CN105385815A - Production process for hot-dip galvanized steel plate - Google Patents

Production process for hot-dip galvanized steel plate Download PDF

Info

Publication number
CN105385815A
CN105385815A CN201510849203.2A CN201510849203A CN105385815A CN 105385815 A CN105385815 A CN 105385815A CN 201510849203 A CN201510849203 A CN 201510849203A CN 105385815 A CN105385815 A CN 105385815A
Authority
CN
China
Prior art keywords
steel plate
zinc
scrubbing
water
electrolysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510849203.2A
Other languages
Chinese (zh)
Inventor
关灼腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoming District Foshan City Poplar And Metal Material Professional Towns Innovation Centers
Original Assignee
Gaoming District Foshan City Poplar And Metal Material Professional Towns Innovation Centers
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaoming District Foshan City Poplar And Metal Material Professional Towns Innovation Centers filed Critical Gaoming District Foshan City Poplar And Metal Material Professional Towns Innovation Centers
Priority to CN201510849203.2A priority Critical patent/CN105385815A/en
Publication of CN105385815A publication Critical patent/CN105385815A/en
Pending legal-status Critical Current

Links

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The invention provides a production process for a hot-dip galvanized steel plate, and relates to the technical field of metal machining. The production process includes the steps of plate surface processing, annealing, hot galvanizing, curing and aftertreatment. The step of plate surface processing includes the sub-steps of dry blowing, wet scrubbing, high-pressure water flushing, electrolysis scrubbing and spraying scrubbing; according to dry blowing, an air blowing gun is used for blowing air to the surface of the steel plate so as to primarily remove adhering objects and dust on the plate surface; according to wet scrubbing, after alkali liquor is sprayed on the plate surface, a scrubbing roller is used for scrubbing the steel plate 1-2 times for further dust removal, impurity removal and oil removal; according to electrolysis scrubbing, the steel plate is placed in an electrolytic cell with two pairs of electrodes for electrolysis, and after electrolysis, a scrubbing roller is used for scrubbing the steel plate 1-2 times. The production process has the beneficial effects that the production cost can be lowered, operation is easy, and product quality is good; moreover, production is stable, the galvanizing effect is good, zinc is not prone to falling off, and anti-rusting capacity is high.

