to provide a kind of alpine region subgrade cross section measuring method, to solve the problem proposed in above-mentioned background technology.
For achieving the above object, present invention employs following technical scheme:
A kind of alpine region subgrade cross section measuring method, comprises the following steps:
1) choose on the ground known planimetric coordinates and elevation a bit as reference mark A, then choose on the ground known coordinate a bit as orientation point B, last hillside is chosen at 2 as measuring point 1 and measuring point 2, and measuring point 1 and reference mark A intervisibility;
2) first total powerstation is set up at reference mark A, directed with orientation point B, calculate the configuration reference mark A of total powerstation and the grid azimuth of orientation point B, finally three-dimensional coordinate measurement is carried out and number record to measuring point 1;
3) finally measuring point 2 is measured, when measuring point 2 and reference mark A intervisibility, direct measurement, when measuring point 2 and the obstructed apparent time of reference mark A, choose on the ground not only with reference mark A intervisibility but also with measuring point 2 intervisibility a bit as intermediate transit point C, the topography and landform character point of reference mark A intervisibility removes total powerstation after measuring directed with A again to C point, all topography and landform character points of measurement intermediate transit point C and other and intermediate transit point C intervisibility.
Preferably, the range of total powerstation is more than 1000m.
Preferably, total powerstation is band automatic rotation motor and the come card TCRP1200+R1000 series Total Station of built-in road Cross Section process of measurement or come card TCA2003 high precision total station or Top health DL-100 series Total Station.
Preferably, total powerstation is Top health DL-100 series Total Station.
Compared with prior art, beneficial effect of the present invention is as follows:
The measuring method that the present invention proposes is measured total powerstation using non-prism and is replaced common total powerstation as data acquisition equipment, measurement data numbering is directly recorded in total powerstation internal memory, as long as second point after first some numbering, thirdly number automatically cumulative 1 without the need to inputting numbering at every turn, as long as a people operates total powerstation and just can complete measurement and record, also climb the mountain without the need to survey crew and measure, guarantee the safety of survey crew, thus improve measuring speed.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of alpine region subgrade cross section measuring method.
Embodiment
Below in conjunction with embodiment, optimal way of the present invention is described in further detail.
As shown in Figure 1, a kind of alpine region subgrade cross section measuring method, comprises the following steps:
1) choose on the ground known planimetric coordinates and elevation a bit as reference mark A, then choose on the ground known coordinate a bit as orientation point B, last hillside is chosen at 2 as measuring point 1 and measuring point 2, and measuring point 1 and reference mark A intervisibility.
2) first total powerstation is set up at reference mark A, total powerstation is Top health DL-100 series Total Station, and the range of total powerstation is more than 1000m, directed with orientation point B, calculate the configuration reference mark A of total powerstation and the grid azimuth of orientation point B, finally three-dimensional coordinate measurement is carried out and number record to measuring point 1.
3) finally measuring point 2 is measured, when measuring point 2 and reference mark A intervisibility, direct measurement, when measuring point 2 and the obstructed apparent time of reference mark A, choose on the ground not only with reference mark A intervisibility but also with measuring point 2 intervisibility a bit as intermediate transit point C, the topography and landform character point of reference mark A intervisibility removes total powerstation after measuring directed with A again to C point, all topography and landform character points of measurement intermediate transit point C and other and intermediate transit point C intervisibility.
The present invention proposes a kind of alpine region subgrade cross section measuring method, the Topographic Feature Point mentioned in this method comprises the highest, minimum point, col line and topographical crest, the density of measurement point is wanted rationally, the density increasing measurement point is needed for the area that topography variation is large, must guarantee within the scope that surveyed point and instrument distance are found range at total powerstation non-prism, note non-prism range finding can affect distance accuracy for turf, tree skill, accumulated snow or cause find range from mistake, and loess, rock reflexes laser signal are strong.During use, first adopt automatic motor total powerstation to start subgrade cross section process of measurement autoscan and measure subgrade cross section, but manual measurement is needed for meadow, woods ground, accumulated snow ground and other Topographic Feature Point.
Above embodiment is only be described the preferred embodiment of the present invention; not scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; the various distortion that those of ordinary skill in the art make technical scheme of the present invention and improvement, all should fall in protection domain that claims of the present invention determines.
Claims (4)
1. an alpine region subgrade cross section measuring method, is characterized in that, comprises the following steps:
Choose on the ground known planimetric coordinates and elevation a bit as reference mark A, then choose on the ground known coordinate a bit as orientation point B, last hillside is chosen at 2 as measuring point 1 and measuring point 2, and measuring point 1 and reference mark A intervisibility;
First set up total powerstation at reference mark A, directed with orientation point B, calculate the configuration reference mark A of total powerstation and the grid azimuth of orientation point B, finally three-dimensional coordinate measurement is carried out and number record to measuring point 1;
Finally measure measuring point 2, when measuring point 2 and reference mark A intervisibility, direct measurement, when measuring point 2 and the obstructed apparent time of reference mark A, choose on the ground not only with reference mark A intervisibility but also with measuring point 2 intervisibility a bit as intermediate transit point C, the topography and landform character point of reference mark A intervisibility removes total powerstation after measuring directed with A again to C point, all topography and landform character points of measurement intermediate transit point C and other and intermediate transit point C intervisibility.
2. alpine region according to claim 1 subgrade cross section measuring method, it is characterized in that, the range of described total powerstation is more than 1000m.
3. alpine region according to claim 1 subgrade cross section measuring method, it is characterized in that, described total powerstation is band automatic rotation motor and the come card TCRP1200+R1000 series Total Station of built-in road Cross Section process of measurement or come card TCA2003 high precision total station or Top health DL-100 series Total Station.