Description

A kind of production technique of galvanizing steel plate
Technical field
The present invention relates to metal working technical area, especially a kind of production technique of galvanizing steel plate.
Background technology
A lot of country notices the seriousness of " corrosion " very early, according to estimates, because of the loss that corrosion protection causes, within 1 year, about reaches 3.5 ﹪ of gross national product (GNP) in Japan.In the U.S., this ratio is 4.2 ﹪, is 3.5 ﹪ in Britain, and Germany is 3 ﹪.So advanced country has all set up relevant anticorrosive technique research institution, to take various effective measures, avoid or reduce its loss.
Galvanizing is galvanizing again, as the effective anti-corrosion of metal mode of one, has been widely used on the metal construction facility of every profession and trade.Galvanizing be by rust cleaning after steel beam column immerse in the zinc liquid of about 600 DEG C high temperature melt, make steel beam column surface attachment zinc layers, zinc coating thickness must not be less than 65 μm to 5mm with lower thin sheet, is not less than 86 μm to slab, thus plays etch-proof object.Durable years is long, manufacture degree is high owing to possessing for galvanizing steel plate, steady quality etc. is a little multiple, thus by a large amount of in the outdoor steel structure by atomospheric corrosion more seriously and not easy-maintaining, as a large amount of electric transmission pole tower, communications tower etc.But under prior art, improper due to production technology method, it is many or have dew iron phenomenon that the galvanizing steel plate of production there will be gloomy, the surperficial zinc granule in lower, the surperficial local area of hardness, and yield rate is not high, increases Financial cost, reduces productive profit.
Summary of the invention
Instant invention overcomes shortcoming of the prior art, provide a kind of production technique of galvanizing steel plate, can not only reduce production cost, simple to operate, good product quality, and administration measure, zinc-plated is effective, is not easy to come off, and rust-proofing ability is strong.
In order to solve the problems of the technologies described above, the present invention is achieved by the following technical solutions:
A production technique for galvanizing steel plate, comprises the process of plate face, annealing, pot galvanize, solidification and aftertreatment;
The process of described plate face comprise dryly to blow, moisteningly to scrub, high pressure water washing, electrolysis is scrubbed and spray is scrubbed, described dry blow refer to jet gun jet to surface of steel plate, by plate face stick thing and dust is tentatively removed; Described moistening scrub refer to and with alkali lye, plate face sprayed after, with brush roll, 1 ~ 2 time is scrubbed to steel plate, does further dedusting, removal of impurities and degreasing; The electrolyzer electrolysis referring to and to be put into by steel plate with 2 pairs of electrodes is scrubbed in described electrolysis, scrubs 1 ~ 2 time after electrolysis with brush roll to steel plate;
Iron and steel is heated to 760 ~ 780 DEG C by described annealing process furnace, soaking 730 ~ 740 DEG C, insulation 15 ~ 20s; Described pot galvanize refer to the method for blowing a cold wind over by heating after steel plate drop to 540 ~ 550 DEG C by the speed of 20 ~ 25 DEG C/s, put in the zinc liquid of 475 ~ 485 DEG C soak 20 ~ 25s;
Described solidification refers to that the steel plate taken out from zinc liquid is put into temperature to be 300 ~ 350 DEG C, to use in the holding furnace of infrared heating, and storage period is 20 ~ 30 minutes;
Described aftertreatment comprises cooling, polishing, straightening, passivation and batches, described cooling comprises air-cooled and water-cooled, air-cooled referring to uses the freezing air containing 5 ~ 8% nitrogen directly to blow plate face, the temperature of zinc steel plate is made to be down to 100 ~ 200 DEG C, described water-cooled refers to and is immersed in completely in water by zinc steel plate, and the temperature of zinc steel plate is down to 50 ~ 60 DEG C.
Further, described dry blowing refers to that the gas with pressure is 10 ~ 12MPa carries out purge 2 ~ 3 times to often opening surface of steel plate, and the time often all over purge is 5 ~ 10 minutes.
Further, described alkali lye refers to by sodium hydroxide powder, second alcohol and water by the formulated alkaline liquid of the mass ratio of 1:05:20, the manner of formulation of described alkali lye is, first by after second alcohol and water mixing and stirring, be heated to 40 ~ 60 DEG C, pour sodium hydroxide powder again into stir, maintain the temperature at 30 ~ 50 DEG C of reaction 20 ~ 30min and form.
Further, described polishing refers to and first sprays zinc surface of steel plate with clear water, after rinsing with the surface of de-salted water to zinc steel plate again, put in hydraulic pressure four roller wet type polishing machine, setting polishing pressure is 1700 ~ 1900kN, and with high pressure demineralized water, the working roll in polishing machine is sprayed in polishing process, remove cadmia; always Also with clear water, zinc steel plate surface is sprayed after polishing, remove and stick thing.
Further, described passivation refers to concentration the surface being applied to zinc steel plate of the three oxidation network dissolution homogeneity being 1.2%, then described zinc steel plate is placed on temperature is dry 10 ~ 15min under the environment of 40 ~ 60 DEG C at once, more naturally places 30 ~ 40min under normal temperature.
Compared with prior art, the invention has the beneficial effects as follows:
The production technique of a kind of galvanizing steel plate of the present invention, not only step is simple, and fraction defective is low, and constant product quality, reduces zinc-plated technology difficulty simultaneously, cost-saving, enhances productivity.
Embodiment
Below the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
A production technique for galvanizing steel plate, comprises the process of plate face, annealing, pot galvanize, solidification and aftertreatment;
The process of plate face comprise dryly to blow, moisteningly to scrub, high pressure water washing, electrolysis is scrubbed and spray is scrubbed, dry blow refer to jet gun jet to surface of steel plate, by plate face stick thing and dust is tentatively removed; Moistening scrub refer to and with alkali lye, plate face sprayed after, with brush roll, 1 time is scrubbed to steel plate, does further dedusting, removal of impurities and degreasing; The electrolyzer electrolysis referring to and to be put into by steel plate with 2 pairs of electrodes is scrubbed in electrolysis, scrubs 2 times after electrolysis with brush roll to steel plate;
Iron and steel is heated to 770 DEG C by annealing process furnace, soaking 735 DEG C, insulation 18s; Pot galvanize refer to the method for blowing a cold wind over by heating after steel plate drop to 545 DEG C by the speed of 22 DEG C/s, put in the zinc liquid of 480 DEG C and soak 23s;
Solidification refers to that the steel plate taken out from zinc liquid is put into temperature to be 330 DEG C, to use in the holding furnace of infrared heating, and storage period is 25 minutes;
Aftertreatment comprises cooling, polishing, straightening, passivation and batches, cooling comprises air-cooled and water-cooled, and air-cooled referring to uses the freezing air containing 6% nitrogen directly to blow plate face, makes the temperature of zinc steel plate be down to 150 DEG C, water-cooled refers to and is immersed in completely in water by zinc steel plate, and the temperature of zinc steel plate is down to 55 DEG C.
Further, dry blowing refers to that the gas with pressure is 11MPa carries out purge 2 times to often opening surface of steel plate, and the time often all over purge is 8 minutes.
Further, alkali lye refers to by sodium hydroxide powder, second alcohol and water by the formulated alkaline liquid of the mass ratio of 1:05:20, the manner of formulation of alkali lye is, first by after second alcohol and water mixing and stirring, be heated to 50 DEG C, pour sodium hydroxide powder again into stir, maintain the temperature at 40 DEG C of reaction 25min and form.
Further, polishing refers to and first sprays zinc surface of steel plate with clear water, after rinsing with the surface of de-salted water to zinc steel plate again, put in hydraulic pressure four roller wet type polishing machine, setting polishing pressure is 1800kN, and with high pressure demineralized water, the working roll in polishing machine is sprayed in polishing process, remove cadmia; always Also with clear water, zinc steel plate surface is sprayed after polishing, remove and stick thing.
Further, passivation refers to concentration the surface being applied to zinc steel plate of the three oxidation network dissolution homogeneity being 1.2%, and then zinc steel plate is placed on temperature is dry 13min under the environment of 50 DEG C at once, more naturally places 35min under normal temperature.
Last it is noted that these are only the preferred embodiments of the present invention; be not limited to the present invention; although with reference to embodiment to invention has been detailed description; for a person skilled in the art; it still can be modified to the technical scheme described in foregoing embodiments; or equivalent replacement is carried out to wherein portion of techniques feature; but it is within the spirit and principles in the present invention all; any amendment of doing, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. a production technique for galvanizing steel plate, is characterized in that, comprises the process of plate face, annealing, pot galvanize, solidification and aftertreatment;
The process of described plate face comprise dryly to blow, moisteningly to scrub, high pressure water washing, electrolysis is scrubbed and spray is scrubbed, described dry blow refer to jet gun jet to surface of steel plate, by plate face stick thing and dust is tentatively removed; Described moistening scrub refer to and with alkali lye, plate face sprayed after, with brush roll, 1 ~ 2 time is scrubbed to steel plate, does further dedusting, removal of impurities and degreasing; The electrolyzer electrolysis referring to and to be put into by steel plate with 2 pairs of electrodes is scrubbed in described electrolysis, scrubs 1 ~ 2 time after electrolysis with brush roll to steel plate;
Iron and steel is heated to 760 ~ 780 DEG C by described annealing process furnace, soaking 730 ~ 740 DEG C, insulation 15 ~ 20s;
Described pot galvanize refer to the method for blowing a cold wind over by heating after steel plate drop to 540 ~ 550 DEG C by the speed of 20 ~ 25 DEG C/s, put in the zinc liquid of 475 ~ 485 DEG C soak 20 ~ 25s;
Described solidification refers to that the steel plate taken out from zinc liquid is put into temperature to be 300 ~ 350 DEG C, to use in the holding furnace of infrared heating, and storage period is 20 ~ 30 minutes;
Described aftertreatment comprises cooling, polishing, straightening, passivation and batches, described cooling comprises air-cooled and water-cooled, air-cooled referring to uses the freezing air containing 5 ~ 8% nitrogen directly to blow plate face, the temperature of zinc steel plate is made to be down to 100 ~ 200 DEG C, described water-cooled refers to and is immersed in completely in water by zinc steel plate, and the temperature of zinc steel plate is down to 50 ~ 60 DEG C.
2. the production technique of a kind of galvanizing steel plate according to claim 1, is characterized in that, described dry blowing refers to that the gas with pressure is 10 ~ 12MPa carries out purge 2 ~ 3 times to often opening surface of steel plate, and the time often all over purge is 5 ~ 10 minutes.
3. the production technique of a kind of galvanizing steel plate according to claim 1, it is characterized in that, described alkali lye refers to by sodium hydroxide powder, second alcohol and water by the formulated alkaline liquid of the mass ratio of 1:05:20, the manner of formulation of described alkali lye is, first by after second alcohol and water mixing and stirring, be heated to 40 ~ 60 DEG C, then pour sodium hydroxide powder into and stir, maintain the temperature at 30 ~ 50 DEG C of reaction 20 ~ 30min and form.
4. the production technique of a kind of galvanizing steel plate according to claim 1, it is characterized in that, described polishing refers to and first sprays zinc surface of steel plate with clear water, after rinsing with the surface of de-salted water to zinc steel plate again, put in hydraulic pressure four roller wet type polishing machine, setting polishing pressure is 1700 ~ 1900kN, and sprays the working roll in polishing machine with high pressure demineralized water in polishing process always, removes cadmia; Also with clear water, zinc steel plate surface is sprayed after polishing, remove and stick thing.
5. the production technique of a kind of galvanizing steel plate according to claim 1, it is characterized in that, described passivation refers to concentration the surface being applied to zinc steel plate of the three oxidation network dissolution homogeneity being 1.2%, then described zinc steel plate is placed on temperature is dry 10 ~ 15min under the environment of 40 ~ 60 DEG C at once, naturally 30 ~ 40min is placed again under normal temperature.
CN201510849203.2A 2015-11-26 2015-11-26 Production process for hot-dip galvanized steel plate Pending CN105385815A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510849203.2A CN105385815A (en) 2015-11-26 2015-11-26 Production process for hot-dip galvanized steel plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510849203.2A CN105385815A (en) 2015-11-26 2015-11-26 Production process for hot-dip galvanized steel plate

Publications (1)

Publication Number Publication Date
CN105385815A true CN105385815A (en) 2016-03-09

Family

ID=55418588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510849203.2A Pending CN105385815A (en) 2015-11-26 2015-11-26 Production process for hot-dip galvanized steel plate

Country Status (1)

Country Link
CN (1) CN105385815A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106435105A (en) * 2016-12-01 2017-02-22 浙江东南金属薄板有限公司 Preparation method of hot-dip-galvanizing steel coil
CN112024496A (en) * 2020-07-09 2020-12-04 浙江协和陶瓷有限公司 Electrolytic cleaning system and electrolytic cleaning method using same
CN112239841A (en) * 2020-11-02 2021-01-19 马鞍山钢铁股份有限公司 Control method for edge pocking mark defects of continuous hot-dip galvanized strip steel
US11313021B2 (en) * 2017-05-26 2022-04-26 Baoshan Iron & Steel Co., Ltd. Hot dipped medium manganese steel and manufacturing method therefor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1281056A (en) * 1999-07-19 2001-01-24 左继营 Electrically baking zinc technology
CN102676969A (en) * 2012-05-10 2012-09-19 佛山津西金兰冷轧板有限公司 Manufacturing method for hot-dip galvanized steel sheet
CN102776460A (en) * 2012-03-19 2012-11-14 江苏大力神科技股份有限公司 Production method of thin steel strip hot galvanizing
CN104213017A (en) * 2014-08-29 2014-12-17 武汉钢铁(集团)公司 Galvanized steel sheet and production process thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1281056A (en) * 1999-07-19 2001-01-24 左继营 Electrically baking zinc technology
CN102776460A (en) * 2012-03-19 2012-11-14 江苏大力神科技股份有限公司 Production method of thin steel strip hot galvanizing
CN102676969A (en) * 2012-05-10 2012-09-19 佛山津西金兰冷轧板有限公司 Manufacturing method for hot-dip galvanized steel sheet
CN104213017A (en) * 2014-08-29 2014-12-17 武汉钢铁(集团)公司 Galvanized steel sheet and production process thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴光治: "带钢连续热镀锌及其退火炉的技术进步", 《国外金属热处理》 *
朱久发: "国外汽车用热镀锌板生产技术综述", 《冶金信息导刊》 *
朱立: "《钢材热镀锌》", 31 March 2006 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106435105A (en) * 2016-12-01 2017-02-22 浙江东南金属薄板有限公司 Preparation method of hot-dip-galvanizing steel coil
US11313021B2 (en) * 2017-05-26 2022-04-26 Baoshan Iron & Steel Co., Ltd. Hot dipped medium manganese steel and manufacturing method therefor
CN112024496A (en) * 2020-07-09 2020-12-04 浙江协和陶瓷有限公司 Electrolytic cleaning system and electrolytic cleaning method using same
CN112239841A (en) * 2020-11-02 2021-01-19 马鞍山钢铁股份有限公司 Control method for edge pocking mark defects of continuous hot-dip galvanized strip steel

Similar Documents

Publication Publication Date Title
CN105385815A (en) Production process for hot-dip galvanized steel plate
CN102776460B (en) Production method of thin steel strip hot galvanizing
KR20170010794A (en) Method for producing hot-plated product by hot rolling, direct cold rolling without pickling, and reduction annealing
CN108977874B (en) Annealing and pickling method for duplex stainless steel
CN103668030A (en) Improved hot galvanizing method of iron handicraft or furniture
CN103334099A (en) Environmentally-friendly multifunctional metal surface treating fluid
CN105239065B (en) A kind of aluminium sheet passivation technology
CN107513681B (en) Hot-dip galvanizing process
CN110172657A (en) The hot-dipping zinc, aluminum, silicon alloy layer steel plate/belt and preparation method of excellent corrosion resistance
CN106702101B (en) Continuous Heat is coated with the preparation process of colored galvanized steel plain sheet
CN104178718A (en) Production method of prestressed hot-galvanized steel wire for bridge
CN109628708A (en) A kind of stainless steel band annealing and pickling method of environmental protection and energy saving
CN102268623B (en) Strip steel hot-dip galvanizing technology
CN110499485B (en) Alloying treatment method for preparing high-pulverization-resistance hot-dip galvanized coating
CN107740022B (en) A kind of hot-dip aluminum zinc magnesium alloy fluxing agent
CN106756960A (en) A kind of stainless steel cold-rolled plate process of surface treatment
CN109457280A (en) A kind of process of electrogalvanizing
CN103014578A (en) Formulation of hot galvanizing fluxing agent
CN106222594A (en) A kind of galvanization production line
CN103966645A (en) Stepping electrophoresis line production technology
CN101392360A (en) Hot-dipped aluminum technique method of heavy duty automobile exhaust tube
CN110358903A (en) A kind of production technology of hot-galvanized steel band
CN107988611A (en) A kind of aluminium shape surface pre-treating technology
CN104975251A (en) Hot-dip galvanizing plating auxiliary agent
CN112063946A (en) Improved galvanizing process for electric power pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160309

RJ01 Rejection of invention patent application after publication