4. alpine region according to claim 1 subgrade cross section measuring method, is characterized in that, described total powerstation is Top health DL-100 series Total Station.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510672730.0A CN105387843B (en) | 2015-10-13 | 2015-10-13 | A kind of alpine region subgrade cross section measuring method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510672730.0A CN105387843B (en) | 2015-10-13 | 2015-10-13 | A kind of alpine region subgrade cross section measuring method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105387843A true CN105387843A (en) | 2016-03-09 |
CN105387843B CN105387843B (en) | 2018-01-02 |
Family
ID=55420398
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510672730.0A Active CN105387843B (en) | 2015-10-13 | 2015-10-13 | A kind of alpine region subgrade cross section measuring method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105387843B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110207661A (en) * | 2019-07-01 | 2019-09-06 | 中铁大桥局集团第二工程有限公司 | A method of installation reflector plate establishes reference line measurement tower crane verticality |
CN114440831A (en) * | 2021-12-20 | 2022-05-06 | 中国华冶科工集团有限公司 | Mine section inspection method based on total station point projection |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006071356A (en) * | 2004-08-31 | 2006-03-16 | Sgs:Kk | Three-dimensional movement measuring method using nonprism distance measuring means |
CN102682210A (en) * | 2012-05-08 | 2012-09-19 | 南通大学 | Self-adaptive frog cluster evolutionary tree designing method used for electronic medical record attribute reduction |
CN103792542A (en) * | 2014-02-11 | 2014-05-14 | 中铁第四勘察设计院集团有限公司 | Dangerous rock fallen rock investigation method based on ground laser radar technology |
JP2014232111A (en) * | 2014-07-25 | 2014-12-11 | 富士設計株式会社 | Form investigation method for three-dimensional measurement object |
CN104614038A (en) * | 2015-01-29 | 2015-05-13 | 长江水利委员会水文局 | Horizontal height measurement method utilizing non-prism total station |
-
2015
- 2015-10-13 CN CN201510672730.0A patent/CN105387843B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006071356A (en) * | 2004-08-31 | 2006-03-16 | Sgs:Kk | Three-dimensional movement measuring method using nonprism distance measuring means |
CN102682210A (en) * | 2012-05-08 | 2012-09-19 | 南通大学 | Self-adaptive frog cluster evolutionary tree designing method used for electronic medical record attribute reduction |
CN103792542A (en) * | 2014-02-11 | 2014-05-14 | 中铁第四勘察设计院集团有限公司 | Dangerous rock fallen rock investigation method based on ground laser radar technology |
JP2014232111A (en) * | 2014-07-25 | 2014-12-11 | 富士設計株式会社 | Form investigation method for three-dimensional measurement object |
CN104614038A (en) * | 2015-01-29 | 2015-05-13 | 长江水利委员会水文局 | Horizontal height measurement method utilizing non-prism total station |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110207661A (en) * | 2019-07-01 | 2019-09-06 | 中铁大桥局集团第二工程有限公司 | A method of installation reflector plate establishes reference line measurement tower crane verticality |
CN114440831A (en) * | 2021-12-20 | 2022-05-06 | 中国华冶科工集团有限公司 | Mine section inspection method based on total station point projection |
CN114440831B (en) * | 2021-12-20 | 2023-11-03 | 中国华冶科工集团有限公司 | Mine section inspection method based on total station point projection |
Also Published As
Publication number | Publication date |
---|---|
CN105387843B (en) | 2018-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8352188B2 (en) | Apparatus for generating high resolution surface topology map using surface profiling and surveying instrumentation | |
CN101962925B (en) | Method for efficiently measuring three-dimensional coordinates of track based on track precise control net | |
CN110375711A (en) | Ring network trackless measurement construction method in a kind of subway tunnel | |
CN103727920B (en) | The method of height differences by leveling is measured based on geoid's model | |
CN105866791A (en) | Method for improving precision of vehicle-mounted LiDAR point cloud data through target control network | |
CN104652347A (en) | Method for evaluating relation between non-static water level and population affected by submerging in mountain region | |
CN109899076A (en) | The intelligent construction and monitoring system of shield undercrossing tunnel based on BIM technology | |
CN113884077A (en) | Ordinary-speed railway control network in operation period and measuring and setting method thereof | |
CN105387843A (en) | Measuring method for cross section of roadbed in high mountain region | |
CN102636147A (en) | Deformation monitoring method for existing railway line | |
CN110096803B (en) | Method for underwater topography survey and water resource calculation in coal mine subsidence water area | |
CN104931027A (en) | Facing pattern projection setting-out method | |
CN106197378A (en) | A kind of roadbed using unmanned plane to measure | |
CN207923110U (en) | A kind of orbit monitoring dedicated unit | |
CN112161613B (en) | Highway engineering control and measurement method | |
CN103628511A (en) | Setting-out plumbing method for pile foundation casing | |
CN108645379A (en) | A kind of observation procedure of high level City Regions building inclination | |
CN112197703A (en) | Leveling roadbed engineering receiving method based on unmanned aerial vehicle laser ranging | |
CN103758018B (en) | Control the method for the road surface elevation of roadbed | |
CN111380504B (en) | Boundary gridding management method for building equipment | |
CN204831200U (en) | Pavement width automatic measuring device | |
Wang et al. | Study and Application in road survey on CORS Technique | |
CN206037998U (en) | Slope slope measurement device | |
RU2712796C1 (en) | Method for determining the value and direction of deformation of the outer component of the frost blister of permafrost | |
CN108502198A (en) | Fixed-wing unmanned plane city landing point choosing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |